Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Path Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

UAVSAR Flight-Planning System

A system of software partly automates planning of a flight of the Uninhabited Aerial Vehicle Synthetic Aperture Radar (UAVSAR) -- a polarimetric synthetic-aperture radar system aboard an unpiloted or minimally piloted airplane. The software constructs a flight plan that specifies not only the intended flight path but also the setup of the radar system at each point along the path.

Source record↗

Hanford's Double-Shell Tank AY-102 Recovery Project - 17416

Since at least August 2012, Hanford Tank 241-AY-102 (AY-102) has been leaking from its primary tank into its secondary containment. A pumping plan was developed in 2013 to provide a path forward for recommended remediation actions to be implemented as part of the AY-102 Recovery Project. On March 21, 2014, the Washington State Department of Ecology issued Administrative Order No. 10618 requiring Washington River Protection Solutions and the United States Department of Energy to conduct actions related to and including the removal of waste from AY-102. The three parties agreed to resolve the appeal of the Administrative Order through a Settlement Agreement which addresses the remaining requirements and implements enforceable milestone dates, including initiation of waste retrieval by March 4, 2016 and completion of waste retrieval operations by March 4, 2017. The AY-102 Recovery Project was developed to address the Settlement Agreement requirements. While retrieval of waste from Single-Shell Tanks has been performed at Hanford for decades, retrieval from Double-Shell Tank AY-102 required adaptation of the existing technologies to a new environment on a larger scale than previously encountered. A significant number of obstructions and in-tank equipment limit accessibility to the high source term AY-102 waste and the location of the selected receiver tank required installation of an extensive, heavily-shielded above-ground transfer line. Despite countless challenges and obstacles encountered throughout, the project successfully completed system design, fabrication, installation, testing, and the first phase of operations within a highly compressed, aggressive schedule. Waste retrieval operations in AY-102 commenced on March 3, 2016 and the initial operating phase concluded on April 30. Additional sluicing capability was required to complete the mission and four Extended Reach Sluicers were installed to support the second operating phase, which began on December 8, 2016. As of December 31, 2016, approximately 97% of the original waste volume had been removed, resulting in an estimated remaining waste volume of about 75,000 liters. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High Performance Teams Enable Mission Success for SRNL - 16363

The accomplishment of the DOE EM mission of cleaning up the radioactive waste generated as a byproduct of the development and maintenance of nuclear materials over the last 60 years is a daunting task. SRNL specializes in working directly with the 'owners' of the cleanup challenges to identify the desired outcome and develop a solution that can be put into practice. 'We put science to work' is not just a 'tag line' rather it is a concise statement of our values and approach to applying science and engineering to the cleanup objectives. The management of radioactive waste poses multi-decade challenges to DOE EM and the Nation. The ability to harness the depth of knowledge, experience, expertise and passion for safely and effectively solving the technical challenges has reached a critical junction. Perhaps too late to be a natural and organic transition the industry finds itself critically devoid of resources to effectively and efficiently keep focused on the highest order task: cleanup. When project managers plan the resources necessary to perform the planned scope they typically are focused on financial, human, and industrial resources that would be beneficial to project execution. The critical shortage we will be evaluating is experienced and skilled leaders, mentors and coaches in the workforce. The production of educated scientists and engineers is a primary focus at all levels of educational institutions with Science Technology Engineering and Mathematics (STEM) focused curricula beginning in elementary school. The need for leaders who are skilled in inspiring organizational creativity, adept in harnessing and focusing individual energy while effectively communicating to the work force and the clientele equally compelling messages, has never been greater, or their absence in the workforce more ominous. Managers trained in the classical management theory (insert references here) are aging out of the workforce. In many cases these managers have not retained close connection to advancements in their primary field of study but rather have succumbed to the administrivia burdens that typify highly regulated work. The current technically trained workforce while interested in the 'perks' of management (i.e. visibility, pay increases, advancing status) are driven to keep close connection to their technical 'roots' as a fall-back plan should they need to change their career path either by choice or necessity. The challenge is how to achieve the productive hum of a finely tuned organizational model that blends executive vision and drive with technical leadership and excellence in execution. If any of these three tenets of a high performance team falters the ability to recover erodes the performance of the team and begins to weaken the cultural foundation essential to sustaining high performance work teams. At SRNL, recognition of the need to adapt the management dynamics and the business model and to harness the energy of the workforce to sustain - and in fact increase - the level of performance is a driving force in the transformation of the organization. Examples of changes in organizations structure, business systems and employee engagement are discussed as they relate to the impact on accomplishing the cleanup mission and fostering the next generation of great leaders and innovators. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Retrieval and Inspection Operations in Hanford Tank 241-AY-102 - 18234

