Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Tank Farm”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

25 Years Of Environmental Remediation In The General Separations Area Of The Savannah River Site: Lessons Learned About What Worked And What Did Not Work In Soil And Groundwater Cleanup

The Savannah River Site (SRS) is owned and administered by the US Department of Energy (DOE). SRS covers an area of approximately 900 square kilometers. The General Separation Area (GSA) is located roughly in the center of the SRS and includes: radioactive material chemical separations facilities, radioactive waste tank farms, a variety of radioactive seepage basins, and the radioactive waste burial grounds. Radioactive wastes were disposed in the GSA from the mid-1950s through the mid-1990s. Radioactive operations at the F Canyon began in 1954; radioactive operations at H Canyon began in 1955. Waste water disposition to the F and H Seepage Basins began soon after operations started in the canyons. The Old Radioactive Waste Burial Ground (ORWBG) began operations in 1952 to manage solid waste that could be radioactive from all the site operations, and ceased receiving waste in 1972. The Mixed Waste Management Facility (MWMF) and Low Level Radioactive Waste Disposal Facility (LLRWDF) received radioactive solid waste from 1969 until 1995. Environmental legislation enacted in the 1970s, 1980s, and 1990s led to changes in waste management and environmental cleanup practices at SRS. The US Congress passed the Clean Air Act in 1970, and the Clean Water Act in 1972; the Resource Conservation and Recovery Act (RCRA) was enacted in 1976; the Comprehensive Environmental Response Compensation, and Liability Act (CERCLA) was enacted by Congress in 1980; the Federal Facilities Compliance Act (FFCA) was signed into law in 1992. Environmental remediation at the SRS essentially began with a 1987 Settlement Agreement between the SRS and the State of South Carolina (under the South Carolina Department of Health and Environmental Control - SCDHEC), which recognized linkage between many SRS waste management facilities and RCRA. The SRS manages several of the larger groundwater remedial activities under RCRA for facilities recognized early on as environmental problems. All subsequent environmental remediation projects tend to be managed under tri-party agreement (DOE, Environmental Protection Agency, and SCDHEC) through the Federal Facilities Agreement. During 25 years of environmental remediation SRS has stabilized and capped seepage basins, and consolidated and capped waste units and burial grounds in the GSA. Groundwater activities include: pump and treat systems in the groundwater, installation of deep subsurface barrier systems to manage groundwater flow, in situ chemical treatments in the groundwater, and captured contaminated groundwater discharges at the surface for management in a forest irrigation system. Over the last 25 years concentrations of contaminants in the aquifers beneath the GSA and in surface water streams in the GSA have dropped significantly. Closure of 65 waste sites and 4 RCRA facilities has been successfully accomplished. Wastes have been successfully isolated in place beneath a variety of caps and cover systems. Environmental clean-up has progressed to the stage where most of the work involves monitoring, optimization, and maintenance of existing remedial systems. Many lessons have been learned in the process. Geotextile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive, enhanced natural processes to address groundwater contamination are much more cost effective than pump and treat systems. SRS operated two very large pump and treat systems at the F and H Seepage Basins to attempt to limit the release of tritium to Fourmile Branch, a tributary of the Savannah River. The systems were designed to extract contaminated acidic groundwater, remove all contamination except tritium (not possible to remove the tritium from the water), and inject the tritiated groundwater up-gradient of the source area and the plume. The concept was to increase the travel time of the injected water for radioactive decay of the tritium. The two systems were found to be non-effective and potentially mobilizing more contamination. SRS invested approximately $50 million in construction and approximately $100 million in 6 years of operation. The H Seepage Basin pump and treat system was replaced by a series of subsurface barriers that alters the groundwater velocity; the F Seepage Basin pump and treat system was replaced by subsurface barriers forming a funnel and gate augmented by chemical treatment within the gates. These replacement systems are mostly passive and cost approximately $13 million to construct, and have reduced the tritium flux to Fourmile Branch, in these plumes, by over 70%. SRS manages non-acidic tritiated groundwater releases to Fourmile Branch from the southwest plume of the MWMF with a forest irrigation system. Tritiated water is captured with a sheetpile dam below the springs that caused releases to Fourmile Branch. Water from the irrigation pond is pumped to a filter plant prior to irrigation of approximately 26 hectares of mixed forest and developing pine plantation. SRS has almost achieved a 70% reduction in tritium flux to the Branch from this plume. The system cost approximately $5 million to construct with operation cost of approximately $500K per year. In conclusion, many lessons have been learned in 25 years of relatively aggressive remedial activities in the GSA. Geotextile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive, enhanced natural processes to address groundwater contamination are much more cost effective than pump and treat systems. In water management situations with non-accumulative contaminants (tritium, VOCs, etc.) irrigation in a forest setting can be very effective.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Complex Sources and Impacts on Remediation and Monitoring Approaches

