Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “grid scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

527 records · Page 30

Making Coal Relevant for Small Scale Applications: Modular Gasification for Syngas/Engine CHP Applications in Challenging Environments

This Front-End Engineering Design (FEED) study is funded by the US Department of Energy (DOE), and managed by the National Energy Technology Laboratory (NETL) through a Cooperative Agreement awarded to the University of Alaska Fairbanks (UAF) to perform a technical and cost study for the design and installation of a Hamilton-Maurer International (HMI) gasifier for generating a clean syngas for firing in reciprocating engines. An existing diesel engine generator (DEG) and a commercially available spark ignition engine are used to generate electricity with the low-Btu syngas. Other than the HMI gasifier, only commercially available technologies were assumed for this study. An important objective of this design study was to estimate capital and operating costs of small modular coal and coal/biomass fired generating units to provide wind regulation services. Although this study is based on retrofitting an existing coal fired power plant with the HMI gasifier, sufficient data was developed to characterize greenfield units. The original concept was to provide clean syngas and tars/oils from the gasification process to the existing Colt-Pielstick PC2.6B diesel engine generator (9.6 MWe) installed at the UAF Atkinson Power Plant. The intent was to convert the diesel engine to operate in a dual fuel mode, firing both syngas and tars/oils. As the project progressed, Fairbanks Morse Engine (FME), current licensee for the Colt-Pielstick engine line, was not able to develop a modification package for the engine to allow for syngas firing. Although this type of modification is available for firing natural gas, the capability does not extend to syngas. Western Energy Systems, distributor for Innio Jenbacher, was able to offer the Jenbacher Model JMS620 engine. After review of available options, the project team selected a design configuration using two Jenbacher engines rated at 1965 kWe each to fire the syngas, with the oils/tars directed to the Colt Pielstick diesel to be blended with ultra-low sulfur diesel oil (ULSD). The Jenbacher engines are expected to operate at continuous base load, with some load-following ability, while the existing diesel engine will operate in grid support service, with loads varying from a nominal 25% to 100%. An annual capacity factor for the diesel engine is projected to be between 50% and 60%. The overall gasifier and gas clean-up system is sized to produce enough syngas to adequately fuel three Jenbacher Engines for a nominal power output of 5.9 MWe, but this study assumes that only two Jenbacher engines will be installed due to space constraints in the Atkinson Power Plant, and because of expected air emission permit limitations. There is still potential that the excess syngas capacity equivalent to about 2 MWe could be used as supplemental fuel for the DEG. The exhaust from the Jenbacher engines is passed through heat recovery units to generate low pressure steam, thereby providing a significant portion of the steam required for operating the gasifier. The overall performance of the HMI gasifier/engine configuration is summarized as follows: 1) Overall electric efficiency, Jenbacher and diesel engines, based on gasifier fuel production (syngas and pyrolysis liquids) is 35.2% LHV, 2) Overall cogenerating efficiency (electricity plus steam), based on gasifier fuel production (syngas and pyrolysis liquids) is 54.8% LHV, 3) Overall electric efficiency, Jenbacher and diesel engines, based on coal input, is 29.6% LHV, and 4) Overall cogenerating efficiency, electricity plus steam, based on coal input is 46.0%. This project is estimated to have a Bare Erected Cost (BEC) of $\$$ 33.4 million and a Total Plant Cost (TPC) of $\$$ 45.7 million. Based on the original scope, sending both the clean syngas and the oils and tars to the existing diesel engine, the BEC and TPC values would have been $\$$ 23.3 million and $\$$ 32.1 million, respectively. A variable Cost of Electricity (COE) is calculated to reflect only those costs that will be incurred by incremental operation of the system for the HMI gasifier/Jenbacher engine combination. Operation of the diesel engine is determined separately. The variable COE values are: Case 1: 100% Usibelli Coal: (a) HMI gasifier/Jenbacher Engines -- 8.3 cents/kWh; (b) Diesel Engine -- 20.2 cents/kWh, and Case 2: 80% Usibelli Coal + 20% wood chips (proportion based on Btu input, LHV basis): (a) HMI Gasifier/Jenbacher -- 13.7 cents/kWh; (b) Diesel Engine -- 20.2 cents/kWh. The incremental cost of operating the gasifier/Jenbacher system increases with co-firing of wood chips due to the high cost of this material, over five times as costly as Usibelli coal delivered to the Atkinson Power building. The diesel cost is constant as the oils and tars are priced at the same value as the ULSD for the purposes of fueling the diesel engine. Section 8 of this report provides details of the O&M costs. The overall power system is configured to be modular and scalable to provide a wide range of generating capacity using the same components. This allows for reduction in cost, risk, schedule time to engineer and construct, and provides some degree of repeatability for air permitting.

