Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PROCESSING EQUIPMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Dynamic process intensification of binary distillation based on output multiplicity

Process intensification focuses largely on process and equipment design . Much less emphasis has been placed on operational changes to achieve cost savings and increased efficiency. Here, this article introduces the concept of dynamic intensification, defined as changes to the dynamics, operating strategy and/or control of a process that lead to a substantially more efficient processing path. This idea is illustrated in the context of binary distillation. Output multiplicity properties are exploited to establish a new periodic operating mode based on switching between two auxiliary products, which, on a time–average basis, is more energy efficient than steady–state operation. An extensive case study is presented concerning the distillation of a propanol–acetic acid mixture, confirming the theoretical developments. In contrast to previous research (e.g., on cyclic distillation), the present concept has significant advantages as it relies on existing hardware and exploiting system nonlinearity, rather than using specialized equipment operated in a discontinuous fashion.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

AGR-5/6/7 Fuel Fabrication Report

The U.S. Department of Energy Office of Nuclear Energy (DOE NE) and the Idaho National Laboratory (INL) Advanced Reactor Technologies (ART) Advanced Gas Reactor (AGR) Fuel Development and Qualification program (referred to as AGR Fuel program hereafter) are pursuing qualification of tristructural isotropic (TRISO) coated particle fuel for use in high temperature gas cooled reactors (HTGRs). The AGR Fuel program was established to provide a fuel qualification data set in support of the licensing and operation of an HTGR. BWX Technologies Nuclear Operations Group (BWXT-NOG) was subcontracted to fabricate the fuel for the AGR program. Several investments and innovations were realized in preparation to fabricate fuel for the AGR-5/6/7 irradiation experiments that brought fuel fabrication fully out of the laboratory and into engineering-scale operations. These included: • Increased the kernel fabrication line capacity and uniformity • Upgraded ancillary support equipment and processes for the tristructural isotropic (TRISO) coating furnace • Demonstrated efficient production of the matrix precursor powder by dry jet milling of co mingled components • Demonstrated an engineering-scale method for quick and efficient overcoating TRISO particles with the matrix precursor • Demonstrated an automated, multi cavity compacting system with a volumetric feed system • Demonstrated a combined-cycle thermal treatment furnace These changes increased production rates of some of these processes by an order of magnitude or more while eliminating the use of flammable solvents, multiple grinding and sorting operations, and the weighing out of individual die charges. Three fuel kernel lots were fabricated for production of the fuel for AGR-5/6/7. The initial lot (J52R-16-39316) was certified to fuel specifications but was not used because the kernels had a high fraction of internal fissures that caused an unacceptable fraction of the kernels to fragment when charged to the coating furnace where the TRISO coating would be deposited. Fragmented kernels increased the dispersed uranium in the particles and produced a worrisome fraction of dimpled particles with an elevated probability of in-pile failure. After some efforts to identify the cause of the fissure formation, two additional lots were produced with much lower fissure fractions, J52R-16-69317 and 69318. The latter kernel lot was a backup to the first and was not needed. Multiple kernel batches were composited to form each of the lots so as to simulate a commercial-scale operation where kernel batches would also be composited. Multiple TRISO coating runs were performed and the product characterized so that several could be composited into a TRISO lot. TRISO lot J52R-16-98005 conformed to all fuel specifications except the mean outer pyrocarbon (OPyC) layer thickness was thinner than specified. Furthermore, it was determined that the TRISO lot had a dispersed uranium fraction (DUF) that might result in the compacts not meeting the DUF specification. A review of the role of the OPyC layer and consequences of the DUF by the Technical Coordination Team and INL concluded that the fuel was acceptable for use in the AGR-5/6/7 irradiation experiment. The TRISO particles were overcoated with the matrix precursor that had been produced in a jet-milling operation. The overcoating was performed in equipment originally designed to coat pharmaceuticals. The overcoating process performed well; producing highly spherical and uniform overcoats requiring little upgrading and no recycle or rework. TRISO particles were overcoated with the matrix precursor to achieve nominal volumetric packing fractions (PFs) of TRISO particles of 25% and 40% for the irradiation experiments. The 40% PF compacts occupy the first and fifth test capsule in the test train while the inner three capsules are loaded with 25% PF compacts. The resinated graphite matrix precursor powder was a derivative of the German A3-27 matrix formulation, which differs from previous AGR irradiation campaigns that used an A3-3 formulation. Jet milling of the matrix powder precursor produced a finer mean graphite particle size than the milling operations used for the A3-3 matrix powder precursor. Changes made in the matrix formula and equipment yielded compacts with significantly higher matrix density than was attained in previous AGR irradiation campaigns. The changes in the matrix formulation and the means of milling the powders also complicated resolution of the three fuel compact defect fractions, DUF, exposed kernel fraction (EKF), and the silicon carbide defect fraction (SDF). Characterization data from BWXT-NOG had some anomalous results, so samples of the fuel compacts and overcoated TRISO particles were also analyzed by Oak Ridge National Laboratory (ORNL) to ensure that the defect fractions were accurately characterized.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A high-fidelity model for coupling flow and mechanical deformation of the porous paper web - a key to improved understanding of dewatering and rewet at the press section in paper making