Remedy selection, implementation, and coordination with tank farm activities for adjacent waste sites need to be facilitated by a technically defensible description of sources and their relative strength and temporal contributions to groundwater contamination. Detailed data describing contaminant source releases are typically not available, so source locations are highly uncertain. Furthermore, data on sources and model parameters are not readily available through direct measurements. Instead, source data are often derived by extrapolation from a few direct and/or indirect measurements, while model parameters are commonly estimated using inverse modeling or calibration methods. Because the conceptual model of sources will influence the mass and timing of the flux of contaminants to groundwater, uncertainty in the source terms should be considered. Even though a best-fit model can often be identified, it may not be the best representation of the sources given the sparse, uncertain nature of the data used for estimating source terms. To support future feasibility studies, a systematic approach is needed for identifying remediation and monitoring activities appropriate under conditions of uncertainty. In this study, an integrated assessment of alternative conceptual model elements has been examined using the B-Complex site in the Hanford Central Plateau to demonstrate how multiple sources in a waste management complex can be described to identify their relative contributions to groundwater. The heterogeneous structure of the system is modeled based on available field information on the lithological data for both the vadose zone and aquifer. The approach includes a simulation assessment and linkages to site data, with an uncertainty analysis applied to evaluate the effects of source term uncertainty on contaminant mass flux to groundwater. An integrated assessment of alternative conceptual model elements was evaluated to identify how parameter uncertainty impacts both temporal and spatial uncertainties associated with vadose zone source terms. Modeling scenarios identify important characteristics of remediation target zones to provide context for how surface barriers, in situ remedies, and water-table treatment zones can be designed to account for source dynamics. Ramifications for remediation and monitoring are discussed within the context of the source term uncertainty. The described approach facilitates systematically addressing alternative conceptual model questions in relation to remediation and monitoring and supports the remedial investigation/ feasibility study process and the remediation strategy development for the Hanford Central Plateau.

Rockhold, Mark L.↗

Remediation of Centre Pier, Port Hope, Ontario: Historical, Logistical, Regulatory and Technical Challenges - 13118

Centre Pier is a 3.9 ha property owned by the Commissioners of the Port Hope Harbour in the Municipality of Port Hope, Ontario, Canada. It is centrally located on the Port Hope waterfront and is bounded on the west by the Port Hope Harbour, on the east by the Ganaraska River, on the south by Lake Ontario, and on the north by a railway corridor. The property is currently leased by the Commissioners of the Port Hope Harbour to the Cameco Corporation which owns the four onsite building that are used as warehouse space for their uranium conversion facility located on the western side of the Harbour. Remediation of this site forms part of the Port Hope Project being undertaken by Atomic Energy of Canada Limited (AECL) and Public Works and Government Services Canada (PWGSC) as part of the Port Hope Area Initiative (PHAI). Soil impacts include radiological, metals and petroleum hydrocarbons resulting from long term historical industrial use. Radiological impacts in soil extend across most of the site primarily within the upper metre of fill. Metals-contaminated soil is present across the entire site in the underlying fill material. The metals-contaminated fill extends to a maximum depth of 2.0 m below grade at the north end of the site which is underlain by peat. However, the metals-contaminated soil could extend to the top of the bedrock on the remainder of the site. Based on the elevation of the bedrock in the adjacent river and Harbour Basin, the metals-contaminated soil may extend to a depth of 5.6 m or 6.5 m below existing grade. Petroleum-contaminated soil is present on the southeast side of the site, where a storage tank farm was previously located. Challenges include: - The complex history of the site both relating to site use and Pier construction. Pier development began in the 1800's and was undertaken by many different entities. Modifications and repairs were made over the years resulting in several different types of Pier walls and fill that must be considered during remediation. A wide variety of industrial activity on the Pier including extensive foundry operations as well as the industrial nature of the fill used to construct the Pier has resulted in extensive contamination distribution. The Pier structure will require reinforcement to permit both the remediation of the Pier and the adjacent Harbour and remediation techniques will need to be well suited to minimize disruption of wall structures as well as being able to deal with fill ranging from ash to boulders. - Multiple stakeholders are responsible for building demolition, remediation of radiological impacts, remediation of industrial impacts and the use of the site as a staging area for Harbour sediment remediation. The successful remediation of the Centre Pier will require careful negotiation and planning for the various remediation activities noted above. - The depth of contamination on the Pier would result in the complete removal of the Pier if all contamination were to be excavated. Therefore, a Risk Assessment will be conducted to determine the appropriate means for in situ risk management for materials to be left in place below a proposed depth of 1.5 m below current grade. With the concurrence of the property owners and Provincial regulators, the Risk Assessment will be undertaken in accordance with the Provincial requirements that will ensure adequate protection of the environment and future users of the site. - The end use of the Pier has yet to be confirmed by the Municipality. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

