Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operating systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Five-year summary and evaluation of operations and performance of the Utica aquifer and North Lake Basin Wetlands restoration project in 2004-2009.

This document reviews the performance of the groundwater (and wetlands) restoration program implemented by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Utica, Nebraska, during the first five years (2004-2009) of this initiative. The report summarizes treatment system operational data and regulatory compliance monitoring results for the site during this period, together with the results of the targeted groundwater sampling and analysis for volatile organic compounds (VOCs) conducted in early 2010 (following completion of the fifth year of systems operation), to assess the initial five years of progress of the Utica remediation effort. On the basis of the 2003 groundwater sampling results, a remedial system employing 4 extraction wells (GWEX1-GWEX4), with groundwater treatment by spray irrigation and conventional air stripping, was implemented with the concurrence of the CCC/USDA and the agencies (Table 1.1). The principal components of the system are shown in Figure 1.3 and are briefly described in Section 1.2. Operation of well GWEX4 and the associated air stripper began on October 29, 2004, and routine operation of wells GWEX1-GWEX3 and the spray irrigation treatment units began on November 22, 2004.

54 ENVIRONMENTAL SCIENCES↗

Techniques for Achieving High Reliability Operation of the Spallation Neutron Source High Power Radio-Frequency System

The Spallation Neutron Source (SNS) high power radiofrequency (HPRF) system operates with high reliability to support the goals of the SNS user program. In recent operational periods the availability of the HPRF system has exceeded 97 percent while the neutron source availability overall is typically greater than 90 percent. SNS has a unique set of 92 HPRF stations that operate at either 402.5 MHz or 805 MHz with peak output power ranging from 550 kW to 5 MW and average power ranging from 49.5 kW to 450 kW. The HPRF transmitters consist of chassis-mounted power supplies, solid-state amplifiers and other equipment that support the operation of the klystrons that ultimately provide the RF power to the accelerating structures. Management of the operation and maintenance of the HPRF system has increasingly focused on reliability and sustainability in recent years. Techniques for klystron lifetime preservation and optimization of transmitter reliability have been developed and will be described.

Moss, John↗

Laboratory Evaluation of Federated, Hierarchical Controls for Distribution Power System Management: Preprint

The connection of more loads and distributed energy resources (DERs) to the distribution power system brings both challenges and opportunities to system operators. There are opportunities to aggregate flexible loads and DERs to provide transmission grid services, but the coordinated actions of DERs being managed by independent, third-party DER aggregators to support transmission system operations can present challenges. We developed a federated DER management architecture and control framework that aims to manage heterogeneous DERs to deliver reliable transmission grid services while respecting distribution system constraints. The controls include stochastic day-ahead optimization, model predictive control, and a simple real-time management scheme. We present simulation results obtained from a realistic laboratory test bed of federated controls managing DERs within a substation service area to make the substation net power follow the optimal net power determined by the day-ahead optimization based on cost and limiting reverse power flow.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Conversion of the LLNL/CAMS 1 MV biomedical AMS system to a semi-automated natural abundance 14C spectrometer: system optimization and performance evaluation

The Lawrence Livermore National Laboratory – Center for Accelerator Mass Spectrometry compact 1 MV biomedical accelerator mass spectrometer was repurposed and optimized for the semi-automated radiocarbon measurement of natural abundance environmental samples. Here we present results from 15 months of routine system operation and evaluate the system performance based on 30 sample wheels measured with consistent operating conditions over 7 months from August 2019 to March 2020. Additionally, the average measurement precision was 2.7 ± 0.7‰. System accuracy was assessed with measurements of 14 C-free materials, standard materials with 14 C-content spanning 0.5 to 1.5 F 14 C, and by comparison to split samples measured with the 10 MV AMS system. Overall, this system can routinely measure samples as small as 300 µgC and less than 33000 years without the need for size-specific correction protocols.

