Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “and Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Modeling for a Digital Twin-Based Remote Operation System Framework

New reactor designs and technologies are being developed to grow and advance the nuclear industry. Microreactors are one of the many new concepts for advancing the industry. Microreactors are very small reactors generally designed to have an operating power of 20 MWth or less. They are ideal for many applications in which it would not be feasible to have a large-scale reactor, such as powering remote communities, military bases, and mining sites. Many of these applications currently rely on diesel generators for power, and replacing those generators with the carbon-free energy of a microreactor is a major driving factor for microreactor development. However, most of the use cases for microreactors are in isolated locations where construction and labor costs are much higher. Microreactors will need to be comparable to other energy production methods for their deployment to be successful. Remotely operating the microreactor has a great potential to benefit the economics and make it more cost competitive. With remote operations, the operation facility location could be strategically chosen based on factors such as construction costs, workforce size, etc. The benefits of remote operations could be leveraged even more if the remote operation system is semi-autonomous. If the remote operation system is semi-autonomous, more microreactors could be operated and monitored from one remote operation facility. Additionally, with the system handling some tasks for the human operator, it could reduce the number of operating staff necessary for the microreactor. Digital twins can be used to introduce a level of automation to the remote operation system. Digital twins are capable of component monitoring, system operation and control, and predictive performance [1]. All of those features are important for a successful semi-autonomous remote operation system.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Extended Low Load Boiler Operation to Improve Performance and Economics of an Existing Coal Fired Power Plant (Final Report)

The overall goal is to improve the performance and economics of existing coal fired power plants by extending low load boiler operation to lower loads than is currently achievable. The objective of this program is to develop and validate sensor hardware and analytical algorithms to lower plant operating expenses (OPEX) for the currently operating pulverized coal utility boiler fleet. Coal fired utility boilers are increasingly under grid dispatch pressure. In some cases, the coal fired cost of generation is noncompetitive with respect to natural gas generation and subsidized renewable sources. To remain profitable and remain fully compliant with existing environmental regulations, the installed coal fired fleet must find technologies which allow it to move into a more flexible cyclic load dispatch model. Today the installed coal fired utility fleet must be cost of generation competitive, fully emissions compliant, and responsive to the variability inherent in renewable energy generation sources. In the Phase I of the project, GE Steam Power, Inc. (GE) performed modeling of different operating scenarios for low load operation using an existing full plant dynamic model developed for a 660MW steam power plant. Sensors and analytic algorithms to enable a stable and steady coal supply for low load pulverizer operation were identified and tested at the Pulverizer Development Facility (PDF) at GE’s Clean Energy Center in Bloomfield, Connecticut. Sensors and analytic algorithms to enable stable combustion for low load operation were identified and tested at the 15 MWth Industrial Scale Burner facility (ISBF) at GE’s Clean Energy Center. A concept was developed to test the sensors and control algorithms, down selected after testing, at a full-scale coal fired power plant. A budget estimate was then developed, and the concept was implemented at an existing utility power plant. The specific objectives of the experimental work were to: • Identify and select sensors and analytic algorithms for monitoring coal pulverizer operation at lower loads to provide stable operation and appropriate coal fineness at lower coal throughput; Identify and select sensors and analytic algorithms for a Boiler Flame Stability Monitor to better balance air and fuel at each burner. This enables a reduction in a coal boiler’s safe low load power level while maintaining stable flame characteristics; Develop a concept in Phase I for low load operation of a full-scale power plant and develop a budget estimate for testing and execute the test plan at an existing plant in Phase II; Validate the capability of the extended low load boiler system to extend the minimum load operating point in a safe and reliable manner on an existing full-scale utility boiler. At the completion of this experimental study, GE has developed a set of sensors and analytic algorithms, down selected after testing, that have the potential to enable safe low load operation of a utility boiler. GE has also identified a host site for testing these identified sensors and analytic algorithms. GE has generated a full set of deliverables that provide sufficient information to proceed with the next step of testing at a host site. This includes a potential host site and budget estimate for concept testing at host site. In the Phase II of the project, a series of field tests were completed to validate the extended low load boiler operation, which consisted of detailed engineering, installation, commissioning, and testing the additional sensors and analytics for the coal-fired combustion system on an existing full-scale utility boiler. The optimization work has been supported by the host plant and endorsed by their engineering and operation staff.

01 COAL, LIGNITE, AND PEAT↗

ISS Remote User Payload Operations Training and Support

For more than ten years hundreds of payloads have been, and are currently being, successfully operated onboard the ISS. These payloads are operated by a diverse set of users all over the world. Due to the current international economic environment payload operations are being streamlined, in more and more cases, by using the payload investigators and scientists to also fill the role of operators. Taking this into consideration, increasingly, we have payload operators that are new to space operations and practices, therefore ground systems training and support have become a more critical aspect in ensuring a successful payload mission. The ISS ground systems payload interface is the Payload Operations and Integration Center (POIC), located at Marshall Space Flight Center. ISS ground systems training for all remote ISS payload operators, as well as the ISS POIC CADRE, are centralized at this facility. The POIC is the starting point for a remote payload operator to learn how to integrate, and operate their payload, successfully onboard the ISS. Additionally, the CADRE that supports the payload user community are trained and operate from this facility. This paper will give an overview of the ISS ground systems at the POIC, as it relates to the payload user/operator and CADRE community. The entire training process from initial contact with the POIC to in-flight operations will be reviewed and improvements to this process will be presented. More importantly we will present current training methods and proposed methodology whereby the user community will be trained more efficiently and thoroughly. Also, we will discuss how we can more effectively support users in their operations concept to programmatically conduct certain aspects of payload operations to reduce costs.

