Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “crew scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Mission safety evaluation report for STS-37, postflight edition

STS-37/Atlantis was launched on April 5, 1991 from Kennedy Space Center launch complex 39B at 9:23 a.m. Eastern Standard Time (EST). Launch was delayed 4 minutes 45 seconds because of safety concerns about the low cloud ceiling and the wind direction in the potential blast area. Based on the limited number and type of inflight anomalies encountered, the Space Shuttle operated satisfactorily throughout the STS-37 mission. A contingency EVA was performed by the crew on Flight Day (FD) 3 to free a sticky Gamma Ray Observatory (GRO) high gain antenna, after which the GRO primary payload was successfully deployed by the Orbiter's Remote Manipulator System. The GRO, which weighed just over 35,000 lbs, was the heaviest NASA science satellite ever deployed by the Space Shuttle into low Earth orbit. The scheduled entry/landing on FD 6 was waved off for one day due to high wind conditions at Edwards Air Force Base. Atlantis landed on FD 7, 11 April 1991 on Edwards AFB lakebed runway 33 at 9:55 a.m. Eastern Daylight Time.

Hill, William C.↗

Using AI/expert system technology to automate planning and replanning for the HST servicing missions

This paper describes a knowledge-based system that has been developed to automate planning and scheduling for the Hubble Space Telescope (HST) Servicing Missions. This new system is the Servicing Mission Planning and Replanning Tool (SM/PART). SM/PART has been delivered to the HST Flight Operations Team (FOT) at Goddard Space Flight Center (GSFC) where it is being used to build integrated time lines and command plans to control the activities of the HST, Shuttle, Crew and ground systems for the next HST Servicing Mission. SM/PART reuses and extends AI/expert system technology from Interactive Experimenter Planning System (IEPS) systems to build or rebuild time lines and command plans more rapidly than was possible for previous missions where they were built manually. This capability provides an important safety factor for the HST, Shuttle and Crew in case unexpected events occur during the mission.

Bogovich, L.↗

STS-106 Crew Interviews: Richard A. Mastracchio

Live footage of a preflight interview with Mission Specialist Richard A. Mastracchio is seen. The interview addresses many different questions including why Mastracchio became interested in the space program, the events that led to his interest, his 14 year career path through the Johnson Space Center (JSC) as an engineer before finally getting selected into the astronaut program. Other interesting information that this one-on-one interview discusses is the main goal of the STS-106 mission, and its scheduled docking with the new International Space Station (ISS) since the arrival and connection of the Zvezda Service Module. Mastracchio also mentions his responsibility during the much-anticipated docking and scheduled space-walk.

Source record↗

Planning to Explore: Using a Coordinated Multisource Infrastructure to Overcome Present and Future Space Flight Planning Challenges

Few human endeavors present as much of a planning and scheduling challenge as space flight, particularly manned space flight. Just on the operational side of it, efforts of thousands of people across hundreds of organizations need to be coordinated. Numerous tasks of varying complexity and nature, from scientific to construction, need to be accomplished within limited mission time frames. Resources need to be carefully managed and contingencies worked out, often on a very short notice. From the beginning of the NASA space program, planning has been done by large teams of domain experts working months, sometimes years, to put together a single mission. This approach, while proven very reliable up to now, is becoming increasingly harder to sustain. Elevated levels of NASA space activities, from deployment of the new Crew Exploration Vehicle (CEV) and completion of the International Space Station (ISS), to the planned lunar missions and permanent lunar bases, will put an even greater strain on this largely manual process. While several attempts to automate it have been made in the past, none have fully succeeded. In this paper we describe the current NASA planning methods, outline their advantages and disadvantages, discuss the planning challenges of upcoming missions and propose a distributed planning/scheduling framework (CMMD) aimed at unifying and optimizing the planning effort. CMMD will not attempt to make the process completely automated, but rather serve in a decision support capacity for human managers and planners. It will help manage information gathering, creation of partial and consolidated schedules, inter-team negotiations, contingencies investigation, and rapid re-planning when the situation demands it. The fist area of CMMD application will be planning for Extravehicular Activities (EVA) and associated logistics. Other potential applications, not only in the space flight domain, and future research efforts will be discussed as well.

