History and Logic Model NASA Goddard Space Flight Center Instrument and Payload Systems Engineering Technical Performance Study

Historically, some NASA missions have exceeded schedule and cost commitments. Studies suggest technical performance is a contributor. The 1980 NASA Project Management Study concluded, "one of the most significant contributors to cost and schedule growth is inadequate definition of technical and management aspects of a program..." (as cited in GAO/NSIAD-93-97, p. 11). The 1991 NASA Roles and Missions Report identified a "need for increased emphasis on technological readiness and requirements on the front end of a program" (as cited in GAO/NSIAD-93-97, p. 11). The 1992 NASA Program Costs Report stated that NASA officials identified, among other things, "insufficient definition studies... [and] program redesigns and technical complexities" as reasons for cost and schedule overruns (GAO/NSAID-93-97, p. 11). The 2002 Task Force on Acquisition of National Security Space Programs found "requirements definition and control issues, unhealthy cost bias in proposal evaluation, widespread lack of budget reserves required to implement high risk programs on schedule, and an overall underappreciation of the importance of appropriately staffed and trained system engineering staff to manage the technologically demanding and unique aspects of space programs" (DoD, 2003, p.i.) In 2007, The NASA Office of the Chief Engineer chartered the NASA Instrument Capability Study (NICS) “to determine whether NASA instrument developers are facing challenges that impact the capability to design and build quality instruments or whether there are flaws in the acquisition strategy evidenced by schedule delays, cost overruns, and increased technical risk via design deficiencies. The... team was also chartered to determine if occurrences [are]... isolated cases or if there are generic issues... If the issues [are] found to be generic, the team [is] to offer solutions to recover such capability" (NICS Report, 2008, p. vi). The 2008 NICS Report, led by Goddard Space Flight Center (GSFC), identified challenges to instrument technical performance consistent with findings from previous reports. In 2017, the Instrument Project Division (IPD) Implementation Study was initiated to determine if there was a change in meeting schedule and cost commitments after implementing certain NICS recommendations. In 2018, the Instrument Technical Performance Study was initiated to determine the current state of Instrument Technical Performance in the GSFC Payload & Instrument Systems Engineering Branch. The purpose of the combined studies is to answer the question, "Is there a relationship between meeting NASA scientific instrument technical success and meeting schedule and cost commitments? If yes, what is the relationship?" References Department of Defense Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics. (2003). The report of the defense science board/ air force scientific advisory board joint task force on acquisition of national security space programs. Washington DC. Government Accounting Office. (1992). NASA program costs: Space missions require substantially more funding than initially estimated. GAO/NSIAD-93-97. Washington DC. National Aeronautics and Space Administration, National Oceanic and Atmospheric Agency, Department of Defense. (2008). The NASA instrument capability study final report. NP-2008-11-058-GSFC. Washington DC.

