Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Role of Operating Flexibility in Planning Studies

This project was conceived to examine the flexibility needs of the future California power grid. The analysis explores the need to establish generation planning metrics and standards that explicitly consider the operating flexibility needs of the system as the State pursues its aggressive renewable power generation goals. New methods and tools have been developed to use high resolution models of the grid that take into account uncertainties regarding renewable generation, load, equipment reliability, and economic growth. These models leverage high performance computational resources to fully explore the range of possible grid conditions that may lead to loss of load. The cost effectiveness of operating policies and hardware configurations that increase grid flexibility are examined with the tools to provide actionable information to grid planners and stakeholders.

24 POWER TRANSMISSION AND DISTRIBUTION↗

RePOWERD: Restoration of Power Outage from Wide-area Severe Weather Disruptions

The purpose of the RePOWERD project is to develop a probabilistic and a simulation based power restoration forecasting model for tropical storms based on geographic utility service areas, impacts to energy infrastructures and transportation networks, time-varying customer outage number, crew information (i.e., crew size, crew staging requirements), and utility restoration plans. Energy infrastructure is a critical lifeline essential for the United States’ national and economic security. Like other critical infrastructures, this infrastructure is aging and is at a high risk of damages from extreme weather events. Based on the number of reported outages in EAGLE-I during 2020 and 2021, it is evident that the current energy infrastructure is not equipped to handle extreme event impacts and will contribute to significant outages. From a resilience perspective, it is essential to forecast restoration time in the event of a severe weather induced power outage to assist the US Department of Energy, emergency managers, and first responders with resource planning. This project contributes to this crucial need. This report details the models, that were developed in this pilot study, to determine the rate of restoration and estimated time of restoration (ETR) during tropical storm events within counties and utility service areas based on damage to energy infrastructures and total number of customers experiencing outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SDN Project

The SDN Project completed on time and on budget and successfully accomplished 100% of the scope of work outlined in the original Statement of Project Objective (SOPO). The SDN Project formed an alliance between Ameren Corporation, University of Illinois Urbana- Champaign (UIUC), Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). The objective of the SDN Project is to address Topic Area of Interest 2: Sustain critical energy delivery functions while responding to a cyber-intrusion under Funding Opportunity Announcement DE-FOA-0000797. The goal of the project is to design and commercially release technology that provides a method to sustain critical energy delivery functions during a cyber intrusion and to do this control system operators need the ability to quickly identify and isolate the affected network areas, and re-route critical information and control flows around. The objective of the SDN Project is to develop a Flow Controller that monitors, configures, and maintains the safe, reliable network traffic flows of all the local area networks (LANs) on a control system in the Energy sector. The SDN team identified the core attributes of a control system and produced an SDN flow controller that has the same core attributes enabling networks to be designed, configured and deployed that maximize the whitelisted, deny-bydefault and purpose built networks. This project researched, developed and commercially released technology that: Enables all field networks be to configured and monitored as if they are a single asset to be protected; Enables greatly improved and even precalculated response actions to reliability and cyber events; Supports pre-configured localized response actions tailored to provide resilience against failures and centralized response to cyber-attacks that improve network reliability and availability; Architecturally enables the right subject matter experts, who are usually the information technology and operational technology engineers, to be the ones centrally administering the technology and responding to events; Simplifies network configuration, improving deterministic Ethernet transport times, and providing instant visualization on where the communication circuits are and how all circuits are impacted when changes (e.g., configuration changes, failures or intrusions) happen, allowing operators to minimize downtime; and Improves the ability to identify deviations in network behavior resulting in detection and analysis of potential cyber intrusions and faster response times Results: This project has forever changed the way critical infrastructure networks are designed, secured, deployed and maintained. The cybersecurity and performance advantages achieved are significant, simply put traditional networking has been obsoleted while the team maintained Ethernet interoperability avoiding any legacy concerns. The team commercially released technology that accomplished all the cybersecurity goals outlined in the SOPO and completed it by executing the project management plan approved in the initial contract. The resulting Energy sector SDN flow controller model number is SEL-5056 and can be freely downloaded from the www.SELinc.com website. This technology not only improves the cybersecurity of control systems but has measured results that it improves the performance and reliability of the control system as well. This means the system owners can confidently apply it to their systems knowing that it will, “first do no harm” but actually improve the system as well. Success of the project is best measured by the sales and deployment of the technology. System owners in industrial, electric, defense, and oil and gas only months after commercial release have approved plans for deployment.

