Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TANK”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

CFD and Thermodynamic Model Predictions of No-Vent Tank Filling in Microgravity

Cryogenic Fluid Management (CFM) of propellant fluids under low gravity conditions present an important challenge in the pursuit of NASA’s future long-duration space missions. Success of these missions relies to a large extent on the ability to store and transfer the cryogenic liquid fuels efficiently and safely. To this end, the Zero-Boil-Off Tank Filling and Transfer Experiment (ZBOT-FT) undertaken by University of Bremen in collaboration with Case Western Reserve University aims at studying two phase flow tank-to-tank transfer operations in microgravity using a simulant fluid, Perfluoro-n-pentane (PNP). As part of this effort, in this work, we present a system level homogeneous thermodynamic model and a two-phase Computational Fluid Dynamics (CFD) model of a no-vent cylindrical tank filling in microgravity. Both 2D axisymmetric and 3D parametric simulations case studies are performed to show the detailed physics of the filling process and the evolution of tank pressure for filling flow rates between 1.0 and 1.65 mL/s. A zero-dimensional homogeneous thermodynamic model is also developed to predict the final steady state tank pressure analytically. Comparison of the 2D and 3D CFD predictions of final pressures to the steady state thermodynamic results displays very good agreement. However, it is shown that the 2D axisymmetric model predicts a maxima in tank pressure before reaching steady state. It is indicted that this pressure maxima is caused by the constraints inherent in the axisymmetric model and is absent in the 3D and thermodynamic pressure predictions.

Two Phase Flow↗

Parametric Analysis of the Charge-Hold-Vent Method for Cryogenic Propellant Tank Chill Down

Abstract. In the absence of external heat exchangers, the on-orbit transfer of cryogenic propellants requires the receiver tank to first be quenched to a sufficiently low energy state to allow for a continuous no-vent fill to avoid unnecessary venting of liquid. One proposed method for tank chilldown that minimizes the potential for venting liquid is the charge hold vent (CHV) method. CHV follows a cyclic process that gradually removes thermal energy from the receiver tank by injecting liquid with the vent valve closed and allowing the fluid and wall to reach near-thermal equilibrium before venting the superheated vapor. However, the CHV method must be optimized to minimize complexity, mass, and time. This paper presents a modular CHV analytical model used to quantify the number of cycles and propellant mass consumed based on first principles. The model is used to examine the effect of eight parameters: receiver tank material, volume, mass, maximum expected operating pressure, and initial pressure, liquid injection pressure and temperature, and the target temperature. The model is validated against the only two available CHV datasets. Based on results, the tank mass-to-volume ratio is the most important factor in determining the number of CHV cycles and thus degree of difficulty in tank chilldown. The model can easily be used for early-stage design, sizing, and analysis of cryogenic propellant transfer systems. Keywords: tank chilldown, charge-hold-vent, no-vent fill

Tank Chilldown↗

STATISTICAL SAMPLING FOR IN-SERVICE INSPECTION OF LIQUID WASTE TANKS AT THE SAVANNAH RIVER SITE

Savannah River Remediation, LLC (SRR) is implementing a statistical sampling strategy for In-Service Inspection (ISI) of Liquid Waste (LW) Tanks at the United States Department of Energy's Savannah River Site (SRS) in Aiken, South Carolina. As a component of SRS's corrosion control program, the ISI program assesses tank wall structural integrity through the use of ultrasonic testing (UT). The statistical strategy for ISI is based on the random sampling of a number of vertically oriented unit areas, called strips, within each tank. The number of strips to inspect was determined so as to attain, over time, a high probability of observing at least one of the worst 5% in terms of pitting and corrosion across all tanks. The probability estimation to determine the number of strips to inspect was performed using the hypergeometric distribution. Statistical tolerance limits for pit depth and corrosion rates were calculated by fitting the lognormal distribution to the data. In addition to the strip sampling strategy, a single strip within each tank was identified to serve as the baseline for a longitudinal assessment of the tank safe operational life. The statistical sampling strategy enables the ISI program to develop individual profiles of LW tank wall structural integrity that collectively provide a high confidence in their safety and integrity over operational lifetimes.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

STATUS OF THE DEVELOPMENT OF IN-TANK/AT-TANK SEPARATIONS TECHNOLOGIES FOR FOR HIGH-LEVEL WASTE PROCESSING FOR THE U.S. DEPARTMENT OF ENERGY