Roth, Karl↗

Effectiveness of Redundant Communications Systems in Maintaining Operational Control of Small Unmanned Aircraft

NASA has been researching prototype technologies for an Unmanned Aircraft System (UAS) Traffic Management (UTM) system to facilitate enabling of safe and efficient civilian low-altitude airspace and UAS operations, in a series of Technical Capability Levels (TCL) activities that are increasingly complex. In TCL1, completed in 2015, visual line-of-sight operations such as agriculture, firefighting and infrastructure monitoring were addressed with a focus on geofencing and operations scheduling. Technologies and requirements needed for beyond visual line-of-sight (BVLOS) operations in sparsely populated areas were examined in TCL2 in 2016, and those for operations over moderately populated areas in TCL3 in 2017 and 2018. TCL4 will build on the earlier TCLs and focus on technologies and requirements for operations in higher-density urban areas for tasks such as news gathering, package delivery and for managing large-scale contingencies. This paper describes a communications test conducted in TCL3 and discusses insights gained from the test. In the test, operators were directed to equip UAS with redundant Command and Control (C2) communications systems, send a maneuver command to Unmanned Aircraft (UA) via the primary system, then verify execution of the sent command. This exercise was repeated with each redundant system. The test was designed to assess effectiveness of redundant C2 systems in maintaining operational control of UA. Several UAS were configured with varying arrangements to achieve redundancy, including two identical radio modems using the same frequency band, WiFi and Long-Term Evolution (LTE) cellular modems, etc. From the test, digital data such as time maneuver command sent, time maneuver verified, etc., were collected. Descriptions of methods to detect loss of C2 communications and contingency steps for such event were collected and assessed. The final paper will include a detailed analysis of the collected data leading to the following insights. First, effectiveness of redundant C2 systems depends on several factors, such as operational environment and communications service availability. For example, use of two identical point-to-point radio to connect operator and UA on the same frequency band can be effective in mitigating radio malfunction when operating in an environment where possibility of Radio Frequency (RF) interference is low, such as over open plains. However, the same arrangement may not be effective where high level of RF transmissions in broad spectrum ranges can be expected, such as over or near urban areas. For redundant systems that consist of external communications services, such as cellular and satellite communications network, redundancy is maintained only in the areas where more than one services are available. Therefore, UAS operators should have the means to plan for and monitor the performance of external communications services they are relying on to control UA. Second, communications performance needs, such as the minimum data transfer rate and the maximum tolerable latency, should be assessed to reflect the potential hazard that can come from loss of UA control. For example, UA operations over desolate area pose less hazard to people than operations over densely populated area and performance need for the former would be less than the latter.

Jung, Jaewoo↗

Corridor Design and Analysis for UAM Operations

The Urban Air Mobility (UAM) concept is a part of Advanced Air Mobility (AAM), a joint initiative between the Federal Aviation Administration (FAA), NASA, and industry to develop an air transportation system that uses new electric (i.e., green) air vehicles in geographical areas previously underserved by traditional aviation. Market forecast studies predict that there will be demand for alternate modes of air transportation using electric Vertical Take-off and Landing aircraft. UAM expands transportation networks by introducing short flights to move people and goods around metropolitan areas​. UAM is expected to improve mobility for the public, decongest road traffic, reduce trip time, and decrease strain on existing public transportation networks. Various challenges exist to make the introduction of UAM operations successful in the U.S. National Airspace System (NAS). These include but are not limited to integration with existing airports and airspace, provision of air traffic services (e.g., separation), vehicle design and certification, and community acceptance. The focus of this paper is on integration of UAM operations into the NAS via introduction of new airspace structures. UAM will operate within a regulatory, operational, and technical environment that is incorporated into the NAS​. As per the UAM Concept of Operations (ConOps), the FAA retains regulatory authority and is responsible for establishing operational parameters and maintaining oversight. The FAA’s UAM ConOps describes flights at low altitudes (below 5,000 ft) with minimal disruption to established conventional aircraft traffic and limited voice interactions with the Air Traffic Control (ATC). Early stages of UAM may use existing procedures to safely integrate UAM with conventional flights. This would involve flying under Part 91 Visual Flight Rules (VFR) and using voice for communications. The initial UAM ecosystem will utilize the current infrastructure such as routes, helipads, and ATC services, where practicable. ​A NASA study explored the use of existing helicopter routes in Dallas Fort Worth (DFW) airspace for initial UAM operations with a Letter of Agreement (LOA) that included procedures to request a Class B (controlled airspace) clearance. The research showed that the chosen approach was feasible for near-term, low-demand UAM traffic, but was not scalable. The growth of operations in today’s aviation system has resulted in airspace reorganization and procedures to ensure safety and efficiency as traffic rates increase. One proposed operating innovation that can help with the scalability of UAM is establishing routes and corridors. This may look similar to the Area Navigation (RNAV) procedures used today to streamline operations into busy airports. However, instead of FAA automation systems and ATC managing the flow of traffic, some UAM concepts envision a third-party service provider performing this role as part of the Provider of Services for UAM (PSU) network. The FAA’s UAM ConOps posits that new airspace structures such as UAM corridors include the following design criteria: 1) Minimal impact on existing NAS operations, 2) no or minimal additional ATC services, 3) public interest considerations such as noise, safety, and security, and 4) customer needs. The airspace available in urban environments is limited by the height of buildings, the effect of weather including wind gusts, privacy needs, and a clearance envelope. The new airspace structure would need to be designed around large airports and urban areas where the initial market demand is likely to exist. NASA has started evaluating airspace in the Dallas Fort Worth area to design new airspace structures, keeping the first two design criteria in mind. It is assumed that there will be an on-board pilot-in-command, and the flights will operate under VFR in Visual Meteorological Conditions. Corridors will be required in controlled airspace, whereas UAM operations can fly in uncontrolled Class G and E airspace using current day rules. Keeler et. al identified factors and heuristics for development of routes for UAM operations for integration with airspace close to large airports such as Dallas Fort Worth and Dallas Love Field. This paper describes the heuristics applied to define the corridors, analyzes them with respect to legacy traffic and presents key results.

