Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “assembly processes”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Improved fabrication of electrolytic capacitors

After processing parts for assembly, insulative cup is fitted to bottom of can, then electrolytic solution consisting of white sulfuric acid gel is inserted into can. Pellet is put in can and is fitted tightly into cup. Finally, bead weld is formed between can and header plug.

Gamari, F. J.↗

Spacecraft utensil/hand cleansing fixture

A system concept for an inflight utensil/hand cleansing fixture is described which includes the following features: (1) capability for efficient cleansing and rinsing of utensils or hands, and (2) provision for general waste fluid disposal. The design concept provides for the capability of functioning for a 30 day shuttle mission containing seven occupants/users. The long range goal is to provide a functioning system capable of operating for missions of at least 120 days. The fixture is a self-contained unit that can be installed in the standard water interface requirements. Service to the unit is a single source of unheated potable water and water is discharged from the unit into a single return waste connection. In addition, the design includes provisions for the intake and discharge of purge air and the discharge of evolved gases. Both the air and the gases are filtered or processed in the assembly before releasing them into the habitability area.

Rosener, A. A.↗

Laminating Polyimide Films

Thermoplastic polyimide adhesive is used to bond polyimide sheets into flexible laminates. Films are first primed with polyimide adhesive, then bonded together under heat and pressure. Adhesive is cast on separate surface, then sandwiched between polyimide and/or metal films for final assembly. Objectives of process are to improve bonding of high-temperature polyimide film, prepare flexible, large-area, void-free laminates from polyimide film, and laminate polyimide film not only to itself but to metal surfaces.

St. Clair, A. K.↗

Interleaved array antenna technology development

This is the third phase of a program to establish an antenna concept for shuttle and free flying spacecraft earth resources experiments using Synthetic Aperture Radar. The feasibility of a plated graphite epoxy waveguide for a space antenna was evaluated. A quantity of flat panels and waveguides were developed, procured, and tested for electrical and mechanical properties. In addition, processes for the assembly of a unique waveguide array were investigated. Finally, trades between various configurations that would allow elevation (range) electronic scanning and that would minimize feed complexity for various RF bandwidths were made.

Source record↗

Development of graphite composite adapter for Galileo spacecraft

This paper discusses the Galileo spacecraft adapter: its interface loads and stiffness capability; configuration design/analysis methodology; verification of buckling margin, local stresses, and mass properties; and the basis for graphite-epoxy material selections and tooling approach, as well as the fabrication, layup, machining, assembly, and drilling processes.

Archer, J. S.↗

Ureilites are not igneous differentiates

Although most all meteorites are as old as the solar system (4.5 billion years), they can be subdivided into primitive and evolved groups, depending on the extent of their chemical and physical processing. Primitive meteorites, most of which are chondrites, are assemblages of dust and millimeter-sized pellets from the presolar nebula, which were not extensively heated and processed since their assembly. Thus they provide information about the conditions in the nebular cloud. Many of the evolved meteorites are achondrites, which are igneous rocks produced by melting on or within an asteroidal object known as the parent body. A major unsolved problem in solar system studies is identification of the source of heat which led to melting of the achondrites. The role of oxygen isotopes in establishing genetic relationships among meteorites is examined.

Clayton, Robert N.↗

Identifying Bearing Balls With Radioisotopes

Proposed scheme for identification of members of manufactured lot of bearing balls based on detection of characteristic isotopes. All balls in lot irradiated to produce easily recognized radioactive isotopes in known concentrations and/or known ratios of concentrations and known rates of decay on their surfaces. Scheme conceived to track precise bearing balls through various stages of assembly, disassembly, and processing.