Within the U.S. Department of Energy's (DOE) Office of Technology Innovation and Development, the Office of Waste Processing manages a research and development program related to the treatment and disposition of radioactive waste. At the Savannah River (South Carolina) and Hanford (Washington) Sites, approximately 90 million gallons of waste are distributed among 226 storage tanks (grouped or collocated in 'tank farms'). This waste may be considered to contain mixed and stratified high activity and low activity constituent waste liquids, salts and sludges that are collectively managed as high level waste (HLW). A large majority of these wastes and associated facilities are unique to the DOE, meaning many of the programs to treat these materials are 'first-of-a-kind' and unprecedented in scope and complexity. As a result, the technologies required to disposition these wastes must be developed from basic principles, or require significant re-engineering to adapt to DOE's specific applications. Of particular interest recently, the development of In-tank or At-Tank separation processes have the potential to treat waste with high returns on financial investment. The primary objective associated with In-Tank or At-Tank separation processes is to accelerate waste processing. Insertion of the technologies will (1) maximize available tank space to efficiently support permanent waste disposition including vitrification; (2) treat problematic waste prior to transfer to the primary processing facilities at either site (i.e., Hanford's Waste Treatment and Immobilization Plant (WTP) or Savannah River's Salt Waste Processing Facility (SWPF)); and (3) create a parallel treatment process to shorten the overall treatment duration. This paper will review the status of several of the R&D projects being developed by the U.S. DOE including insertion of the ion exchange (IX) technologies, such as Small Column Ion Exchange (SCIX) at Savannah River. This has the potential to align the salt and sludge processing life cycle, thereby reducing the Defense Waste Processing Facility (DWPF) mission by 7 years. Additionally at the Hanford site, problematic waste streams, such as high boehmite and phosphate wastes, could be treated prior to receipt by WTP and thus dramatically improve the capacity of the facility to process HLW. Treatment of boehmite by continuous sludge leaching (CSL) before receipt by WTP will dramatically reduce the process cycle time for the WTP pretreatment facility, while treatment of phosphate will significantly reduce the number of HLW borosilicate glass canisters produced at the WTP. These and other promising technologies will be discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chemical Sludge Heel Removal At The Savannah River Site F-Tank Farm Closure Project

Chemical Sludge Removal (CSR) is the final waste removal activity planned for some of the oldest nuclear waste tanks located at the Savannah River Site (SRS) in Aiken, SC. In 2008, CSR will be used to empty two of these waste tanks in preparation for final closure. The two waste tanks chosen to undergo this process have previously leaked small amounts of nuclear waste from the primary tank into an underground secondary containment pan. CSR involves adding aqueous oxalic acid to the waste tank in order to dissolve the remaining sludge heel. The resultant acidic waste solution is then pumped to another waste tank where it will be neutralized and then stored awaiting further processing. The waste tanks to be cleaned have a storage capacity of 2.84 E+06 liters (750,000 gallons) and a target sludge heel volume of 1.89 E+04 liters (5,000 gallons) or less for the initiation of CSR. The purpose of this paper is to describe the CSR process and to discuss the most significant technical issues associated with the development of CSR. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Testing of a Solid-Liquid Interface Monitor for High-Level Waste Tanks

A high-level waste (HLW) monitor has been designed, fabricated and tested at full-scale for deployment inside a Hanford tank. The Solid-Liquid Interface Monitor (SLIM) integrates a commercial sonar system with a mechanical deployment system for deploying into an underground waste tank. The system has undergone several design modifications based upon changing requirements at Hanford. We will present the various designs of the monitor from first to last and will present performance data from the various prototype systems. We will also present modeling of stresses in the enclosure under 85 mph wind loading. The system must be able to function at winds up to 15 mph and must withstand a maximum loading of 85 mph. There will be several examples presented of engineering tradeoffs made as FIU analyzed new requirements and modified the design to accommodate. We will present our current plans for installing into the Cold Test Facility at Hanford and into a double-shelled tank at Hanford. Finally, we will present our vision for how this technology can be used at Hanford and Savannah River Site to improve the filling and emptying of high-level waste tanks. In conclusion: 1. The manually operated first-generation SLIM is a viable option on tanks where personnel are allowed to work on top of the tank. 2. The remote controlled second-generation SLIM can be utilized on tanks where personnel access is limited. 3. The totally enclosed fourth-generation SLIM, when the design is finalized, can be used when the possibility exists for wind dispersion of any HLW that maybe on the system. 4. The profiling sonar can be used effectively for real-time monitoring of the solid-liquid interface over a large area. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Appurtenance Influence on Type III Hanford Single-Shell Tank Structural Integrity - 12255