43 PARTICLE ACCELERATORS↗

Free piston linear motor compressor and associated systems of operation

A linear motor compressor including a compressor housing and a cylinder housing having a plurality of opposing compression chambers. A piston freely reciprocates within the cylinder housing using a linear electric motor. A piston position feedback control system provides adaptive current output as a function of position feedback and/or velocity feedback from the piston and/or the electric motor, to directly power and control the electric motor, wherein the piston reciprocates without assistance from a mechanical spring or other equivalent centering force.

Stair, Jason↗

Development of a Conceptual Chum Salmon Emergence Model for Ives Island

The objective of the study described herein was to develop a conceptual model of chum salmon emergence that was based on empirical water temperature of the riverbed and river in specific locations where chum salmon spawn in the Ives Island area. The conceptual model was developed using water temperature data that have been collected in the past and are currently being collected in the Ives Island area. The model will be useful to system operators who need to estimate the complete distribution of chum salmon emergence (first emergence through final emergence) in order to balance chum salmon redd protection and power system operation.

Murray, Christopher J.↗

NSTX-U Control System Upgrades

The National Spherical Tokamak Experiment (NSTX) is undergoing a wealth of upgrades (NSTX-U). These upgrades, especially including an elongated pulse length, require broad changes to the control system that has served NSTX well. A new fiber serial Front Panel Data Port input and output (I/O) stream will supersede the aging copper parallel version. Driver support for the new I/O and cyber security concerns require updating the operating system from Redhat Enterprise Linux (RHEL) v4 to RedHawk (based on RHEL) v6. While the basic control system continues to use the General Atomics Plasma Control System (GA PCS), the effort to forward port the entire software package to run under 64-bit Linux instead of 32-bit Linux included PCS modifications subsequently shared with GA and other PCS users. Software updates focused on three key areas: (1) code modernization through coding standards (C99/C11), (2) code portability and maintainability through use of the GA PCS code generator, and (3) support of 64-bit platforms. Central to the control system upgrade is the use of a complete real time (RT) Linux platform provided by Concurrent Computer Corporation, consisting of a computer (iHawk), an operating system and drivers (RedHawk), and RT tools (NightStar). Strong vendor support coupled with an extensive RT toolset influenced this decision. The new real-time Linux platform, I/O, and software engineering will foster enhanced capability and performance for NSTX-U plasma control.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Solar and Wind Forecast Error Reserve Sharing in a Multi-Utility Region

As electricity systems transition to higher levels of solar and wind generation, electric system operators will likely need to hold additional reserves to manage solar and wind forecast error. Because solar and wind forecast errors tend to be weakly correlated across space, system operators can reduce their reserve requirements by sharing reserves. This paper examines the benefits of forecast error reserve sharing among balancing areas in the Southeastern United States, in scenarios in which solar and wind generation ranges from 34% to 65% of total generation. It finds that day-ahead forecast error reserve requirements increase linearly with growth in solar and wind generation capacity (6%-10% of total capacity), but that reserve sharing can significantly reduce these requirements (by 6%-29%). It finds that, in economic terms, the value of forecast error reserve sharing ($\$$0.09-$\$$1.24 billion per year, $\$$0.12-$\$$1.68/MWh of load across scenarios) tends to decline with higher levels of solar and wind generation, due to lower reserve and energy prices. Even with declines in reserve prices, forecast error reserve sharing can still provide substantial value, though with higher levels of solar, wind, and electricity storage this value is increasingly tied to avoiding scarcity prices.

14 SOLAR ENERGY↗

Open-Source Steady-State Models for Integration of Wave Energy Converter into Microgrids

This paper proposes a software framework, WEC-Grid, for integrating wave energy converters (WECs) into power flow software, such as Siemens PSS®E, to aid the integration of alternative energy sources into Microgrids. While integrating alternative sources such as WECs presents specific challenges such as cost, power quality, and power variability, wave energy is a promising renewable energy resource. Evaluating the integration of WECs into the power grid is a complex and nuanced problem that requires seamless communication between a WEC model and power flow software. The presented WEC-Grid software framework bridges and extends the functionality of WEC-Sim, an open-source WEC modeling package for MATLAB, through a wave-to-wire (W2W) electro-mechanical power conversion and processing model. WEC-Grid acts as a software wrapper, handler, and communication layer between the W2W modeler and power flow software. The software is designed to represent each grid system as a class object, allowing power system operators to perform power system duties such as contingency planning and dispatch operations. The integration of WECs with PSS®E’s power flow calculations workflow is demonstrated with an IEEE RTS case study.

