Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “System Operator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

OPALS: Mission System Operations Architecture for an Optical Communications Demonstration on the ISS

In spring 2014, the Optical PAyload for Lasercomm Science (OPALS) will launch to the International Space Station (ISS) to demonstrate space-to-ground optical communications. During a 90-day baseline mission, OPALS will downlink high quality, short duration videos to the Optical Communications Telescope Laboratory (OCTL) in Wrightwood, California. To achieve mission success, interfaces to the ISS payload operations infrastructure are established. For OPALS, the interfaces facilitate activity planning, hazardous laser operations, commanding, and telemetry transmission. In addition, internal processes such as pointing prediction and data processing satisfy the technical requirements of the mission. The OPALS operations team participates in Operational Readiness Tests (ORTs) with external partners to exercise coordination processes and train for the overall mission. The tests have provided valuable insight into operational considerations on the ISS.

Abrahamson, Matthew J.↗

Unmanned Aircraft System (UAS) Traffic Management (UTM): Enabling Civilian Low-Altitude Airspace and Unmanned Aerial System Operations

Just a year ago we laid out the UTM challenges and NASA's proposed solutions. During the past year NASA's goal continues to be to conduct research, development and testing to identify airspace operations requirements to enable large-scale visual and beyond visual line-of-sight UAS operations in the low-altitude airspace. Significant progress has been made, and NASA is continuing to move forward.

UTM↗

2019 Corrective Measures Implementation and Intermim Measures Annual Status Report: Summary of Biosparge System Operation and Maintenance, and Interim Groundwater Monitoring Mobile Launch Platform / Vehicle Assembly Building Area (SWMU 056) Kennedy Space Center, Florida

This report presents a summary of the Corrective Measures Implementation (CMI) and Interim Measure (IM) implementation activities that occurred from May 2019 through December 2019 at the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, Solid Waste Management Unit 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida.

MOBILE LAUNCH PLATFORM / VEHICLE ASSEMBLY BUILDING↗

The SIRTF Science Operations System

This paper describes the role and function of the SSC, the architecture of the SOS, and discusses the major SOS subsystems. Examples of products generated by the SOS are included.

science↗