System Performance Testing of the Pulse-Echo Ultrasonic Instrument for Critical Velocity Determination during Hanford Tank Waste Transfer Operations - 13584

The delivery of Hanford double-shell tank waste to the Hanford Tank Waste Treatment and Immobilization Plant (WTP) is governed by specific Waste Acceptance Criteria that are identified in ICD 19 - Interface Control Document for Waste Feed. Waste must be certified as acceptable before it can be delivered to the WTP. The fluid transfer velocity at which solid particulate deposition occurs in waste slurry transport piping (critical velocity) is a key waste acceptance parameter that must be accurately characterized to determine if the waste is acceptable for transfer to the WTP. Washington River Protection Solutions and the Pacific Northwest National Laboratory have been evaluating the ultrasonic PulseEcho instrument since 2010 for its ability to detect particle settling and determine critical velocity in a horizontal slurry transport pipeline for slurries containing particles with a mean particle diameter of =14 micrometers (μm). In 2012 the PulseEcho instrument was further evaluated under WRPS' System Performance test campaign to identify critical velocities for slurries that are expected to be encountered during Hanford tank waste retrieval operations or bounding for tank waste feed. This three-year evaluation has demonstrated the ability of the ultrasonic PulseEcho instrument to detect the onset of critical velocity for a broad range of physical and rheological slurry properties that are likely encountered during the waste feed transfer operations between the Hanford tank farms and the WTP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Regulatory Framework for Salt Waste Disposal and Tank Closure at the Savannah River Site - 13663

The end of the Cold War has left a legacy of approximately 37 million gallons of radioactive waste in the aging waste tanks at the Department of Energy's Savannah River Site (SRS). A robust program is in place to remove waste from these tanks, treat the waste to separate into a relatively small volume of high-level waste and a large volume of low-level waste, and to actively dispose of the low-level waste on-site and close the waste tanks and associated ancillary structures. To support performance-based, risk-informed decision making and to ensure compliance with all regulatory requirements, the U.S. Department of Energy (DOE) and its current and past contractors have worked closely with the South Carolina Department of Health and Environmental Control (SCDHEC), the U.S. Environmental Protection Agency (EPA) and the Nuclear Regulatory Commission (NRC) to develop and implement a framework for on-site low-level waste disposal and closure of the SRS waste tanks. The Atomic Energy Act of 1954, as amended, provides DOE the authority to manage defense-related radioactive waste. DOE Order 435.1 and its associated manual and guidance documents detail this radioactive waste management process. The DOE also has a requirement to consult with the NRC in determining that waste that formerly was classified as high-level waste can be safely managed as either low-level waste or transuranic waste. Once DOE makes a determination, NRC then has a responsibility to monitor DOE's actions in coordination with SCDHEC to ensure compliance with the Title 10 Code of Federal Regulations Part 61 (10CFR61), Subpart C performance objectives. The management of hazardous waste substances or components at SRS is regulated by SCDHEC and the EPA. The foundation for the interactions between DOE, SCDHEC and EPA is the SRS Federal Facility Agreement (FFA). Managing this array of requirements and successfully interacting with regulators, consultants and stakeholders is a challenging task but ensures thorough and thoughtful processes for disposing of the SRS low-level waste and the closure of the tank farm facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of the Waste-Incidental-to-Reprocessing Citation Process at the West Valley Demonstration Project - 12250

