Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Probabilistic Risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Control of Risks Through the Use of Procedures: A Method for Evaluating the Change in Risk

This paper considers how procedures can be used to control risks faced by an organization and proposes a means of recognizing if a particular procedure reduces risk or contributes to the organization's exposure. The proposed method was developed out of the review of work documents and the governing procedures performed in the wake of the Columbia accident by NASA and the Space Shuttle prime contractor, United Space Alliance, LLC. A technique was needed to understand the rules, or procedural controls, in place at the time in the context of how important the role of each rule was. The proposed method assesses procedural risks, the residual risk associated with a hazard after a procedure's influence is accounted for, by considering each clause of a procedure as a unique procedural control that may be beneficial or harmful. For procedural risks with consequences severe enough to threaten the survival of the organization, the method measures the characteristics of each risk on a scale that is an alternative to the traditional consequence/likelihood couple. The dual benefits of the substitute scales are that they eliminate both the need to quantify a relationship between different consequence types and the need for the extensive history a probabilistic risk assessment would require. Control Value is used as an analog for the consequence, where the value of a rule is based on how well the control reduces the severity of the consequence when operating successfully. This value is composed of two parts: the inevitability of the consequence in the absence of the control, and the opportunity to intervene before the consequence is realized. High value controls will be ones where there is minimal need for intervention but maximum opportunity to actively prevent the outcome. Failure Likelihood is used as the substitute for the conventional likelihood of the outcome. For procedural controls, a failure is considered to be any non-malicious violation of the rule, whether intended or not. The model used for describing the Failure Likelihood considers how well a task was established by evaluating that task on five components. The components selected to define a well established task are: that it be defined, assigned to someone capable, that they be trained appropriately, that the actions be organized to enable proper completion and that some form of independent monitoring be performed. Validation of the method was based on the information provided by a group of experts in Space Shuttle ground processing when they were presented with 5 scenarios that identified a clause from a procedure. For each scenario, they recorded their perception of how important the associated rule was and how likely it was to fail. They then rated the components of Control Value and Failure Likelihood for all the scenarios. The order in which each reviewer ranked the scenarios Control Value and Failure Likelihood was compared to the order in which they ranked the scenarios for each of the associated components; inevitability and opportunity for Control Value and definition, assignment, training, organization and monitoring for Failure Likelihood. This order comparison showed how the components contributed to a relative relationship to the substitute risk element. With the relationship established for Space Shuttle ground processing, this method can be used to gauge if the introduction or removal of a particular rule will increase or decrease the .risk associated with the hazard it is intended to control.

Praino, Gregory T.↗

Cabin Environment Physics Risk Model

This paper presents a Cabin Environment Physics Risk (CEPR) model that predicts the time for an initial failure of Environmental Control and Life Support System (ECLSS) functionality to propagate into a hazardous environment and trigger a loss-of-crew (LOC) event. This physics-of failure model allows a probabilistic risk assessment of a crewed spacecraft to account for the cabin environment, which can serve as a buffer to protect the crew during an abort from orbit and ultimately enable a safe return. The results of the CEPR model replace the assumption that failure of the crew critical ECLSS functionality causes LOC instantly, and provide a more accurate representation of the spacecraft's risk posture. The instant-LOC assumption is shown to be excessively conservative and, moreover, can impact the relative risk drivers identified for the spacecraft. This, in turn, could lead the design team to allocate mass for equipment to reduce overly conservative risk estimates in a suboptimal configuration, which inherently increases the overall risk to the crew. For example, available mass could be poorly used to add redundant ECLSS components that have a negligible benefit but appear to make the vehicle safer due to poor assumptions about the propagation time of ECLSS failures.