42 ENGINEERING↗

Survey Report for the Characterization of the Five Tanks Located Near the Old Salvage Yard at the Y-12 National Security Complex, Oak Ridge, Tennessee

This summary report presents analytical results, radiological survey data, and other data/information for disposition planning of the five tanks located west of the Old Salvage Yard (OSY) at the Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. Field personnel from Oak Ridge Associated Universities (ORAU) and URS?CH2M Oak Ridge LLC completed data collection in May 2012 per the project-specific plan (PSP) (ORAU 2012). Deviations from the PSP are addressed in the body of this report. Characterization activities included three data collection modes: visual inspection, radiological survey, and volumetric sampling/analysis. This report includes the final validated dataset and updates associated with the Tank 2 residues originally thought to be a biological bloom (e.g., slime mold) but ultimately identified as iron sulfate crystals.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LCLS-II Cryomodules Production Experience and Lessons Learned Towards LCLS-II-HE Project

LCLS-II is an upgrade project for the linear coherent light source (LCLS) at SLAC. The LCLS-II linac consists of thirty-five 1.3 GHz and two 3.9 GHz superconducting RF (SRF) continuous wave (CW) cryomodules with high quality factor cavities. Cryomodules were produced at Fermilab and at Jefferson Lab in collaboration with SLAC. Fermilab successfully completed the assembly, testing and delivery of seventeen 1.3 GHz and three 3.9 GHz cryomodules. LCLS-II-HE is a planned upgrade project to LCLS-II. The LCLS-II-HE linac will consist of twenty-three 1.3 GHz cryomodules with high gradient and high quality factor cavities. This paper presents LCLS-II-HE cryomodule production plans, emphasizing the improvements done based on the challenges, mitigations, and lessons learned from LCLS-II.

43 PARTICLE ACCELERATORS↗

Advanced Control Systems for Wave Energy Converters

This submission contains several papers, a final report, descriptions of a theoretical framework for two types of control systems, and descriptions of eight real-time flap load control policies with the objective of assessing the potential improvement of annual average capture efficiency at a reference site on an MHK device developed by Resolute Marine Energy, Inc. (RME). The submission also contains an LCOE model that estimates the performance and related energy cost improvements that each advanced control system might provide and recommendations for improving DOE's LCOE model. The two types of control systems are for wave energy converters which transform data into commands that, in the case of RME's OWSC wave energy converter, provide real-time adjustments to damping forces applied to the prime mover via the power take-off system (PTO). The control theories developed were: 1) Model Predictive Control (MPC) or so-called "non-causal" control whereby sensors deployed seaward of a wave energy converter measure incoming wave characteristics and transmit that information to a data processor which issues commands to the PTO to adjust the damping force to an optimal value; and 2) "Causal" control which utilizes local sensors on the wave energy converter itself to transmit information to a data processor which then issues appropriate commands to the PTO. The two advanced control policies developed by Scruggs and Re Vision were then compared to a simple control policy, Coulomb damping, which was utilized by RME during the two rounds of ocean trials it had conducted prior to the commencement of this project. The project work plan initially included a provision for RME to conduct hardware-in-the-loop (HIL) testing of the data processors and configurations of valves, sensors and rectifiers needed to implement the two advanced control systems developed by Scruggs and Re Vision Consulting but the funding for that aspect of the project was cut at the conclusion of Budget Period 1. Accordingly, more work needs to be done to determine: a) means and feasibility of implementing real-time control; and b) added costs associated with such implementation taking into account estimated effects on system availability in addition to component costs.

