Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “S-BAND”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Dielectric image-resonator multiplexer

A two, three or four channel multiplexer can be operated in the TE 01δ or HE 11δ modes, each channel of the multiplexer has one bandpass filter, with each filter usually having a plurality of cavities. One cavity of each filter is a common cavity with all of the other filters of the multiplexer. The common cavity contains one independent dielectric quarter-cut or half-cut image resonator for each filter representing a channel- of the multiplexer. Each resonator is mounted on a suitable support the common cavity provides a common junction and contains a loop coupling to couple electromagnetic energy between the various· channels. The multiplexer has at least one input and at least one output. Previous microwave multiplexers have a plurality of bandpass filters arranged on a coaxial manifold. With the multiplexer of the present invention, the manifold can be eliminated. Further, at the S-band or L-band, substantial weight and volume savings can be achieved using the multiplexer of the present invention without sacrificing performance. This can be very important for space applications.

Wai-Cheung Tang↗

Equivalent circuit model of traveling-wave maser slow-wave structures

An approach is presented for deriving transmission line equivalent circuits that can approximately model the S-parameter response of traveling wave maser slow wave structures. The technique is illustrated by computing the S-parameter responses of an X-band and S-band maser slow wave structure and comparing these with experimental measurements.

Shell, J.↗

Comparison of lightning location data and polarisation radar observations of clouds

Simultaneous observations of both the precipitation and the lightning associated with thunderstorms show that the lightning is within 3 km of the maximum precipitation echo. The intensity and type of the precipitation is observed with 500 m spatial accuracy using an S-band polarization radar and the position of the lightning is inferred from a low frequency magnetic direction finding location system. Empirical adjustment to the angles using the redundancy of the lightning data reduce this error. Radar echoes above 45dBZ may be caused by soft hail or hailstones, but similarly intense echoes may result from melting snow. The data show that a new polarization radar parameter, the linear depolarization ratio, can distinguish between soft hail and melting snow, and that the intense radar echoes associated with melting snow pose no threat of lightning. A lightning risk only exists when the radar indicates that the clouds contain soft hail or hailstones.

Illingworth, A. J.↗

Spacecraft Doppler tracking with a VLBI antenna

Preliminary results are reported from Doppler-shift measurements to the Voyager-2 spacecraft at a distance of 26 AU, obtained using the 32-m VLBI antenna at Medicina (Italy) during July and August 1988. The apparatus comprises the el-az antenna, an S-X-band receiver, a hydrogen maser to generate the reference signal, a Mark III VLBI terminal, and a digital tone extractor capable of isolating a tone of known frequency from a noisy signal and giving its phase and amplitude. A signal transmitted in S-band from the NASA Deep Space Network (DSN) station in Australia and retransmitted coherently in X-band by Voyager, was received 7 h 6 min later at Medicina and at the DSN station in Madrid. Sample data are presented graphically and shown to be of generally high quality; further in-depth analysis is under way.

Comoretto, G.↗

A technology assessment of alternative communications systems for the space exploration initiative

Telecommunications, Navigation, and Information Management (TNIM) services are vital to accomplish the ambitious goals of the Space Exploration Initiative (SEI). A technology assessment is provided for four alternative lunar and Mars operational TNIM systems based on detailed communications link analyses. The four alternative systems range from a minimum to a fully enhanced capability and use frequencies from S-band, through ka-band, and up to optical wavelengths. Included are technology development schedules as they relate to present SEI mission architecture time frames.

Ponchak, Denise S.↗

International Space Network interoperability results and status

In 1986, NASA, ESA, and NASDA instituted the Space Network Interoperability Panel (SNIP) to coordinate the activities of these three national agencies during the exploratory phase of new space communications systems' development. To date, the deliberations of SNIP have led to (1) ESA's changing of its European Data Relay Satellite's S-band center frequency from fixed to tunable, (2) NASDA's changing of two comsats' Ka-band return link frequency from 32 GHz to the 26 GHz standard adopted by ESA, and (3) NASA's adoption of the Ka-band, in addition to the Ku-band, as the high data rate interorbital link of the ATDRS. A tabulation of interoperability considerations for the three space agencies is presented.