Robbins, Geraldine↗

Development of New Lunar Highland Regolith Simulant, NUW-LHT-5M

Introduction: NASA has a need for large quantities of lunar simulants that closely match future manned lunar missions at landing sites near the Lunar South Pole. The current simulant was designed to approximate NU-LHT-2M, and -4M, except using natural minerals and a fully synthetic, non-basaltic, high calcium glass. Washington Mills in Niagara Falls, NY was contracted to produce this new simulant due to their electric arc furnace (EAF) fusion technology and capabilities for crushing and sizing ceramics. The primary objectives of this work were: (1) to create a commercially produced simulant that contains a high fidelity, high calcium (An90+), low Mg/Fe glass without basaltic constituents; (2) to create a simulant that uses existing, terrestrially mined, and readily available minerals blended with a synthetic glass, and (3) accomplish objectives (1) and (2) using conventional processing methods capable of production levels that can meet substantial current and future demands of NASA projects. Another consideration was that highland simulants closest to meeting these requirements, NU-LHT-2M and -4M types, are out of production and largely out of stock. Design: The design chosen for development and production for this work is NU-LHT-2M, de-signed by Doug Stoeser and Douglas Rickman, which uses Stillwater anorthosite and norite rocks and synthetic glass. The composition targeted the average composition, glass content and particle size distribution of Apollo 16 samples [1]. The design utilizes two Stillwater minerals, anorthosite (37.7 wt.%), norite (17.6 wt.%), a commercially sourced olivine (4.7 wt.%), and a synthetic glass (40 wt.%). Processing: Stillwater rocks were hand collected and initially crushed by the USGS. Further crushing and milling was performed at Washing-ton Mills. For the glass, oxides were blended in the ap-propriate ratios, blended in a v-blender, and placed in a graphite lined, water cooled pot. The mixture was fused in Washington Mills’ pilot scale, 500 kW EAF. The molten glass was then poured into water and quenched to inhibit crystallization. Several pour/quench cycles were required to produce the total quantity of glass needed. Anorthosite, norite and olivine were milled together to the target particle size in a ball mill. The glass was ball milled separately. The complete simulant was produced by blending the milled materials. Particle size distribution, phase and chemical analyses of the materials was were per-formed at Washington Mills. Results: The glass composition was found to match the Apollo 16 oxide content average [1] quite well, with the exception of SiO2 and Fe2O3. The deviation of SiO2 and Fe2O3 from batched content was believed to be due to limitations inherent in the use of the arc furnace technique for these types of materials. A particle size distribution of the full simulant formulation closely matching the average for the Apollo 16 samples was also achieved. Fig. 1 shows the morphology of the final simulant particles. The size distribution is compared to the target in Fig. 2. Conclusions: A new lunar highlands type simulant containing a high-quality synthetic glass, closely matching an average composition of the Apollo 16 regolith was produced. Processing utilized easily scalable mineral and glass making methods.

simulant↗

To discuss illicit nuclear trafficking

The Illicit nuclear trafficking panel was conducted at the 4th Annual INMM workshop on Reducing the Risk from Radioactive and Nuclear Materials on February 2-3, 2010 in Washington DC. While the workshop occurred prior to the Nuclear Security Summit, April 12-13 2010 in Washington DC, some of the summit issues were raised during the workshop. The Communique of the Washington Nuclear Security Summit stated that 'Nuclear terrorism is one of the most challenging threats to international security, and strong nuclear security measures are the most effective means to prevent terrorists, criminals, or other unauthorized actors from acquiring nuclear materials.' The Illicit Trafficking panel is one means to strengthen nuclear security and cooperation at bilateral, regional and multilateral levels. Such a panel promotes nuclear security culture through technology development, human resources development, education and training. It is a tool which stresses the importance of international cooperation and coordination of assistance to improve efforts to prevent and respond to incidents of illicit nuclear trafficking. Illicit trafficking panel included representatives from US government, an international organization (IAEA), private industry and a non-governmental organization to discuss illicit nuclear trafficking issues. The focus of discussions was on best practices and challenges for addressing illicit nuclear trafficking. Terrorism connection. Workshop discussions pointed out the identification of terrorist connections with several trafficking incidents. Several trafficking cases involved real buyers (as opposed to undercover law enforcement agents) and there have been reports identifying individuals associated with terrorist organizations as prospective plutonium buyers. Some specific groups have been identified that consistently search for materials to buy on the black market, but no criminal groups were identified that specialize in nuclear materials or isotope smuggling. In most cases, sellers do not find legitimate buyers; however, there have been specific cases where sellers did find actual terrorist group representatives. There appears to be a connection between terrorist groups engaged in trafficking conventional arms and explosives components that are also looking for both nuclear materials and radioisotopes. Sale opportunities may create additional demand for such materials. As we can observe from Figure 1, many cases in the mid-90s involved kilogram quantities of material. There were smaller amounts of material moved in 2001, 2003 and 2006. While we have seen less trafficking cases involving PujHEU in recent years, the fact that it continues at all is troubling. The trafficking cases can be presented through their life cycle: Diversion of materials leads to Trafficker and then to Terrorist/Proliferator. Most of the information we have in trafficking cases is on the Trafficker. In 16 cases reported by the IAEA, there are 10 prosecutions of the involved trafficker. However, there are no confirmed diversions of material recorded in any of the 18 seizures. Most seizures were sting operations performed by law enforcement or security agents with no actual illicit end-user involved.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

One System Integrated Project Team: Retrieval And Delivery Of The Hanford Tank Wastes For Vitrification In The Waste Treatment Plant