The interim stabilized Hanford Single-Shell Tanks (SSTs) are currently undergoing a state of the art analysis to assess the structural integrity of the waste storage tanks, for cleanup and closure operations, considering their adverse thermal histories and an updated seismic hazard for the Hanford Site near Richland, Washington. The SSTs contain a variety of ancillary pits, piping, piping supports, risers, equipment, and penetrations known as appurtenances. These appurtenances may alter the structural response and ultimately could affect the structural integrity of the SSTs. An important challenge to the structural analysis of the SSTs is to determine the impact of these appurtenances on structural integrity. To achieve this, the various appurtenances were reviewed and a bounding appurtenance configuration for the SST Type III tanks was analyzed using finite element models for both thermal and operating loads as well as seismic loads. Tank structural demands from the finite element analyses were evaluated according to American Concrete Institute (ACI-349) code requirements to determine the tank structural integrity. The appurtenances configuration is found to increase the demand to capacity ratios in local regions near the appurtenances. Away from the appurtenances the influence on structural integrity is minor. The ACI-349-06 evaluation of the Type III SST bounding appurtenance configuration shows the tank is still structurally sound under all evaluated load combinations. When the appurtenance model D/C ratios were compared to those from the baseline axisymmetric model it was found that there were significant differences in the results, particularly under seismic loading conditions. This indicates that the effect of appurtenances on tank structural integrity should at least be considered in all SST AORs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Control room consolidation at Hanford tank farms for improved conduct of operation - 15345

Washington River Protection Solutions (WRPS) manages the underground waste storage tanks at the Hanford site in Washington State on behalf of the DOE Office of River Protection. There are 177 tanks distributed among 18 tank farms spread across an area of desert scrub covering about 20 square miles. A single evaporator facility supports the tanks to provide waste reduction activities. Farms and associated equipment, including exhausters, have been operated locally since installation. Upgrades over time introduced limited automation, but using inconsistent platforms, and providing isolated control locations around the farms. However, as the Tank Farms move from maintenance operations to production operations, with increased numbers of waste transfers and evaporator campaigns, and also prepare for integration with the adjacent Hanford Waste Treatment Plant, then operational improvements were planned and are being implemented. Infrastructure improvement projects included upgrades of control systems to a common platform, and installation of a fiber optic based local area network to the majority of farms, which together provided a distributed control system supporting tank farms. This new infrastructure provided the basis to propose consolidation of control and monitoring operations to a single location. More than a single location, the new Central Control Room was to increase effectiveness of operations by providing full status of all activities being performed across the Tank Farms and the Evaporator. The recent addition of productivity e-tools also would provide capability for management, supervisors and operators to make informed decisions regarding facility operations, through custom online applications designed to provide real time information derived from operational data. For example, tracking turnover activities between shifts, and maintaining compliance with limited conditions for operations. The Central Control Room would also have a single supervisor able to effectively manage the status of all assets and processes. The expected benefits of this arrangement include increased operator utility, increased situational awareness, improved response time for upset conditions, improvement in operator environment, and reductions in operating costs. The projected ROI for the Central Control Room when fully operational was projected to be about two years based on reduced costs from freeing up operations staff to perform other work plus the time and material savings realized by operations being performed with increased situational awareness. So the Central Control Room would become a hub for monitoring and controlling facility operations while responding to real time information affecting productivity and performance, from a centralized location customized to a fresh working environment. Over a 14-month period, WRPS developed the concept and engineering, procured over 500 items, modified and installed in renovated building, and completed transition and testing of this new Central Control Room, turning over the initial phase to Operations for 24/7 use in April 2014. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Retrieval and Inspection Operations in Hanford Tank 241-AY-102 - 18234