The West Valley Demonstration Project recently achieved a breakthrough in management of radioactive waste from reprocessing of spent nuclear fuel by taking advantage of lessons learned at other Department of Energy (DOE) sites in implementation of the waste-incidental-to-reprocessing citation process of DOE Manual 435.1-1, Radioactive Waste Management. This breakthrough involved a revision to the site procedure on waste-incidental to reprocessing. This procedure revision served as the basis for a determination by the DOE West Valley field office using the citation process that three secondary waste streams consisting of equipment that had once been contaminated by association with HLW are not HLW following decontamination and may be disposed of as low-level waste (LLW) or transuranic waste. These waste streams, which comprised much of the approximately 380 cubic meters of West Valley waste contaminated by association with HLW, included several vessels and certain tank farm equipment. By making use of lessons learned in use of the citation process by other DOE sites and information developed to support use of the citation process at the Hanford site and the Savannah River Site, the team developed a technical basis for showing that use of the citation process of DOE Manual 435.1-1 for the three new waste stream was appropriate and technically justified. The Waste Management Working Group of the EFCOG assisted in transferring lessons learned by drawing on experience from around the DOE complex. This process shared knowledge about effective implementation of the citation process in a manner that proved to be beneficial to the West Valley Demonstration Project and resulted in a technical basis document that could be used to determine that the three new waste streams were not HLW. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radioactive Bench-scale Steam Reformer Demonstration of a Monolithic Steam Reformed Mineralized Waste Form for Hanford Waste Treatment Plant Secondary Waste - 12306

Hanford currently has 212,000 m{sup 3} (56 million gallons) of highly radioactive mixed waste stored in the Hanford tank farm. This waste will be processed to produce both high-level and low-level activity fractions, both of which are to be vitrified. Supplemental treatment options have been under evaluation for treating portions of the low-activity waste, as well as the liquid secondary waste from the low-activity waste vitrification process. One technology under consideration has been the THOR{sup R} fluidized bed steam reforming process offered by THOR Treatment Technologies, LLC (TTT). As a follow-on effort to TTT's 2008 pilot plant FBSR non-radioactive demonstration for treating low-activity waste and waste treatment plant secondary waste, TTT, in conjunction with Savannah River National Laboratory, has completed a bench scale evaluation of this same technology on a chemically adjusted radioactive surrogate of Hanford's waste treatment plant secondary waste stream. This test generated a granular product that was subsequently formed into monoliths, using a geo-polymer as the binding agent, that were subjected to compressibility testing, the Product Consistency Test and other leachability tests, and chemical composition analyses. This testing has demonstrated that the mineralized waste form, produced by co-processing waste with kaolin clay using the TTT process, is as durable as low-activity waste glass. Testing has shown the resulting monolith waste form is durable, leach resistant, and chemically stable, and has the added benefit of capturing and retaining the majority of Tc-99, I-129, and other target species at high levels. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Treatment Plant - 12508