Urban Air Mobility↗

“Just Do It” Mission Operations Training in a COVID World

“No”- “not”- “can’t do it” – these words don’t fly in M2020 Mission Operations. The M2020 Surface Mission Operations Team trained for landing the Perseverance Rover under COVID-19 remote work/mandatory stay-at-home conditions. Training activities included presenting Flight Schools to the team via video conferencing, training COVID personal safety requirements to on-premises staff, and constantly updating and communicating COVID restrictions to the team as safety requirements changed. This paper explores the impact of COVID on the Mission System Training for M2020 Mission Operations. The layers of COVID, aptly named the “COVID Tax” by team management, affected project roles, communications, personnel interactions, operations facility usage and training exercises practiced by the team. Flight Schools and Operational Readiness Tests (ORTs) are driving forces behind the surface mission operations training. These activities work hand-in-hand to prepare the team for landing day, surface operations that transition from cruise to nominal operations, and nominal operations. Under normal training conditions, Flight Schools and ORTs are only concerned with tactical operations for the Uplink (Command) Downlink (Analysis) and Campaign Implementation (Planning) Teams of scientists and system engineers. Due to COVID, and the necessity to maintain physical distance between people, training for the landing team needed to include the new category of COVID personal safety. COVID also necessitated remote teams and video conferencing of the entirety of Flight Schools. This reliance on distance learning had not been done on previous missions. We will explore the advantages and disadvantages of video conferencing as a training platform; training effectiveness in communicating and practicing the multiple changes to the COVID safety protocols; and the timing in which we received and responded to COVID directives. Additionally, this paper will review the practical measures taken by the on-premises team and how the team adapted during the readiness tests, landing, and early mission operations, as well as how the team responded to the post-vaccine ramping down of COVID Protocols. The M2020 Surface Mission Operations Team responded very well to the challenges of COVID. All pre-landing operational and COVID-related training was completed. Post-landing COVID Training was provided as needed to new on-premises personnel. Training presented on COVID for the first operational readiness test (ORT) consisted of 2.5 hours of training. Each ORT had COVID Training. A person who had participated in all of the ORTs from September 2020 – February 2021 would have received over 7 hours of COVID Training. By ORT-12 (approximately 8 weeks after the first ORT), the Training team consolidated the original COVID training to a one-hour COVID Basic Training course, with additional recommended training. The Basic training course was updated after landing, as vaccines became available. COVID Training had multiple Flight Schools in the self-directed Blackboard Learning system, as well as a Quick Reference Wiki for Onboarding of new on-premises personnel and keeping on-premises personnel up-to-date. COVID Training covered many topics including practical methods of 6-foot distancing, how to interact with an IT professional when help was needed at a workstation, and challenging indoor meal-eating protocols. COVID Training continued to be updated, as the lab and the project respond to the virus variants and federal, state and local ordinances.

Rosette, Theresa↗

Viper Science Operations: Lunar Dynamic Science Table and ‘Tracker’ Tool.

Introduction: The NASA VIPER lunar rover mission [1] presents a unique operational paradigm within the history of robotic spaceflight. The proximity of the Moon to the Earth and the terrain elements (surface characteristics, light/shadow dynamics, communication links) of the Lunar South Polar landing site create unprecedented operational conditions between these two planetary bodies. Apollo era lunar science and exploration included humans in situ to operate instruments and assimilate observational inputs in real-time. Previous lunar orbital missions have worked to operational timescales, e.g., decisional timelines and communication exchanges, that were weeks in duration. Mars rover missions have worked to operational timescales, e.g., decisional timelines and communication exchanges between Mars and Earth, that were hours, days, and weeks in length. In the case of the VIPER mission, our operational decisioning for rover driving and instrument commanding will be compressed to minute-scale timeframes. These operational conditions will directly impact the workflow and speed with which the VIPER Science Team (VST) will be required to synthesize and analyze data and produce timely science-driven decisions throughout surface mission operations [2]. The VST in the VIPER Mission Science Center (MSC) and the Mission Operations Center (MOC) shall provide mission-enhancing scientific input to guide traverse planning and drill site confirmation/selection throughout surface operations. Further, the VST input will be of vital importance to the mission’s ability to maximize science return and to meet broader NASA objectives for future lunar ISRU and exploration activities. Specifically, the VST in the MSC and MOC will provide science-driven, consensus-based, timely input and decision-making to enhance mission operations and align mission science return with broader Agency goals. They will enable the characterization of the distribution (lateral and vertical extent, concentration, variability), form (chemical/physical state of these reservoirs of lunar water and key isotopes), and context (e.g., accessibility/overburden, environment, soil mechanics, trafficability, and temperatures) of lunar polar volatiles and water content for the VIPER mission. Additionally, the MSC will be selecting or reconfirming the location and path towards and from the third drill site (Drill Site Charlie) within each Science Station [6]. To enable scientific decision-making within the operational paradigm of the VIPER lunar rover mission requires detailed articulation of the VST’s scientific objectives and goals, and the operationalization of these objectives and goals through their association with specific data products, tasks, and decisional procedures. Further, defining and tracking scientific success metrics throughout surface operations will enable the VST to have a quantified understanding of the mission’s evolving ability to accomplish the stated scientific objectives and goals both during and after the mission. This abstract provides an overview of the methods and development activities towards defining, operationalizing, and tracking scientific objectives and goals throughout VIPER surface operations. Specifically, we focus on the VIPER Lunar Dynamic Science Table (LDST) and the VIPER “Tracker” tool.

