Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “dispatch optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Modeling the Strategic Behavior of an Active Distribution Network in the ISO Markets

With increasing integration of distributed energy resources (DERs), active distribution networks (ADNs) can actively participate in the electricity markets by dispatching their DERs, which can change the existing electricity market paradigm. It is essential to investigate the strategic behaviors of ADNs and their DER dispatch when they participate in the wholesale market as price-makers. This paper proposes a bi-level optimization model to study the strategic behavior of an ADN in both energy and reserve markets. The optimal scheduling of DERs in the ADN is modeled as the upper level problem and the joint energy and reserve market-clearing of the ISO is modeled as the lower-level problem. The two-level optimization models exchange bidding information and energy/reserve prices with each other. The proposed bi-Ievel optimization problem is converted to a mathematical programming with equilibrium constraints (MPEC) by using Karush-Kuhn Tucker (KKT) conditions and strong duality theory. Further, the MPEC problem is reformulated as a computationally-solvable mixed integer second order cone programming (MISOCP) model. The simulation results on an illustrative case demonstrate the impact of the strategic bidding of the ADN on the day-ahead energy and reserve market prices.

Xue, Yaosuo↗

Concentrating Solar Power (CSP) Plant Optimization Study for the California Power Market (CalCSP)

In the United States, many states are implementing goals to achieve 100% carbon free power generation by 2050 or sooner. California has one of the more aggressive goals to achieve 100% carbon free generation of its retail power sales by 2045. California has excellent solar resources, but to accomplish this goal, California’s power utilities will need new zero carbon resources that can replace the natural gas units that they currently rely on for suppling power at night. Appropriately configured concentrating solar power plants with thermal energy storage are an option to serve this nighttime load. These plants would be designed to take advantage of CSP’s low-cost thermal energy storage and collect and store energy during the day and then be dispatched to produce power at night. The U.S. Department of Energy has funded a study to identify the design of a CSP plant that optimally meets the evolving CA grid needs. This will be done by taking a fresh look at how CSP technologies can best be designed to meet the emerging nighttime market for carbon free power generation or zero-carbon firm resources. The paper provides an overview of the study and present preliminary findings on the California power market requirements, CSP configurations, technoeconomic analysis, siting opportunities, and key issues for CSP deployment in this market.

Price, Hank (ORCID:0000000267049197)↗

Optimal Load Ensemble Control in Chance-Constrained Optimal Power Flow

Distribution system operators (DSOs) world-wide foresee a rapid roll-out of distributed energy resources. From the system perspective, their reliable and cost effective integration requires accounting for their physical properties in operating tools used by the DSO. This work describes an decomposable approach to leverage the dispatch flexibility of thermostatically controlled loads (TCLs) for operating distribution systems with a high penetration level of photovoltaic resources. Each TCL ensemble is modeled using the Markov Decision Process (MDP). The MDP model is then integrated with a chance constrained optimal power flow that accounts for the uncertainty of PV resources. Since the integrated optimization model cannot be solved efficiently by existing dynamic programming methods or off-the-shelf solvers, this paper proposes an iterative Spatio-Temporal Dual Decomposition algorithm (ST-D2). Finally, we demonstrate the merits of the proposed integrated optimization and ST-D2 algorithm on the IEEE 33-bus test system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Economic dispatch for electricity merchant with energy storage and wind plant: State of charge based decision making considering market impact and uncertainties

Here this paper investigates how the market impact of electricity merchants and uncertainty of wind generation affect their co-optimized scheduling policy, specifically for merchants who have both energy storage and wind plants. In the existing literature, merchants' trading actions are usually assumed not to affect market prices; however, a large-scale energy storage merchant's actions can affect market prices. To this end, we approximate the electricity price by a linear function of the quantity of power traded by the merchant in the reward function to achieve decision-making incorporating the market impact. This paper utilizes the dynamic programming approach to analyze merchants' optimal multi-period decision-making incorporating market impact, uncertain wind generation, and energy storage constraints. First, our results demonstrate that for a merchant with co-located energy storage facilities and wind power plants, the energy storage's feasible state of charge (SOC) range can be segmented into four possible sub-ranges by three analytically developed SOC reference points. The unique optimal trading decision can be achieved by comparing the current energy inventory and the SOC references of the next period. Second, our results show that market impact and uncertainties substantially change the optimal storage scheduling policy by impacting the values of the reference points. To mitigate the negative effect of the merchant's market impact on buying and selling actions, the merchant may reduce the amount of generating or pumping electricity each period to maximize profit. Moreover, we identify and investigate the trade-off between market price and transaction quantity. Our findings provide co-optimized scheduling guidance for electricity merchants with co-located energy storage and renewable power plants systems.