Fahnestock, Dale↗

NASA's Magellan mission to Venus

At the end of its planned 243-day mission, by which time Venus will have completed a full rotation beneath Magellan's orbit, over 70 percent of the Venus surface shall have been mapped to high resolution; the volume of data thus obtained will exceed that from all previous U.S. planetary missions combined. An innovative SAR instrument will map Venus to an order-of-magnitude higher resolution than that possible with previous probes. Parameters controlling the spacing of SAR S-band pulses' transmission and reception, their number and frequency of repetition, etc., are changed as many as 300 times per mapping pass in order to accommodate the spacecraft's constantly varying orbital geometry.

Doody, Dave↗

Integrated receiver for NASA tracking and data relay satellite system

The tracking and data relay satellite system (TDRSS) provides a flexible communications system for low-earth-orbit spacecraft and a source of tracking data to permit the location of the many orbital platforms to be accessed. Central to the TDRSS ground terminal is the integrated receiver which provides data demodulation, decoding, and deinterleaving over the range of 100 sps to 12 Msps, and all the tracking services in a single high-performance design. The requirements and design of the integrated receiver (IR), as well as an unbalanced quadriphase shift keying (UQPSK) receiver/demodulator under development for use in the TDRSS are discussed. The top level architecture of the IR is presented, and the implementation of the primary functions in the receiver is described. A single IR replaces the 12 different chassis currently required to support a single S-band single-access service. This approach has proven to be successful.

Bricker, P.↗

European Telecommunications Satellite II (EUTELSAT II)

EUTELSAT II is a regional public telecommunications system for Europe. The services which will be provided are telephone and television. The satellites will be placed at a geostationary orbit within the arcs of 6 degrees east to 19 degrees east or 26 degrees to 36 degrees east. The designed lifetime is 7 years. After separation of the satellites from the launch vehicles, telemetry, telecommand, and ranging will be performed within the S-band frequencies. After positioning of the satellite at its final geostationary orbit, the Ku-band telecommunication equipment will be activated. From this time on, all satellite control operations will be performed in Ku-band. The Deep Space Network (DSN) will support the transfer and drift orbit mission phases. The coverage will consist of the 26-m antennas at Goldstone and Canberra as prime support for the transfer and drift orbits. Maximum support will consist of a 7-day period, plus 14 days of contingency support. Information is given in tabular form for DSN support, frequency assignments, telemetry, command, and tracking support responsibility.

Laemmel, G.↗

Nimbus-7

The DSN (Deep Space Network) mission support requirements for Nimbus 7 are summarized. The basic Nimbus series spacecraft is attitude-stabilized in three axes, with the yaw axis always pointing towards the center of the Earth. The spacecraft provides a stable platform, power, command, and data handling support for active and passive sensors for daily global surveillance of the atmosphere, and for mapping details of the atmospheric structure and Earth surface from satellite altitudes. The Nimbus 7 mission objectives are outlined and the DSN support requirements are defined through the presentation of tables and narratives describing the spacecraft flight profile; DSN support coverage; S-band frequency assignments; support parameters for telemetry, command and support systems; and tracking support responsibility.

Foreman, M.↗

Ionospheric refraction effects on TOPEX orbit determination accuracy using the Tracking and Data Relay Satellite System (TDRSS)

This investigation concerns the effects on Ocean Topography Experiment (TOPEX) spacecraft operational orbit determination of ionospheric refraction error affecting tracking measurements from the Tracking and Data Relay Satellite System (TDRSS). Although tracking error from this source is mitigated by the high frequencies (K-band) used for the space-to-ground links and by the high altitudes for the space-to-space links, these effects are of concern for the relatively high-altitude (1334 kilometers) TOPEX mission. This concern is due to the accuracy required for operational orbit-determination by the Goddard Space Flight Center (GSFC) and to the expectation that solar activity will still be relatively high at TOPEX launch in mid-1992. The ionospheric refraction error on S-band space-to-space links was calculated by a prototype observation-correction algorithm using the Bent model of ionosphere electron densities implemented in the context of the Goddard Trajectory Determination System (GTDS). Orbit determination error was evaluated by comparing parallel TOPEX orbit solutions, applying and omitting the correction, using the same simulated TDRSS tracking observations. The tracking scenarios simulated those planned for the observation phase of the TOPEX mission, with a preponderance of one-way return-link Doppler measurements. The results of the analysis showed most TOPEX operational accuracy requirements to be little affected by space-to-space ionospheric error. The determination of along-track velocity changes after ground-track adjustment maneuvers, however, is significantly affected when compared with the stringent 0.1-millimeter-per-second accuracy requirements, assuming uncoupled premaneuver and postmaneuver orbit determination. Space-to-space ionospheric refraction on the 24-hour postmaneuver arc alone causes 0.2 millimeter-per-second errors in along-track delta-v determination using uncoupled solutions. Coupling the premaneuver and postmaneuver solutions, however, appears likely to reduce this figure substantially. Plans and recommendations for response to these findings are presented.