16 TIDAL AND WAVE POWER↗

Detection and Analysis of Threats to the Energy Sector: DATES

This report summarizes Detection and Analysis of Threats to the Energy Sector (DATES), a project sponsored by the United States Department of Energy and performed by a team led by SRI International, with collaboration from Sandia National Laboratories, ArcSight, Inc., and Invensys Process Systems. DATES sought to advance the state of the practice in intrusion detection and situational awareness with respect to cyber attacks in energy systems. This was achieved through adaptation of detection algorithms for process systems as well as development of novel anomaly detection techniques suited for such systems into a detection suite. These detection components, together with third-party commercial security systems, were interfaced with the commercial Security Information Event Management (SIEM) solution from ArcSight. The efficacy of the integrated solution was demonstrated on two testbeds, one based on a Distributed Control System (DCS) from Invensys, and the other based on the Virtual Control System Environment (VCSE) from Sandia. These achievements advance the DOE Cybersecurity Roadmap [DOE2006] goals in the area of security monitoring. The project ran from October 2007 until March 2010, with the final six months focused on experimentation. In the validation phase, team members from SRI and Sandia coupled the two test environments and carried out a number of distributed and cross-site attacks against various points in one or both testbeds. Alert messages from the distributed, heterogeneous detection components were correlated using the ArcSight SIEM platform, providing within-site and cross-site views of the attacks. In particular, the team demonstrated detection and visualization of network zone traversal and denial-of-service attacks. These capabilities were presented to the DistribuTech Conference and Exhibition in March 2010. The project was hampered by interruption of funding due to continuing resolution issues and agreement on cost share for four months in 2008. This resulted in delays in finalizing agreements with commercial partners, and in particular the Invensys testbed was not installed until December 2008 (as opposed to the March 2008 plan). The project resulted in a number of conference presentations and publications, and was well received when presented at industry forums. In spite of some interest on the part of the utility sector, we were unfortunately not able to engage a utility for a full-scale pilot deployment.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

2016 Update of Hanford Glass Property Models and Constraints for Use in Estimating the Glass Mass to be Produced at Hanford by Implementing Current Enhanced Glass Formulation Efforts

Recent glass formulation and melter testing data have suggested that significant increases in waste loading in high-level waste (HLW) and low-activity waste (LAW) glasses are possible over current system planning estimates. In 2013 a set of models and constraints based on these data were developed and published (Vienna et al. 2013). Since that report roughly 200 additional glasses have been tested and lessons were learned in the application of the preliminary set of models and constraints. This report summarizes the advancements in glass formulation and glass property estimation since Vienna et al. 2013 (using the additional data and lessons learned) and updates the recommended set of enhanced glass property-composition models and constraints for use in River Protection Project (RPP) planning. The combined data (although limited in some cases) were evaluated to determine a set of constraints and models that could be used to estimate the maximum loading of specific waste compositions in glass. It is recommended that these models and constraints be used to estimate the likely HLW and LAW glass masses that would result if the current glass formulation studies are successfully completed. It is recognized that some of the models are preliminary in nature and will change in the coming years. In addition, the models do not currently address the prediction uncertainties that would be required before they could be used in plant operations. The models and constraints are only meant to give an indication of rough glass masses and are not intended to be used in quality-affecting activities or decisions. A current research program is in place to develop the data, models, and uncertainty descriptions for that purpose. A fundamental tenet underlying the research reported in this and the previous document is the attempt to be less conservative, but still realistic, than previous studies when developing constraints for the estimation of glass to be produced by implementing current enhanced glass formulation efforts. The less conservative approach documented herein should allow for the estimate of glass masses that may be realized if the current efforts in enhanced glass formulations are completed over the coming years, and are as successful as early indications suggest they may be. Because of this approach, there is an unquantifiable uncertainty in the ultimate glass mass projections due to model prediction uncertainties that must be considered, along with other system uncertainties, such as waste compositions and amounts to be immobilized, split factors between LAW and HLW, etc. A plan to estimate the impact of those uncertainties has been developed and a future update will document the results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-F-T-499: Anatomic Features for Selection of Electronic Tissue Compensation Radiotherapy in Early-Stage Breast Cancer Patients After Breast-Conserving Surgery