Balaban, Edward↗

Human Adaptation to Isolated and Confined Environments

A study was conducted over seven months in a winter Antarctic isolated and confined environment (ICE). Physiological and psychological data was collected several times a week. Information was collected on a monthly basis on behavior and the use of physical facilities. Adaptation and information indicated that there was a significant decrease in epinephrine and norepinephrine during the middle trimester of the winter. No vital changes were found for blood pressure. Self reports of hostility and anxiety show a linear increase. There were no significant changes in depression during ICE. The physiological and psychological data do not move in a synchronous fashion over time. The data also suggest that both ambient qualities of an ICE and discrete social environmental events, such as the arrival of the summer crew, have an impact on the outcome measures used. It may be most appropiate to develop a model for ICE's that incorporates not only global chronic stressors common to all ICE's but also the role of discrete environmental effects which can minimize or enhance the influence of more chronic stressors. Behavioral adjustment information highlight the importance of developing schedules which balance work and recreational activities.

Evans, Gary W.↗

Assured crew return capability Crew Emergency Return Vehicle (CERV) avionics

The Crew Emergency Return Vehicle (CERV) is being defined to provide Assured Crew Return Capability (ACRC) for Space Station Freedom. The CERV, in providing the standby lifeboat capability, would remain in a dormat mode over long periods of time as would a lifeboat on a ship at sea. The vehicle must be simple, reliable, and constantly available to assure the crew's safety. The CERV must also provide this capability in a cost effective and affordable manner. The CERV Project philosophy of a simple vehicle is to maximize its useability by a physically deconditioned crew. The vehicle reliability goes unquestioned since, when needed, it is the vehicle of last resort. Therefore, its systems and subsystems must be simple, proven, state-of-the-art technology with sufficient redundancy to make it available for use as required for the life of the program. The CERV Project Phase 1'/2 Request for Proposal (RFP) is currently scheduled for release on October 2, 1989. The Phase 1'/2 effort will affirm the existing project requirements or amend and modify them based on a thorough evaluation of the contractor(s) recommendations. The system definition phase, Phase 2, will serve to define CERV systems and subsystems. The current CERV Project schedule has Phase 2 scheduled to begin October 1990. Since a firm CERV avionics design is not in place at this time, the treatment of the CERV avionics complement for the reference configuration is not intended to express a preference with regard to a system or subsystem.

Myers, Harvey Dean↗

On-Orbit and Ground Performance of the PGBA Plant Growth Facility

PGBA, a plant growth facility developed for commercial space biotechnology research, successfully grew a total of 30 plants (6 species) for 10 days on board the Space Shuttle Endeavour (STS-77) and is scheduled for reflight on board MSL-1 (STS-83) for a 16 day flight. The PGBA life support systems provide atmospheric, thermal, and humidity control as well as lighting and nutrient supply in a 23.6 liter chamber. Atmosphere treatment includes ethylene and other hydrocarbon removal, CO2 replenishment, and O2 control. The normally closed system uses controlled CO2 replenishment from the crew cabin as required by the plants. Temperature is controlled (1 C) at user-specified setpoints between 20-32 C, using water-filled coolant loops, solid state Peltier thermoelectric devices, and liquid heat exchangers. The thermoelectric cooling systems were optimized for low power consumption and high cooling efficiencies. Relative humidity is maintained between 60-100% using a cooled porous metal plate to remove water vapor from the air stream without cooling the bulk air below the dew point. The lighting system utilizes three compact fluorescent bi-axial lights with variable lighting control and light intensity (PAR) between 220 and 330 micromol/sq m/s at a distance of 20 cm in spaceflight configuration (on orbit power limited to 230 Watt for entire payload). A ground, up to 550 micromol/sq m/s light intensity can be achieved with 330 Watt payload power consumption. Plant water and nutrient support is sustained via the 'Nutrient Pack' system including the passive or active 'Water Replenishable Nutrient Pack.' The root matrix material (soil or Agar) and nutrient formulation of each pack is prepared according to plant species and experimental requirements. These systems were designed by NASA Ames personnel. Data acquisition and control systems provide 32 channels of environmental data as well as digitized or analog video signals for downlink.

Hoehn, A.↗

Robotic Lunar Exploration

This presentation describes current Lunar Exploration plans and objectives. It begins with specific statements from the President s vision for U.S. Space Exploration which pertain to robotic lunar missions. An outline of missions objectives is provided, along with a high-level schedule of events through the year 2025. Focus is then given to the Lunar Robotic and Precursor Program (LPRP) to describe objectives and goals. Recent developments in the Program are explained - specifically, the renaming of the RLEP program to "LPRP" and the movement of the program office to MSFC. A brief summary of the synergy expected between the robotic and crewed missions, with the LSAM descent stage Project is given. The Lunar Reconnaissance Orbiter mission, with its co-manifested Lunar Crater Observation and Sensing Satellite (LCROSS), is then described with an overview of the payloads and mission objectives. Finally, information is given about the expected future of the LPRP program and Exploration and the development of a compressive Lunar Exploration Architecture.

