Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “deployment strategy”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

A Play-Based Exploration of CO 2 Storage in the Illinois Basin: Community Baseline Assessment for Carbon Storage Engagement Planning in the Illinois Basin

This report presents a stakeholder mapping analysis conducted as part of the Play-Based Exploration of CO 2 Storage in the Illinois Basin project (DOE Cooperative Agreement DE-FE0032366). The analysis was undertaken to systematically identify, categorize, and characterize stakeholder groups and community conditions relevant to the planning and deployment of carbon capture and storage (CCS) infrastructure across the Illinois Basin. Its purpose is to establish a contextual baseline that informs targeted engagement strategies, supports equitable project planning, and strengthens the social dimensions of CCS site screening.

01 COAL, LIGNITE, AND PEAT↗

On the Viability of Quantum Annealers to Solve Fluid Flows

This paper explores the suitability of upcoming novel computing technologies, particularly adiabatic annealing based quantum computers, to solve fluid dynamics problems that form a critical component of several science and engineering applications. For our experiments, we start with a well-studied one-dimensional simple flow problem, and provide a framework to convert such problems in continuum to a form amenable for deployment on such quantum annealers. Since the DWave annealer returns multiple states sampling the energy landscape of the problem, we explore multiple solution selection strategies to approximate the solution of the problem. We analyze the continuum solutions obtained both qualitatively and quantitatively as well as their sensitivities to the particular solution selection scheme.

42 ENGINEERING↗

Dynamic Modeling, Trajectory Optimization, and Linear Control of Cable-Driven Parallel Robots for Automated Panelized Building Retrofits

The construction industry faces a growing need for automation to reduce costs, improve accuracy and productivity, and address labor shortages. One area that stands to benefit significantly from automation is panelized prefabricated building envelope retrofits, which can improve a building’s energy efficiency in heating and cooling interior spaces. In this paper, we propose using cable-driven parallel robots (CDPRs), which can effectively lift and handle large objects, to install these panels. However, implementing CDPRs presents significant challenges because of their nonlinear dynamics, complex trajectory planning, and precise control requirements. To tackle these challenges, this work focuses on a new application of established control and trajectory optimization theories in a CDPR simulation of a building envelope retrofit under real-world conditions. We first model the dynamics of CDPRs, highlighting the critical role of damping in system behavior. Building on this dynamic model, we formulate a trajectory optimization problem to generate feasible and efficient motion plans for the robot under operational and environmental constraints. Given the high precision required in the construction industry, accurately tracking the optimized trajectory is essential. However, challenges such as partial observability and external vibrations complicate this task. To address these issues, a Linear Quadratic Gaussian control framework is applied, enabling the robot to track the optimized trajectories with precision. Simulation results show that the proposed controller enables precise end effector positioning with errors under 4 mm, even in the presence of external wind disturbances. Through comprehensive simulations, our approach allows for an in-depth exploration of the system’s nonlinear dynamics, trajectory optimization, and control strategies under controlled yet highly realistic conditions. The results demonstrate the feasibility of CDPRs for automating panel installation and provide insights into their practical deployment.

CDPR↗

Tether fundamentals

Some fundamental aspects of tethers are presented and briefly discussed. The effects of gravity gradients, dumbbell libration in circular orbits, tether control strategies and impact hazards for tethers are among those fundamentals. Also considered are aerodynamic drag, constraints in momentum transfer applications and constraints with permanently deployed tethers. The theoretical feasibility of these concepts are reviewed.

Carroll, J. A.↗

A Physics-Informed Reinforcement Learning Framework for Economic-Thermal Co-Optimization of Crypto Mining Data Centers: Preprint