Risk↗

Construction of a cyber attack model for nuclear power plants - 115

The consideration of how a compromised digital component can impact neighboring components is critical to understanding the progression of cyber attacks. The degree of influence that one component may have on another depends on a variety of factors, including the sharing of resources such as network bandwidth or processing power, the level of trust between components, and the inclusion of segmentation devices such as firewalls. The interactions among components via mechanisms that are unique to the digital world are not usually considered in traditional probabilistic risk assessment (PRA). This means potential sequences of events that may occur during an attack may be missed if one were to only look at conventional accident sequences. This paper presents a method where, starting from the initial attack vector, the progression of a cyber attack can be modeled. The propagation of the attack is modeled by considering certain attributes of the digital components in the system. These attributes determine the potential vulnerability of a component to different classes of attack and the capability gained by the attackers once they are in control of the equipment. The use of attributes allows similar components (components with the same set of attributes) to be modeled in the same way, thereby reducing the computing resources required for analyzing large systems. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Topics in Nuclear Power

The 104 nuclear plants operating in the US today are far safer than they were 20-30 years ago. For example, there's been about a 100-fold reduction in the occurrence of 'significant events' since the late 1970s. Although the youngest of currently operating US plants was designed in the 1970s, all have been significantly modified over the years. Key contributors to the safety gains are a vigilant culture, much improved equipment reliability, greatly improved training of operators and maintenance workers, worldwide sharing of experience, and the effective use of probabilistic risk assessment. Several manufacturers have submitted high quality new designs for large reactors to the U.S. Nuclear Regulatory Commission (NRC) for design approval, and some designers are taking a second look at the economies of smaller, modular reactors.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

An Approach to Risk-Based Design Incorporating Damage Tolerance Analyses

Incorporating risk-based design as an integral part of spacecraft development is becoming more and more common. Assessment of uncertainties associated with design parameters and environmental aspects such as loading provides increased knowledge of the design and its performance. Results of such studies can contribute to mitigating risk through a system-level assessment. Understanding the risk of an event occurring, the probability of its occurrence, and the consequences of its occurrence can lead to robust, reliable designs. This paper describes an approach to risk-based structural design incorporating damage-tolerance analysis. The application of this approach to a candidate Earth-entry vehicle is described. The emphasis of the paper is on describing an approach for establishing damage-tolerant structural response inputs to a system-level probabilistic risk assessment.

Knight, Norman F., Jr.↗

Bayesian Analysis for Risk Assessment of Selected Medical Events in Support of the Integrated Medical Model Effort

The Exploration Medical Capability project is creating a catalog of risk assessments using the Integrated Medical Model (IMM). The IMM is a software-based system intended to assist mission planners in preparing for spaceflight missions by helping them to make informed decisions about medical preparations and supplies needed for combating and treating various medical events using Probabilistic Risk Assessment. The objective is to use statistical analyses to inform the IMM decision tool with estimated probabilities of medical events occurring during an exploration mission. Because data regarding astronaut health are limited, Bayesian statistical analysis is used. Bayesian inference combines prior knowledge, such as data from the general U.S. population, the U.S. Submarine Force, or the analog astronaut population located at the NASA Johnson Space Center, with observed data for the medical condition of interest. The posterior results reflect the best evidence for specific medical events occurring in flight. Bayes theorem provides a formal mechanism for combining available observed data with data from similar studies to support the quantification process. The IMM team performed Bayesian updates on the following medical events: angina, appendicitis, atrial fibrillation, atrial flutter, dental abscess, dental caries, dental periodontal disease, gallstone disease, herpes zoster, renal stones, seizure, and stroke.

Gilkey, Kelly M.↗

Optimization of Mitigating System Performance Index to Improve Nuclear Power Plant Safety and Efficiency

MSPI (Mitigation System Performance Index) is one of the risk-informed, plant-specific performance indicators of NRC’s Reactor Oversight Process. MSPI is used by the regulator and nuclear industry to monitor and assess the performance of plant mitigating systems. In this project, a calculation tool has been developed by incorporating the plant operation data, Probabilistic Risk Assessment (PRA) data, and industry baseline values to automate the calculation process of MSPI and the generation of the report. This is the first stage in an effort to optimize the MSPI through advanced artificial intelligence (AI) and machine learning (ML) techniques to improve nuclear power plant safety and efficiency.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Risk Methodology for Assessment of Fuel Debris Retrieval Options at the Fukushima Daiichi Nuclear Power Station