In August 2012, a periodic annulus inspection of tank 241-AY-102 (AY-102) identified a leak from the primary tank into the secondary containment. A pumping plan was developed in 2013 to provide a path forward for recommended remediation actions to be implemented as part of the AY-102 Recovery Project. On March 21, 2014, the Washington State Department of Ecology issued an Administrative Order requiring Washington River Protection Solutions and the United States Department of Energy to conduct actions related to and including the removal of waste from AY-102. The parties agreed to resolve the appeal of the Administrative Order through a Settlement Agreement which addressed the remaining requirements and implemented enforceable milestone dates, including completion of waste removal operations, and performance of an inspection aimed at determining the cause of the leak. The AY-102 Recovery Project was developed to address the Settlement Agreement requirements. While retrieval of waste from Single-Shell Tanks has been performed at Hanford for decades, retrieval from Double-Shell Tank AY-102 required adaptation of the existing technologies to a new environment on a larger scale than previously encountered. Despite countless challenges and obstacles encountered throughout, the project successfully completed system design, fabrication, installation, testing, and retrieval operations within a highly compressed, aggressive schedule. Waste removal activities in AY-102 completed in February 2017. Subsequent inspection activities were completed as part of a multi-step process aimed at determining the likely cause of failure and assessing the feasibility of repair. A variety of input data were used in evaluating the likely failure mechanism, such as video examinations that revealed numerous through-floor penetrations and significant degradation across the visible surface area. Based on the operational history of the tank, corrosion testing and analysis, and the visual appearance of the confirmed leak sites, service-induced pitting corrosion due to the historic waste composition and operating conditions appears to be the primary degradation mechanism leading to failure of the tank. The inspection data has demonstrated that repairing and returning AY-102 to service would likely introduce substantial technical, logistical, and financial challenges due to the extent of bottom-plate damage. As a result, tank AY-102 will ultimately be closed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sodium and Lithium Hydride Shields At the Department of Energy's Oak Ridge Reservation - 18412