Butner, Myles F.↗

Control of intelligent robots in space

In view of space activities like International Space Station, Man-Tended-Free-Flyer (MTFF) and free flying platforms, the development of intelligent robotic systems is gaining increasing importance. The range of applications that have to be performed by robotic systems in space includes e.g., the execution of experiments in space laboratories, the service and maintenance of satellites and flying platforms, the support of automatic production processes or the assembly of large network structures. Some of these tasks will require the development of bi-armed or of multiple robotic systems including functional redundancy. For the development of robotic systems which are able to perform this variety of tasks a hierarchically structured modular concept of automation is required. This concept is characterized by high flexibility as well as by automatic specialization to the particular sequence of tasks that have to be performed. On the other hand it has to be designed such that the human operator can influence or guide the system on different levels of control supervision, and decision. This leads to requirements for the hardware and software concept which permit a range of application of the robotic systems from telemanipulation to autonomous operation. The realization of this goal requires strong efforts in the development of new methods, software and hardware concepts, and the integration into an automation concept.

Freund, E.↗

Modular VLSI Reed-Solomon Decoder

Proposed Reed-Solomon decoder contains multiple very-large-scale integrated (VLSI) circuit chips of same type. Each chip contains sets of logic cells and subcells performing functions from all stages of decoding process. Full decoder assembled by concatenating chips, with selective utilization of cells in particular chips. Cost of development reduced by factor of 5. In addition, decoder programmable in field and switched between 8-bit and 10-bit symbol sizes.

Hsu, In-Shek↗

Lunar transfer vehicle studies

Lunar transportation architectures exist for several different mission scenarios. Direct flights from Earth are possible, as the Apollo program clearly demonstrated. Alternatively, a space transfer vehicle could be constructed in space by using the Space Station as a base of operations, or multiple vehicles could be launched from Earth and dock in LEO without using a space station for support. Similarly, returning personnel could proceed directly to Earth or rendezvous at the Space Station for a ride back home on the Space Shuttle. Multiple design concepts exist which are compatible with these scenarios and which can support requirements of cargo, personnel, and mission objectives. Regardless of the ultimate mission selected, some technologies will certainly play a key role in the design and operation of advanced lunar transfer vehicles. Current technologies are capable of delivering astronauts to the lunar surface, but improvements are needed to affordably transfer the material and equipment that will be needed for establishing a lunar base. Materials and structures advances, in particular, will enable the development of more capable cryogenic fluid management and propulsion systems, improved structures, and more efficient vehicle assembly, servicing and processing.

Keeley, Joseph T.↗

Directions for lunar construction - A derivation of requirements from a construction scenario analysis

This paper provides an initial trade-off study among several lunar construction options available to the Space Exploration Initiative. The relative time effectiveness of Extra-Vehicular Activity (EVA), Intra-Vehicular Activity (IVA), and Earth-based remote control assembly and construction methods are studied. Also considered is whether there is any construction time savings to building roads in advance, or surveying the construction sites with orbiters or rovers in advance. The study was conducted by adding detail to a potentially real scenario - a nuclear power plant - and applying time multipliers for the various control options and terrain alternatives, provided by roboticists among the authors. The authors conclude that IVA is a faster construction method than either EVA or construction conducted remotely from Earth. Surveying proposed sites in advance, with orbiters and rovers, provides a significant time savings through adding to certainty, and therefore may be cost effective. Developing a heavy-lift launch capability and minimizing assembly and construction processes by landing large payloads is probably worthwhile to the degree possible, as construction activities would use a large amount of surface operations time.

Dias, William S.↗

SSME component assembly and life management expert system

The space shuttle utilizes several rocket engine systems, all of which must function with a high degree of reliability for successful mission completion. The space shuttle main engine (SSME) is by far the most complex of the rocket engine systems and is designed to be reusable. The reusability of spacecraft systems introduces many problems related to testing, reliability, and logistics. Components must be assembled from parts inventories in a manner which will most effectively utilize the available parts. Assembly must be scheduled to efficiently utilize available assembly benches while still maintaining flight schedules. Assembled components must be assigned to as many contiguous flights as possible, to minimize component changes. Each component must undergo a rigorous testing program prior to flight. In addition, testing and assembly of flight engines and components must be done in conjunction with the assembly and testing of developmental engines and components. The development, testing, manufacture, and flight assignments of the engine fleet involves the satisfaction of many logistical and operational requirements, subject to many constraints. The purpose of the SSME Component Assembly and Life Management Expert System (CALMES) is to assist the engine assembly and scheduling process, and to insure that these activities utilize available resources as efficiently as possible.