Darlene Sze Shien Lim↗

Evaluation of Initial and Mid-Term Air Traffic Procedures for Urban Air Mobility Operations

Urban air mobility (UAM) operations are expected to expand in scale over the next several years as novel aircraft types, including electric vertical takeoff and landing aircraft, are certified and begin operations. These new aircraft may increase safety, decrease noise, and lower operating costs compared with helicopters, allowing them to operate in ways existing aircraft do not. It is vital that these expanded operations are compatible with and do not disrupt existing operations or the air traffic management system. To study the ways in which scaled UAM operations can best integrate in the national airspace system, NASA and Joby Aviation partnered to conduct a high-fidelity air traffic controller-in-the-loop study. Building on air traffic procedures used to manage high tempo operations in other parts of the airspace, new procedures, routes, and communications protocols were developed and tested by retired controllers in NASA’s Future Flight Central tower simulation facility. In addition, new cooperative airspace constructs in the form of corridors were developed to understand their potential contributions to even greater scales of operation. The controllers managed traffic scenarios in the Dallas-Fort Worth and Dallas Love Field airports consisting of fleets of up to 100 UAM aircraft operating alongside traditional traffic . Metrics for air traffic controller workload, duration of communications, departure delays, and other measures of allowable aircraft throughput were collected. The analysis indicates that using today’s procedures for initial UAM operations under nominal conditions could enable up to 40 operations per hour to an airport’s central terminal area if that involved crossing a runway and up to 55operations per hour if reaching the central terminal did not involve crossing a runway. Operations at these tempos did not delay or otherwise interfere with simulated runway traffic and were rated acceptable by the air traffic controllers. The new corridor constructs dramatically lowered controller workload in certain circumstances, suggesting they may be effective in further increasing the allowable scale of operations.

Urban Air Mobility↗

Evaluating OpenSHMEM Explicit Remote Memory Access Operations and Merged Requests

The OpenSHMEM Library Specification has evolved consid- erably since version 1.0. Recently, non-blocking implicit Remote Memory Access (RMA) operations were introduced in OpenSHMEM 1.3. These provide a way to achieve better overlap between communication and computation. However, the implicit non-blocking operations do not pro- vide a separate handle to track and complete the individual RMA opera- tions. They are guaranteed to be completed after either a shmem quiet(), shmem barrier() or a shmem barrier all() is called. These are global com- pletion and synchronization operations. Though this semantic is expected to achieve a higher message rate for the applications, the drawback is that it does not allow fine-grained control over the completion of RMA operations. In this paper, first, we introduce non-blocking RMA operations with requests, where each operation has an explicit request to track and com- plete the operation. Second, we introduce interfaces to merge multiple requests into a single request handle. The merged request tracks multiple user-selected RMA operations, which provides the flexibility of tracking related communication operations with one request handle. Lastly, we explore the implications in terms of performance, productivity, usability and the possibility of defining different patterns of communication via merging of requests. Our experimental results show that a well designed and implemented OpenSHMEM stack can hide the overhead of allocating and managing the requests. The latency of RMA operations with requests is similar to blocking and implicit non-blocking RMA operations. We test our implementation with the Scalable Synthetic Compact Applications (SSCA #1) benchmark and observe that using RMA operations with requests and merging of these requests outperform the implementation using blocking RMA operations and implicit non-blocking operations by 49% and 74% respectively.

Boehm, Swen↗

Hydropower Operations in the Colorado River Basin: Institutional Analysis of Opportunities and Constraints