The Waste Treatment Plant (WTP) will immobilize millions of gallons of Hanford's tank waste into solid glass using a proven technology called vitrification. The vitrification process will turn the waste into a stable glass form that is safe for long-term storage. Our discussion of the WTP will include a description of the ongoing design and construction of this large, complex, first-of-a-kind project. The concept for the operation of the WTP is to separate high-level and low-activity waste fractions, and immobilize those fractions in glass using vitrification. The WTP includes four major nuclear facilities and various support facilities. Waste from the Tank Farms is first pumped to the Pretreatment Facility at the WTP through an underground pipe-in-pipe system. When construction is complete, the Pretreatment Facility will be 12 stories high, 540 feet long and 215 feet wide, making it the largest of the four major nuclear facilities that compose the WTP. The total size of this facility will be more than 490,000 square feet. More than 8.2 million craft hours are required to construct this facility. Currently, the Pretreatment Facility is 51 percent complete. At the Pretreatment Facility the waste is pumped to the interior waste feed receipt vessels. Each of these four vessels is 55-feet tall and has a 375,000 gallon capacity, which makes them the largest vessels inside the Pretreatment Facility. These vessels contain a series of internal pulse-jet mixers to keep incoming waste properly mixed. The vessels are inside the black-cell areas, completely enclosed behind thick steel-laced, high strength concrete walls. The black cells are designed to be maintenance free with no moving parts. Once hot operations commence the black-cell area will be inaccessible. Surrounded by black cells, is the 'hot cell canyon'. The hot cell contains all the moving and replaceable components to remove solids and extract liquids. In this area, there is ultrafiltration equipment, cesium-ion exchange columns, evaporator boilers and recirculation pumps, and various mechanical process pumps for transferring process fluids. During the first phase of pretreatment, the waste will be concentrated using an evaporation process. Solids will be filtered out, and the remaining soluble, highly radioactive isotopes will be removed using an ion-exchange process. The high-level solids will be sent to the High-Level Waste (HLW) Vitrification Facility, and the low activity liquids will be sent to the Low-Activity Waste (LAW) Vitrification Facility for further processing. The high-level waste will be transferred via underground pipes to the HLW Facility from the Pretreatment Facility. The waste first arrives at the wet cell, which rests inside a black-cell area. The pretreated waste is transferred through shielded pipes into a series of melter preparation and feed vessels before reaching the melters. Liquids from various facility processes also return to the wet cell for interim storage before recycling back to the Pretreatment Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Direct-Feed Low-Activity Waste: First Feed Flowsheet - 17108

In support of hot commissioning of the Low-Activity Waste Pretreatment System (LAWPS) and the Hanford Tank Waste Treatment and Immobilization Plant (WTP) LAW facility, the First Feed Flowsheet was initiated to project process stream characteristics and unit operation performance. The First Feed Flowsheet uses flowsheet models to simulate the preparation of the first feed campaign in Tank Farms and the subsequent feeding of the waste to the Low-Activity Waste Pretreatment System (LAWPS) and the WTP LAW facility. Three different models were used: a chemistry model of waste transfers developed in the Environmental Simulation Program (ESP), Washington River Protection Solutions' (WRPS') dynamic gPROMS{sup TM} LAWPS flowsheet model, and WTP's Dynamic G2 flowsheet model. Information from all three models showed favorable comparison of the waste feeds and secondary liquid wastes against waste compatibility assessment and waste acceptance criteria at multiple stages in the flowsheet. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Prioritization of Model Support Activities for Performance and Safety Assessments - 17111

and tank farm closure consider the performance of a wide variety of wastes, facilities and natural systems over very long time frames. Within the United States Department of Energy - Office of Environmental Management (DOE-EM), several PAs are currently being developed and similar applications are underway at numerous locations around the world. The Savannah River National Laboratory (SRNL) is providing technical support for PAs at several DOE-EM sites and developed recommendations for approaches to prioritize model support activities to help focus efforts on activities that would be expected to significantly influence decision-making. A general approach has been developed to identify data needs for the modeling, foster integration and communication between the PA team and the groups providing model support, and document the basis for prioritization of specific model support efforts. The approach addresses development of the rationale for efforts to address key needs and also describe the rationale for not pursuing efforts that are not expected to influence the conclusions of the PA. The approach will be of use for groups conducting PAs for waste disposal and can also be applied for other modeling efforts for site restoration activities (e.g., decommissioning, environmental remediation, etc.). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Integrated Waste Feed Delivery Plan for the Direct Feed Low-Activity Waste Mission - 17160