17 WIND ENERGY↗

Optimal self-healing strategy for microgrid islanding

Renewable resource based microgrids provide reliable and cost-effective electricity with low carbon emissions. The flexibility of operating in grid-connected or islanded modes enables a microgrid to serve loads reliably. In the case of unexpected events happening to the main grid, the microgrid will isolate itself and operate in islanded mode to prevent any adversary impacts. The availability of renewable generation in the microgrid has significant impacts on the islanding strategy and different scenarios need to be considered. This study proposes a comprehensive microgrid self-healing strategy under different circumstances. The proposed strategy encompasses generation re-dispatch, network reconfiguration, and load shedding. The microgrid self-healing problem is formulated as a mixed-integer quadratic programming problem, which provides a globally optimal solution to facilitate smooth islanding of the microgrid. A modified Consortium for Electric Reliability Technology Solutions microgrid is used to conduct simulation under various scenarios. The simulation results demonstrate the efficiency of the proposed self-healing strategy in minimising costs of load shedding and generation with optimal switching actions.

optimal self-healing strategy↗

Hybrid Imitation Learning for Real-Time Service Restoration in Resilient Distribution Systems

Self-healing capability is a critical factor for a resilient distribution system, which requires intelligent agents to automatically perform service restoration online, including network reconfiguration and reactive power dispatch. Here, the article proposes the imitation learning framework for training such an agent, where the agent will interact with an expert built based on the mixed-integer program to learn its optimal policy, and therefore significantly improve the training efficiency compared with exploration-dominant reinforcement learning (RL) methods. This significantly improved training efficiency makes the training problem under N-k scenarios tractable. A hybrid policy network is proposed to handle tie-line operations and reactive power dispatch simultaneously to further improve the restoration performance. The 33-bus and 119-bus systems with N-k disturbances are employed to conduct the training. The results indicate that the proposed method outperforms traditional RL algorithms such as the deep-Q network.

42 ENGINEERING↗

Chance Constrained Optimal Power Flow: Risk-Aware Network Control under Uncertainty

When uncontrollable resources fluctuate, Optimum Power Flow (OPF), routinely used by the electric power industry to re-dispatch hourly controllable generation (coal, gas and hydro plants) over control areas of transmission networks, can result in grid instability, and, potentially, cascading outages. This risk arises be cause OPF dispatch is computed without awareness of major uncertainty, in particular fluctuations in renewable output. As a result, grid operation under the OPF with renewable variability can lead to frequent conditions where power line flow ratings are significantly exceeded. Such a condition, which is borne by simulations of real grids, would likely resulting in automatic line tripping to protect lines from thermal stress, a risky and undesirable outcome which compromises stability. Smart grid goals include a commitment to large penetration of highly fluctuating renewables, thus calling to reconsider current practices, in particular the use of standard OPF. Our Chance Constrained (CC) OPF corrects the problem and mitigates dangerous renewable fluctuations with minimal changes in the current operational procedure. Assuming availability of a reliable wind forecast parameterizing the distribution function of the uncertain generation, our CC-OPF satisfies all the constraints with high probability while simultaneously minimizing the cost of economic re-dispatch. CC-OPF allows efficient implementation, e.g. solving a typical instance over the 2746-bus Polish network in 20s on a standard laptop.

Energy Planning, Policy, & Economy(29)↗

Hawaiian Electric Company (HECO) Grid Optimization with Solar (Cooperative Research and Development Final Report)

The purpose of this project is to provide a software platform that gives utility companies the capability to seamlessly dispatch legacy devices (at both the distribution and subtransmission levels) and distributed energy resources (DERs) to achieve system-wide performance and reliability targets–such as minimizing loss, reducing voltage violation, and corresponding imbalance–for extreme solar futures with well over 100% (capacity) penetrations.