The Colorado River Basin is facing an unprecedented drought. In ongoing drought management efforts, limited attention has been paid to hydropower generation. While some studies do exist on hydropower, they are quantitative in nature and focus on calculating the reduction in megawatts generated at dams in the Basin with declining water availability. These studies simplify the complex process of hydropower generation; water availability is but one factor that impacts hydropower generation. At a more fundamental level, formal institutional arrangements, that is, laws, policies, and rules create the framework within which dams are operated and hydropower is generated. This paper conducts a comparative institutional analysis of water, environment, and energy laws and policies and changes therein to understand the constraints and opportunities faced by hydropower generation in the Colorado River Basin. To tease out the nuances in how institutional arrangements affect dam operations and hydropower generation, the comparative analysis focuses on the two largest and strategically important dams in the Basin: Hoover and Glen Canyon. This paper uses Elinor Ostrom’s Institutional Analysis and Development Framework to analyze laws and policies at three levels: constitutional-choice, collective-choice, and operational levels. Constitutional-choice level laws and policies apply to the entire Basin, whereas collective-choice level and operational level laws and policies are dam specific. Hoover and Glen Canyon Dams face similar biophysical challenges by the virtue of their location in the same river basin. Yet, despite the similarity in the biophysical setting, the analysis in this study finds that the differences in the applicability of constitutional-choice level laws along with the differences in dam specific collective-choice and operational level institutional arrangements produce a distinct set of constraints for hydropower generation at Hoover and Glen Canyon Dams. Even without a drought, water and environmental laws at both the constitutionalchoice and collective-choice levels as well as power contracts constrain hydropower generation and limit the flexibility with which Glen Canyon Dam can be operated. Water and environmental laws also impose specific water release requirements that, at times, require off-peak power generation at Glen Canyon Dam. On the other hand, even with a drought, Hoover Dam faces limited hydropower generation constraints and can operate flexibly. This is because constitutional-choice level laws and dam-specific collective-choice and operational level laws pose limited constraints for flexible daily operations at Hoover. The result is that Hoover Dam can generate hydropower at the same level as it did three decades ago and operate flexibly to provide ancillary services and peaking generation. While water and environmental laws and policies pose constraints for hydropower generation, the analysis in this study further finds that specific historic provisions within energyrelated institutional arrangements and recent changes within power contracts have maintained and even enhanced the value of hydropower to power customers. Historic institutional provisions ensure that hydropower is sold ‘at cost’ making this resource economically competitive with wholesale electricity market rates. Recent power contract modifications have resulted in the amendment of an older resale prohibition clause to expand the flexibility available to power customers in using their capacity and/or energy allocation in RTOs, ISOs, and bulk power markets. This amendment has opened up an opportunity for customers, especially Hoover power customers, to use flexible generation and ancillary services in a market environment. In addition, the extension of power contract duration to the legally maximum term has enhanced the reliability and stability of this resource for customers. In the Colorado River Basin, despite the enduring economic responsibility of power customers—where laws require customers to pay for a large portion of construction and O&M costs whether or not they actually receive hydropower— the persistent threat of a drought-induced water shortage, and constraints imposed by water and environmental laws and policies, power customers continue to invest in this resource as energy-related institutional arrangements and power contract provisions protect the reasons why they value hydropower. Lastly, the analysis in this study finds that the consequences of changes in hydropower generation for energy users, irrigators, and environmental programs in the Basin depend on how specific institutional arrangements tie electricity revenues to irrigation aid and environmental programs, and how the power contracts themselves are set up. Collective-choice level institutional arrangements create a higher level of financial dependency of irrigation aid and environmental programs on electricity revenues in the Upper Basin—the legal subdivision of Colorado River where Glen Canyon Dam is located—compared to the Lower Basin—the legal subdivision of Colorado River where Hoover Dam is located. Therefore, changes in hydropower generation or the way its revenue is collected and used will have far reacting detrimental consequences for the Upper Basin. Likewise, differences in the nature of power contracts for Glen Canyon and Hoover Dams also creates differences in the financial impact incurred by energy users when there is a reduction in hydropower generation. While this study identifies the types of impacts on resource users as a result of specific institutional arrangements, the calculation of extent of impact warrants further attention. Hydropower in the United States is in a unique position today. The strategic importance of this resource for the nation’s electricity sector is rapidly growing even as its contribution to overall electricity generation remains fairly small. This strategic importance, however, is built hydropower’s ability to operate flexibly in order to support the integration of intermittent renewable generating sources and the expansion of electricity markets. As this study shows, such flexibility may not be available at certain plants not due to the lack of water availability but because of institutional constraints. Institutional arrangements may also require dam operators to first consider high priority water uses (such as irrigation or environmental needs), which in turn may limit the ability to generate hydropower when it is most valuable or useful. Engineering and quantitative models, such as production cost models, recognize policy constraints for hydropower operations but often inadequately capture or assume away such constraints in the models. A failure to account for policy constraints in these models runs the risk of inaccurate representation of the operational flexibility and capacity available at specific hydropower plants, which can result in over/underestimation of hydropower’s ability to support the integration of variable renewable resources and address grid reliability concerns. Against this background, this paper and the analysis herein serves as an example of how we can systematically identify institutional constraints (and opportunities) that influence the flexibility in not only generating electricity at specific dams but also using this hydropower once it is generated.

13 HYDRO ENERGY↗

Work Domain Analysis of a Predecessor Sodium-Cooled Reactor as Baseline for AdvSMR Operational Concepts

This report presents the results of the Work Domain Analysis for the Experimental Breeder Reactor (EBR-II). This is part of the phase of the research designed to incorporate Cognitive Work Analysis in the development of a framework for the formalization of an Operational Concept (OpsCon) for Advanced Small Modular Reactors (AdvSMRs). For a new AdvSMR design, information obtained through Cognitive Work Analysis, combined with human performance criteria, can and should be used in during the operational phase of a plant to assess the crew performance aspects associated with identified AdvSMR operational concepts. The main objective of this phase was to develop an analytical and descriptive framework that will help systems and human factors engineers to understand the design and operational requirements of the emerging generation of small, advanced, multi-modular reactors. Using EBR-II as a predecessor to emerging sodium-cooled reactor designs required the application of a method suitable to the structured and systematic analysis of the plant to assist in identifying key features of the work associated with it and to clarify the operational and other constraints. The analysis included the identification and description of operating scenarios that were considered characteristic of this type of nuclear power plant. This is an invaluable aspect of Operational Concept development since it typically reveals aspects of future plant configurations that will have an impact on operations. These include, for example, the effect of core design, different coolants, reactor-to-power conversion unit ratios, modular plant layout, modular versus central control rooms, plant siting, and many more. Multi-modular plants in particular are expected to have a significant impact on overall OpsCon in general, and human performance in particular. To support unconventional modes of operation, the modern control room of a multi-module plant would typically require advanced HSIs that would provide sophisticated operational information visualization, coupled with adaptive automation schemes and operator support systems to reduce complexity. These all have to be mapped at some point to human performance requirements. The EBR-II results will be used as a baseline that will be extrapolated in the extended Cognitive Work Analysis phase to the analysis of a selected advanced sodium-cooled SMR design as a way to establish non-conventional operational concepts. The Work Domain Analysis results achieved during this phase have not only established an organizing and analytical framework for describing existing sociotechnical systems, but have also indicated that the method is particularly suited to the analysis of prospective and immature designs. The results of the EBR-II Work Domain Analysis have indicated that the methodology is scientifically sound and generalizable to any operating environment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Multi-Operator Multi-UAV (MOMU) Control: Exploring the Influence of Sensor Tools and Playbook Task Delegation