In August 2012, a periodic annulus inspection of tank 241-AY-102 (AY-102) identified a leak from the primary tank into the secondary containment. A pumping plan was developed in 2013 to provide a path forward for recommended remediation actions to be implemented as part of the AY-102 Recovery Project. On March 21, 2014, the Washington State Department of Ecology issued an Administrative Order requiring Washington River Protection Solutions and the United States Department of Energy to conduct actions related to and including the removal of waste from AY-102. The parties agreed to resolve the appeal of the Administrative Order through a Settlement Agreement which addressed the remaining requirements and implemented enforceable milestone dates, including completion of waste removal operations, and performance of an inspection aimed at determining the cause of the leak. The AY-102 Recovery Project was developed to address the Settlement Agreement requirements. While retrieval of waste from Single-Shell Tanks has been performed at Hanford for decades, retrieval from Double-Shell Tank AY-102 required adaptation of the existing technologies to a new environment on a larger scale than previously encountered. Despite countless challenges and obstacles encountered throughout, the project successfully completed system design, fabrication, installation, testing, and retrieval operations within a highly compressed, aggressive schedule. Waste removal activities in AY-102 completed in February 2017. Subsequent inspection activities were completed as part of a multi-step process aimed at determining the likely cause of failure and assessing the feasibility of repair. A variety of input data were used in evaluating the likely failure mechanism, such as video examinations that revealed numerous through-floor penetrations and significant degradation across the visible surface area. Based on the operational history of the tank, corrosion testing and analysis, and the visual appearance of the confirmed leak sites, service-induced pitting corrosion due to the historic waste composition and operating conditions appears to be the primary degradation mechanism leading to failure of the tank. The inspection data has demonstrated that repairing and returning AY-102 to service would likely introduce substantial technical, logistical, and financial challenges due to the extent of bottom-plate damage. As a result, tank AY-102 will ultimately be closed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Prototype Dual Robot System to Perform Ultrasonic and Visual Inspection for the Bottom of Double-Shell Tanks - 18624

Up to this point, ultrasonic inspection-based condition data has only been available for double-shell tank (DST) sidewalls because direct inspection access to the primary tank bottom is limited to vent duct channels in an insulating refractory pad that the primary tank rests on. Probe access through the air slot would provide the opportunity to get information about the condition of the bottom of the primary tank, but it is a challenge to deploy a crawling robot that is capable of performing nondestructive ultrasonic and visual inspection through confined air slots. As such, a conceptual prototype of a deployable inspection robot system to enable ultrasonic and visual inspection for DST base through ventilation ducts was designed and fabricated. This prototype dual robot system consisting of the AnnulusBot and the MouseBot can be integrated with nondestructive evaluation (NDE) sensors to inspect and examine the physical properties of the underside of DSTs to enable status assessment. The AnnulusBot was designed to carry the MouseBot and to be deployed to the annulus space through a riser. To deploy the MouseBot to every ventilation channel in the annulus, the arm consisting of a boom and a forearm was used to place the MouseBot on the underside of the tank. The AnnulusBot used segmented wheels enable to traverse pipes and other potential obstacles. The cable management system utilized motorized wheels to feed the cable into the ventilation channel. This would reduce the amount of work that the MouseBot would have to do during inspection. This feeding mechanism would also be used to retrieve the MouseBot at the end of its inspection. Additionally, if the MouseBot fails, this mechanism would be used for retrieval. Once deployed, the MouseBot navigates to the center of the tank via the air ventilation channel beneath the inner shell (the primary tank) while inspecting the space. The MouseBot is then retrieved from the channel by a combination of its own drive power and the AnnulusBot retracting the attached umbilical cord. Compare with the AnnulusBot, the physical dimensional limitations of the MouseBot were a greater challenge. As the surface state of the concrete of the air channels could have variable texture, and may contain debris, it was decided not to travel along this surface. The ceiling of these channels is carbon steel and can be utilized throughout the channel. To use this travel surface, magnetic wheels were employed. A foreseeable problem with the use of magnets on this surface, is that they would preclude the use of eddy currents sensors. However, other technologies like ultrasonic technology sensors should be unaffected. Laboratory scale test was performed on a mock-up single wedge of the refractory pad to evaluate maneuverability of the MouseBot. The electronic components for the prototype would work in the ranges of 150-185 deg. F (65.6-85 deg. C). Both the AnnulusBot and MouseBot will be subject to constant radiation. All major printed circuit board (PCB) microcontroller components were designed to be situated outside of the annulus space and inside the main control panel to avoid radiation-induced failure. As future work, electronic components including the Arduinos that used Atmel commercial microcontrollers will be replaced with the high temperature rated Atmel microcontrollers so that the robots can be operated reliably at ambient temperatures up to 200 deg. F (93.3 deg. C). In addition, the robots will be service life tested to evaluate performance at elevated temperature and under gamma irradiation. (authors)