14 SOLAR ENERGY↗

FARM User Guidance and Instructions

The FARM (Feasible Actuator Range Modifier) module is a component of the RAVEN-based FORCE framework for the analysis of Integrated Energy Systems (IES). FARM aids HERON in the solution of the power dispatch problem by evaluating feasible set-point signals to be issued to the control systems of the different IES unit components. Set-points need to satisfy limits on both production variables (i.e., the variables to be optimized such as the electrical power, etc.) and process variables tied to the service life of equipment (e.g., steam flowrate, vessel pressure, turbine firing temperature, etc.). To enforce all these limits, a two-stage approach is adopted. First, the power dispatcher algorithm in HERON module estimates set-points that meet the constraints on the production variables, e.g., power levels and power ramp rate limits. These constraints are called explicit constraints. Then, if necessary, FARM adjusts these set-points to ensure the respect of the limits on the process variables of interest, given the knowledge of the system dynamics acquired through machine learning algorithms. These constraints are called implicit constraints. From this standpoint, FARM constitutes a bridge between the HERON power dispatcher that adopts a simplified description of the IES unit (low-resolution physics) and the HYBRID high-fidelity models (high-resolution physics). In this report, the general workflow and the software requirements of FARM module are summarized, and the detailed instructions for installing FARM software, running built-in example cases, deriving Linear Parameter-Varying (LPV) state-space models, and using FARM for user-defined power dispatch problems are provided.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

FARM supervisory capabilities for thermal energy storage

The FARM (Feasible Actuator Range Modifier) module is a component of the RAVEN-based FORCE framework for the analysis of Integrated Energy Systems (IES). FARM aids HERON in the solution of the power dispatch problem by evaluating feasible set-point signals to be issued to the control systems of the different IES unit components. Set-points need to satisfy limits on both production variables (i.e., the variables to be optimized such as the electrical power, etc.) and process variables tied to the service life of equipment (e.g., steam flowrate, vessel pressure, turbine firing temperature, etc.). To enforce all these limits, a two-stage approach is adopted. First, the power dispatcher algorithm in HERON module estimates set-points that meet the constraints on the production variables, e.g., power levels and power ramp rate limits. These constraints are called explicit constraints. Then, if necessary, FARM adjusts these set-points to ensure the respect of the limits on the process variables of interest, given the knowledge of the system dynamics acquired through machine learning algorithms. These constraints are called implicit constraints. From this standpoint, FARM constitutes a bridge between the HERON power dispatcher that adopts a simplified description of the IES unit (low-resolution physics) and the HYBRID high-fidelity models (high-resolution physics). In this report, an overview of the major capabilities of the latest release of FARM is provided, along with a summary of the tool demonstration campaign conducted at the Dynamic Energy Technology and Integration Laboratory (DETAIL) facility. These results assess the performance of the control system architecture embedding FARM both as a Validator of the HERON power dispatcher and as a real time Supervisory control scheme. Additionally, the report outlines the areas that FARM might benefit from, along with proposed solutions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Stochastic scheduling of generating units with weekly energy storage: A hybrid decomposition approach

We propose a solution method for the large-scale stochastic unit commitment (SUC) problem with weekly-dispatched energy storage and significant weather-dependent stochastic generating capacity. Weekly storage facilities that mostly charge during weekends and discharge during weekdays require a weekly scheduling of generating units, which result in a large-scale optimization problem. This SUC problem is formulated as a two-stage stochastic model and we use the conditional value-at-risk as a risk measure. Using a Benders framework, the proposed solution method decomposes the problem into a mixed-integer linear master problem and linear and continuous subproblems. The master problem corresponds to the first-stage decisions throughout the week and includes all the commitment (binary) variables and their corresponding constraints. The subproblems correspond to the actual dispatch of the generating units on a weekly basis. Based on the success of column-and-constraint generation algorithms to solve robust optimization problems, we improve the low communication between the master problem and the subproblems in the standard Benders decomposition by adding primal variables and constraints from the subproblems to the master problem, which provides a better approximation of the recourse function. Furthermore, our computational experiments demonstrate the effectiveness of the proposed decomposition method using an instance of the South Carolina synthetic system with 90 generating units under 40 scenarios.

25 ENERGY STORAGE↗

Optimization of a Virtual Power Plant to Provide Frequency Support.