The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank wastes and for building and operating the WTP. The tank wastes are the result of Hanford's nearly fifty (50) years of plutonium production. In the intervening years, waste characteristics have been increasingly better understood. However, waste characteristics that are uncertain and will remain as such represent a significant technical challenge in terms of retrieval, transport, and treatment, as well as for design and construction ofWTP. What also is clear is that the longer the waste remains in the tanks, the greater the risk to the environment and the people of the Pacific Northwest. The goal of both projects - tank operations and waste treatment - is to diminish the risks posed by the waste in the tanks at the earliest possible date. About two hundred (200) WTP and TOC employees comprise the IPT. Individual work groups within One System include Technical, Project Integration & Controls, Front-End Design & Project Definition, Commissioning, Nuclear Safety & Engineering Systems Integration, and Environmental Safety and Health and Quality Assurance (ESH&QA). Additional functions and team members will be added as the WTP approaches the operational phase. The team has undertaken several initiatives since its formation to collaborate on issues: (1) alternate scenarios for delivery of wastes from the tank farms to WTP; (2) improvements in managing Interface Control Documents; (3) coordination on various technical issues, including the Defense Nuclear Facilities Nuclear Safety Board's Recommendation 2010-2; (4) deployment of the SmartPlant Foundation-configuration Management System; and (5) preparation of the joint contract deliverable of the Operational Readiness Support Plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluating Tradeoffs for Water, Fire, Biofuels, and Fish

The Washington State Academy of Sciences (WSAS) is a not-for-profit organization of more than 300 elected members who are nationally recognized for their scientific and technical expertise. All members of the National Academies of Sciences, Engineering and Medicine who reside in Washington State are invited to join; others are elected in recognition of their scientific and technical contributions to our nation and their desire to contribute their expertise to inform issues in Washington State

Wigmosta, Mark S.↗

Geothermal Exploration of Mount Baker Hot Springs Through Ground-Based Magnetic and Gravity Surveys

The Washington State Division of Geology and Earth Resources (WDGER), together with the USGS, Altarock Energy Inc., Colorado College, Temple University, Innovate Geothermal Ltd., University of British Columbia, and Western Washington University(WWU), conducted phase two of a geothermal play fairway exploration at three plays (Mount Baker, Mount St. Helens seismic zone, and Wind River valley) along the Washington Cascade Range. The Mount Baker (MB) play is an ideal location for further investigation as a potential geothermal resource due to the presence of thermal features, young volcanic centers, existing geothermal leases, accessibility, and its proximity to existing transmission lines at the Baker Lake Dam. The goal of phase II exploration at all three plays is to collect geologic and geophysical data to help constrain spatial changes in subsurface lithology and structures that may be associated with the geothermal systems. Furthermore, this paper discusses the geothermal potential of the southeast flank of Mount Baker, WA by interpreting newly collected ground-based gravity and magnetic data. The Mount Baker play was surveyed from July-September, 2016 by the USGS, WDGER, and WWU. Results of a detailed magnetic and gravity surveys of the region surrounding the Baker hot springs, the primary surface expression of the hydrothermal system, are presented here. Gravity data were collected at 495 stations in the study area amounting to an area of roughly 150 square km. Approximately 93 km of line magnetometer data were collected within the study area, over a dozen magnetic susceptibility measurements were taken at 50 locations and about 50 hand samples were collected for density measurements. Preliminary data and modeling suggest pronounced magnetic anomalies trending NE/SW, generally in line with previously mapped lineaments identified in LiDAR. We present a series of preliminary two-dimensional forward models of the gravity and magnetic data as well as a 3D inversion model of magnetic susceptibility and interpret these models in terms of the structural controls influencing the Baker hot springs and hydrothermal system.

Geophysics↗

Applying Lean Concepts to Waste Site Closure - 13137

Washington Closure Hanford (WCH) was selected by the U.S. Department of Energy, Richland Operations Office to manage the River Corridor Closure Project, a 10-year contract in which WCH will clean up 220 mi{sup 2} of contaminated land at the Hanford Site in Richland, Washington. In the summer of 2011, with Tri-Party (DOE-RL, Environmental Protection Agency and Washington State Department of Ecology) Agreement Milestones due at the end of the calendar year, standard work practices were challenged in regards to closure documentation development. The Lean process, a concept that maximizes customer value while minimizing waste, was introduced to WCH's Sample Design and Cleanup Verification organization with the intention of eliminating waste and maximizing efficiencies. The outcome of implementing Lean processes and concepts was impressive. It was determined that the number of non-value added steps far outnumbered the value added steps. Internal processing time, document size, and review times were all reduced significantly; relationships with the customer and the regulators were also improved; and collaborative working relationships with the Tri Parties have been strengthened by working together on Lean initiatives. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