The U.S. pulp and paper industry is the third-largest manufacturing user of energy, with an energy demand of 2,540 trillion Btu in 2010. Within the papermaking process, drying consumes over 400 trillion Btu annually which makes it one of the largest energy saving opportunities. In the 2014 Forest Products Industry Technology Roadmap, it is concluded that increasing the paper web solid content entering the dryer section from the current 45- 55 percent to approaching 65 percent, which would save 1.0 MMBtu per ton or 20 percent of the energy used in drying, is one of the most needed technology breakthroughs to achieve a more sustainable approach for manufacturing pulp and paper products. Achieving such significant energy savings highly depends on understanding the fundamental dynamics of the wet press process and then developing optimized solutions for design of more energy-efficient press processes and equipment. The objective of this project is to develop reliable computational capabilities to accurately simulate the flow of water from/to the porous pulp medium (dewatering/rewetting) during the pressing process in paper making.

42 ENGINEERING↗

2195 Aluminum-Copper-Lithium Friction Plug Welding Development

Technology developments and applications of friction plug welding is presented. This friction repair welding technology is being studied for implementation on the Space Transportation System's Super Light Weight External Tank. Single plug repairs will be used on a vast majority of weld defects, however, linear defects of up to several inches can be repaired by overlapping plug welds. Methods and results of tensile, bend, simulated service, surface crack tension and other tests at room and cryogenic temperatures is discussed. Attempts to implement Friction Plug Welding has led to both tool and process changes in an attempt to minimize expansive tooling and lengthy implementation times. Process control equipment and data storage methods intended for large scale production will also be addressed. Benefits include increased strength and toughness, decreased weld repair time, automated and highly reliable process, and a lower probability of having to re-repair defect locations.

Takeshita, Rike P.↗

EFRT M12 Issue Resolution: Comparison of PEP and Bench-Scale Oxidative Leaching Results

Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed and constructed and is to be operated as part of a plan to respond to issue M12, “Undemonstrated Leaching Processes.” The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing. Two operating scenarios are currently being evaluated for the ultrafiltration process (UFP) and leaching operations. The first scenario has caustic leaching performed in the UFP-2 ultrafiltration feed vessels (i.e., vessel UFP-VSL-T02A in the PEP; and vessels UFP-VSL-00002A and B in the WTP PTF). The second scenario has caustic leaching conducted in the UFP-1 ultrafiltration feed preparation vessels (i.e., vessels UFP-VSL-T01A and B in the PEP; vessels UFP-VSL-00001A and B in the WTP PTF). In both scenarios, 19-M sodium hydroxide solution (NaOH, caustic) is added to the waste slurry in the vessels to dissolve solid aluminum compounds (e.g., gibbsite, boehmite). Caustic addition is followed by a heating step that uses direct steam injection to accelerate the leaching process. Following the caustic leach, the vessel contents are cooled using vessel cooling jackets and/or external heat exchangers. The main difference between the two scenarios is that for leaching in UFP1, the 19-M NaOH is added to un-concentrated waste slurry (3 to 8 wt% solids), while for leaching in UFP2, the slurry is concentrated to nominally 20 wt% solids using cross-flow ultrafiltration before the addition of caustic. For wastes that have significantly high chromium content, the caustic leaching and slurry dewatering is followed by adding sodium permanganate to UFP-VSL-T02A, and the slurry is subjected to oxidative leaching at nominally ambient temperature. The purpose of the oxidative leaching is to selectively oxidize the poorly alkaline-soluble Cr(III) believed to be the insoluble form in Hanford tank sludge to the much more alkaline-soluble Cr(VI), e.g., chromate. The work described in this report provides the test results that are related to the efficiency of the oxidative leaching process to support process modeling based on tests performed with a Hanford waste simulant. The tests were completed both at the lab-bench scale and in the PEP. The purpose of this report is to summarize the results from both scales that are related to oxidative leaching chemistry to support a scale factor for the submodels to be used in the G2 model, which predicts WTP operating performance. Owing to schedule constraints, the PEP test data to be included in this report are limited to those from Integrated Tests A (T01 A/B caustic leaching) and B (T02A caustic leaching).