Purpose: To explore the correlations between anatomic features and dose-volumetric parameters in 3DCRT and eComp whole breast irradiation and identify the feasibility of anatomic parameters to predict the planning method selection. Methods: We compared the effectiveness between conventional three-dimensional conformal radiotherapy (3DCRT) and electronic tissue compensation (eComp) for whole breast irradiation. 3DCRT and eComp planning techniques were used to generate treatment plans for 60 whole breast patients, respectively. The planning goal was to cover 95% of the planning target volume (PTV) with 95% of the prescription dose while minimizing dose to lung, heart, and skin. Statistical analyses were performed between critical organ doses and patient anatomic features, i.e., central lung distance (CLD), maximal heart distance (MHD), maximal heart length (MHL) and breast separation (BS). Results: Comparing to 3DCRT plans, on the average, eComp treatment planning process was about 7 minutes longer, but resulted in lower lung V20Gy, lower mean skin dose, with similar heart dose. The benefits were more pronounced for larger breast patients. To keep the lung V20Gy lower than 20% and mean skin dose lower than 85% of the prescription dose, eComp was the preferred method for patients with more than 2.3 cm CLD or larger than 22.5 cm BS. Conclusion: The study results may be useful in providing a handy criterion in clinical practice allowing us to easily choose between different planning techniques to satisfy the planning goal with minimal increase in complexity and cost. This study was supported by National Natural Science Foundation of China (NO. 31420103915) and Chongqing Health and Family Planning Commission Project (2015MSXM012).

60 APPLIED LIFE SCIENCES↗

Preload Characterization of Short Models of MQXF the Nb 3 Sn Low-β Quadrupole for the Hi-Lumi LHC

MQXF is the Nb3Sn Low-β Quadrupole magnet that the HL-LHC project is planning to install in the LHC interaction regions in 2026 as part of an upgrade to increase the LHC inte-grated luminosity by about a factor of ten. The magnet will be fab-ricated in two different lengths: 4.2 m for MQXFA, built in the US by the Accelerator Upgrade Project (AUP), and 7.15 m for MQXFB, fabricated by CERN. In order to qualify the magnet de-sign and characterize its performance with different conductors, cable geometries and pre-load configuration, five short model magnets, called MQXFS, were fabricated, assembled and tested. The latest model, MQXFS6, uses a new powder-in-tube (PIT) su-perconducting wire, featuring a bundle barrier surrounding the filaments. The coil and the support structure were equipped with strain gauges and optical fibres to monitor strain during assembly, cool-down and excitation. In this paper we further develop the conventional azimuthal preload analysis and introduce a new set of tools for MQXF coil pack characterization which we use to an-alyse the behaviour of MQXFS6 room temperature preload and to reanalyse all the short models tested at CERN. A comparison is made between all the studied magnets revealing new characteriz-ing preload parameters.

43 PARTICLE ACCELERATORS↗

Modernizing Fermilab's Accelerator Control Hardware

Modernizing the Fermilab accelerator control system is essential to future operations of the laboratory's accelerator complex. The existing control system has evolved over four decades and uses hardware that is no longer available.The Accelerator Controls Operations Research Network (ACORN) Project will modernize the control system and replace end-of-life power supplies to enable future accelerator complex operations with megawatt particle beams. The ACORN project is planning to replace Fermilab s obsolete CAMAC crate-and-card controls hardware with modern MicroTCA hardware. There are over 2,000 CAMAC cards and over 250 CAMAC crates serving various functions in Fermilab s control system. We will review the existing CAMAC hardware and provide updates on the status of the ACORN project, which includes the conceptual design of the MicroTCA replacement hardware and software tools for supporting the installation of hundreds of MicroTCA crates.