The rapid expansion of cryptocurrency mining has created a new class of high-density data centers characterized by extreme thermal flux and high sensitivity to volatile economic markets. Traditional thermal management strategies, typically reliant on rule-based control, maintain static setpoints that fail to account for fluctuating electricity prices and cryptocurrency values - factors critical to mining profitability. To address this, we present a physics-informed reinforcement learning (PIRL) framework for economic-thermal co-optimization in crypto mining data centers. This framework consists of a proximal policy optimization (PPO) agent, a virtual testbed powered by high-fidelity physics-based models, and an interactive frontend dashboard. The PPO agent is trained using the virtual testbed and strict hardware safety limits. This physics-informed approach allows the agent to learn a stochastic policy that dynamically balances mining revenue against operational costs by co-optimizing HVAC cooling setpoints and IT computational hashrate. The simulation results demonstrate that the integrated framework achieved an 8.62% increase in net operational profit compared to traditional baseline strategies while strictly adhering to safety-critical temperature constraints (coolant supply temperature < 32 degrees C). This work provides a scalable template for the deployment of reinforcement learning in mission critical facilities where economic volatility and physical safety must be managed simultaneously.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Making It Happen: On-Site Renewable Energy and Storage Challenges and Solutions for Commercial Buildings: Preprint

The U.S. Department of Energy's (DOE's) Better Climate Challenge invites organizations to partner with DOE to set ambitious, portfolio-wide greenhouse gas (GHG) emissions reduction goals. To better understand the barriers to these goals and to demonstrate successful emissions reduction pathways, organizations can access working groups as one form of technical assistance from leading experts. One working group focus was the use of on-site renewable energy and storage - a key decarbonization strategy after energy efficiency. Members of the Better Climate Challenge onsite renewable energy and storage working group first identified barriers to implementing these technologies. Solutions were then brainstormed to support portfolio building owners to move from single systems to widespread implementation. Example insights include improving understandings of installation processes and location decisions, making the business case to relevant stakeholders, discussing unanticipated challenges throughout the process, and replicating these technologies across portfolios. This paper details valuable market feedback and highlights pathways to move toward widespread deployment of renewable energy and storage solutions.

building decarbonization strategies↗

Design Concepts for a Small Space-Based GEO Relay Satellite for Missions Between Low Earth and near Earth Orbits

The main purpose of the Small Space-Based Geosynchronous Earth orbiting (GEO) satellite is to provide a space link to the user mission spacecraft for relaying data through ground networks to user Mission Control Centers. The Small Space Based Satellite (SSBS) will provide services comparable to those of a NASA Tracking Data Relay Satellite (TDRS) for the same type of links. The SSBS services will keep the user burden the same or lower than for TDRS and will support the same or higher data rates than those currently supported by TDRS. At present, TDRSS provides links and coverage below GEO; however, SSBS links and coverage capability to above GEO missions are being considered for the future, especially for Human Space Flight Missions (HSF). There is also a rising need for the capability to support high data rate links (exceeding 1 Gbps) for imaging applications. The communication payload on the SSBS will provide S/Ka-band single access links to the mission and a Ku-band link to the ground, with an optical communication payload as an option. To design the communication payload, various link budgets were analyzed and many possible operational scenarios examined. To reduce user burden, using a larger-sized antenna than is currently in use by TDRS was considered. Because of the SSBS design size, it was found that a SpaceX Falcon 9 rocket could deliver three SSBSs to GEO. This will greatly reduce the launch costs per satellite. Using electric propulsion was also evaluated versus using chemical propulsion; the power system size and time to orbit for various power systems were also considered. This paper will describe how the SSBS will meet future service requirements, concept of operations, and the design to meet NASA users' needs for below and above GEO missions. These users' needs not only address the observational mission requirements but also possible HSF missions to the year 2030. We will provide the trade-off analysis of the communication payload design in terms of the number of links looking above and below GEO; the detailed design of a GEO SSBS spacecraft bus and its accommodation of the communication payload, and a summary of the trade study that resulted in the selection of the Falcon 9 launch vehicle to deploy the SSBS and its impact on cost reductions per satellite. ======================================================================== Several initiatives have taken place within NASA1 and international space agencies2 to create a human exploration strategy for expanding human presence into the solar system; these initiatives have been driven by multiple factors to benefit Earth. Of the many elements in the strategy one stands out: to send robotic and human missions to destinations beyond Low Earth Orbit (LEO), including cis-lunar space, Near-Earth Asteroids (NEAs), the Moon, and Mars and its moons.3, 4 The time frame for human exploration to various destinations, based on the public information available,1,4 is shown in Figure 1. Advance planning is needed to define how future space communications services will be provided in the new budget environment to meet future space communications needs. The spacecraft for these missions can be dispersed anywhere from below LEO to beyond GEO, and to various destinations within the solar system. NASA's Space Communications and Navigation (SCaN) program office provides communication and tracking services to space missions during launch, in-orbit testing, and operation phases. Currently, SCaN's space networking relay satellites mainly provide services to users below GEO, at Near Earth Orbit (NEO), below LEO, and in deep space. The potential exists for using a space-based relay satellite, located in the vicinity of various solar system destinations, to provide communication space links to missions both below and above its orbit. Such relays can meet the needs of human exploration missions for maximum connectivity to Earth locations and for reduced latency. In the past, several studies assessed the ability of satellite-based relays working above GEO in conjunction with Earth ground stations. Many of these focused on the trade between space relay and direct-to-Earth station links5,6,7. Several others focused on top-level architecture based on relays at various destinations8,9,10,11,12. Much has changed in terms of microwave and optical technology since the publication of the referenced papers; Ka-band communication systems are being deployed, optical communication is being demonstrated, and spacecraft buses are becoming increasingly more functional and operational. A design concept study was undertaken to access the potential for deploying a Small Space-Based Satellite (SSBS) relay capable of serving missions between LEO and NEO. The needs of future human exploration missions were analyzed, and a notional relay-based architecture concept was generated as shown in Fig. 1. Relay satellites in Earth through cis-Lunar orbits are normally located in stable orbits requiring low fuel consumption. Relay satellites for Mars orbit are normally selected based on the mission requirement and projected fuel consumption. Relay satellites have extreme commonalities of functions between them, differing only in the redundancy and frequencies used; therefore, the relay satellite in GEO was selected for further analysis since it will be the first step in achieving a relay-based architecture for human exploration missions (see Fig.Figure 2). The mission design methodology developed by the Collaborative Modeling for Parametric Assessment of Space Systems (COMPASS) team13 was used to produce the satellite relay design and to perform various design trades. At the start of the activity, the team was provided with the detailed concept of the notional architecture and the system and communication payload drivers.