01 COAL, LIGNITE, AND PEAT↗

NYSEG Seneca Compressed Air Energy Storage (CAES) Demonstration Project

Compressed Air Energy Storage (CAES) is a hybrid energy storage and generation concept that has many potential benefits especially in a location with increasing percentages of intermittent wind energy generation. The objectives of the NYSEG Seneca CAES Project included: for Phase 1, development of a Front End Engineering Design for a 130MW to 210 MW utility-owned facility including capital costs; project financials based on the engineering design and forecasts of energy market revenues; design of the salt cavern to be used for air storage; draft environmental permit filings; and draft NYISO interconnection filing; for Phase 2, objectives included plant construction with a target in-service date of mid-2016; and for Phase 3, objectives included commercial demonstration, testing, and two-years of performance reporting. This Final Report is presented now at the end of Phase 1 because NYSEG has concluded that the economics of the project are not favorable for development in the current economic environment in New York State. The proposed site is located in NYSEG’s service territory in the Town of Reading, New York, at the southern end of Seneca Lake, in New York State’s Finger Lakes region. The landowner of the proposed site is Inergy, a company that owns the salt solution mining facility at this property. Inergy would have developed a new air storage cavern facility to be designed for NYSEG specifically for the Seneca CAES project. A large volume, natural gas storage facility owned and operated by Inergy is also located near this site and would have provided a source of high pressure pipeline quality natural gas for use in the CAES plant. The site has an electrical take-away capability of 210 MW via two NYSEG 115 kV circuits located approximately one half mile from the plant site. Cooling tower make-up water would have been supplied from Seneca Lake. NYSEG’s engineering consultant WorleyParsons Group thoroughly evaluated three CAES designs and concluded that any of the designs would perform acceptably. Their general scope of work included development of detailed project construction schedules, capital cost and cash flow estimates for both CAES cycles, and development of detailed operational data, including fuel and compression energy requirements, to support dispatch modeling for the CAES cycles. The Dispatch Modeling Consultant selected for this project was Customized Energy Solutions (CES). Their general scope of work included development of wholesale electric and gas market price forecasts and development of a dispatch model specific to CAES technologies. Parsons Brinkerhoff Energy Storage Services (PBESS) was retained to develop an air storage cavern and well system design for the CAES project. Their general scope of work included development of a cavern design, solution mining plan, and air production well design, cost, and schedule estimates for the project. Detailed Front End Engineering Design (FEED) during Phase 1 of the project determined that CAES plant capital equipment costs were much greater than the $\$$125.6- million originally estimated by EPRI for the project. The initial air storage cavern Design Basis was increased from a single five million cubic foot capacity cavern to three, five million cubic foot caverns with associated air production wells and piping. The result of this change in storage cavern Design Basis increased project capital costs significantly. In addition, the development time required to complete the three cavern system was estimated at approximately six years. This meant that the CAES plant would initially go into service with only one third of the required storage capacity and would not achieve full capability until after approximately five years of commercial operation. The market price forecasting and dispatch modeling completed by CES indicated that the CAES technologies would operate at only 10 to 20% capacity factors and the resulting overall project economics were not favorable for further development. As a result of all of these factors, the Phase 1 FEED developed an installed CAES plant cost estimate of approximately $\$$2,300/KW for the 210MW CAES 1A and 2 cycles. The capital cost for the 136 MW CAES 1 cycle was even higher due to the lower generating capacity of the cycle. Notably, the large equipment could have generated additional capacity (up to 270MW) which would have improved the cost per KW; however, the output was limited by the night time transmission system capability. The research herein, therefore, is particular to the site-specific factors that influenced the design and the current and forecasted generation mix and energy prices in Upstate New York and may not necessarily indicate that CAES plants cannot be economically constructed in other places in New York State or the world.