43 PARTICLE ACCELERATORS↗

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 415: Project 57 No. 1 Plutonium Dispersion (NTTR), Nevada (Revision 0)

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 415, Project 57 No. 1 Plutonium Dispersion (NTTR). CAU 415 is located on Range 4808A of the Nevada Test and Training Range (NTTR) and consists of one corrective action site: NAFR-23-02, Pu Contaminated Soil. The CAU 415 site consists of the atmospheric release of radiological contaminants to surface soil from the Project 57 safety experiment conducted in 1957. The safety experiment released plutonium (Pu), uranium (U), and americium (Am) to the surface soil over an area of approximately 1.9 square miles. This area is currently fenced and posted as a radiological contamination area. Vehicles and debris contaminated by the experiment were subsequently buried in a disposal trench within the surface-contaminated, fenced area and are assumed to have released radiological contamination to subsurface soils. Potential source materials in the form of pole-mounted electrical transformers were also identified at the site and will be removed as part of closure activities.

54 ENVIRONMENTAL SCIENCES↗

Appendix F New Construction and Replacement of Existing Facilities at Sandia National Laboratories New Mexico

A number of construction and demolition projects are planned for the 10-year period evaluated in this Sandia National Laboratories, New Mexico (SNL/NM) site-wide environmental impact statement (SWEIS). Construction and decommissioning and demolition (D&D) activities are continually being accomplished at SNL/NM as new facilities are brought on line to replace older, less efficient facilities. The construction and D&D projects presented in this appendix are projected to take place, assuming funding and administrative/regulatory approvals are obtained, under both the No Action Alternative and the Expanded Operations Alternative. Under the Reduced Operations Alternative, no new construction projects were assumed to take place, and D&D activities were assumed to be limited to those needed to maintain a safe operating environment on the site.

42 ENGINEERING↗

BERLinPro Booster Cavity Design, Fabrication and Test Plans

The bERLinPro project, a 100 mA, 50 MeV superconducting RF (SRF) Energy Recovery Linac (ERL) is under construction at Helmholtz-Zentrum Berlin for the purpose of studying the technical challenges and physics of operating a high current, c.w., 1.3 GHz ERL. This machine will utilize three unique SRF cryomodules for the injector, booster and linac module respectively. The booster cryomodule will contain three 2-cell SRF cavities, based on the original design by Cornell University, and will be equipped with twin 115 kW RF power couplers in order to provide the appropriate acceleration to the high current electron beam. This paper will review the status of the fabrication of the 4 booster cavities that have been built for this project by Jefferson Laboratory and look at the challenges presented by the incorporation of fundamental power couplers capable of delivering 115 kW. The test plan for the cavities and couplers will be given along with a brief overview of the cryomodule design.

Burrill, Andrew↗

Selection of Global Climate Model Data for Downscaling With Generative Machine Learning and Use in the Power Planning for Alignment of Climate and Energy Systems Project

The range of results from climate models and scenarios is important to the understanding of uncertainty in power planning analysis. A U.S. Department of Energy-funded analytic project called Power Planning for Alignment of Climate and Energy Systems is developing data and analytic methods to reflect the effects of climate change on key variables for power system planning, as part of the Grid Modernization Lab Consortium. This project will select and prepare global climate model results for use in power system planning models. A related report (Evaluation of Global Climate Models for Use in Energy Analysis) assesses the performance of various global climate models from the Coupled Model Intercomparison Project Phase 6 data archive for their historical skill with respect to energy system performance and for their future projections under multiple climate change scenarios. Building from that report, we describe the selection of a climate scenario (Shared Socioeconomic Pathway [SSP] 2-4.5) and five climate models: TaiESM1, EC-Earth3-CC, GFDL-CM4, EC-Earth3-Veg, and MPI-ESM1-2-HR. We describe the model selection criteria, which were based on the quality of the match between model results under historical conditions and on the representation of the range of future values for several variables. These results will be downscaled via an open-source generative machine learning method called Super-Resolution for Renewable Energy Resource Data with Climate Change Impacts.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