URS-CH2M Oak Ridge LLC (UCOR) is responsible for cleanup of the U.S. Department of Energy's (DOE) East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. Formerly known as the K-25 site, the facility enriched uranium for major defense and energy programs for more than 40 years. DOE is seeking the safest, most environmentally protective and fiscally responsible treatment for its large inventory of radioactive-contaminated metals known as 'shields'. The 66 sodium and lithium shields were constructed for use in experiments at the Tower Shielding Facility (TSF), Oak Ridge National Laboratory (ORNL). The TSF operated from 1954 to 1992 and was designed and built for radiation-shielding studies. The shield containers are constructed of aluminum or stainless steel of varying sizes and shapes that were then filled with either sodium metal or lithium hydride material. The historical records indicate the sodium shields were constructed at the Molten Salt Reactor for use in experiments in the 1971 time frame, while the lithium shields were constructed at the Y-12 site and were used in experiments as early as 1961. A subset of the sodium and lithium shields contain depleted uranium. The sodium and lithium shields were initially used at the TSF to perform in-depth measurements of the neutron transport through the shield materials. Based on process knowledge, the shields are managed as radiologically contaminated containers. Efforts have been made over the last fifteen years to find recycle markets for both the sodium and lithium hydride shields. This includes an onsite operation that was initiated at the East Tennessee Technology Park (ETTP) in 2004. After an operational exothermic reaction incident occurred soon after startup, the onsite ETTP recycling action was discontinued and a search for offsite recycling facilities was initiated. In 2016, the Y-12 National Security Complex was contacted regarding recycle/repurpose of the lithium shields; however, the lithium was determined to not be acceptable for their current repurpose process. To date, no offsite recycling outlets have been identified. Recent progress on the waste disposal actions, a shipment of 22 small sodium shields have been shipped and treated offsite. Therefore, the current shield inventory consists of 29 sodium shields located at ETTP and 15 sodium and lithium hydride shields staged at ORNL. The time period needed to reasonably identify safe disposition or recycling outlets for the shields was expected to exceed the one-year Land Disposal Restrictions storage time limit; therefore, approval was received to add the shields to the Site Treatment Plan (STP) in March, 2017. Until a disposition path is found, the shields will continue to be stored in a safe configuration that is protective of human health and the environment. This engineering evaluation identifies and screens the alternatives for dispositioning the shields at the Oak Ridge(ORR). Four alternatives were evaluated including; (1) macro-encapsulation, (2) deactivation, (3) recycle and (4) leave-in-place. An initial screening was performed, and the alternative passing the initial screening are then evaluated in more detail. The evaluation criteria used included environmental risk, technical feasibility, administrative feasibility, worker safety, nuclear safety, transportation safety, and cost. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of the EarthSHAB Stratospheric Solar Hot Air Balloon Flight Prediction Model Using Balloon Trajectory Data

Abstract The heliotrope is a solar balloon design which is constructed out of painter’s plastic, and the exterior is coated in charcoal powder. Darkening the plastic gives the balloon a high solar absorptance, which allows it to ascend into the lower stratosphere and float for hours at a time. The balloons have previously been used to lift scientific instruments into the stratosphere to study chemical explosions, earthquakes, and stratospheric aerosols. They have also been proposed as a platform for planetary exploration. Flight predictions are crucial to preflight planning to reduce safety risks and meet flight objectives. However, there exists a wide range of possible flight paths due to varying environmental conditions and solar balloon configurations. EarthSHAB is one such software that was designed to support flight planning using the weather forecasts and balloon properties to predict the flight path of a solar balloon. We compare EarthSHAB-simulated flight paths to a set of observed flight paths for the 3.5-m diameter heliotrope design called the “Cloudskimmer.” Using the criteria that the modeled paths must fall within 5% of the observations to be considered successful, we found that EarthSHAB successfully predicted the Cloudskimmer ascent rate and average float altitude 10% and 90% of the time, respectively. We also found that the average difference in the observed and predicted landing locations was 97 km and landing times were 54 ± 38 min. Significant deviations between the observed and predicted ascent rates and excursions at float were found to be associated with heavy payloads and convective cloud development, respectively. Significance Statement Solar balloons are used to lift scientific instruments into the lower stratosphere for hours at a time to study chemical explosions, earthquakes, stratospheric aerosols, and more. The flight paths of solar balloons can be difficult to predict due to variability in their design and surrounding environment. We evaluate the accuracy of EarthSHAB, a software that predicts the altitude profile and horizontal trajectory of a solar balloon using inputs such as the weather, balloon size, and balloon mass. Our results suggest that for the balloon design used in this study, EarthSHAB is best suited for modeling the behavior of balloons with lightweight payloads that do not fly within or directly above clouds.