Ali, M.↗

Large Scale Testing of a Foam/Multilayer Insulation Thermal Control System (TCS) for Cryogenic Upper Stages

The development of high energy cryogenic upper stages is essential for the efficient delivery of large payloads to various destinations envisioned in future programs. A key element in such upper stages is cryogenic fluid management (CFM) advanced development/technology. Due to the cost of and limited opportunities for orbital experiments, ground testing must be employed to the fullest extent possible. Therefore, a system level test bed termed the Multipurpose Hydrogen Test Bed (MHTB), which is representative in size and shape (3 meter diameter by 3 meter long with a volume of 18 cubic meters) of a fully integrated space transportation vehicle liquid hydrogen propellant tank has been established. To date, upper stage studies have often baselined the foam/multilayer insulation (FMLI) combination concept; however, hardware experience with the concept is minimal and was therefore selected for the MHTB. The foam element (isofoam SS-1 171 with an average thickness of 3.5 centimeters) is designed to protect against ground hold/ascent flight environments, and allows for the use of a dry nitrogen purge as opposed to the more complex/heavy helium purge subsystem normally required with MLI in cryogenic applications. The MLI (45 layers of Double Aluminized Mylar with Dacron spacers) provides protection in the vacuum environment of space and is designed for an on-orbit storage period of 45 days. Several unique features were incorporated in the MLI concept and included: variable density MLI (reduces weight and radiation losses by changing the layer density), larger but fewer DAM perforations for venting during ascent to orbit (reduces radiation losses), and roll wrap installation of the MLI with a commercially established process to lower assembly man-hours and reduce seam heat leak. Thermal performance testing of the MHTB TCS was conducted during three test series conducted between September 1995 and May 1996. Results for the ground hold portion of the tests were as expected producing an average heat leak of 63 WattS/M2 at an average foam surface temperature of 170 K. The results of the simulated orbit hold test interval produced heat leaks ranging from 0.085 to 0.22 Watts/squareM at warm boundary temperatures of 164K and 305K, respectively. When compared to the performance for a traditional MLI system, a 60% reduction in orbital heat leak or boiloff was measured. Overall, the MHTB TCS demonstrated satisfactory performance for all mission phases required of a cryogenic upper stage.

Hastings, Leon↗

Radar Images of the Kuiper Quadrangle (Mercury) from Goldstone Radar Data

We have assembled all currently processed radar data from 1989 to 1998 into crude images covering the Kuiper (H6) region on Mercury. The data used were taken to support the ephemeris improvement and gravitational physics programs; however, the resolution is good enough in some cases to make north/south ambiguous images that show some features that can be identified with the Mariner 10 features. Topography profiles along the apparent equator are also available; some of these profiles show ridges and rills as well as crater depths and diameters. The combination of the optical imaging and the radar imaging can be helpful in understanding similar features in radar images of the optically unimaged hemisphere.

Jurgens, R. F.↗

Large-Scale Liquid Hydrogen Testing of Variable Density Multilayer Insulation with a Foam Substrate