The mission of the Nuclear Damage Compensation and Decommissioning Facilitation Corporation (NDF) includes the mid-to-long-term decommissioning planning of the reactors at the Fukushima Daiichi Nuclear Power Station. To carry out its mission, NDF needs to be able to assess worker safety and public health risks that currently exist at the Fukushima Daiichi Nuclear Power Station and the implications of various actions that may be taken to reduce such risks. Pacific Northwest National Laboratory (PNNL) entered into a contract with NDF to support NDF’s mission by developing a risk assessment methodology that will support NDF’s evaluation of options for transitioning molten and solidified fuels within each unit into safer, more stable, configurations given the ever-changing state of knowledge and large uncertainties. The underpinning of this approach, which incorporates both expert elicitation and adapts probabilistic risk assessment and hazard analysis techniques, is its organization of potential release mechanisms and accident scenarios into a more manageable set of safety issues, which are systematically characterized to allow for useful comparison between fuel debris retrieval options as well as the identification of risk drivers and discriminators. The approach also lends itself to be easily updated as the general state of knowledge improves and will serve as a vital input to prioritizing future investigations associated with human health and safety at the Fukushima site. This paper describes the overall approach developed by PNNL to risk-inform the comparison between fuel debris retrieval strategies and discusses lessons learned from implementing the approach.

Fukushima, Risk Assessmnet, Nuclear Decommissionin↗

Command Process Modeling & Risk Analysis

Commanding Errors may be caused by a variety of root causes. It's important to understand the relative significance of each of these causes for making institutional investment decisions. One of these causes is the lack of standardized processes and procedures for command and control. We mitigate this problem by building periodic tables and models corresponding to key functions within it. These models include simulation analysis and probabilistic risk assessment models.

functional analysis↗

Summary

An effective risk assessment system is needed to address the threat posed by an active or passive insider who, acting alone or in collusion, could attempt diversion or theft of nuclear material. The material control and accountability (MC&A) system effectiveness tool (MSET) is a self-assessment or inspection tool utilizing probabilistic risk assessment (PRA) methodology to calculate the system effectiveness of a nuclear facility's material protection, control, and accountability (MPC&A) system. The MSET process is divided into four distinct and separate parts: (1) Completion of the questionnaire that assembles information about the operations of every aspect of the MPC&A system; (2) Conversion of questionnaire data into numeric values associated with risk; (3) Analysis of the numeric data utilizing the MPC&A fault tree and the SAPHIRE computer software; and (4) Self-assessment using the MSET reports to perform the effectiveness evaluation of the facility's MPC&A system. The process should lead to confirmation that mitigating features of the system effectively minimize the threat, or it could lead to the conclusion that system improvements or upgrades are necessary to achieve acceptable protection against the threat. If the need for system improvements or upgrades is indicated when the system is analyzed, MSET provides the capability to evaluate potential or actual system improvements or upgrades. A facility's MC&A system can be evaluated at a point in time. The system can be reevaluated after upgrades are implemented or after other system changes occur. The total system or specific subareas within the system can be evaluated. Areas of potential system improvement can be assessed to determine where the most beneficial and cost-effective improvements should be made. Analyses of risk importance factors show that sustainability is essential for optimal performance and reveals where performance degradation has the greatest impact on total system risk. The risk importance factors show the amount of risk reduction achievable with potential upgrades and the amount of risk reduction achieved after upgrades are completed. Applying the risk assessment tool gives support to budget prioritization by showing where budget support levels must be sustained for MC&A functions most important to risk. Results of the risk assessment are also useful in supporting funding justifications for system improvements that significantly reduce system risk. The functional model, the system risk assessment tool, and the facility evaluation questionnaire are valuable educational tools for MPC&A personnel. These educational tools provide a framework for ongoing dialogue between organizations regarding the design, development, implementation, operation, assessment, and sustainability of MPC&A systems. An organization considering the use of MSET as an analytical tool for evaluating the effectiveness of its MPC&A system will benefit from conducting a complete MSET exercise at an existing nuclear facility.

99 GENERAL AND MISCELLANEOUS↗

Cumulative Distribution Overlap Technique for Artemis Mission Public Entry Risk Assessment

The Artemis missions use a skip-entry profile to accomplish a recovery near the western US coastline, however, the service module debris must still be disposed of safely. For certain contingency return scenarios, the expected dispersed entry profile is biased from the well-analyzed corridor. A novel method is presented for assessing the Cumulative Distribution Function (CDF) of these biased results to ensure they do not contribute additional probabilistic risk to the public. More specifically, the weight of the flight path angle dispersion "tail" of the CDF needs to remain below the well-assessed region. The details of how this method was actually used to screen and plan entry profiles for specific launch windows during the Artemis I mission are shown. This method has potential applicability in other problems where a biased distribution needs to be assessed against a well-defined "core" region.