In order to begin tank waste treatment and reduce the risk to the liquid waste cleanup mission, a plan to directly feed the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Vitrification Facility before other WTP facilities has been implemented. Implementation requires another facility, the Low-Activity Waste Pretreatment System (LAWPS), to generate LAW from tank waste supernatant, along with upgrades to the existing tank farm facilities to provide waste feed and receive process returns. The Integrated Waste Feed Delivery Plan (IWFDP) presents the strategy for reliably delivering compliant waste feed to the LAWPS and subsequently WTP to safely and efficiently accomplish the direct feed LAW (DFLAW) mission. Modifications to existing systems and installation of new systems will be coordinated to meet WTP startup, commissioning, and processing needs. The IWFDP presents the process approach, feed campaign plans, and a list of infrastructure projects required to upgrade the DST system in order to support DFLAW start-up and operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Nonmetallic Components in the Hanford Waste Transfer System - 17287

Nonmetallic materials are currently being used in the United States Department of Energy's Hanford Site Tank Farm waste transfer system. These materials include the inner primary hoses in the hose-in-hose transfer lines (HIHTLs), Garlock{sup R} gaskets, ethylene propylene diene monomer (EPDM) O-rings. These materials are exposed to a number of stressors and the synergistic effects are not well understood. Florida International University (FIU) engineers have developed an experimental test loop to determine how the nonmetallic materials react to both individual and simultaneous stressors. The initial phase of testing includes exposure of coupons and components to caustic material at various temperatures for varying lengths of time. The coupons are manufactured from EPDM and Garlock{sup R} sheets and will be used to evaluate changes in material data from baseline data. Components (inner hoses, O-rings and gaskets) will also be used to determine the effects from an environment similar to its operational environment. The test loop utilizes a 25% NAOH solution as the fluid and can accommodate eighteen component assemblies, each consisting of one EPDM HIHTL, EPDM O-ring and Garlock{sup R} gasket. There are three assembly aging sets, one for each temperature (37.78 deg. C, 54.44 deg. C and 79.44 deg. C) and each set contains six assemblies; three for each of the two time periods (6 months and 1 year). Prior to aging, a sample set of the components had baseline mechanical properties tested and a sample set of the coupons had baseline material properties determined as per ASTM standards. After the aging is completed the mechanical and material properties of the aged samples will be measured and compared with the bass-line data to obtain an understanding of the synergistic effects of the two stressors. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation of Glycolic Acid Flowsheet in the Defense Waste Processing Facility (DWPF) - 17348

The disposition of high level waste (HLW) into canistered waste forms began at Savannah River Site (SRS) in 1996. For its entire processing history, DWPF has added formic acid as a pretreatment step in producing acceptable melter feed from incoming waste sludges sent from the HLW Tank Farms. While this process has been used to successfully produce more than 4,000 radioactive canisters, the addition of formic acid and its tendency to catalytically decompose in the presence of trace quantities of noble metals adds substantial process complexity in order to safely accommodate hydrogen generation and pH shifting during batch operations. Research efforts have been in progress for several years to identify a chemical surrogate for formic acid which performs the essential process functions without the associated negative consequences. The final analytical work to demonstrate the effectiveness of glycolic acid in the DWPF is nearly complete and a project team has been created to safely integrate the new acid into the chemical process. The project team is currently executing an implementation schedule which addresses safety basis development, revision to operations procedures and training, facility modifications, chemical procurement, and updated process monitoring. Introduction of glycolic acid into DWPF is currently scheduled to take place in early 2017, beginning with a blended flowsheet of glycolic and formic acid and ultimately transitioning to glycolic-only processing. This paper provides an overview of planned glycolic acid flowsheet implementation in the DWPF. This paper discusses several issues related to implementing such a significant change to the chemical process including: 1) Process chemistry differences between the two flowsheets with quantitative comparison for several properties of interest; 2) Technical approach to hazards analysis and safety basis development strategy; 3) Status of project execution for major deliverables; and 4) Path forward for facility modifications related to legacy formic acid support equipment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utilizing the Shift Technical Engineer Pipeline to Develop the Next Generation of Engineers - 17354