Relay Satellites↗

Robotics for Energy Infrastructure Construction on Earth and Beyond: Pilot Study Exploring Level 3-4 Semi-Autonomous Installation of a Reduced-Scale Photovoltaic Power Plant Prototype: Preprint

There is a growing need to build energy infrastructure at massive scale on both Earth and in space. On Earth, increasing electricity demand from applications such as AI data centers is driving rapid expansion of power systems, while in space, long-duration missions such as lunar operations require reliable and resilient energy infrastructure that can be deployed quickly. These needs outpace the capabilities of conventional construction methods. Robotic construction offers a path to faster, lower-cost, and more consistent deployment, yet most existing approaches focus on automating individual tasks rather than end-to-end assembly. The Industrialized Construction Innovation (ICI) team at the National Laboratory of the Rockies (NLR), in collaboration with the Colorado School of Mines, has been investigating robotics and automation strategies for rapid end-to-end energy infrastructure construction. This paper presents a pilot study demonstrating level 3-4 semi-autonomous, end-to-end robotic assembly of a reduced-scale photovoltaic power plant prototype under terrestrial conditions. The approach combines hardware redesign of photovoltaic components for robotic compatibility, discrete-event and physics-based robotic simulations in synthetic environments, and sim-to-real deployment to execute end-to-end robotic assembly of[NM1.1][NM1.2] tracking components, structural members, photovoltaic modules, and embedded electrical connections. The pilot identifies key limitations like tolerance management, perception and localization, end effector capability, fastening methods, and multi-physics simulation fidelity, that must be addressed to enable end-to-end robotic assembly of full-scale energy infrastructure. The study highlights how these insights inform scaling strategies for terrestrial energy infrastructure and adaptation to unstructured and extreme environments, including off-world scenarios such as robotic assembly of vertical tall lunar towers.