42 ENGINEERING↗

Finite Element Structural Analysis Evaluating New Retrieval Strategies in the Hanford Waste Tanks 1 - 19125

Several waste retrieval methods being considered for the Hanford underground single- and double-shell nuclear waste storage tanks would require changes to the equipment loads above the tanks or structural modifications to the tanks themselves. Detailed structural analysis has been used in the planning phase to ensure that the reinforced concrete tanks continue to meet structural design codes in the modified configuration of these waste retrieval options. The feasibility of installing new single and multiple large risers penetrating the tank dome was evaluated using this approach. This paper summarizes the structural analysis methods and design codes used to evaluate the introduction of new unreinforced penetrations in a single-shell tank dome. The anticipated equipment loads during current and future waste retrieval operations are evaluated to ensure the continued structural integrity of the tank under thermal, dead weight, and seismic loads. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing and Implementing New Waste Chemistry Controls for Hanford's Double-Shell Tanks - 20041

Waste chemistry controls for the Hanford double-shell tanks (DSTs) were established in the 1980's in response to tank failures caused by stress corrosion cracking (SCC) at the Savannah River Site (SRS). The controls were established based on a combination of SRS chemistry limits and corrosion testing results. Conditions in the Hanford DSTs have changed over time, with the temperature in the majority of the DSTs dropping below 50 deg. C. Testing indicated that the original chemistry control specification and SCC testing performed in 2010 did not protect against pitting corrosion mechanisms - what is believed to have caused the failure of tank 241-AY-102. New waste chemistry controls are necessary to protect the DSTs from both SCC and pitting corrosion. Savannah River National Laboratory (SRNL), with input from the Tank Integrity Expert Panel (TIEP) Corrosion Subgroup (CSG), performed a statistically based investigation of nitrate and halide ion induced pitting corrosion. The investigation was intended to develop a comprehensive waste chemistry envelope that minimizes the risk of both SCC and pitting caused by halide and nitrate ions. The waste chemistry envelope needed to be robust enough to address future waste retrieval and process changes which could significantly change the waste composition of the DSTs. The experimental design allowed the statistically significant ions and their effect on pitting corrosion to be determined. SRNL developed the 'pitting factor' which is an empirical relationship between the statistically significant inhibitive species (hydroxide, and nitrite), and pitting inducing species (nitrate, chloride, and fluoride). The coefficients are weighted factors that show the degree of influence the species have on the propensity for pitting. New waste chemistry control limits were recommended by SRNL, and concurred with by the TIEP CSG, that incorporated the pitting factor along with other limits. The controls developed to reduce the risk of pitting corrosion were evaluated to determine if they also protected against SCC. Hundreds of test results were reviewed and compared against the proposed limits. With the exception of one test result, instances where cracking was observed corresponded to chemistry that was outside of the proposed limits - indicating that the chemistry controls developed for pitting also adequately addressed SCC concerns. Existing tank composition estimates were evaluated against the new chemistry controls - three current tank chemistries are suspect, and may not meet the new chemistry control requirements. These included the interstitial liquid (liquid associated with solids) of DSTs 241-AN-102, 241-AN-106, 241-AN-107, and 241-AY-101. Measures are ongoing to evaluate the tanks with the suspect chemistry. These include varying combinations of: performing additional evaluations (history of use, modeling); DST specific laboratory testing; and, pursuing core samples of the DSTs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Solubility Predictions for Hanford Tank Concentrates with HSC - 20459