25 ENERGY STORAGE↗

The Building ENergy Demand (BEND) Model: A Comprehensive Composite Building Energy Modeling Framework

The Building ENergy Demand (BEND) model was developed at Pacific Northwest National Laboratory (PNNL) to simulate climate-dependent hourly building energy demand with the ability to disaggregate down to or aggregate up to any geographic area of interest, including counties, states, electric utility service territories, and census regions. The BEND modeling framework is designed to study the effects of climate change, economics, technology advancement, and various mitigation policies on aggregate building energy demand. To make the process computationally feasible, BEND reduces granularity in building characteristics and weather forcing while maintaining enough detail to minimize systematic differences (biases) between BEND results and data from the Energy Information Administration (EIA). Based on the Commercial Building Energy Consumption Survey (CBECS) and Residential Energy Consumption Survey (RECS) databases, BEND establishes a set of representative buildings with predefined sets of building types, sizes, and vintages. These representative buildings are defined for each of the four U.S. census regions and the five climate zones used by the EIA for building surveys (hereafter “EIA climate zones”). BEND’s representative buildings are based on a statistical analysis of the CBECS and RECS databases that infers detailed parameters such as construction type, thermal properties, internal loads, equipment and mechanical systems, and operation schedules from the high-level descriptors in those databases (building type, vintage, size, and location). The representative buildings are simplified and consolidated into a set of prototype buildings for the purpose of simulating building energy demand. Combining the prototype buildings with weather files from selected locations and years, BEND creates a set of simulation-ready building models to be run using the EnergyPlus simulation engine (EnergyPlus). The base spatial unit of each BEND simulation is a subregion that is the intersection of an International Energy Conservation Code climate zone, a census region, and an EIA climate zone; analysis for each spatial unit is influenced by the weather file BEND selects to represent the climate-similar area. The major simulation outputs of interest to BEND are hourly energy consumption values for each simulated year, possibly for multiple fuel types. Based on building-stock weights derived from the CBECS/RECS data, the hourly output streams are aggregated to a single, 8760-hour load profile for each of the major building categories—residential and commercial—with the possibility of segregating by fuel types. To correct for biases inherent in the use of a limited suite of representative buildings, BEND is calibrated against observational targets of total annual building energy consumption and hourly load profiles (including peak demand) obtained for the decision-relevant geographic scales of interest (e.g., total electric load data for individual balancing authorities available from EIA). Based on available data such as population distribution, BEND is able to aggregate both up and down scales, allowing the study of building energy demand over a range of spatial scales (e.g., states or counties within the Western Electricity Coordinating Council, Eastern Interconnection, or the entire U.S.) and/or subsets of building types (e.g., office buildings with particular size ranges).