Increasing the penetration of distributed renewable sources, including photovoltaic (PV) sources, poses technical challenges for grid management. The grid has been optimized over decades to rely upon large centralized power plants with well-established feedback controls, but now non-dispatchable, renewable sources are displacing these controllable generators. This one-year study was funded by the Department of Energy (DOE) SunShot program and is intended to better utilize those variable resources by providing electric utilities with the tools to implement frequency regulation and primary frequency reserves using aggregated renewable resources, known as a virtual power plant. The goal is to eventually enable the integration of 100s of Gigawatts into US power systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cascade energy optimization for waste heat recovery in distributed energy systems

The efficiency of distributed energy systems can be significantly increased through waste heat recovery from industry or power generation. The technologies used for this process are typically dependent on the quality and temperature grades of waste heat. To maximize the efficiency of cascade heat utilization, it is important to optimize the choice of waste heat recovery technologies and their operation. Here, a detailed mixed integer linear programming optimization model is proposed for waste heat recovery in a district-scale microgrid. The model can distinguish waste heat quality for planning and operation optimization of distributed energy systems. Heat utilization technologies are formulated in this developed model and categorized in different temperature grades. The developed model is validated using four typical cases under different settings of system operation and business models. It is found that the optimization model, by distinguishing waste heat temperature, can increase energy cost savings by around 5%, compared to models that do not consider waste heat temperature grades. Additionally, the results indicate that the developed model can provide more realistic configuration and technologies dispatch.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dynamic Economic Dispatch Considering Transmission–Distribution Coordination and Automatic Regulation Effect

With the rapid increase of renewable energy sources, the variability and uncertainty in power systems are significantly increased, and the power system operation is facing more and more challenges. In the traditional dynamic economic dispatch (DED) of transmission systems, the frequency and voltage regulation effects are not actively utilized. In addition, the transmission systems and distribution systems are optimized separately; the transmission–distribution coordination effect is not considered. In this article, a new DED is proposed. The optimal scheduling results are obtained by making a balance between operating cost and reliability cost. Both the automatic regulation effect and transmission–distribution coordination effect are explored and exploited in terms of the equivalent reserve, which can reduce the reserve provided by generating units, and can further enhance the security and economics of power system operation. The validity and effectiveness of the proposed model are illustrated by case studies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modular Undersea Compressed Air Energy Storage (UCAES) System

This project has been devoted to the design, optimization, and cost analysis of a unique power plant with integral energy storage. The proposed facility combines a novel underwater compressed air energy storage (UCAES) system with a customized gas turbine generator, providing exceptional power management and overall efficiency. Unlike conventional CAES, opportunities for underwater storage are plentiful and proximal to the power grid. The UCAES system provides coastal and island communities a practical means for managing the volatility of large-scale wind and solar power resources. The result is higher renewable energy absorption and improved electrical reliability with reduced fossil fuel consumption. The UCAES power plant is composed of three major subsystems: The underwater air containment system (ACS), the air transport pipe (ATP), and the land-based power conversion system (PCS). The underwater ACS is made up of modular concrete shell units, structurally optimized for minimal material usage while employing conventional production methods and equipment. Each shell is designed to receive and control loose fill or gravel, serving as the ballast. The static nature of the final structures make them an asset to marine habitats and includes features intended to permit safe and cost-effective deployment. The ATP Connects the ACS modules to each other and to the on-land power conversion system and utilizes high density polyethylene (HDPE) pipe for low cost and long life. The PCS Houses the turbine-generator ‘expander modules’, with peak capacity of 12.3 MWe each, engineered from existing gas turbine equipment and includes electrically driven commercial 3-stage intercooled centrifugal compressors, each nominally drawing 6.6 MWe when matching the turbine flow requirements. The subsystems listed above are designed with the intent to serve as building-blocks to achieve a peak power output rating in the 40 to 120 MWe range, with 0.25 to 4 hours of energy storage capacity. The modular facility with integral energy storage provides some remarkable transient maneuvers and load-following features unachievable by competing technologies. The system can operate as a dispatchable power plant with a fuel-to-electric efficiency over 41%; substantially better that the average existing Hawaiian peak power generation assets. Optimal efficiency can be maintained while load-following due to modular PCS design and is operable with a range of liquid or gaseous fuels while meeting the most stringent California (CARB) emission standards. The system can operate as a peaking energy plant in discharge mode. Power ramp-up equivalent to 215% of continuous load rating within 1 second accomplished by simply turning off the electric compressor(s). Contrarily, the system can offer energy absorption during periods of grid surplus generation. The electric compressors may be sequenced on to absorb power within seconds. More moderate transitions are easily achieved with standard compressor control functions. The system offers unique features as compared to energy storage systems. ‘Round-trip efficiency’, as calculated by industry standard methods, is in the 90% range. The PCS equipment has a mean-time between overhauls of 80,000 hours, with maintenance costs of less than $0.005/kW-hr of electricity delivered. The underwater ACS structures and piping employ materials and designs specified to achieve a 75 year life. With the underwater containment modules qualified as a marine habitat, there would be no decommissioning costs. In conjunction with the engineering work invested in the design of the UCAES power plant, Brayton Energy has employed a team of manufacturing specialists, marine construction engineers, and power industry experts to create a comprehensive economic model that captures the many site-related variables and configuration options. The cost results and methodology have been validated by suppliers, engineers, and deployment specialists through a detailed case study on Hawaii. While creation of the parametric cost model was based on inputs specific to Hawaii, the proposed construction and deployment steps were chosen to be general enough to allow extrapolation across locations world-wide. Analysis of the proposed system shows it to be a viable option and addresses the principal challenges described by the Department of Energy by offering competitive costs, validated safety and reliability, consideration of the regulatory environment, and utilization of industry accepted practices and equipment. The UCAES system is recommended for immediate consideration in Hawaii. Estimation of time to complete planning, design, and construction of the facility is anticipated to take 3 to 5 years. Other coastal and island communities world-wide should realize similar benefits; as the results presented in this report are considered generally transferable to other locations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Adaptive track scheduling to optimize concurrency and vectorization in GeantV