LA100 Equity Strategies. Chapter 4: Lessons Learned and Options for Community Engagement in Los Angeles

The LA100 Equity Strategies project synthesizes community guidance with robust research, modeling, and analysis to identify strategy options that can increase equitable outcomes in Los Angeles' clean energy transition. Grounded in the analysis of past and ongoing energy inequities and engagement with underserved communities, the project presents community-guided strategies that aim to operationalize recognition and procedural justice. Building on the community-identified problems and solutions, and the analysis of the 11 strategies described in Chapter 3, this chapter continues to focus on the solution space through the lens of recognition and procedural justice. It centers the role of community engagement in energy utility planning and project development with a specific focus on how the Los Angeles Department of Water and Power (LADWP) can engage and work equitably with Los Angeles communities to cocreate a clean and just energy future for LA. LA100 Equity Strategies is rooted in the crucial role community engagement plays in restructuring the energy systems of cities, states, and nations. Scholarship on wind, solar, and other transitional energy technologies and projects has documented that such engagement is commonly used as a top-down mechanism for adapting social practices to fit new technological innovations. Yet, understanding how the clean energy transition - with related changes in technologies, infrastructures, practices, and costs - will fit equitably into the existing socio-political context is a challenge that requires substantive collaboration with local communities. Any form of community engagement opens up government officials and utilities to opposition from their public. Meaningful engagement methods turn such dissent into a strength, embracing critical feedback - particularly from communities historically excluded from decision-making - as contributing to more grounded design and effective implementation. Leveraging this collaborative model to further rectify past and ongoing inequities in the social, cultural, and institutional scaffolding of LA, this chapter presents options and methods to support LADWP in launching a just and equitable clean energy transition. We approach community engagement as a critical process linking recognition, procedural, and distributional justice, outlining how LADWP could learn from past engagement, coordinate such knowledge organization-wide, and use engagement as a key tool for achieving energy justice and equity.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

LA100 Equity Strategies. Chapter 5: Low-Income Energy Bill Equity and Affordability

The LA100 Equity Strategies project synthesizes community guidance with robust research, modeling, and analysis to identify strategy options that can increase equitable outcomes in Los Angeles' clean energy transition. Grounded in the analysis of past and ongoing energy inequities and engagement with underserved communities, the project presents community-guided strategies that aim to operationalize recognition and procedural justice. Building on the community-identified problems and solutions, and the analysis of the 11 strategies described in Chapter 3, this chapter continues to focus on the solution space through the lens of recognition and procedural justice. It centers the role of community engagement in energy utility planning and project development with a specific focus on how the Los Angeles Department of Water and Power (LADWP) can engage and work equitably with Los Angeles communities to cocreate a clean and just energy future for LA. LA100 Equity Strategies is rooted in the crucial role community engagement plays in restructuring the energy systems of cities, states, and nations. Scholarship on wind, solar, and other transitional energy technologies and projects has documented that such engagement is commonly used as a top-down mechanism for adapting social practices to fit new technological innovations. Yet, understanding how the clean energy transition - with related changes in technologies, infrastructures, practices, and costs - will fit equitably into the existing socio-political context is a challenge that requires substantive collaboration with local communities. Any form of community engagement opens up government officials and utilities to opposition from their public. Meaningful engagement methods turn such dissent into a strength, embracing critical feedback - particularly from communities historically excluded from decision-making - as contributing to more grounded design and effective implementation. Leveraging this collaborative model to further rectify past and ongoing inequities in the social, cultural, and institutional scaffolding of LA, this chapter presents options and methods to support LADWP in launching a just and equitable clean energy transition. We approach community engagement as a critical process linking recognition, procedural, and distributional justice, outlining how LADWP could learn from past engagement, coordinate such knowledge organization-wide, and use engagement as a key tool for achieving energy justice and equity.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Investigation of Non-Nuclear Plowshare and Vela Uniform Sites - 20447