Lien, Jessica M. [Sandia National Laboratories, Al↗

Global Threat Reduction Initiative Fuel Thermo-Physical Characterization Project: Sample Management Plan

This sample management plan provides guidelines for sectioning, preparation, acceptance criteria, analytical path, and end-of-life disposal for the fuel element segments utilized in the Global Threat Reduction Initiative (GTRI), Fuel Thermo-Physical Characterization Project. The Fuel Thermo-Physical Characterization Project is tasked with analysis of irradiated Low Enriched Uranium (LEU) Molybdenum (U-Mo) fuel element samples to support the GTRI conversion program. Sample analysis may include optical microscopy (OM), scanning electron microscopy (SEM) fuel-surface interface analysis, gas pycnometry (density) measurements, laser flash analysis (LFA), differential scanning calorimetry (DSC), thermogravimetry and differential thermal analysis with mass spectroscopy (TG /DTA-MS), Inductively Coupled Plasma Spectrophotometry (ICP), alpha spectroscopy, and Thermal Ionization Mass Spectroscopy (TIMS). The project will utilize existing Radiochemical Processing Laboratory (RPL) operating, technical, and administrative procedures for sample receipt, processing, and analyses. Test instructions (TIs), which are documents used to provide specific details regarding the implementation of an existing RPL approved technical or operational procedure, will also be used to communicate to staff project specific parameters requested by the Principal Investigator (PI). TIs will be developed, reviewed, and issued in accordance with the latest revision of the RPL-PLN-700, RPL Operations Plan. Additionally, the PI must approve all project test instructions and red-line changes to test instructions.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Accuracy Assessment of Two Gps Fidelity Prediction Services in Urban Terrain

Low altitude flight in urban areas is susceptible to degraded GNSS-based navigation system performance due to terrain interference with radio signals from orbital positioning satellites. Predictive navigation performance fidelity tools are needed a) in preflight planning to assist in the creation of safe flight paths and b) in-flight to provide contingency management agents with the navigation risk of proximal flight corridors. Two navigation fidelity prediction services are validated by comparison with over 6000 readings from GNSS sensors collected along a five-mile path through urban areas of Corpus Christi, Texas, on three dates in 2022. Predictions are based on satellite line of sight through 3D terrain data collected in 2018. Each service predicts a set of navigation fidelity metrics over a user-specified time period. One metric estimated by both is the number of visible satellites. A direct comparison of the number of predicted visible satellites with the number sensed by the receiver is used to validate the prediction services. Results show an exact match in the number of predicted satellites for 60% of the measurements, and a match within +/- 4 satellites for 95% of the measurements. As expected, agreement improves away from vertical blocking terrain. Most cases of mismatch are due a lower predicted count than measured (false negatives), and can be accounted for by receiver pickup of stray signals caused by multipath propagation. About 10% of mismatches are false positives and are mostly accounted for by foliage effects. The two services predict visibility of the same set of satellites 80% of the time, differ by two or less satellites 95% of the time, and can compute predictions for one hour of observations in one minute or less. Validation is analyzed statistically and in detailed case studies of selected observation times. The prediction services validated in this study run fast enough for preflight safety planning. The more stringent challenge of inflight navigation fidelity prediction for contingency management requires both a speedup of the current level of modeling and equally fast stray signal modeling.

Andrew Moore↗

Accuracy Assessment of Two GPS Fidelity Prediction Services in Urban Terrain

Low altitude flight in urban areas is susceptible to degraded GNSS-based navigation system performance due to terrain interference with radio signals from orbital positioning satellites. Predictive navigation performance fidelity tools are needed a) in preflight planning to assist in the creation of safe flight paths and b) in-flight to provide contingency management agents with the navigation risk of proximal flight corridors. Two navigation fidelity prediction services are validated by comparison with over 6000 readings from GNSS sensors collected along a five-mile path through urban areas of Corpus Christi, Texas, on three dates in 2022. Predictions are based on satellite line of sight through 3D terrain data collected in 2018. Each service predicts a set of navigation fidelity metrics over a user-specified time period. One metric estimated by both is the number of visible satellites. A direct comparison of the number of predicted visible satellites with the number sensed by the receiver is used to validate the prediction services. Results show an exact match in the number of predicted satellites for 60% of the measurements, and a match within +/- 4 satellites for 95% of the measurements. As expected, agreement improves away from vertical blocking terrain. Most cases of mismatch are due a lower predicted count than measured (false negatives), and can be accounted for by receiver pickup of stray signals caused by multipath propagation. About 10% of mismatches are false positives and are mostly accounted for by foliage effects. The two services predict visibility of the same set of satellites 80% of the time, differ by two or less satellites 95% of the time, and can compute predictions for one hour of observations in one minute or less. Validation is analyzed statistically and in detailed case studies of selected observation times. The prediction services validated in this study run fast enough for preflight safety planning. The more stringent challenge of inflight navigation fidelity prediction for contingency management requires both a speedup of the current level of modeling and equally fast stray signal modeling.