As the liquid waste contractor for the U.S. Department of Energy's (DOE) Savannah River Site (SRS), Savannah River Remediation (SRR) is responsible for safely treating and dispositioning approximately 35 million gallons of liquid waste stored at SRS. To achieve this mission, SRR manages and operates several complex nuclear facilities. These nuclear facilities include the H and F Tank Farms, the Defense Waste Processing Facility (DWPF), and the Saltstone Processing and Disposal Facility. To support the operations of these complex nuclear facilities, a Shift Technical Engineer (STE) is stationed for every shift. The STE is the sole Engineering Organization representative on-shift and serves as a direct technical resource for operations, including safety basis interpretation, process monitoring and prompt troubleshooting support. The training and qualification for an STE is more intensive than for typical technical staff personnel at SRR, involving additional classes, under-instruction watches, demonstration of practical factors, and culminating in an intense oral board examination. Like many other contractors in the DOE complex, SRR faces the challenge of preparing a significant number of new generation engineers to take the place of an aging workforce. Beyond the traditional training to establish minimum technical qualifications, SRR has established a number of initiatives aimed at accelerating the process of preparing early career engineers to replace experienced senior engineers. These initiatives include an internal rotational program, technical exchange activities with companies at other DOE sites, and an STE pipeline. The STE role provides a unique mechanism for select, early career engineers to gain in-depth knowledge and significant responsibility normally not achieved until much later in their careers. Once qualification is complete, the engineers perform the STE duties, providing technical support for nuclear facility operations. In addition, creating an STE pipeline, where promising young engineers are continually being qualified to replace the on-shift STEs, provides the company with a source of experienced engineers with in-depth technical knowledge as well as valuable experience interfacing with operations and other facility support groups. This paper will discuss the STE position, the qualification process, and how SRR is using the STE qualification pipeline to benefit both the company and the individual engineer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modular Caustic-Side Solvent Extraction Unit (MCU) Improved Solvent Quality and Processing Results - 17496

The Modular Caustic-Side Solvent Extraction (CSSX) Unit (MCU) is a process for Cs-137 removal from legacy nuclear waste. MCU began hot operations in 2008 with an initial planned operating life of three years and a design life of five years. After eight years of operation, MCU has processed more than 23.8 million liters (6.3 million gallons) of waste. The MCU process uses a solvent developed by Oak Ridge National Laboratory (ORNL) to extract the fission product Cs-137 from liquid salt waste, or salt solution (SS), stored in the Tank Farms at Savannah River Site (SRS) after the material has been treated through the Actinide Removal Process (ARP). Batches of SS are prepared and first fed to the ARP, where it is treated to become clarified SS (CSS), then fed to MCU. Once the Cs-137 has been extracted by the solvent, the CSS becomes decontaminated SS (DSS), which is ultimately processed into a cementitious grout at the Saltstone Production Facility (SPF) and subsequently disposed of at the Saltstone Disposal Facility (SDF). The Cs-137 is then stripped from the solvent into an aqueous strip effluent (SE) stream for incorporation into borosilicate glass at the Defense Waste Processing Facility (DWPF). The solvent used in the MCU process is made of four components: the extractant (extracts Cs-137 from CSS), the modifier (increases solubility of extractant and suppressor in the diluent), the suppressor (suppresses the effects of anions and improves stripping), and the diluent (controls density and viscosity). There have been two solvents utilized during the lifetime of MCU. The first solvent was developed by ORNL and was used to design the plant based on its cesium removal capability. Due to the extended life of MCU, in order to continue to minimize the curies disposed at SDF, a new solvent capable of removing more cesium from the CSS was developed by ORNL and implemented at MCU. The second MCU solvent, Next-Generation Solvent (NGS), uses the same modifier and diluent as the original solvent, but a different extractant and suppressor. Subsequent changes to the overall MCU flowsheet were made for the use of NGS. The success of cesium removal from the CSS is often presented as the cesium decontamination factor (DF) achieved for each batch processed. The DF is the ratio of the concentration of cesium in the CSS to the cesium concentration in the DSS. The BOBCalixC6 based solvent was capable of achieving DFs between 100 and 400 for each DSS batch. The NGS solvent is capable of achieving DFs greater than 40,000 for each DSS batch. The NGS blend solvent is currently meeting the goals of the pure NGS solvent. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Engaging the Public on Complex Issues: Communication challenges and Solutions - 17521