New concepts of operations for Unmanned Aerial Vehicles (UAVs) will require a change from the current 2:1 operator to vehicle crew configuration. One particular control paradigm, largely driven by logistics, manpower, and training burdens, as well as the desire to force multiply, involves a single operator simultaneously managing multiple UAVs. This mode of operations has shown to significantly increase cognitive workload and decrease situation awareness, as operators are required to simultaneously attend to multiple sources of information. One potential way to mitigate potential drawbacks of multi-vehicle control by a single operator is to migrate to a multi-operator multi-UAV (MOMU) crew configuration, whereby M operators control N (> M) vehicles. This type of crew configuration can be organized in several ways to dynamically manage cognitive workload, match operator qualifications and skills to mission requirements, increase utilization of available assets, and thereby achieve maximum force multiplication. The present experiment examined task performance in a simulated MOMU environment and evaluated the potential benefits of sensor management aids ("Tools") as well as integrated sensor and flight automation ("Plays") compared to a fully manual condition ("Manual"). Tools support the operator by facilitating rapid understanding and management of sensor information, while the Plays support the operator by offloading/automating subtasks. Six pairs of participants were recruited for this study and tasked with sharing a pool of UAVs in order to conduct reconnaissance, surveillance, and target acquisition (RSTA) missions in adjacent Areas of Operation (AOs). Participants were given four tasks to accomplish, in order of priority: 1) prosecute High Value Targets (HVTs); 2) identify / track targets (military vehicles); 3) identify / mark civilian vehicles; and 4) respond to chat messages. Performance on the mission tasks was measured in terms of accuracy and reaction time. A composite mission score was also calculated using a payoff matrix that weighted each task according to priority. The results indicate that Playbook demonstrated better performance overall with higher accuracy rates and the highest composite score compared to Tools and Manual. The implications of these results to supporting future MOMU concepts of operations is discussed.

Playbook↗

Study of Seamless Microgrid Transition Operation Using Grid-Forming Inverters

This paper investigates operational techniques to achieve seamless (smooth) microgrid (MG) transitions by dispatching a grid-forming (GFM) inverter. In traditional approaches, the GFM inverter must switch between grid-following (GFL) and GFM control modes during MG transition operation. Today's inverter technology allows GFM inverters to always operate in GFM control mode, so it is worth exploring how to use them to achieve smooth MG transition operation. This paper proposes three operational techniques: a traditional scheme of switching between GFL and GFM control; a new scheme of consistent GFM control and shifting the droop intercept up before islanding operation; and a new scheme of consistent GFM control and shifting the droop intercept up before synchronization operation. A full hardware setup is established to compare the three techniques and showcase their implementations in real-world applications. The results show that the third technique outperforms the others and exhibits the best transition performance because the GFM inverter maintains the same operating points during the transition operation. Therefore, we conclude that ensuring smooth MG transition operation requires that the GFM inverter(s) maintain the same operating points (v, f, P, Q, and phase angle) during the transition operation in addition to minimizes the point of common coupling power flow.

grid-forming control↗

ISS Payload Operations Training During the COVID-19 Pandemic: Impacts and Solutions

Introduction: The onset and the protracted duration of the COVID-19 pandemic brought a dramatic and rapid transformation to almost every aspect of humanity in 2020. The world’s space agencies and their missions were not immune to the unpredictable and wide-sweeping changes. One discipline principally affected was mission operations and the various groups supporting that critical function. Mission support teams, especially for complex and crewed missions like the International Space Station (ISS) were forced to rapidly rethink how and where control center staff performed their vital work. Operations training – an essential element to mission ops, had unique hurdles to overcome. Operations training is responsible for preparing astronaut crews for their scientific missions, providing recurring proficiency and currency material to flight controllers, as well as ensuring new team members are ready to join their colleagues on console. Every element of training was impacted by COVID restrictions. From orientation and introductory classes for new controllers, training for scientists and payload developers, to simulations and advanced lessons, critical On the Job Training (OJT) and final evaluations; all aspects faced new challenges. Operations trainers at NASA’s Marshall Space Flight Center (MSFC) in Huntsville, Alabama, were forced to rethink, retool, and become more efficient with trainees and training resources in order to continue supporting payload operations on the ISS. Impacts and Barriers to Operations Training: The pandemic started in the United States in early March 2020. Immediately, NASA mandated that the support for ISS real-time operations was critical. As a result, physical access to the ISS Payload Operations Center was restricted to only those people supporting console operations. Thus, use of on-site NASA facilities and any trainer to trainee face-to-face interaction was not authorized. Trainers and trainees had to quickly shift to 100% remote learning. In the short term, this was not a problem since NASA had already prepared Information Technology (IT) resources that facilitated remote access to mission resources like classes, documents and teleconferences. However, instructors quickly discovered the classes that they were accustomed to delivering in a large classroom environment did not translate well to remote teaching. The lack of non-verbal communication with the class became a major barrier to instruction. Another significant hurdle to operations training was the mandate that all simulations could only be held remotely. The logistics of planning and executing even small simulations proved to be challenging, almost impossible, due to IT technology and public internet limitations. With simulations essentially stopped, as well as the restrictions on most OJT training, trainees were essentially stopped in their advancement towards certification. An additional barrier that had to be overcome was the formal documentation of the curriculum objectives. Even though NASA had been deliberately transitioning to electronic documents for years, some organizations were still relying on “pen and ink” documents to formalize training completion. The logistics of implementing secure and controlled e-signature documents in a standardized, NASA approved format had to be addressed. Lesson Learned and Efficiencies: Once the various limitations were identified, ISS trainers at MSFC discussed, proposed, and prioritized new options and techniques. Transitioning to all electronic learning materials and certifications was a relevantly easy fix. Teaching courses to large and diverse groups took additional shifts in the NASA training paradigm. Likewise, methods and procedures for preparing astronauts for their missions were forced to be revised. Simulation supervisors and their teams were also forced to find more efficient techniques to provide realistic training experience. Communication and approvals from management was essential. In every case, the ISS payload operations instructors found novel and efficient solutions to all functions listed above. This paper will discuss the factors and solutions payloads operations trainers found to keep scientific research on the ISS flying forward to mission success.