Reentry↗

Cumulative Distribution Overlap Technique for Artemis Mission Public Entry Risk Assessment

The Artemis missions use a skip-entry profile to accomplish a recovery near the western US coastline, however, the service module debris must still be disposed of safely. For certain contingency return scenarios, the expected dispersed entry profile is biased from the well-analyzed corridor. A novel method is presented for assessing the Cumulative Distribution Function (CDF) of these biased results to ensure they do not contribute additional probabilistic risk to the public. More specifically, the weight of the flight path angle dispersion "tail" of the CDF needs to remain below the well-assessed region. The details of how this method was actually used to screen and plan entry profiles for specific launch windows during the Artemis I mission are shown. This method has potential applicability in other problems where a biased distribution needs to be assessed against a well-defined "core" region.

Reentry↗

Component Repair Times Obtained from MSPI Data

Information concerning times to repair or restore equipment to service given a failure is valuable to probabilistic risk assessments (PRAs). Examples of such uses in modern PRAs include estimation of the probability of failing to restore a failed component within a specified time period (typically tied to recovering a mitigating system before core damage occurs at nuclear power plants) and the determination of mission times for support system initiating event (SSIE) fault tree models. Information on equipment repair or restoration times applicable to PRA modeling is limited and dated for U.S. commercial nuclear power plants. However, the Mitigating Systems Performance Index (MSPI) program covering all U.S. commercial nuclear power plants provides up-to-date information on restoration times for a limited set of component types. This paper describes the MSPI program data available and analyzes the data to obtain median and mean component restoration times as well as non-restoration cumulative probability curves. The MSPI program provides guidance for monitoring both planned and unplanned outages of trains of selected mitigating systems deemed important to safety. For systems included within the MSPI program, plants monitor both train UA and component unreliability (UR) against baseline values. If the combined system UA and UR increases sufficiently above established baseline results (converted to an estimated change in core damage frequency or CDF), a “white” (or worse) indicator is generated for that system. That in turn results in increased oversight by the US Nuclear Regulatory Commission (NRC) and can impact a plant’s insurance rating. Therefore, there is pressure to return MSPI program components to service as soon as possible after a failure occurs. Three sets of unplanned outages might be used to determine the component repair durations desired in this article: all unplanned outages for the train type that includes the component of interest, only unplanned outages associated with failures of the component of interest, and only unplanned outages associated with PRA failures of the component of interest. The paper will describe how component repair times can be generated from each set and which approach is most applicable. Repair time information will be summarized for MSPI pumps and diesel generators using data over 2003 – 2007. Also, trend information over 2003 – 2012 will be presented to indicate whether the 2003 – 2007 repair time information is still considered applicable. For certain types of pumps, mean repair times are significantly higher than the typically assumed 24 h duration.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Topics in nuclear power

The 101 nuclear plants operating in the US today are far safer than they were 20-30 years ago. For example, there's been about a 100-fold reduction in the occurrence of 'significant events' since the late 1970s. Although the youngest of currently operating US plants was designed in the 1970s, all have been significantly modified over the years. Key contributors to the safety gains are a vigilant culture, much improved equipment reliability, greatly improved training of operators and maintenance workers, worldwide sharing of experience, and the effective use of probabilistic risk assessment. Several manufacturers have submitted high quality new designs for large reactors to the U.S. Nuclear Regulatory Commission (NRC) for design approval, and several companies are vigorously working on designs for smaller, modular reactors. Although the Fukushima reactor accident in March 2011 in Japan has been an almost unmitigated disaster for the local population due to their being displaced from their homes and workplaces and also due to the land contamination, its 'lessons learned' have been important for the broader nuclear industry, and will surely result in safer nuclear plants worldwide - indeed, have already done so, with more safety improvements to come.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Impact of Passive Safety on FHR Instrumentation Systems Design and Classification