The commercially available Outotec HSC 9.9.0{sup R} provides excellent predictions for the solubilities of many species for Hanford waste tank concentrates. The HSC solubility predictions with a Harvie activity model agreed well with five boildowns that showed solubility limits for NaNO{sub 3}, NaNO{sub 2}, Na{sub 2}CO{sub 3}, NaF, Na{sub 2}SO{sub 4}, and Na{sub 3}PO{sub 4}. However, the HSC did not predict density and therefore water content very well and therefore we used the measured densities and derived water content from the difference between measured density and assays. Furthermore, we adjusted the HSC enthalpy for the minor species Na{sub 3}PO{sub 4}*NaF double salt in order to fit the five boildowns as well. Previous work has shown that gibbsite becomes and remains supersaturated in all of these boildowns and so there was no alumina precipitation despite supersaturation. Furthermore, an equilibrium model like HSC always shows complete oxidation of any TOC in the presence of nitrate and nitrite. We therefore suppressed the HSC oxidation of acetate and oxalate in order to fit measured acetate and oxalate solubilities as TOC. Space in Hanford waste tanks is very limited and therefore evaporator campaigns continue to recover needed tank space from dilute tank liquids. Prior to each evaporator campaign, a boildown of a sample of tank liquid for each campaign provides a basis for planning by measuring density, water activity, soluble species, and solids precipitation as a function of concentration at 18 deg. C. These boildowns then provide validations and calibrations for the HSC solubility prediction for Hanford wastes. Previous work has shown the solubilities of minor electrolytes in these five boildowns follow rather simple power law solubility products. Hanford's 222-S laboratory has reported each of five boildowns for concentrated liquids from five waste tanks and tank blends. All boildowns eventually showed the precipitation of the dominant electrolyte, NaNO{sub 3}, and overall solution activity largely drives all solubility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Methane Emissions Produced by Pneumatic Devices and Produced Water Tanks on Natural Gas Wellsites

In recent years, more scrutiny has been placed on the release of greenhouse gasses (GHGs) by the oil and gas industry in North America as climate concerns increase. In the coming years, stricter regulations proposed by the Environmental Protection Agency (EPA) concerning the release of GHGs will further direct attention to GHG emissions quantification, modeling, and overall reduction. Active natural gas wellsites employ production equipment that routinely emits methane during normal operation. Production equipment often includes, but is not limited to, gas production units (GPUs), pneumatic controllers (PCs) and actuators powered by produced natural gas, and produced water storage tanks. This work details direct methane emission measurements taken at active natural gas wellsites originating from intermittent pneumatic controllers and produced water storage tanks. Efforts to model methane flows originating from these sources are also detailed, and those results are compared to direct measurement. The direct methane emissions measurement campaign collected flow data from two active dry wellsites in the Marcellus shale region. These measurement campaigns captured, in total, several weeks of continuous data from these sites. Data included multiple pneumatic device vent flowrate channels, a single channel monitoring total emissions vented from the produced water storage tanks, and corresponding site weather data. Periodic composition measurements were taken from flows vented from produced water tanks. Computational modeling efforts attempted to mimic a given site’s methane emissions behavior given limited input parameters. Direct measurement data and simulation data yielded, through reduction and analysis, apparent methane emissions factors, statistics on pneumatic device actuation events, important relationships between GPU parameters and pneumatic device actuation events, produced water storage tank vent flows and flow compositions, and parameters most contributing to the magnitude and frequency of these fugitive methane emissions. Measurements, considering data from a 72hr period, produced PC emissions factors from 0.008 to 0.03 SCFH per device with an average device emitting 0.026 SCFH at the first site. The second site produced PC emissions factors spanning from 0.05 to 25.47 SCFH with an average device emitting 1.93 SCFH not including the 25.47 SCFH device, which was assumed to be malfunctioning. Two unique water tank emission measurements were made, 618 g CH4 per hour and 32.6 g CH4 per hour. On a water basis, the water tank emissions factors were 0.66 and 0.042 kg CH4 per bbl of water, respectively.

03 NATURAL GAS↗

CHEMICAL SLUDGE HEEL REMOVAL AT THE SAVANNAH RIVER SITE F TANK FARM CLOSURE PROJECT 8183

Chemical Sludge Removal (CSR) is the final waste removal activity planned for some of the oldest nuclear waste tanks located at the Savannah River Site (SRS) in Aiken, SC. In 2008, CSR will be used to empty two of these waste tanks in preparation for final closure. The two waste tanks chosen to undergo this process have previously leaked small amounts of nuclear waste from the primary tank into an underground secondary containment pan. CSR involves adding aqueous oxalic acid to the waste tank in order to dissolve the remaining sludge heel. The resultant acidic waste solution is then pumped to another waste tank where it will be neutralized and then stored awaiting further processing. The waste tanks to be cleaned have a storage capacity of 2.84E+06 liters (750,000 gallons) and a target sludge heel volume of 1.89E+04 liters (5,000 gallons) or less for the initiation of CSR. The purpose of this paper is to describe the CSR process and to discuss the most significant technical issues associated with the development of CSR.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