The Plowshare Program was initiated by the Atomic Energy Commission, a predecessor agency to the US Department of Energy (DOE), to investigate peaceful uses of nuclear devices. 'Vela Uniform,' part of the broader Project Vela, was designed to use nuclear and other explosions to increase the capability of the United States to detect nuclear tests through seismicity. There were underground nuclear tests conducted off the Nevada National Security Site (NNSS) as part of the Plowshare Program (e.g., the Gnome-Coach, New Mexico, Site) and the Vela Uniform Program (e.g., Project Shoal, Nevada, Site) at which the DOE Office of Legacy Management (LM) has been conducting long-term surveillance and maintenance since fiscal year (FY) 2006. There are many additional locations, particularly for the Plowshare Program, that were considered for nuclear tests or used for non-nuclear tests off the NNSS. Some were only named on paper, but at 30 sites, field work such as drilling test wells and conducting tests using conventional explosives was done. A Plowshare nuclear explosion had been proposed at Project Chariot but was canceled in 1962. In 1992, the discovery of soils contaminated with radionuclides from tracer experiments led to a cleanup by the DOE Office of Environmental Management (EM) of the Project Chariot, Alaska, Site, which was completed in 1994. Following the cleanup of the Project Chariot site, EM was concerned that there might be environmental liabilities at other Plowshare or Vela Uniform sites where field investigations were done, even if the nuclear test was never conducted. The EM Program at the Nevada Site Office began examining records and visiting selected locations that were evaluated for Plowshare and Vela Uniform non-nuclear tests. In total, 161 Plowshare and 14 Vela Uniform sites or proposed projects were identified. The Desert Research Institute (DRI) created summaries of the work carried out at these sites and developed a collection of unclassified documents for them. Preliminary investigations had been conducted at these sites by both LM and EM since the early 2000's. In 2016, in preparation for accepting responsibility for the sites, LM started a program to determine if there were any environmental or safety liabilities associated with them. In 2019, LM formally accepted responsibility for these sites off the NNSS where non-nuclear explosive tests were conducted or where underground nuclear tests were proposed as part of the Plowshare and Vela Uniform programs but were never conducted. LM responsibilities will include maintaining institutional knowledge of the sites, responding to public inquiries, and addressing any concerns at each site. To minimize risk associated with site management, LM has archived all historical records compiled by DRI and has performed limited investigations at sites identified by the prior studies as having a higher potential liability. Preserving records related to site operations reduces the risk of doing unnecessary site investigations in the future caused by the loss of institutional knowledge. During the investigations, some maintenance needs were identified and will be addressed by the end of FY 2021. At the end of FY 2021, investigations, maintenance, and archiving activities will be complete. Remnants of test activities found at sites include craters, mud pits, debris, and open boreholes. Open boreholes are being plugged and abandoned in accordance with state regulatory standards. Other issues are being addressed in accordance with land owner requests and preferences as well as state regulations. Archiving activities include the development of project summaries identifying key operational details and current condition to allow site managers to be easily briefed. The LM experience at non-nuclear Plowshare and Vela Uniform sites applies to other programs where there is the potential for liability associated with the non-nuclear aspects of nuclear programs. This may include support activities or early phases of planned nuclear projects. Preserving institutional knowledge enables land managers to adequately address any concerns associated with operations and lowers risk. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