02 PETROLEUM↗

PEP Integrated Test D Run Report Caustic and Oxidative Leaching in UFP-VSL-T02A

Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed and operated as part of a plan to respond to issue M12, "Undemonstrated Leaching Processes" of the External Flowsheet Review Team (EFRT) issue response plan. The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing. Two operating scenarios are currently being evaluated for the ultrafiltration process (UFP) and leaching operations. The first scenario (Test B and D) has caustic leaching performed in the UFP-2 ultrafiltration feed vessels (i.e., vessel UFP-VSL-T02A in the PEP and vessels UFP-VSL-00002A and B in the WTP PTF). The second scenario (Test A) has caustic leaching conducted in the UFP-1 ultrafiltration feed preparation vessels (i.e., vessels UFP-VSL-T01A and B in the PEP and vessels UFP VSL-00001A and B in the WTP PTF). In Test D, 19M sodium hydroxide (NaOH, caustic) was added to the waste slurry in the UFP VSL T02 vessel after the solids were concentrated to ~20% undissolved solids. The NaOH was added to leach solid aluminum compounds (e.g., gibbsite, boehmite). Caustic addition is followed by heating to 85°C using direct injection of steam to accelerate the leach process. The main difference of Test D compared to Test B is that the leach temperature is 85°C for 24 hrs as compared to 100°C for 12 hours. The other difference is the Test D simulant had Cr in the simulant from the start of processing and Test B had Cr added to adjust the simulant composition after aluminum leaching. Following the caustic leach, the UFP-VSL-T02A vessel contents are cooled using the vessel cooling jacket. The slurry was then concentrated to 17 wt% undissolved solids and washed with inhibited water to remove NaOH and other soluble salts. Next, the slurry was oxidatively leached using sodium permanganate to solubilize chrome. The slurry was then washed to remove the dissolved chrome and concentrated.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pretreatment Engineering Platform (PEP) Integrated Test B Run Report--Caustic and Oxidative Leaching in UFP-VSL-T02A

Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed and operated as part of a plan to respond to issue M12, “Undemonstrated Leaching Processes” of the External Flowsheet Review Team (EFRT) issue response plan.( ) The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PEP Run Report for Integrated Test A, Caustic Leaching in UFP-VSL-T01A, Oxidative Leaching in UFP-VSL-T02A

Pacific Northwest National Laboratory (PNNL) was tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed and constructed and operated as part of a plan to respond to issue M12, “Undemonstrated Leaching Processes.”(a) The PEP, located in the Process Engineering Laboratory-West (PDLW) located in Richland, Washington, is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PEP Run Report for Simulant Shakedown/Functional Testing

Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Waste Treatment Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed, and operated as part of a plan to respond to issue M12, "Undemonstrated Leaching Processes." The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing. Two operating scenarios are currently being evaluated for the ultrafiltration process (UFP) and leaching operations. The first scenario has caustic leaching performed in the UFP-2 ultrafiltration feed vessels (i.e., vessel UFP-VSL-T02A in the PEP; and vessels UFP-VSL-00002A and B in the WTP PTF). The second scenario has caustic leaching conducted in the UFP-1 ultrafiltration feed preparation vessels (i.e., vessels UFP-VSL-T01A and B in the PEP; vessels UFP-VSL-00001A and B in the WTP PTF). In both scenarios, 19-M sodium hydroxide solution (NaOH, caustic) is added to the waste slurry in the vessels to leach solid aluminum compounds (e.g., gibbsite, boehmite). Caustic addition is followed by a heating step that uses direct injection of steam to accelerate the leach process. Following the caustic leach, the vessel contents are cooled using vessel cooling jackets and/or external heat exchangers. The main difference between the two scenarios is that for leaching in UFP-1, the 19-M NaOH is added to un-concentrated waste slurry (3-8 wt% solids), while for leaching in UFP-2, the slurry is concentrated to nominally 20 wt% solids using cross-flow ultrafiltration before the addition of caustic. In both scenarios, following the caustic leach, the slurry was then concentrated to 17 wt% and washed with inhibited water to remove NaOH and other soluble salts. Next, the slurry was oxidatively leached using sodium permanganate to solubilize chrome. The slurry was then washed to remove the dissolved chrome and concentrated.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EFRT M-12 Issue Resolution: Comparison of Filter Performance at PEP and CUF Scale

Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed, and operated as part of a plan to respond to issue M12, “Undemonstrated Leaching Processes” of the External Flowsheet Review Team (EFRT) issue response plan.(a) The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EFRT M-12 Issue Resolution: Comparison of PEP and Bench-Scale Oxidative Leaching Results

Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed, and operated as part of a plan to respond to issue M12, “Undemonstrated Leaching Processes” of the External Flowsheet Review Team (EFRT) issue response plan.( ) The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EFRT M-12 Issue Resolution: Solids Washing

Pacific Northwest National Laboratory (PNNL) was tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed, and operated as part of a plan to respond to issue M12, “Undemonstrated Leaching Processes” of the External Flowsheet Review Team (EFRT) issue response plan.( ) The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Precision Cleaning - Path to Premier

ITT Space Systems Division s new Precision Cleaning facility provides critical cleaning and packaging of aerospace flight hardware and optical payloads to meet customer performance requirements. The Precision Cleaning Path to Premier Project was a 2007 capital project and is a key element in the approved Premier Resource Management - Integrated Supply Chain Footprint Optimization Project. Formerly precision cleaning was located offsite in a leased building. A new facility equipped with modern precision cleaning equipment including advanced process analytical technology and improved capabilities was designed and built after outsourcing solutions were investigated and found lacking in ability to meet quality specifications and schedule needs. SSD cleans parts that can range in size from a single threaded fastener all the way up to large composite structures. Materials that can be processed include optics, composites, metals and various high performance coatings. We are required to provide verification to our customers that we have met their particulate and molecular cleanliness requirements and we have that analytical capability in this new facility. The new facility footprint is approximately half the size of the former leased operation and provides double the amount of throughput. Process improvements and new cleaning equipment are projected to increase 1st pass yield from 78% to 98% avoiding $300K+/yr in rework costs. Cost avoidance of $350K/yr will result from elimination of rent, IT services, transportation, and decreased utility costs. Savings due to reduced staff expected to net $4-500K/yr.

Mackler, Scott E.↗

Process Testing Results and Scaling for the Hanford Waste Treatment and Immobilization Plant (WTP) Pretreatment Engineering Platform - 10173

The U.S. Department of Energy-Office of River Protection’s Hanford Tank Waste Treatment and Immobilization Plant (WTP) is being designed and built to pretreat and then vitrify a large portion of the wastes in Hanford’s 177 underground waste storage tanks at Richland, Washington. In support of this effort, engineering-scale tests at the Pretreatment Engineering Platform (PEP) have been completed to confirm the process design and provide improved projections of system capacity. The PEP is a 1/4.5-scale facility designed, constructed, and operated to test the integrated leaching and ultrafiltration processes being deployed at the WTP. The PEP replicates the WTP leaching processes with prototypic equipment and control strategies and non-prototypic ancillary equipment to support the core processing. The testing approach used a nonradioactive aqueous slurry simulant to demonstrate the unit operations of caustic and oxidative leaching, cross-flow ultrafiltration solids concentration, and solids washing. Parallel tests conducted at the laboratory scale with identical simulants provided results that allow scale-up factors to be developed between the laboratory and PEP performance. This paper presents the scale-up factors determined between the laboratory and engineering-scale results and presents arguments that extend these results to the full-scale process.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Costs Associated With Propane Vehicle Fueling Infrastructure