One System Integrated Project Team: Retrieval and Delivery of Hanford Tank Wastes for Vitrification in the Waste Treatment Plant - 13234

The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety-conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank wastes and for building and operating the WTP. The tank wastes are the result of Hanford's nearly fifty (50) years of plutonium production. In the intervening years, waste characteristics have been increasingly better understood. However, waste characteristics that are uncertain and will remain as such represent a significant technical challenge in terms of retrieval, transport, and treatment, as well as for design and construction of WTP. What also is clear is that the longer the waste remains in the tanks, the greater the risk to the environment and the people of the Pacific Northwest. The goal of both projects - tank operations and waste treatment - is to diminish the risks posed by the waste in the tanks at the earliest possible date. About two hundred (200) WTP and TOC employees comprise the IPT. Individual work groups within One System include Technical, Project Integration and Controls, Front-End Design and Project Definition, Commissioning, Nuclear Safety and Engineering Systems Integration, and Environmental Safety and Health and Quality Assurance (ESH and QA). Additional functions and team members will be added as the WTP approaches the operational phase. The team has undertaken several initiatives since its formation to collaborate on issues: (1) alternate scenarios for delivery of wastes from the tank farms to WTP; (2) improvements in managing Interface Control Documents; (3) coordination on various technical issues, including the Defense Nuclear Facilities Nuclear Safety Board's Recommendation 2010-2; (4) deployment of the SmartPlant{sup R} Foundation-Configuration Management System; and (5) preparation of the joint contract deliverable of the Operational Readiness Support Plan. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Exposure Assumptions Underlying Cleanups to Industrial Versus Unrestricted Uses: Comparison of State and Federal Approaches - 17228

The Environmental Protection Agency (EPA) and various states have designated a variety of cleanup levels ranging from restricted (too much residual contamination to allow any use) to unrestricted or residential. Although there are many potential exposure scenarios, the States of Washington and New Jersey identify only two levels for cleanup of chemical contaminants in soil: 'unrestricted' and 'industrial' (Washington) and 'residential' vs 'non-residential' (New Jersey). Other agencies such as EPA and DOE recognize several levels of recreational use, between unrestricted and industrial, and likewise there are several levels of residential use as well. Cleanup criteria may allow or preclude the use of ground water for drinking, swimming pools, gardens, or lawns. Tribal unrestricted scenarios include the use of water (probably surface water in most scenarios) for sweat lodges, and have calculated high level exposure pathways for both dermal and inhalation pathways as well as ingestion. For residential scenarios, inadvertent ingestion of soil, drinking of ground water, and consumption of local foods represent the highest exposure pathways. Intermediate, recreational pathways may be non-consumptive (hiking, bird watching, photography) or consumptive (hunting, fishing, harvesting plants and medicines), the latter entailing much higher potential exposures. For each land-use there is a corresponding exposure scenario, with different assumptions about the maximally exposed individual, their age, and the amounts of air, water, soil, and foods they consume. For each exposure pathway one can compute the ratio between the exposure assumptions for any two scenarios. The product of the ratios comprises a Vulnerability Index. The index is higher for children than adults. For Washington this Index is reflected in the 'industrial' vs 'unrestricted' soil cleanup levels, which are 43.7 times lower for 'unrestricted'. This paper explores the similarities and differences in the exposure scenarios and vulnerability of the maximally exposed individuals and the consequences of a mismatch between current cleanup levels and possible future land uses. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Direct Feed Low Activity Waste Integrated Permitting - 16642