The multipurpose hydrogen test bed (MHTB), with an 18-cu m liquid hydrogen tank, was used to evaluate a combination foam/multilayer combination insulation (MLI) concept. The foam element (Isofoam SS-1171) insulates during ground hold/ascent flight, and allowed a dry nitrogen purge as opposed to the more complex/heavy helium purge subsystem normally required. The 45-layer MLI was designed for an on-orbit storage period of 45 days. Unique WI features include a variable layer density, larger but fewer double-aluminized Mylar perforations for ascent to orbit venting, and a commercially established roll-wrap installation process that reduced assembly man-hours and resulted in a roust, virtually seamless MLI. Insulation performance was measured during three test series. The spray-on foam insulation (SOFI) successfully prevented purge gas liquefaction within the MLI and resulted in the expected ground hold heat leak of 63 W/sq m. The orbit hold tests resulted in heat leaks of 0.085 and 0.22 W/sq m with warm boundary temperatures of 164 and 305 K, respectively. Compared to the best previously measured performance with a traditional MLI system, a 41-percent heat leak reduction with 25 fewer MLI layers was achieved. The MHTB MLI heat leak is half that calculated for a constant layer density MLI.

Martin, J. J.↗

High Speed PC Based Data Acquisition and Instrumentation for Measurement of Simulated Low Earth Orbit Thermally Induced Disturbances

The Hubble Space Telescope (HST) Disturbance Verification Test (DVT) was conducted to characterize responses of the Observatory's new set of rigid solar array's (SA3) to thermally induced 'creak' or stiction releases. The data acquired in the DVT were used in verification of the HST Pointing Control System on-orbit performance, post-Servicing Mission 3B (SM3B). The test simulated the on-orbit environment on a deployed SA3 flight wing. Instrumentation for this test required pretest simulations in order to select the correct sensitivities. Vacuum compatible, highly accurate accelerometers and force gages were used for this test. The complexity of the test, as well as a short planning schedule, required a data acquisition system that was easy to configure, highly flexible, and extremely robust. A PC Windows oriented data acquisition system meets these requirements, allowing the test engineers to minimize the time required to plan and perform complex environmental test. The SA3 DVT provided a direct practical and complex demonstration of the versatility that PC based data acquisition systems provide. Two PC based data acquisition systems were assembled to acquire, process, distribute, and provide real time processing for several types of transducers used in the SA3 DVT. A high sample rate digital tape recorder was used to archive the sensor signals. The two systems provided multi-channel hardware and software architecture and were selected based on the test requirements. How these systems acquire and processes multiple data rates from different transducer types is discussed, along with the system hardware and software architecture.

Sills, Joel W., Jr.↗

A Planetary Protection Strategy for the Mars Aerial Regional-Scale Environmental Survey (ARES) Mission Concept

The Aerial Regional-scale Environmental Survey (ARES) is a Mars exploration mission concept designed to send an airplane to fly through the lower atmosphere of Mars, with the goal of taking scientific measurements of the atmosphere, surface, and subsurface phenomenon. ARES was first proposed to the Mars Scout program in December 2002 for a 2007 launch opportunity and was selected to proceed with a Phase A study, step-2 proposal which was submitted in May 2003. ARES was not selected for the Scout mission, but efforts continued on risk reduction of the atmospheric flight system in preparation for the next Mars Scout opportunity in 2006. The ARES concept was again proposed in July 2006 to the Mars Scout program but was not selected to proceed into Phase A. This document describes the Planetary Protection strategy that was developed in ARES Pre Phase-A activities to help identify, early in the design process, certain hardware, assemblies, and/or subsystems that will require unique design considerations based on constraints imposed by Planetary Protection requirements. Had ARES been selected as an exploration project, information in this document would make up the ARES Project Planetary Protection Plan.

Kuhl, Christopher A.↗

Digital Radiography Qualification of Tube Welding

The Orion Project will be directing Lockheed Martin to perform orbital arc welding on commodities metallic tubing as part of the Multi Purpose Crew Vehicle assembly and integration process in the Operations and Checkout High bay at Kennedy Space Center. The current method of nondestructive evaluation is utilizing traditional film based x-rays. Due to the high number of welds that are necessary to join the commodities tubing (approx 470), a more efficient and expeditious method of nondestructive evaluation is desired. Digital radiography will be qualified as part of a broader NNWG project scope.

Carl, Chad↗