POTENTIAL FOR STRESS CORROSION CRACKING OF A537 CARBON STEEL NUCLEAR WASTE TANKS CONTAINING HIGHLY CAUSTIC SOLUTIONS

The evaporator recycle streams of nuclear waste tanks may contain waste in a chemistry and temperature regime that exceeds the current corrosion control program, which imposes temperature limits to mitigate caustic stress corrosion cracking (CSCC). A review of the recent service history found that two of these A537 carbon steel tanks were operated in highly concentrated hydroxide solution at high temperature. Visual inspections, experimental testing, and a review of the tank service history have shown that CSCC has occurred in uncooled/un-stress relieved tanks of similar construction. Therefore, it appears that the efficacy of stress relief of welding residual stress is the primary corrosion-limiting mechanism. The objective of this experimental program is to test A537 carbon steel small scale welded U-bend specimens and large welded plates (30.48 x 30.38 x 2.54 cm) in a caustic solution with upper bound chemistry (12 M hydroxide and 1 M each of nitrate, nitrite, and aluminate) and temperature (125 C). These conditions simulate worst-case situations in these nuclear waste tanks. Both as-welded and stress-relieved specimens have been tested. No evidence of stress corrosion cracking was found in the U-bend specimens after 21 days of testing. The large plate test was completed after 12 weeks of immersion in a similar solution at 125 C except that the aluminate concentration was reduced to 0.3 M. Visual inspection of the plate revealed that stress corrosion cracking had not initiated from the machined crack tips in the weld or in the heat affected zone. NDE ultrasonic testing also confirmed subsurface cracking did not occur. Based on these results, it can be concluded that the environmental condition of these tests was unable to develop stress corrosion cracking within the test periods for the small welded U-bends and for the large plates, which were welded with an identical procedure as used in the construction of the actual nuclear waste tanks in the 1960s. The absence of evidence of stress corrosion cracking and general corrosion in the laboratory-scaled specimens indicate that this type of nuclear waste tank is not susceptible to highly caustic solutions up to 12 M hydroxide at 125 C when sufficient nitrite inhibitor is present.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of the SRNL-Washed tank 51 sludge batch 9 qualification sample

Savannah River National Laboratory (SRNL) personnel have been requested to qualify the next sludge batch (Sludge Batch 9 – SB9) for processing at the Defense Waste Processing Facility (DWPF). To accomplish this task, Savannah River Remediation (SRR) sent SRNL a 3-L sample of Tank 51H slurry to be characterized, washed, and then used in a lab-scale demonstration of the DWPF flowsheet (after combining with Tank 40H sludge). SRNL has washed the Tank 51H sample per the Tank Farm washing strategy as of October 20, 2015. A part of the qualification process is extensive radionuclide and chemical characterization of the SRNL-washed Tank 51H slurry. This report documents the chemical characterization of the washed slurry; radiological characterization is in progress and will be documented in a separate report. The analytical results of this characterization are comparable to the Tank Farm projections. Therefore, it is recommended that SRNL use this washed slurry for the ongoing SB9 qualification activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Empirical characterization of vertical-tube inlets in hot-water storage tanks

Hot-water storage in residential and commercial tanks is of growing interest for peak-shifting the electrical demand associated with hot-water loads. How the water enters the tank can significantly affect the extraction efficiency of the storage. Vertical-tube inlets (VTIs) direct cold water into the tank. The VTI design influences whether large-scale mixing occurs, which can reduce the delivery capacity of the hot-water storage. In this work, the mixing at the VTI discharge was characterized by the eddy diffusivity factor (EDF) in an allometric curve fit to the ratio Re:Ri using inlet superficial velocities. The full experimental campaign tested VTI's with Re’s between 170 and 22,300 and Ri's between 0 and 376. Animated visualization of the experimentally measured data is provided, showing tank temperature evolution during inlet flows. The most predictive correlations for EDF are for VTI Re in the transition zone (i.e. ~2300 < Re < ~10,000) and at a Ri corresponding to a stably stratified tank (i.e. Ri > 5). For vertical-tubes that distribute cold water below the thermocline, increasing the EDF will decrease the stratification in a hot-water tank as EDF quantifies inlet mixing. Overall, the new correlations for VTIs can be used to design and model thermally-stratified storage tanks.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