14 SOLAR ENERGY↗

Ideas For Infusing In-Space Servicing, Assembly and Manufacturing Concepts into Nuclear Electric Propulsion Architectures

NASA is currently investigating nuclear electric propulsion (NEP) for human Mars transport within the space nuclear propulsion portfolio. NEP spacecraft have the following characteristics, they: 1) include very large structures (~100-meter length); 2) are comprised of many components/modules; and 3) have very long lifetimes (e.g., 50 years for fuel rods). Thus, NEP spacecraft can be classified as a “persistent asset,” which is any zero-g or planetary surface system that benefits from in-space assembly (ISA) or multiple visits for servicing, repairs, and upgrades. NEP spacecraft will benefit from taking advantage of, and incorporating, In-space Servicing, Assembly, and Manufacturing (ISAM) capabilities in the spacecraft architecture from the onset, enabling system maintenance, repair, and evolution. ISA has a long history of being proposed for, and studied as, a means for achieving large systems in space. More recently, the benefits of ISA have been recognized by NASA, the Department of Defense (DOD), other government agencies, and commercial space companies, and thus, ISAM is being actively pursued at a national level. Past and current strategies for achieving large structures in space have relied largely on two strategies; the first is to launch monolithic structures (designed to meet launch vehicle requirements for payload size and mass) that are docked or berthed to other monolithic structures on-orbit to form a larger structure (e.g., the International Space Station [ISS]); the second is folding and packaging large structures to fit inside a payload fairing and deploying the full-sized structure (unaided) once on-orbit (e.g., the James Webb Space Telescope [JWST]). To date, conceptual architecture studies performed for NEP spacecraft capable of human-rated Mars transport have only included a combination of the two previously mentioned strategies. This paper will propose ideas for infusing ISAM strategies into NEP vehicle architectures that leverage existing and near future technologies and enable the resulting NEP systems to be realized in a more time- and cost-efficient manner.

in-space assembly↗

Ideas for Infusing In-Space Servicing, Assembly, and Manufacturing Concepts into Nuclear Electric Propulsion Architectures

NASA is currently investigating nuclear electric propulsion (NEP) for human Mars transport within the space nuclear propulsion portfolio. NEP spacecraft have the following characteristics, they: 1) include very large structures (~100-meter length); 2) are comprised of many components/modules; and 3) have very long lifetimes (e.g., 50 years for fuel rods). Thus, NEP spacecraft can be classified as a “persistent asset,” which is any zero-g or planetary surface system that benefits from in-space assembly (ISA) or multiple visits for servicing, repairs, and upgrades. NEP spacecraft will benefit from taking advantage of, and incorporating, In-space Servicing, Assembly, and Manufacturing (ISAM) capabilities in the spacecraft architecture from the onset, enabling system maintenance, repair, and evolution. ISA has a long history of being proposed for, and studied as, a means for achieving large systems in space. More recently, the benefits of ISA have been recognized by NASA, the Department of Defense (DOD), other government agencies, and commercial space companies, and thus, ISAM is being actively pursued at a national level. Past and current strategies for achieving large structures in space have relied largely on two strategies; the first is to launch monolithic structures (designed to meet launch vehicle requirements for payload size and mass) that are docked or berthed to other monolithic structures on-orbit to form a larger structure (e.g., the International Space Station [ISS]); the second is folding and packaging large structures to fit inside a payload fairing and deploying the full-sized structure (unaided) once on-orbit (e.g., the James Webb Space Telescope [JWST]). To date, conceptual architecture studies performed for NEP spacecraft capable of human-rated Mars transport have only included a combination of the two previously mentioned strategies. This paper will propose ideas for infusing ISAM strategies into NEP vehicle architectures that leverage existing and near future technologies and enable the resulting NEP systems to be realized in a more time- and cost-efficient manner.

in-space assembly↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

The Cost of Offshore Wind Energy in the United States From 2025 to 2050

This study presents estimates of the levelized cost of energy (LCOE) of offshore wind energy throughout major U.S. coastal regions between a time frame of 2025 - 2050. The LCOE modeling accounts for impacts of supply chain shocks, inflation, and rising interest rates on cost. Given the near-term uncertainty in these factors, we present three possible scenarios driven by how uncertainty in costs, technology, and deployment may evolve over time. The cost increases reported by industry in recent years will likely be felt over next several years, but we expect long-term cost reductions enabled by growing offshore wind deployment and industry learning. This study helps inform decision-makers about the potential role that offshore wind energy can play in future clean energy strategies.