An overall Hanford permitting strategy for the U. S. Department of Energy (DOE) Office of River Protection (ORP) is being developed to support the Direct Feed Low- Activity Waste (DFLAW) Program. The strategy identifies new permits and modifications of existing permits, as well as major regulatory approvals to support the startup and operation of nuclear systems necessary to feed low activity tank waste, pretreat the waste, operate the Waste Treatment and Immobilization Plant (WTP) Low Activity Waste (LAW) facility to treat tank waste, and dispose of waste streams. Types of permits include hazardous waste, toxic air, and radiological air licenses. Four different Contractors manage operations at Tank Farms, WTP, Utilities/Infrastructure, and Waste Disposal. Due to this complexity and the number of interfaces required, the need to have a strategic overview of all permits was evident. Approximately 25 permits and 4 major regulatory approvals are identified to implement DFLAW. The strategy will help guide integrated planning, scheduling and sequencing of permits and regulatory approvals to support DOE ORP's overall schedule for construction, commissioning and operation of DFLAW. Development of the strategy included extensive collaboration and coordination of an Integrated Permitting Team with staff and management representation from DOE, CH2M Hill Plateau Remediation Contractor (CHPRC), Washington River Protection Solutions LLC (WRPS), and Bechtel National Inc. (BNI). Information sessions and briefings have been conducted with the Washington State Department of Ecology (Ecology) and Washington State Department of Health (DOH) in the development of this overall strategy. Additionally, interface meetings are held with Ecology and DOH on specific projects early in the design phase to validate the permitting approach, identify key issues and information, and discuss requirements and assumptions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fortifying Environmental Compliance Strategies at Hanford - 19541

At the Hanford Site, located near Richland, Washington, the Department of Energy is cleaning up legacy radioactive and mixed-waste generated from the Manhattan Project in the 1940's. A major component of cleaning up the waste is maintaining compliance with federal and state environmental regulations. Environmental compliance is also determined through permits, agreements, and consent orders issued by regulating agencies such as the Washington State Department of Health: Office of Radiation Protection, Washington State Department of Ecology Nuclear Waste Program, and the Environmental Protection Agency. Maintaining compliance at Hanford reduces environmental impacts and addresses violations, or non-compliances. The following strategies improve compliance and support the avoidance of enforcement actions. At Hanford, regulatory agency environmental enforcement actions, and their corrective actions, are tracked to completion using databases maintained by inspection subject matter experts. The databases are used to provide the Department of Energy and contractor management with up-to-date status of regulatory agency activity and the required corrective actions. Trending enforcement actions helps target compliance vulnerabilities. Findings and corrective actions that are entered into the databases are then trended by date, location, responsible contractor, agency, and type of compliance issue. The ability to review previous non-compliances in certain locations of the Site, or by general alleged violation, provides the project's environmental contacts with information on what types of issues to look for on pre-inspection walk downs. Finding non-compliances during pre-inspection walk downs allows the contractor to correct the issue and avoid potential fines from regulating agencies. The walk downs are conducted by environmental specialists and project personnel looking for issues that may be viewed as a compliance problem. Using agency checklists and previous inspection correspondence can help to provide valuable information during pre-inspection activities. Training regulatory agency inspectors on Site security requirements, cultural and ecological standards, and inspection protocols allows for increased efficiency and reduces potential miscommunication between regulatory agencies and the regulated contractors. The training also allows the contractors to give the regulating agencies the up-to-date policies and procedures that will be addressed during the inspection. Hanford has pre-identified inspection coordinators within each contractor to assist in coordinating with Department of Energy personnel, projects, and management prior to the inspections. These inspection coordinators notify affected management, accommodate and escort the regulators to locations they ask to inspect, set up requested interviews, and gather requested information that will need to be cleared for public release. These practices make for positive experiences and interactions with the regulating agency personnel and help reduce and eliminate environmental non-compliances, findings, violations, and fines. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NAVIGATING A QUALITY ROUTE TO A NATIONAL SAFETY AWARD