Radomski, M. S.↗

Evolution of the large Deep Space Network antennas

The evolution of the largest antenna of the US NASA Deep Space Network (DSN) is described. The design, performance analysis, and measurement techniques, beginning with its initial 64-m operation at S-band (2295 MHz) in 1966 and continuing through the present ka-band (32-GHz) operation at 70 m, is described. Although their diameters and mountings differ, these parabolic antennas all employ a Cassegrainian feed system, and each antenna dish surface is constructed of precision-shaped perforated-aluminum panels that are secured to an open steel framework

Imbriale, William A.↗

Radio frequency interference effect on PN code sequence lock detector

The authors find the probabilities of detection and false alarm of the pseudonoise (PN) sequence code lock detector when strong radio frequency interference (RFI) hits the communications link. Both a linear model and a soft-limiter nonlinear model for a transponder receiver are considered. In addition, both continuous wave (CW) RFI and pulse RFI are analyzed, and a discussion is included of how strong CW RFI can knock out the PN code lock detector in a linear or a soft-limiter transponder. As an example, the Space Station Freedom forward S-band PN system is evaluated. It is shown that a soft-limiter transponder can protect the PN code lock detector against a typical pulse RFI, but it can degrade the PN code lock detector performance more than a linear transponder if CW RFI hits the link.

Kwon, Hyuck M.↗

A multiparameter radar examination of a mesoscale convective system

Differences in the rainrates of various cells embedded within a mesoscale convective system on July 13, 1986 during the Cooperative Huntsville Meteorological experiment are examined. The NCAR CP2 S-band polarimetric radar deployed near Huntsville, Alabama, is used to characterize the rainfall field. Rainfall estimates are compared and contrasted using the single-parameter Marshall and Palmer (1948) method with the Illingworth and Caylor (1989) dual-polarization technique (ILC). The primary differences in the rainrate estimates are shown to be associated with the differences in the drop size distributions, derived from the ILC technique, that occur within the various storms.

Wright, P. D.↗

TDRS and the TDRS System

An overview of the Tracking and Data Relay Satellite (TDRS) system is given, including a brief history, the purpose of the TDRS, and who controls the satellite. The S-band and KU-band antennae are described. Footage of the TDRS-E (the fifth TDRS) deployment and images of various spacecraft from space are shown, along with computer simulations of the TDRS's operation.

Source record↗

Magellan Post Launch Mission Operation Report

Magellan was successfully launched by the Space Shuttle Atlantis from the Kennedy Space Center at 2:47 p.m. EDT on May 4, 1989. The Inertial Upper Stage (IUS) booster and attached Magellan Spacecraft were successfully deployed from Atlantis on Rev. 5 as planned, at 06:14 hrs Mission Elapsed Time (MET). The two IUS propulsion burns which began at 07:14 hrs MET and were completed at 07:22 hrs MET, placed the Magellan Spacecraft almost perfectly on its preplanned trajectory to Venus. The IUS was jettisoned at 07:40 hrs MET and Magellan telemetry was immediately acquired by the Deep Space Network (DSN). A spacecraft trajectory correction maneuver was performed on May 21 and the spacecraft is in the planned standard cruise configuration with all systems operating nominally. An initial attempt was made to launch Atlantis on April 28, 1989, but the launch was scrubbed at T-31 sec due to a failure of the liquid hydrogen recirculation pump on Space Shuttle Main Engine #1. The countdown had proceeded smoothly until T-20 min when the Magellan radio receiver "locked-on" the MIL 71 Unified S-Band (USB) transmission as the transmitter power was increased fro 2 kw to 10 kw in support of the orbiter launch. During the planned hold at T-9 min, the USB was confirmed as the source of the receiver "lock" and Magellan's launch readiness was reaffirmed. In addition a five-minute extension of the T-9 hold occurred when a range safety computer went off-line, creating a loss of redundancy in the range safety computer network. Following resumption of the countdown, both the orbiter and Magellan flows proceeded smoothly until the launch was scrubbed at T-31 sec.

Source record↗