ISS Operations↗

Study of Seamless Microgrid Transition Operation Using Grid-Forming Inverters

This paper investigates operational techniques to achieve seamless (smooth) microgrid (MG) transitions by dispatching a grid-forming (GFM) inverter. In traditional approaches, the GFM inverter must switch between grid-following (GFL) and GFM control modes during MG transition operation. Today's inverter technology allows GFM inverters to always operate in GFM control mode, so it is worth exploring how to use them to achieve smooth MG transition operation. This paper proposes three operational techniques: a traditional scheme of switching between GFL and GFM control; a new scheme of consistent GFM control and shifting the droop intercept up before islanding operation; and a new scheme of consistent GFM control and shifting the droop intercept up before synchronization operation. A full hardware setup is established to compare the three techniques and showcase their implementations in real-world applications. The results show that the third technique outperforms the others and exhibits the best transition performance because the GFM inverter maintains the same operating points during the transition operation. Therefore, we conclude that ensuring smooth MG transition operation requires that the GFM inverter(s) maintain the same operating points (v, f, P, Q, and phase angle) during the transition operation in addition to minimizes the point of common coupling power flow.

grid-forming↗

Thermally Conductive Backsheets (TCB) for Reduced Operating Temperatures

The performance of photovoltaic (PV) modules is primarily influenced by the plane of array (POA) irradiance and their operating temperature. The lower the module operating temperature, the higher is its performance. Increasing a module’s operating temperature reduces its power output due to an increase in the semiconductor’s intrinsic carrier density, leading to a reduction in the open-circuit voltage and, subsequently, reducing the maximum power point voltage. Reducing the operating temperature lowers the levelized cost of energy (LCOE) via increased energy production (i.e., more kilowatt hour over the life of the asset) and increased service lifetime (years in the field). The module operating temperature is dictated by the weather parameters and the thermal properties of module construction materials. The primary weather parameters influencing the PV module temperature are: the ambient temperature (directly related), irradiance (directly related), and wind speed (inversely related). The primary thermal properties of module construction materials influencing the PV module temperature are: the optical transmissivity and thermal conductivity of superstrate, the thermal conductivity of substrate, the thermal conductivity of encapsulant and the efficiency of the encapsulated solar cells. The primary goal of this study is to reduce the operating temperature of PV modules using thermally conductive backsheet (TCB) substrates developed by the industry. The temperature of PV modules installed in a large multi-MW plant can also be influenced by their physical locations in the plants due to the influence of wind direction. A thermal mapping of PV plants has also been investigated and presented in this study. The most commonly used PV backsheet material has been polyvinyl fluoride (DuPont trade name “Tedlar”)-based backsheet, which typically has three layers: Tedlar–polyethylene terephthalate (PET)–Tedlar (TPT). The primary goal of this project is to reduce the module operating temperature below the benchmark TPT backsheet temperature using newly developed TCBs by the industry. The overall approach of this project involves six focus areas: i) select and procure one TPT and thirteen promising TCBs available in the industry; ii) construct a large number of 1-cell and 9-cell modules using benchmark TPT and selected TCBs [all other construction materials are fixed and they are: glass superstrate, EVA encapsulant, mono-Si cell and junction box]; iii) to identify best performing TCBs, monitor the long-term field operating temperatures of the constructed modules which are installed in three climatic conditions (hot-low wind [Mesa, AZ], hot-high wind [Maricopa County, AZ] and temperate [Cumberland County, NC]; iv) to identify the most durable TCB, perform extended accelerated reliability testing of modules constructed with best three TCBs and benchmark TPT; v) to predict module temperature, develop physical and empirical thermal models with and without thermal properties of all construction materials in the modules, respectively; and vi) to determine the influence of wind speed and direction on the module operating temperature in a plant, and perform thermal mapping of PV modules in two large PV plants [Maricopa County, AZ and Cumberland County, NC]. The key achievements of this project are listed below: Backsheet selection: 14 backsheets were procured after an extensive literature and industry search. Finally, based on the thermal and other selection criteria, 1 TPT and 4 thermally conductive backsheets were selected for this project. Fabrication of mini modules: 50 one-cell modules were fabricated in year 1 for thermal performance evaluation. The module design was changed to nine-cell module at start of year 2 to mimic commercial design. 20 nine-cell modules were fabricated in year 2 for thermal performance evaluation. 28 four-cell modules were fabricated in year 3 for accelerated stress-testing. Thermal conductivity of backsheets: Year 1 TCBs showed at least 8% higher thermal conductivities than TPT. Year 2 and 3 TCBs showed at least 20% higher thermal conductivities than TPT. Installation of mini PV modules at three sites: 6 one-cell modules and 8 nine-cell modules were installed at AZ-1 site [Mesa, AZ]. 12 one-cell modules and 6 nine-cell modules were installed at each of two powerplants (AZ-2 [Maricopa County, AZ] and NC sites). Nominal operating cell temperatures (NOCT) of mini PV modules: NOCT of TCBs were observed to be lower than TPT with differences as high as 2°C. Comparison of thermal performance: The median operating temperature of one-cell modules was found to be reduced by 2°C by using TCB_A modules compared to TPT modules on several days in a month for few months in a year. The median temperature improvement of 4oC was achieved at several instances on a few days, but not all days, in a year using multiple TCBs compared to TPT. The final project milestone of achieving median temperature improvement of 5oC was achieved at several instances on a few days, but not all days, in a year using TCB_A compared to TPT. Empirical thermal model (without the need of construction material properties): Empirical thermal model for one-cell module was developed based on the input data of irradiance, wind speed and ambient temperatures. The primary input data differentiator for temperature differences between TPT and TCBs appears to be the irradiance level (solar gain). Accelerated durability testing: 20 four-cell modules using 4 backsheets (1 TPT and 3 TCBs) were exposed to Damp Heat 1000 hours (8 modules), UV/Thermal cycling (50 cycles)/Humidity freeze (10 cycles) test sequence (8 modules) and UV Weathering for qualification (8 modules). All the modules with four selected backsheets passed the stress tests per the retest guidelines of IEC 61215 standard for the backsheet change. Simplified comparative LCOE analysis: Using backsheet-specific power degradation levels in the accelerated tests (for TCB_A and TPT only), efficiency, service lifetime and assuming same cost for all backsheets, the LCOE of modules using TCB_A is determined to be lower than TPT. Due to lower operating temperature of TCB_A-based modules compared to TPT-based modules, the operating efficiency and service life of TCB_A-based modules are calculated to be higher than TPT-based modules. Temperature mapping of PV power plants: A distinct temperature difference (as high as 4°C) has been observed between the modules located in various parts of a single PV plant.