Echols, Raymond↗

STS-103 Crew Interviews: John Grunsfeld

Live footage of a preflight interview with Mission Specialist John M. Grunsfeld is seen. The interview addresses many different questions including why Grunsfeld became an astronaut, and the events that led to his interest. Other interesting information that this one-on-one interview discusses is an explanation of the why this required mission to service the Hubble Space Telescope must take place at such an early date, and a brief touch on Grunsfeld's responsibility during any of the four space walks scheduled for this mission.

Source record↗

STS-96 Crew Interview: Tamara Jernigan

Live footage of a preflight interview with Mission Specialist Tamara E. Jernigan is seen. The interview addresses many different questions including why Jernigan became an astronaut, the events that led to her interest, and her career path. Other interesting information that this one-on-one interview discusses is the logistics and supply mission, why it is important to send equipment to the International Space Station (ISS), and the Integrated Cargo Carrier (ICC). Jernigan mentions Discovery's anticipated docking with the ISS, her scheduled space walk with Daniel T. Barry, plans for the supply and equipment transfers, and a fly-around maneuver to take pictures of the ISS.

Source record↗

Trial by Fire

Boeing is preparing a range of Delta IV Heavy launcher options for NASA Crew Exploration Vehicle (CEV) and unmanned cargo transportation architectures to the Moon and Mars, now that the massive new rocket has been flight tested. The December 21 launch of the 232-ft. vehicle on 2 million lb. thrust marked the largest all-liquid expendable booster flown since the last Saturn V in 1973. A second Delta IV Heavy mission is scheduled for this summer carrying a U.S. Air Force missile warning satellite. The first launch carried a dummy payload. Boeing wants NASA to consider the Delta IV Heavy for manned CEV missions, but is also pushing the Heavy for unmanned exploration launch roles. One Delta IV Medium version could also be a CEV player. Boeing says even modest upgrades could double the Delta Heavy's Earth orbit capability to more than 50 metric tons, including being able to fire up to 20 metric tons on escape trajectories to Mars.

Covault, Craig↗

STS-103 Crew Interviews: Mike Foale

Live footage of a preflight interview with Mission Specialist C. Michael Foale is seen. The interview addresses many different questions including why Foale became an astronaut, what were the events that led to his interest. Other interesting information that this one-on-one interview discusses is an explanation of the why this required mission to service the Hubble Space Telescope must take place at such an early date, and a brief touch on Foale's responsibility during any of the four space walks scheduled for this mission.

Source record↗

Vehicle management and mission planning in support of shuttle operations.

An operational approach to shuttle mission planning during high flight frequency years (20 or more flights per year) is described wherein diverse mission planning functions interface via an interactive computer system and common data base. The Vehicle Management and Mission Planning System (VMMPS) is proposed as a means of helping to accomplish the mission planning function. The VMMPS will link together into an interactive system the major mission planning areas such as trajectory, crew, vehicle performance, and launch operations. A common data base will be an integral part of the system and the concept of standard mission types and phases will be used to minimize mission to mission uniqueness. The use of this system will eliminate much redundancy and replanning, shorten interface times between functions, and provide a means to evaluate unplanned events and modify schedules.

Pruett, W. R.↗

STS-72 Flight Day 9

On this ninth day of the STS-72 mission, the flight crew, Cmdr. Brian Duffy, Pilot Brent W. Jett, and Mission Specialists Leroy Chiao, Daniel T. Barry, Winston E. Scott, and Koichi Wakata (NASDA), awakened to music from the movie Star Wars. The astronauts conducted a news conference via satellite and answered questions from both Japanese and U.S. reporters at the Kennedy Space Center and the Johnson Space Center. The preparation for the scheduled night landing continues from the previous day's activities.