Deming quality methodologies applied to safety are recognized with the National Safety Council's annual Robert W. Campbell Award. Over the last ten years, the implementation of Statistical Process Control and quality methodologies at the U.S. Department of Energy's Hanford Site have contributed to improved safety. Improvements attributed to Statistical Process Control are evidenced in Occupational Safety and Health records and documented through several articles in Quality Progress and the American Society of Safety Engineers publication, Professional Safety. Statistical trending of safety, quality, and occurrence data continues to playa key role in improving safety and quality at what has been called the world's largest environmental cleanup project. DOE's Hanford Site played a pivotal role in the nation's defense beginning in the 1940s, when it was established as part of the Manhattan Project. After more than 50 years of producing material for nuclear weapons, Hanford, which covers 586 square miles in southeastern Washington state, is now focused on three outcomes: (1) Restoring the Columbia River corridor for multiple uses; (2) Transitioning the central plateau to support long-term waste management; and (3) Putting DOE assets to work for the future. The current environmental cleanup mission faces challenges of overlapping technical, political, regulatory, environmental, and cultural interests. From Oct. 1, 1996 through Sept. 30, 2008, Fluor Hanford was a prime contractor to the Department of Energy's Richland Operations Office. In this role, Fluor Hanford managed several major cleanup activities that included dismantling former nuclear-processing facilities, cleaning up the Site's contaminated groundwater, retrieving and processing transuranic waste for shipment and disposal off-site, maintaining the Site's infrastructure, providing security and fire protection, and operating the Volpentest HAMMER Training and Education Center. On October 1,2008, a transition occurred that changed Fluor's role at Hanford. Fluor's work at Hanford was split in two with the technical scope being assumed by the CH2M HILL Plateau Remediation Company (CHPRC) CHPRC is now spearheading much of the cleanup work associated with former nuclear-processing facilities, contaminated groundwater, and transuranic waste. Fluor is an integrated subcontractor to CH PRC in this effort. In addition, at the time of this writing, while the final outcome is being determined for the new Mission Support Contract, Fluor Hanford has had its contract extended to provide site-wide services that include security, fire protection, infrastructure, and operating the HAMMER facility. The emphasis has to be on doing work safely, delivering quality work, controlling costs, and meeting deadlines. Statistical support is provided by Fluor to the PRC, within Fluor Hanford, and to a third contractor, Washington Closure Hanford, which is tasked with cleaning up approximately 210 square miles designated as the Columbia River corridor along the outer edge of the Hanford Site. The closing months of Fluor Hanford's 12 year contract were busy, characterized by special events that capped its work as a prime cleanup contractor, transitions of work scope and personnel, and the completion numerous activities. At this time, Fluor's work and approach to safety were featured in state and national forums. A 'Blockbuster' presentation at the Washington State Governor's Industrial Safety Conference in September 2008 featured Fluor Hanford's Chief Operating Officer, a company Safety Representative, and me. Simultaneously, an award ceremony in Anaheim, Calif. recognized Fluor Hanford as the winner of the 2008 Robert W. Campbell Award. The Robert W. Campbell Award is co-sponsored by Exxon Mobil Corporation and the National Safety Council. Named after a pioneer of industrial safety, the Campbell Award recognizes organizations that demonstrate how integration of environmental, health and safety (EHS) management into business operations is a cornerstone of their corporate success. Fluor Hanford received the award for corporations with more than 1,000 employees. Campbell Award winners undergo rigorous assessments that include site visits and comprehensive evaluations of their commitment to, and implementation of, EHS practices. Award winners work with an international partnership of 21 organizations to develop case studies that illustrate their superior EHS programs and best practices, for use by top business and engineering schools worldwide. Quality methodologies in place at Fluor Hanford played a key role in the award process. Fluor Hanford's integrated use of Statistical Process Control and Pareto Charts for analyzing and displaying EHS performance were viewed favorably by the award judges.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Computational Optimization of 133m Xe Production via Neutron Irradiation in a TRIGA Reactor

Here, the Comprehensive Nuclear-Test-Ban Treaty bans all nuclear tests worldwide. As part of treaty compliance, the concentration of radioactive nuclides in the atmosphere is monitored to detect nuclear weapons tests. Radioactive noble gas fission products, specifically radioxenon, can vent into the atmosphere after a nuclear weapons test, even if the test is well contained underground or underwater. Radioxenon thus serves as a signal for nuclear weapons tests. All atmospheric monitoring systems require samples of radioxenon isotopes for detector calibration, quality control, and certification. Here, we present a novel, improved method for creating samples of 133m Xe via neutron irradiation of 132 Xe in the Washington State University TRIGA reactor. 132 Xe neutron absorption results in either 133 Xe or 133m Xe—thermal neutron absorption results in 133m Xe 12% of the time, while fast neutron absorption (above ~1 MeV) results in 133m Xe ~50% of the time. To optimize the production of 133m Xe via neutron absorption in 132 Xe in the thermal TRIGA reactor, spectral tuning using an irradiation chamber is required to maximize the fraction of fast neutrons being absorbed and minimize the number of thermal neutrons interacting with the 132 Xe. We used MCNP to tally 132 Xe absorptions with the isotopic tally function, flux tallies and neutron attenuation to estimate the number of neutrons reaching the 132 Xe through the irradiation chamber, and the adjoint importance function to improve the source strength estimate. Additionally, we performed a heat transfer analysis for safety considerations. It was determined that the use of a 96% enriched 10 B boron carbide chamber, placed next to the fuel elements in reactor position D8, increases the 133m Xe/ 133 Xe activity ratio from a baseline value of 0.3 to 1.0, a 233% increase. Additionally, it was determined that the alpha heating produced in the boron does not become an unmanageable problem in the Washington State University reactor.