Fluoride salt-cooled high-temperature reactors (FHRs) will rely more extensively on passive safety than earlier reactor classes. 10CFR50 Appendix A, General Design Criteria for Nuclear Power Plants, establishes minimum design requirements to provide reasonable assurance of adequate safety. 10CFR50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, provides guidance on how the safety significance of systems, structures, and components (SSCs) should be reflected in their regulatory treatment. The Nuclear Energy Institute (NEI) has provided 10 CFR 50.69 SSC Categorization Guideline (NEI-00-04) that factors in probabilistic risk assessment (PRA) model insights, as well as deterministic insights, through an integrated decision-making panel. Employing the PRA to inform deterministic requirements enables an appropriately balanced, technically sound categorization to be established. No FHR currently has an adequate PRA or set of design basis accidents to enable establishing the safety classification of its SSCs. While all SSCs used to comply with the general design criteria (GDCs) will be safety related, the intent is to limit the instrumentation risk significance through effective design and reliance on inherent passive safety characteristics. For example, FHRs have no safety-significant temperature threshold phenomena, thus enabling the primary and reserve reactivity control systems required by GDC 26 to be passively, thermally triggered at temperatures well below those for which core or primary coolant boundary damage would occur. Moreover, the passive thermal triggering of the primary and reserve shutdown systems may relegate the control rod drive motors to the control system, substantially decreasing the amount of safety-significant wiring needed. Similarly, FHR decay heat removal systems are intended to be running continuously to minimize the amount of safety-significant instrumentation needed to initiate operation of systems and components important to safety as required in GDC 20. This paper provides an overview of the design process employed to develop a pre-conceptual FHR instrumentation architecture intended to lower plant capital and operational costs by minimizing reliance on expensive, safety related, safety-significant instrumentation through the use of inherent passive features of FHRs.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Success Path Method: Introduction to the Success Path Method Software Tool©

As part of its commitment to advancing safety and reliability assessment methodologies, Argonne National Laboratory pioneered the use of an evaluation method called the Success Path Method (SPM) to improve risk management for offshore oil and gas operations. The development of the SPM at Argonne has been driven by the need to improve existing risk assessment methodologies by focusing on the steps necessary for success rather than failure modes alone. This is particularly important for industrial environments like offshore facilities that perform multiple functions under a continuously evolving set of operational conditions – such as water depth and temperature, currents, and weather conditions. In these dynamic environments, the traditional Probabilistic Risk Assessment (PRA) approach is far too complex as it focuses on what can go wrong – which comprises an infinite failure space that must be fully explored and understood. By shifting the focus to a finite space of success paths, the SPM enables operators and decision makers to prioritize a manageable number of steps that must go right to ensure success. Building on its five decades of experience in safety assessments for the nuclear industry, Argonne made major adaptations to existing risk assessment methods utilizing features similar to fault trees that are traditionally used in PRA to map all pathways in which the system can malfunction. In contrast, SPM identifies the components and processes that must function correctly to achieve specific outcomes – such as preventing the uncontrolled release of hydrocarbons during drilling operations. The SPM framework integrates equipment, procedures, software, processes, and human actions to ensure that physical barriers meet critical safety functions in dynamic operational conditions. This approach helps identify failure modes and improve operational risk management by narrowing the focus to key success elements, which in turn reduces uncertainty and helps users understand, manage, and respond to failures.

97 MATHEMATICS AND COMPUTING↗

An Evaluation of The Dynamic Physical Security Risk Assessment Methodology for Fleet-Wide Applications