This document is designed to help fleets understand the cost factors associated with propane vehicle fueling infrastructure. It provides an overview of the equipment and processes necessary to develop a propane fueling station and offers estimated cost ranges.

propane, fueling infrastructure, equipment, liquef↗

FIRST OPERATING RESULTS OF A DYNAMIC GAS BEARING TURBINE IN AN INDUSTRIAL HYDROGEN LIQUEFIER

Hydrogen has been brought into focus of industry and public since fossil fuels are depleting and costs are increasing dramatically. Beside these issues new high-tech processes in the industry are in need for hydrogen at ultra pure quality. To achieve these requirements and for efficient transportation, hydrogen is liquefied in industrial plants. Linde Gas has commissioned a new 5.5 TPD Hydrogen liquefier in Leuna, Germany, which has been engineered and supplied by Linde Kryotechnik. One of the four expansion turbines installed in the liquefaction process is equipped with dynamic gas bearings. Several design features and operational characteristics of this application will be discussed. The presentation will include results of efficiency and operational reliability that have been determined from performance tests. The advantages of the Linde dynamic gas bearing turbine for future use in hydrogen liquefaction plants will be shown.

42 ENGINEERING↗

The influence of the launch site operational environment on Space Shuttle scientific payloads

The effects of prelaunch assembly, testing, and integration activities on the scientific payload at the KSC are examined. The functions of the Shuttle and payload organizations of the KSC are discussed. The processing of the various types of pyaloads, and the amount of access to the payload during processing and after landing are described. The KSC facility contains: an Operations and Checkout Building, a Vertical Processing Facility, Cargo Integration and Test Equipment, an Orbiter Processing Facility, a Payload Changeout Room, payload transportation equipment, and Shuttle launch pads.

Schuiling, Roelof L.↗

Acoustic Travel-Time Tomography for Wind Energy

New remote sensing technologies for direct observation of the atmospheric flow in the proximity of operating wind turbines are necessary for the advancement of wind turbine design, wind plant control, and the validation of high-fidelity numerical models; fundamental goals of the DOE Wind Energy Technology Office's (WETO's) A2e program. Modern remote sensing technologies for commercial and research applications rely on the backscatter of light or sound waves, which limits spatial and temporal resolution and cannot produce reliable flow estimates near solid bodies or reflective surfaces. Acoustic tomography (AT) is an innovative sensing technology based on fundamental thermodynamic properties of the atmosphere and an inverse algorithm that can reconstruct both velocity and temperature fields within a network of acoustic transducers. AT relies on the direct travel path of acoustic signals between speakers and microphones in the network and can achieve much higher resolutions than conventional backscatter technologies. For wind energy R&D applications, AT represents an extremely economical option over other remote sensing technologies, integrating mature and commonly available acoustic and signal processing hardware. This report is intended as an update on the development of the AT array on the NREL Flatirons Campus (FC) and includes a brief review of the instrumentation, the calibration of equipment, signal processing, and resulting flow field estimates. Designs for future AT systems and applications are detailed in this report, including summaries of new capabilities, engineering and theoretical challenges, and anticipated costs help to outline future directions for AT technology R\&D. The potential for application of AT to utility-scale turbines is also discussed. Investing in the development of the proposed instrument will establish AT as a transformational RS technique that represents a significant advance in measurement instrumentation, enabling new fundamental insights into the structure of the atmospheric boundary layer and supporting applications for wind energy, pollution transport, and resource characterization. AT is also an extremely economical option over other RS instruments, integrating mature and commonly available acoustic and signal processing hardware.

17 WIND ENERGY↗