Source record↗

Orion GN and C Overview and Architecture

The Crew Exploration Vehicle, named Orion, is a critical element in the Constellation Program to develop the transportation system needed to send humans back to the moon and then beyond. Lockheed Martin is the prime contractor for the Orion spacecraft, which is managed by the Johnson Space Center. The Orion GN&C sub-system is being jointly developed by NASA and Lockheed Martin through a mode team approach. The GN&C is a critical element of the Orion mission to carry astronauts to low earth orbit to service the International Space Station and then on later flights to transfer and return a crew of four to the moon. The Orion GN&C system must perform monitoring and abort functions during ascent, rendezvous and docking in both low earth and lunar orbits, perform uncrewed lunar loiter operations, perform trans earth injection and atmospheric entry and landing. The Orion also must be integrated with the Ares I Crew Launch Vehicle, the Earth Departure Stage of the Ares V and the Lunar Surface Access Module. This paper provides an overview of the Orion GN&C system. The functional capabilities of the Orion GN&C will be provided in the context of Constellation architecture, the key GN&C requirements will be summarized, the GN&C architecture will be presented, the development schedule and plans will summarized and finally conclusions will be presented.

Hu, Howard↗

NASA's Cryogenic Fluid Management Technology Development Roadmaps

The maturation of Cryogenic Fluid Management (CFM) Technologies is essential for achieving NASA's future long duration missions. Propulsion systems utilizing cryogens are necessary to achieve NASA's exploration missions to the moon, Mars, and beyond. Current State Of the Art (SOA) CFM technologies enable cryogenic propellants to be stored for several hours prior to their use. However, some envisioned mission architectures require that cryogens to be stored for two years or longer. The fundamental roles of CFM technologies are long term storage of cryogens, propellant tank pressure control and propellant delivery. In the presence of heat, the cryogens will "boil-off" over time resulting in excessive pressure buildup, off-nominal propellant conditions for engine consumption, and propellant loss. To achieve long term storage and tank pressure control, the CFM elements will intercept and/or remove any heat from the propulsion system. All functions are required to be performed both with and without the presence of a gravitational field. Which CFM technologies are required is a function of the cryogens used, mission architecture, vehicle design and propellant tank size. To enable NASA's crewed missions beyond Low Earth Orbit, a total of twenty-seven CFM technologies have been identified to support various In-Space Stages and Lander/Ascent Vehicles. A set of CFM Technology Development Roadmaps have been created identifying the current Technology Readiness Level (TRL) of each element, current technology "gaps", and existing technology development efforts. The roadmaps include a methodical approach and schedule to achieve a flight demonstration, hence maturing CFM technologies to TRL 6/7 for infusion into the NASA's exploration elements. Additionally, a survey of the aerospace industry was completed to understand their views on the various technologies and how they would be infused. This does not cover all possible technologies, but rather those that are of interest to NASA specifically.

Cryogenic fluid management↗

Crew Health and Performance Integrated Data Architecture (CHP-IDA) TechPort May 2024

Future exploration missions to Mars will have increased need for crew autonomy. Crew Health & Performance (CHP) related data on the ISS is currently, manually downlinked and in disparate locations, which limits crew autonomy for future missions. The CHP-IDA project is developing a backend data system platform that grants the ability to seamlessly collect, store, process, and display CHP-related data for exploration missions. This platform allows for integration of data and advanced analytics that offer crew and ground teams better insight into the crew’s health and performance. It also enables applications that can improve the crew’s ability to provide more autonomous medical care during exploration missions. Data will be collected automatically to reduce crew and ground team time and effort and will synchronize across all in-mission vehicles, habitats, and ground as communication delay permits. The Human Research Program’s (HRP) Medical Data Architecture (MDA) project focused on this backend data architecture but for medical data only. The CHP-IDA project, a joint effort between HRP’s Exploration Medical Capability (ExMC) element and the Exploration Medical Integrated Product Team (XMIPT), expands this capability to all relevant CHP-related data. The additional inputs from nutrition, environment, exercise, radiation, and any other relevant sources will give more insight into crew’s health and performance. Currently, the Human Systems Engineering and Integration Division at Johnson Space Center (JSC) is designing the system. The team completed a system requirements review (SRR) in FY22 and now the focus is on core software development, testbed buildup, and use case scenario demonstration. An end-to-end demonstration with multiple data sources across CHP domains is schedule for the end of FY24 where all three focus areas will be displayed. Following this ground demo, the software will be completed, tested, and validated for flight.

Courtney M Schkurko↗

STS-106 Crew Interviews: Terrence W. Wilcutt

Live footage of a preflight interview with Mission Commander Terrence W. Wilcutt is seen. The interview addresses many different questions including why Wilcutt became an astronaut, the events that led to his interest, and his career both as a High School Mathematics Teacher and as a member of the US Marine Corps. Other interesting information that this one-on-one interview discusses are his responsibilities during docking and undocking of the spacecraft, and possible shorter time frame turnarounds for missions. Wilcutt also mentions the scheduled installation and transfer of equipment into the new International Space Station (ISS).

Source record↗