The requirements for U.S. nuclear power plants to maintain a large onsite physical security force contribute to their high operational costs. The cost of maintaining the current physical security posture is approximately 10% of the overall operation and maintenance budget for commercial nuclear power plants. The goal of the Light Water Reactor Sustainability (LWRS) program’s physical security pathway is to develop tools, methods, and technologies and provide the technical basis for an optimized physical security posture. The conservatisms built into current security postures may be analyzed and minimized to reduce security costs while still ensuring adequate security and operational safety. The research performed at Idaho National Laboratory within LWRS program’s physical security pathway has successfully developed a dynamic force-on-force modeling framework using various computer simulation tools and integrating them with the dynamic assessment Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool. This integrated process for physical security analysis is named Modeling and Analysis for Safety Security using Dynamic EMRALD Framework (MASS-DEF). This document provides an update on the progress in applying the MASS-DEF process to an operating commercial nuclear power plant as well as additional industry feedback regarding use of the tool for other physical security risk-informed topics. This report is only a summary of the progress and does not contain specific modeling results as those contain sensitive security information. Previous reports described how a user could integrate their plant-specific force-on-force models with the dynamic simulation tool EMRALD, model operator actions, and integrate with probabilistic risk assessment tools, such as CAFTA (Computer Aided Fault Tree Analysis System) or SAPHIRE (Systems Analysis Programs for Hands-on Integrated Reliability Evaluations), and with thermal-hydraulic tools, such as RELAP-5 or MAAP. Previous reports applied various combinations of available simulations codes with EMRALD using generic plant models to demonstrate how to perform the analysis. This report is an update the progress of applying the dynamic computational framework to an actual nuclear facility using their security scenarios and timelines. This report also provides an update to the procedural guidance for the MASS-DEF process and an overview of the generic models available for use by utilities. This report does not contain any plant’s sensitive information and/or safeguards information. This study’s purpose was to verify that the results achieved using generic models are similar to actual plant results and refine our guidance on the use of the framework. This assessment enables further analysis, such as what-if scenarios and staff-reduction evaluation, thereby optimizing physical security at plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

R&D Roadmap for Enhanced Resilient Plant Systems, Metrics, Scenarios, Risk Analysis, and Modeling and Simulation

The nuclear industry and the U.S. Department of Energy are jointly developing accident tolerant fuel (ATF) which has the potential to greatly improve the safety and economic performance of the current fleet of NPPs. The combination of ATF with the optimal use of FLEX equipment (deployed as an industry response to the Fukushima Daiichi Nuclear Power Plant (NPP) accident in 2012), enhancements on plant components and systems, incorporation of augmented cooling systems or new passive cooling systems, and improvements in fuel cycle efficiency, have the potential to render the NPPs more efficient and resilient to events (both internally and externally initiated) that have the potential to challenge the integrity of the fuel or plant containment. In this report, combinations of these plant improvements are called Enhanced Resilient Plant Systems. In order to accelerate the development and deployment of the components that comprise Enhanced Resilient Plant Systems, a well-integrated toolkit that is fuel/clad-, fuel cycle-, systems-, and scenario-centric is required to provide a ready platform for the analysis of the advanced ATF fuel and cladding materials that are being developed, as well as plant systems modifications to achieve enhanced resiliency. Since the deployment of these enhancements will comprise a risk/benefit tradeoff of their impacts on plant safety and economics, the envisioned toolkit will need to be capable to characterizing the multidimensional aspects associated with these evaluations and provide decision-makers with information that can optimize the technological, economic, and safety benefits that are to be obtained. The Risk-Informed Systems Analysis (RISA) Pathway of the DOE Light Water Reactor Sustainability (LWRS) Program initiated several research tasks to develop analytical capabilities to support the industry in the transition to the ATF and Enhanced Resilient Plant Systems. The general idea behind the initiative is the development of an integrated evaluation approach which combines the plant probabilistic risk assessment (PRA) models with Multi-Physics Best Estimate Plus Uncertainty (MP-BEPU) analyses in a seamless fashion. The integrated evaluation framework aims at enabling plant system configuration variations to be studied with speed and precision, including detailed risk and benefit assessments of introducing ATF and Enhanced Resilient Plant Systems into current LWR plants to achieve both safety and operational performance enhancements. The focus of this report is to present an integrated research and development (R&D) roadmap to identify and perform high value evaluations of proposed ATF and Enhanced Resilient Plant Systems concepts to identify both the technical (e.g. benefits to risk, safety, and operational margins) and the economic (i.e. business and cost) elements associated with industry adoption of the technology. The integrated evaluation approach will be developed to support the development, testing, qualification, licensing, and deployment of ATF and Enhanced Resilient Plant Systems technology that is capable of achieving substantial safety and economic improvements as well as timely widespread adoption by the US nuclear industry.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