The GeantV project is focused on the R&D of new particle transport techniques to maximize parallelism on multiple levels, profiting from the use of both SIMD instructions and co-processors for the CPU-intensive calculations specific to this type of applications. In our approach, vectors of tracks belonging to multiple events and matching different locality criteria must be gathered and dispatched to algorithms having vector signatures. While the transport propagates tracks and changes their individual states, data locality becomes harder to maintain. The scheduling policy has to be changed to maintain efficient vectors while keeping an optimal level of concurrency. The model has complex dynamics requiring tuning the thresholds to switch between the normal regime and special modes, i.e. prioritizing events to allow flushing memory, adding new events in the transport pipeline to boost locality, dynamically adjusting the particle vector size or switching between vector to single track mode when vectorization causes only overhead. Lastly, this work requires a comprehensive study for optimizing these parameters to make the behaviour of the scheduler self-adapting, presenting here its initial results.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Accelerating Development of Advanced Inverters.

Increasing the penetration of distributed renewable sources, including photovoltaic (PV) generators, poses technical challenges for grid management. The grid has been optimized over decades to rely on large centralized power plants with well-established feedback controls. Conventional generators provide relatively constant dispatchable power and help to regulate both voltage and frequency. In contrast, photovoltaic (PV) power is variable, is only as predictable as the weather, and provides no control action. Thus, as conventional generation is displaced by PV power, utility operation stake holders are concerned about managing fluctuations in grid voltage and frequency. Furthermore, since the operation of these distributed resources are bound by certain rules that require they stop delivering power when measured voltage or frequency deviate from the nominal operating point, there are also concerns that a single grid event may cause a large fraction of generation to turn off, triggering a black out or break-up of an electric power system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Real-Time Optimized Load Recovery Considering Frequency Constraints

A self-healing power grid can mitigate the impact of power outages and recover the affected area swiftly. To properly size the optimal amount and location of de-energized loads in the presence of both conventional and renewable sources, a precise optimization-based load recovery tool is proposed herein. The steady-state and transient behaviors of loads have been taken into account. The proposed tool contains three separate problems that interact with each other during the restoration period. The first-level problem determines the dispatching of generation units. The second-level problem comprises the non-linear algebraic equations, whose task is to provide the initial conditions for the third-level problem. Finally, the third-level problem intends to determine the optimal location and amount of load pickup through modeling the governor of generators as well as loads' dynamic behaviors. To examine the effectiveness of the proposed tool, a modified IEEE 39-system under a partial blackout condition has been tested. The results are verified by a commercial time-domain simulation software (PSS/E) to demonstrate the accuracy of the proposed approach. Ultimately, the impact of wind turbine frequency control on the load recovery process has been studied under different penetration levels.

24 POWER TRANSMISSION AND DISTRIBUTION↗