37 - INORGANIC, ORGANIC, PHYSICAL AND ANALYTICAL C↗

EMP Attachment 1: DOE-SC PNNL Site Sampling and Analysis Plan

This Sampling and Analysis Plan (SAP) is written for the radiological environmental air surveillance program for the DOE-SC PNNL Site, Richland Washington. It provides the requirements for planning sampling events, and the requirements imposed on the analytical laboratory analyzing the air samples. The actual air sampling process is in procedure EPRP-AIR-029. The rationale for analyte selection, media, and sampling site location has been vetted through the data quality objectives (DQO) process (Barnett et al. 2010). The results from the DQO process have been reviewed and approved by the Washington State Department of Health. The DQO process (Barnett et al. 2010) identified seven specific radionuclides for analysis along with the need for gross alpha and gross beta radiological analyses. The analytes are 241<\sup>Am, 243<\sup>Am, 244<\sup>Cm, 60<\sup>Co, 238<\sup>Pu, 239<\sup>Pu, and 233<\sup>U. The report also determined that air samples for particulates are the only sample matrix required for the monitoring program. These samples are collected on 47-mm glass-fiber filters.

54 ENVIRONMENTAL SCIENCES↗

Los Alamos National Laboratory Release of Cesium-137 Corrective Action Plan

This Corrective Action Plan (CAP) was developed by a team chartered by John Sarrao, Deputy Director for Science, Technology, and Engineering (DDSTE), to review and respond to the findings of the Joint National Nuclear Security Administration/Triad National Security (NNSA/Triad) Investigation Team (JIT) Joint Investigation Report for the “Sealed Source Recovery at the University of Washington Harborview Training and Research Facility Results in Release of Cesium-137 on May 2, 2019,” dated March 30, 2020. On May 2, 2019, International Isotopes, Inc. (INIS), a subcontractor to Triad National Security, LLC, inadvertently breached a sealed cesium-137 source at the University of Washington (UW), Harborview Medical Center Research and Training (HRT) building in downtown Seattle while attempting to recover the source for the National Nuclear Security Administration (NNSA) Off-Site Source Recovery Program (OSRP). The source breach resulted in contamination of personnel and the HRT building, as well as a release of radioactive material to the environment

07 ISOTOPE AND RADIATION SOURCES↗

CARETS: A prototype regional environmental information system. Volume 13: Utility of CARETS products to local planners; an evaluation

The Metropolitan Washington Council of Governments (MWCOG) in cooperation with and under contract to the U.S. Geological Survey, conducted an evaluation of the utility of remote-sensor derived land use data produced by the USGS Central Atlantic Regional Ecological Test Site (CARETS) project. Investigators invited representatives of Washington, D.C. metropolitan area planning agencies to a workshop, introduced them to the CARETS products, and asked them to evaluate the products. In follow-up interviews, planners from 12 participating agencies reported general support for the fulI spectrum of CARETS products but gave more positive responses towards products with which they had some familiarity. Planners considered some products of limited utility because of (1) insufficient detail, (2) too small a scale, or (3) lack of technical capability to incorporate the information and products into the current planning process. Some planners expressed doubt about the application of CARETS products in most day-to-day planning activities , which involve specific rezoning requests or site development plans requiring highly localized data. The greatest potential of the CARETS products was in the identification of broad development patterns at the county or regional level. An appendix documents the results of an inventory of local government decisions relating to land use.

Land use planning↗