Public buy-in and support can make or break a project that has local environmental effects and implications, especially if that project takes place in a large community that is in-touch with its local and national government. Because of this, effective public communication is essential to the future of projects that can have an impact on a local community. This paper addresses the challenges and methods of communicating complex, scientific and/or technical issues with the public in an easy-to-understand, engaging manner while still accomplishing the communication goals of the organization. For consideration in particular is the challenge of communicating the proposed path forward and ongoing progress being made at ORP's tank farms and Waste Treatment and Immobilization Plant project to help build support and acceptance with local and national audiences. By using a variety of engagement opportunities and communication tools, we are able to educate the public on the issues being addressed by the organization, the possible solutions to these issues, and the challenges involved. An engaged and well-informed public can assist the organization in accomplishing its mission by educating and influencing audiences that have an impact on the organization. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

25 years of environmental remediation in the general separations area of the Savannah river site: lessons learned about what worked and what did not work in soil and groundwater cleanup - 15270

The Savannah River Site, which is owned and administered by the US Department of Energy, covers approximately 900 square kilometers. The General Separation Area is located in the center of the site and includes: radioactive material chemical separations facilities, radioactive waste tank farms, radioactive seepage basins, and the radioactive waste burial grounds. Radioactive wastes were disposed in the General Separation Area from the mid-1950's through the mid-1990's. Operations at the F Canyon began in 1954 and at H Canyon began in 1955. Waste water disposition to the F and H Seepage Basins began soon after operations started in the canyons. The Old Radioactive Waste Burial Ground began operations in 1952 to manage solid waste that could be radioactive from all the site operations, and ceased receiving waste in 1972. The Mixed Waste Management Facility and Low Level Radioactive Waste Disposal Facility received radioactive solid waste from 1969 until 1995. Environmental legislation enacted in the 1970's through 1990's led to changes in waste management and environmental cleanup practices. The US Congress passed the Clean Air Act in 1970 and the Clean Water Act in 1972; the Resource Conservation and Recovery Act was enacted in 1976; the Comprehensive Environmental Response Compensation, and Liability Act was enacted by Congress in 1980; and the Federal Facilities Compliance Act was signed into law in 1992. Environmental remediation at the Savannah River Site essentially began with a 1987 Settlement Agreement between the Savannah River Site and the State of South Carolina. The site manages several of the larger groundwater remedial activities under the Resource Conservation and Recovery Act for facilities recognized early on as environmental problems. All subsequent remediation projects are managed under a tri-party agreement (Department of Energy, Environmental Protection Agency, and South Carolina Department of Health and Environmental Control) through the Federal Facilities Agreement. Environmental remediation activities during the past 25 years have stabilized and capped seepage basins as well as consolidated and capped waste units and burial grounds in the General Separation Area. Groundwater activities include: pump and treat systems in the groundwater, installation of deep subsurface barrier systems to manage groundwater flow, in situ chemical treatments in the groundwater, and captured contaminated groundwater discharges at the surface for management in a forest irrigation system. Concentrations of contaminants in the aquifers beneath the General Separation Area and in surface water streams in the General Separation Area have decreased over the past 25 years. Closure of 65 waste sites and 4 Resource Conservation and Recovery Act facilities has been successfully accomplished. Environmental clean-up has progressed to the stage where most of the work involves monitoring, optimization, and maintenance of existing remedial systems. Many lessons have been learned in the process of remediating the General Separations Area. Geo-textile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive and enhanced natural processes to address contamination are much more cost effective than pump and treat systems. Forest irrigation can be very effective in water management situations with non-accumulative contaminants such as tritium and volatile organic contaminants. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste minimization efforts at the H-Canyon nuclear materials processing facility located at the Savannah River Site - 15535

During the last decade, the H-Canyon at the Savannah River Site (SRS) has employed various means to minimize liquid waste generation and/or to segregate liquid waste that favors generation of low level vs high level wastes. The primary drivers were cost reduction and support of SRS liquid waste tank farm feed to the SRS's Defense Waste Processing Facility. Recent High Level Waste (HLW) volume restrictions (transfers of liquid waste from the H-Canyon to the SRS's Liquid Waste System) imposed on H-Canyon have renewed waste minimization efforts. For the next several years, H-Canyon is faced with a HLW transfer reduction of approximately 65% (reduced from approximately 300,000 gallons to 100,000 gallons). This comes at a time when H-Canyon (and a companion facility named HB-Line) are about to begin executing two high profile missions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