17 WIND ENERGY↗

Hydrogen Transportation and Distributed Energy Systems Risk and Feasibility Assessment for Airport Facilities - CRADA 555 (Abstract)

This CRADA presents the strategy that Pacific Northwest National Laboratory (PNNL) and Sandia National Laboratories (SNL) will take to support PDX in performing a risk assessment for several hydrogen deployment scenarios. It is intended that the deployment of hydrogen at PDX could serve several roles, including decarbonizing its bus fleet and building out a distributed energy system which could also be used to facilitate emergency operations. PDX’s initial plans concern replacing their current fleet of 28 busses with FCEBs. To do so, PDX will need to deploy the hydrogen systems needed to support the buses. This includes hydrogen storage, production, delivery, filling, compression, and maintenance. PDX also has long range plans to build a distributed energy system to support normal and resilient operations. This study will investigate the risks of each plan individually, and a combined plan which serves both. Additionally, PDX is in an area with the potential for high seismic activity, as such this work will also include a seismic risk assessment. A detailed risk assessment using PDX as a test case is necessary to ensure the deployment of large-scale hydrogen is successful and to understand the benefits or drawbacks in contrast to electric only technologies. Many technologies have been proposed that claim to utilize hydrogen for both transportation and distributed energy systems; however, these technologies need to be analyzed as they apply to an actual site. The physical infrastructure and hydrogen use cases for PDX will be analyzed, a risk assessment will be performed on the hydrogen infrastructure and distributed energy system. These assessments will be useful for understanding how each of these technologies would perform as applied to a large public facility and public safety. The results of this CRADA, and an impact of the DOE funding, will evaluate hydrogen as a key fuel for PDX and will accelerate by several years availability of hydrogen, fuel cells, and other low-carbon technologies.

08 HYDROGEN↗

2011 Mars Science Laboratory Launch Period Design

The Mars Science Laboratory mission, set to launch in the fall of 2011, has the primary objective of landing the most advanced rover to date to the surface of Mars to assess whether Mars ever was, or still is today, able to sustain carbon-based life. Arriving at Mars in August 2012, the Mars Science Laboratory will also demonstrate the ability to deliver large payloads to the surface of Mars, land more accurately (than previous missions) in a 20-km by 25-km ellipse, and traverse up to 20 km. Following guided entry and parachute deployment, the spacecraft will descend on a parachute and a Powered Descent Vehicle to safely land the rover on the surface of Mars. The launch/arrival strategy is driven by several key requirements, which include: launch vehicle capability, atmosphere-relative entry speed, communications coverage during Entry, Descent and Landing, latitude accessibility, and dust storm season avoidance. Notable among these requirements is maintaining a telecommunications link from atmospheric entry to landing plus one minute, via a Direct-To-Earth X-band link and via orbital assets using an UHF link, to ensure that any failure during Entry, Descent and Landing can be reconstructed in case of a mission anomaly. Due to concerns related to the lifetime of the relay orbiters, two additional launch/arrival strategies have been developed to improve Entry, Descent, and Landing communications. This paper discusses the final launch/arrival strategy selected prior to the launch period down-selection that is scheduled to occur in August 2011. It is also important to note that this paper is an update to Ref. 1 in that it includes two new Type 1 launch periods and drops the Type 2 launch period that is no longer considered.

mission design↗

A Tool for the Risk-Informed Management of Critical Mission Resilience

We describe a methodology and tool for the risk-informed management and planning of mission resilience. By mapping concepts of resilience onto the elements of a streamlined risk model we are able to tap the substantial portfolio of established risk concepts to provide rapid insights in the evaluation and high-level screening of prospective resilience enhancement measures. This provides a risk-informed, levelized basis for the comparison of disparate resilience solutions and the means of establishing preferences. The methodology begins with identification of critical missions met by a site, and establishment of the supporting physical assets. Scenarios that would result in failure of these assets are systematically identified. Each scenario comprises three elements: realization of a hazard or threat resulting in loss of resources (the current focus being on power, natural gas, and water) to the asset, failure of measures in place to protect the asset against those losses, and realization of the consequent impacts. These scenarios are quantified in terms of their probabilities of occurrence and the magnitude of the resultant consequences (mission outage time), allowing risk-prioritization to focus resilience enhancement considerations. What-If? analyses are conducted through adjusting elements of the risk calculation to reflect the deployment of prospective resilience measures, by which means the efficacies of each of those measures can be compared using common risk metrics across diverse resilience strategies. This paper will also describe the insights from example applications.