24 POWER TRANSMISSION AND DISTRIBUTION↗

SBIR Phase II Final Report - Multi-Protocol Energy Management Gateway for Home-Area Networks

Significant amounts of electricity, natural gas, and heating oil are wasted by homeowners due to inefficient operation and inadequate maintenance of heating, ventilation, and air conditioning (HVAC) equipment. Coincident’s work under this award reduces energy waste, saves consumers money, and reduces carbon emissions. It does so in three ways: First, Coincident’s approach replaces the traditional thermostat with a wireless network of sensors and controllers that measure temperature, humidity and occupancy in multiple rooms in the house. The “Internet of Things” is a technology trend holding the promise of ubiquitous inexpensive sensors. The reality, however, is that energy and HVAC monitoring and management is a patchwork of incompatible protocols and expensive proprietary technologies. Coincident’s multi-protocol architecture, developed in part under this award tackles this problem and brings low cost interoperable sensor and control devices to market. Second, the Coincident system eliminates hard-to-program and rigid thermostat schedules and instead provides automatic operation of heating and cooling by combining individual temperature and comfort preferences with energy-saving targets, real-time utility use information, weather data, and room utilization patterns. Energy efficiency technology must be appealing to consumers otherwise it will not be used. The Coincident user interface has engaging features such as remote control from any smart phone or web browser and per-room performance breakdowns. Expected energy savings resulting from more efficient operation of heating and air conditioning equipment are in the range of 10-20%. Third, the Coincident system provides heating and air-conditioning contractors with fine-grained performance data for every residence they support (subject to customer privacy controls). This data is integrated from diverse networks within the residence and includes HVAC performance and fuel use data. This information allows the partner to validate energy savings and identify potential system faults (whether from installation problems or maintenance issues). When combined with professional installation as part of high-efficiency HVAC upgrade, energy savings levels of 20-30% can be achieved. Economic feasibility of energy efficiency technology is one of the key challenges addressed in this award. The Coincident system is engineered to be delivered at a disruptive price point, making the system financially feasible for new and retrofit homes of all types and sizes. The Coincident system is intended to be sold through the HVAC professional—the industry most capable of improving HVAC efficiency. Providing HVAC contractors with detailed home performance data motivates them to sell the product, provides them with maintenance and upgrade revenue opportunities, and therefore delivers customer savings and environmental benefits. Having demonstrated technical and financial feasibility, Coincident has won additional grants and awards, participated in pilot projects, started partnership discussions with several HVAC equipment vendors, and has lined up several large channel partners ready to participate in large pilot rollouts.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Computational Algorithms for Unit Commitment with AC Power Flows (Final Report)

Security-constrained unit commitment (SCUC) is a key component in power system operations. When AC power flow constraints are considered in the SCUC model (AC-SCUC), the problem becomes extremely difficult due to its discrete and non-convex nature, as described in “Grid Optimization Competition Challenge 3 Problem Formulation (GOCC)”. There are four main challenges: (i) Discrete decisions regarding unit online/offline status and start-up/shut-down procedures for every single unit. The number of discrete decision variables increases considerably when a system integrates multiple generators; (ii) Configuration-based combined-cycle formulations, and multi-commodity models that include ramping products, spin/non-spin products, and regulation up/down products. The combined-cycle units introduce additional discrete decision variables and auxiliary service products further complicate the model by connecting multi-commodity products’ continuous and discrete variables; (iii) SCUC models with AC power flow constraints are far more complex due to massive bilinear terms in the large-scale nonlinear power balance equations. The nonlinear power balance equations are further complicated by the discrete step control variables of shunts; (iv) N − 1 contingency analysis. The size of the model increases linearly with the number of contingencies considered, greatly increasing the size of the optimization model. Accordingly, there is an emergent need to develop a robust algorithm capable of deriving a high-quality solution in a short time and passing through contingency tests simultaneously. In this project, we explore innovative techniques to address this challenging problem by integrating advanced polyhedral theory, approximation methods, relaxation strategies, decomposition techniques, and parallel computing. Each technique approaches the problem from a different perspective, leveraging its specific strengths to tackle distinct challenges. Each individual method has demonstrated its effectiveness in the PI’s previous research. Their integration is expected to significantly reduce the computational time required to solve the proposed complex problem. Successful completion of this project has the potential to transform the industry by enhancing optimization solvers capable of handling large-scale day-ahead energy market clearing models within strict time constraints, while incorporating AC power flow constraints. This advancement will lead to reduced overall generation costs and, consequently, increased social welfare.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