Andrew J. Moore↗

Laser Communications Relay Demonstration (LCRD) Update and the Path Towards Optical Relay Operations

This Presentation provides a concept for an evolution of NASAs optical communications near Earth relay architecture. NASA's Laser Communications Relay Demonstration (LCRD), a joint project between NASAs Goddard Space Flight Center (GSFC), the Jet Propulsion Laboratory - California Institute of Technology (JPL), and the Massachusetts Institute of Technology Lincoln Laboratory (MIT LL). LCRD will provide a minimum of two years of high data rate optical communications service experiments in geosynchronous orbit (GEO), following launch in 2019. This paper will provide an update of the LCRD mission status and planned capabilities and experiments, followed by a discussion of the path from LCRD to operational network capabilities.

Space Communications↗

Laser Communications Relay Demonstration (LCRD) Update and the Path Towards Optical Relay Operations

This paper provides a concept for an evolution of NASA's optical communications near Earth relay architecture. NASA's Laser Communications Relay Demonstration (LCRD), a joint project between NASA's Goddard Space Flight Center (GSFC), the Jet Propulsion Laboratory - California Institute of Technology (JPL), and the Massachusetts Institute of Technology Lincoln Laboratory (MIT LL). LCRD will provide a minimum of two years of high data rate optical communications service experiments in geosynchronous orbit (GEO), following launch in 2019. This paper will provide an update of the LCRD mission status and planned capabilities and experiments, followed by a discussion of the path from LCRD to operational network capabilities.

Space Communications↗

Wide-Field Astronomical Surveys in the Next Decade

Wide-angle surveys have been an engine for new discoveries throughout the modern history of astronomy, and have been among the most highly cited and scientifically productive observing facilities in recent years. This trend is likely to continue over the next decade, as many of the most important questions in astrophysics are best tackled with massive surveys, often in synergy with each other and in tandem with the more traditional observatories. We argue that these surveys are most productive and have the greatest impact when the data from the surveys are made public in a timely manner. The rise of the 'survey astronomer' is a substantial change in the demographics of our field; one of the most important challenges of the next decade is to find ways to recognize the intellectual contributions of those who work on the infrastructure of surveys (hardware, software, survey planning and operations, and databases/data distribution), and to make career paths to allow them to thrive.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

SU-E-T-413: Experience-Based VMAT Plan Quality Database

Purpose: To quantify VMAT plan quality using a retrospective study of over 200 clinical treated VMAT plans created using the Eclipse Treatment Planning System to create benchmarks of plan quality for a few categories of treatment sites. Methods: Using a controlled phantom geometry, various dosimetric indices were investigated to quantify dosimetric plan quality as a function of isocenter displacement from center of mass, average path length, number of arcs and PTV proximity to critical structures. Beginning with published dosimetry indices from SRS and SBRT evaluations, UDI (Unified Dosimetry Index) and modified UDI were tested before creating a new factor VMAT-DI. VMAT-DI was developed within boundaries of this project and it includes renormalized factors of conformity index, coverage index, modified gradient index and homogeneity index as well as indices based on routine clinical practice such as absolute dose max index. The plans were then evaluated using the VMAT-DI such that benchmarks for planning could be created. Results: The majority of the plans evaluated could be assigned VMAT-DI values within a range for each treatment site. However, the outliers were results of difficult planning parameters such as very irregular targets, inhomogeneities or difficult to achieve critical structure constraints. To effectively use VMAT-DI for guidance, especially for prediction of the plan quality for body sites new to the practice, VMATDI database needs to be subdivided by target complexity and by body site index/average path length factor. Conclusion: An experienced-based VMAT-DI database can be used to help analyze plans before evaluation by the physician to show that it adheres to the clinical standards of previously treated VMAT plans which will make a guideline for concluding the optimization. The introduction of institution-wide clinical planning protocols, standardizing OAR naming and constraints will make it possible to incorporate a cumulative critical structure dosimetry index such as NTCP.