resilience, risk, risk assesment, energy, water↗

Assessing Customer Experience and Business Models around Price-to-Device Communication and Smart Control Pathways in CalFlexHub

California is facing three major challenges in electrical grid operation: renewable overgeneration, steep evening ramping, and growing peak demand. The state has identified dynamic retail price response as a key strategy evidenced by CPUC’s Dynamic Rates proceeding and CEC’s Load Management Standards. Furthermore, the CEC launched a $16M “California Load Flexibility Research and Deployment Hub (CalFlexHub)” administered by Berkeley Lab to accelerate price-response flexible load technologies in buildings and EV charging. There are more than 16 laboratory and field demonstration projects in CalFlexHub, each demonstrating innovative automated price-response technologies. CalFlexHub tests various pathways through which hourly price signals and triggered control commands are communicated to load-flexible devices such as smart thermostats, heat pumps, water heaters, and EVs. We identified seven unique communication and control pathways, which involve combinations of third-party cloud, device OEM’s cloud, building central gateway, and local controller in between the price server and the load-flexible devices. It is important for utilities and policy makers to understand the long-term implications of each pathway in designing future programs and creating related policies and mandates for market transformation. We propose an evaluation framework including the following aspects: ● Functionality: connectivity and uptime, resilience, and optimization; ● Customer experience: simplicity in setup, troubleshooting support, continuity, customer choice, first cost, and ongoing cost; ● Business model and scalability: advance interoperability, holistic solution, bridge unique gap, customer base, and value streams and pricing structures. In this paper, we identify emerging business models associated with each communication pathway and discuss their positive features and challenges from the above aspects.

Liu, Jingjing↗

Techno-Economic Assessments of Second-Life Batteries for Electric Vehicle Charging Stations

When electric vehicle (EV) batteries degrade below a certain capacity, they may no longer be suitable for automotive use but can be repurposed as second-life batteries (SLBs) for other applications, such as EV charging stations. When integrated with photovoltaic (PV) systems, SLB can store surplus solar energy, reducing reliance on the grid and lowering operational costs. This paper presents a novel techno-economic assessment framework for deploying SLBs in combination with PV in grid-connected EV charging stations. The proposed framework integrates the value proposition, charging station operation, optimal dispatch strategies, battery degradation modeling, input data requirements, and detailed procedures for generating key economic performance metrics. Insightful analyses are performed to assess the performance of SLBs in comparison to new batteries across various cost scenarios. The results indicate that SLBs become financially attractive when their cost is 40% or lower than new batteries.

energy storage↗

Optimization of Conditions for Photoluminescence-Based Sensing of Critical Minerals: Strategies and Outlook

Economically critical minerals and metals are vital to America’s security, with application areas in energy, advanced technologies, and defense systems. The growing implementation of renewable energy sources such as electric vehicles is expected to significantly increase demand for these minerals, while the global supply is monopolistic, with most of the production occurring in a few countries outside of the US. To mitigate potential supply chain vulnerabilities, the domestic production of economically critical metals has become a bipartisan priority of the US government, and unconventional sources such as coal and its utilization byproducts such as fly ash and acid mine drainage are being actively explored as an alternative method for meeting domestic demand. Slow and expensive characterization methods for critical metals present a significant pain point for domestic production, which has led to the exploration of alternative low-cost, portable platforms capable of detecting target metals during resource prospecting and downstream process monitoring. The National Energy Technology Laboratory has developed a portable fiber optic-based luminescence spectrometer that utilizes a metal-organic framework (MOF) material to detect and distinguish parts-per-billion levels of the visible-emitting rare earth elements terbium, dysprosium, samarium, and europium, which are all economically critical metals. Although preliminary results with this system are promising, a crucial barrier to practical deployment is the ability to operate in low pH, high ionic strength environments, as acidic conditions and the presence of other metal ions can significantly reduce luminescence signal. Here, current strategies related to sample treatment, material design, and sensor configuration are discussed in the context of improving sensor performance in application-relevant conditions. Additionally, future opportunities, such as the optimization of the sensing binding environment through computational methods and specific metals to be removed for treatment will be discussed, presenting a forward-looking view for innovation in luminescent sensing of critical metals.

36 MATERIALS SCIENCE↗