14 SOLAR ENERGY↗

Intelligent Process Visualization through Nuclear Operation Process Modeling, Reasoning, and Object Detection from Field Videos (Final Report)

This report is a deliverable for the “Final Report” task of DOE NEET Project 19-16790, "Context-Aware Safety Information Display for Nuclear Field Workers." This project's overall goal is to test the hypothesis that integrating computer vision and process reasoning methods will enable proactive visualization of the safe operation and maintenance processes of Nuclear Power Plants (NPP) for field workers. Augmented Reality (AR) glasses adopting such proactive safety information visualization techniques can significantly increase personnel safety and reduce the NPP’s operating costs. The current practice of monitoring NPPs requires workers to switch between digital models, data, and physical workspaces in identifying relevant but potentially occluded objects and in assessing the risks of operation and maintenance processes. On the other hand, frequently changed field conditions require field workers to report to supervisors for real-time guidance. Such guidance is essential to ensure that changing conditions will not invalidate or endanger the work order and other ongoing processes that may jeopardize NPP operations. Additionally, incorrect recognition of equipment objects can result in communication errors and safety problems. AR techniques can assist engineers in viewing the physical workspaces with objects labeled with detailed operation procedures and safety reminders during field operations. The project team developed an “Intelligent Context-Aware Safety Information Display” (ICAD) for supporting Nuclear Power Plant (NPP) field workers in achieving safe and efficient execution of a series of operational tasks in uncertain and changing workspaces of an NPP. Before designing the ICAD-AR prototype, the project team synthesized NPP operational knowledge models through literature review studies, surveys, interviews with domain experts, and knowledge modeling. The project team conducted an extensive study of the operational procedures of various NPPs, and digital technologies that can support the safe and efficient execution of those procedures in different NPP operational contexts. This literature review helped the project team conduct surveys and interviews with nuclear engineers and field workers to identify three categories of information. The NPP knowledge modeling efforts reveal that the three categories of information identified have different levels of importance in a typical procedure of carrying out a series of tasks to achieve a specific NPP operation goal (e.g., shutdown, mode changes). These three categories of information include 1) Workspace dynamics – the changing spatial arrangements of workspaces, tools, protection equipment, and supporting materials, 2) Workflow prognostics – the dynamic dependencies between different parts of an NPP that functionally support and influence each other in terms of safety and efficiency, and 3) Hazards – objects and spaces that contain hazardous materials or physical conditions that can pose risks to workers or mechanical systems. The project team has profiled the importance levels of these categories of information into a knowledge model. This knowledge model specifies what types of information are more critical for a given task in a given workspace so that computers can automatically identify critical objects and sensors in a scene for delivering context-ware safety information to field workers through AR devices. Significant research development of this project results in technical research outcomes and a prototyping system that illustrates the technical feasibility of establishing an ICAD-AR system supporting the proactive safety information display for nuclear field workers. This final report summarizes the project team’s technological achievements in the past three years. Overall, the project team completed the development and integration of five techniques into a prototype ICAD Augmented Reality (ICAD-AR) system and demonstrated the developed system’s real-time execution in a mechanical room. The project team completed the analysis of using this prototype in other types of workspaces based on 3D image data and digital design models collected from two additional workspaces (a water treatment plant and a flow loop training facility). The integrated techniques include 1) Natural Language Processing (NLP) algorithms supporting the generation and updates of nuclear fieldwork process models based on text analysis of work packages and operation manuals; 2) sensor log analysis for predicting control actions in given sensor reading contexts; 3) computer vision algorithms for automatic localization and navigation of workers; 4) object detection algorithms for identifying task-related objects and correlated sensors for safety checking; 5) AR technique as a platform for supporting the integration. The testing results of these five techniques have shown that 1) the sensor log analysis model can predict the next control action with an accuracy of 0.883; 2) the trained natural language processing model can extract more than 80% of the critical information from paper-based procedures (PBPs); 3) the navigation algorithm with the integration of Visual Inertial Odometry (VIO) and Non-Recursive Bayesian Filter methods make operator’s trajectory estimation resilient to drift error; 4) the computer vision algorithm can detect task-specific and safety-critical objects with an average accuracy of 95.3%. The project team used work procedures collected from a flow loop training facility and two datasets collected from two mechanical rooms simulating the workspaces of NPPs to demonstrate the technical capabilities of the developed ICAD-AR prototype. The demonstration validated the technical feasibility of establishing the ICAD-AR system for nuclear field workers and identified the challenges in 1) automatic text analysis of work packages; 2) use of limited samples of sensor logs for predicting the proper timings of control actions; 3) reliably tracking workers and their task progress in mechanical rooms with many similar objects.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