07 ISOTOPE AND RADIATION SOURCES↗

LCRD Update and Path to Optical Relay Operations

Speaker and Presenter at the Lincoln Laboratory Communications Workshop on May 23, 2017 at the Massachusetts Institute of Technology Lincoln Laboratory in Lexington, MA. This presentation discusses a concept for an evolution of NASAs optical communications near-Earth relay architecture. NASA's Laser Communications Relay Demonstration (LCRD) is a joint project between NASAs Goddard Space Flight Center (GSFC), the Jet Propulsion Laboratory California Institute of Technology (JPL), and the Massachusetts Institute of Technology Lincoln Laboratory (MIT LL). LCRD will provide a minimum of two years of high data rate optical communications service experiments in geosynchronous orbit (GEO) following launch in 2019. This presentation will provide an update of the LCRD mission status and planned capabilities and experiments, followed by a discussion of the path from LCRD to operational network capabilities.

Space Communications↗

TUBSAT-1, satellite technology for educational purposes

TUBSAT-1 (Technical University of Berlin Satellite) is an experimental low-cost satellite within the NASA Get Away Special (GAS) program. This project is being financed by the German BMFT (Federal Ministry for Research and Technology), mainly for student education. The dimensions and weight are determined by GAS requirements and the satellite will be ejected from the space shuttle into an approximately 300-km circular orbit. It is a sun/star oriented satellite with an additional spin stabilization mode. The first planned payload is to be used for observing flight paths of migratory birds from northern Europe to southern Africa and back.

Ginati, A.↗

Processor Would Find Best Paths On Map

Proposed very-large-scale integrated (VLSI) circuit image-data processor finds path of least cost from specified origin to any destination on map. Cost of traversal assigned to each picture element of map. Path of least cost from originating picture element to every other picture element computed as path that preserves as much as possible of signal transmitted by originating picture element. Dedicated microprocessor at each picture element stores cost of traversal and performs its share of computations of paths of least cost. Least-cost-path problem occurs in research, military maneuvers, and in planning routes of vehicles.

Eberhardt, Silvio P.↗

The sixth generation robot in space

The knowledge based simulator developed in the artificial intelligence laboratory has become a working test bed for experimenting with intelligent reasoning architectures. With this simulator, recently, small experiments have been done with an aim to simulate robot behavior to avoid colliding paths. An automatic extension of such experiments to intelligently planning robots in space demands advanced reasoning architectures. One such architecture for general purpose problem solving is explored. The robot, seen as a knowledge base machine, goes via predesigned abstraction mechanism for problem understanding and response generation. The three phases in one such abstraction scheme are: abstraction for representation, abstraction for evaluation, and abstraction for resolution. Such abstractions require multimodality. This multimodality requires the use of intensional variables to deal with beliefs in the system. Abstraction mechanisms help in synthesizing possible propagating lattices for such beliefs. The machine controller enters into a sixth generation paradigm.

Butcher, A.↗

Transcript of Interview: Mark K. Craig

This document is a transcript of an interview given by Howard E. McCurdy to Mark K. Craig. Craig gives details on his background including information on his family, education, and career path, his reaction to the news that America was planning to put a man on the Moon, why he thinks we should go to Mars, and the political speeches made at the time of early human space exploration planning.

McCurdy, Howard E.↗