16 TIDAL AND WAVE POWER↗

Tools for Large-Scale Mobile Malware Analysis

Analyzing mobile applications for malicious behavior is an important area of re- search, and is made di cult, in part, by the increasingly large number of appli- cations available for the major operating systems. There are currently over 1.2 million apps available in both the Google Play and Apple App stores (the respec- tive o cial marketplaces for the Android and iOS operating systems)[1, 2]. Our research provides two large-scale analysis tools to aid in the detection and analysis of mobile malware. The rst tool we present, Andlantis, is a scalable dynamic analysis system capa- ble of processing over 3000 Android applications per hour. Traditionally, Android dynamic analysis techniques have been relatively limited in scale due to the compu- tational resources required to emulate the full Android system to achieve accurate execution. Andlantis is the most scalable Android dynamic analysis framework to date, and is able to collect valuable forensic data, which helps reverse-engineers and malware researchers identify and understand anomalous application behavior. We discuss the results of running 1261 malware samples through the system, and provide examples of malware analysis performed with the resulting data. While techniques exist to perform static analysis on a large number of appli- cations, large-scale analysis of iOS applications has been relatively small scale due to the closed nature of the iOS ecosystem, and the di culty of acquiring appli- cations for analysis. The second tool we present, iClone, addresses the challenges associated with iOS research in order to detect application clones within a dataset of over 20,000 iOS applications.

97 MATHEMATICS AND COMPUTING↗

Solar and Wind Forecast Error Reserve Sharing in a Multi-Utility Region

As electricity systems transition to higher levels of solar and wind generation, electric system operators will likely need to hold additional reserves to manage the forecast error associated with these resources. Because wind and solar forecast errors tend to be poorly correlated across space, system operators can reduce their reserve requirements by sharing reserves. This paper examines the value of forecast error reserve sharing among balancing areas in the Southeast United States. It finds that forecast error reserve requirements increase linearly with growth in solar and wind generation capacity but that reserve sharing can significantly reduce physical (MW) reserve requirements (from 25%-26% to 18%-19% of average load in high solar scenarios). It finds that the value of forecast error reserve sharing declines with higher levels of solar and wind generation, due to lower wholesale energy and reserve prices. Even with declines in wholesale prices, forecast error reserve sharing can still provide substantial value (as much as $\$$400 million per year in a high solar scenario), though with higher levels of solar, wind, and electricity storage, this value is increasingly tied to avoiding scarcity prices. The results suggest the importance of coordinated capacity expansion planning for forecast error reserve sharing.

14 SOLAR ENERGY↗

Integration of Hybrids into Wholesale Power Markets

With growing commercial activity around utility-scale hybrid storage projects in the Unites States, independent system operators (ISOs) and regional transmission organizations (RTOs) are faced with making decisions on how to represent such emerging technology resources in the market clearing software through the definition of hybrid resource participation models. System operators are facing increasing uncertainties around efficient and reliable ways to operate these resources given the ambiguity around their impacts, particularly when high levels of hybrid resources are present. This study aimed to evaluate and compare the performance implications of different hybrid resource participation models in a realistic wholesale electricity market setting with significant deployment of hybrid resources, and to provide the industry with metrics that quantify the advantages and disadvantages of different participation options using realistic electricity market simulations. The different participation models are compared in terms of the impact to reliability of the overall system, the ability of the market to access the full capabilities of hybrid resources as measured by the economic efficiency, and asset profitability.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Networked HIL Simulation System for Modeling Large-scale Power Systems

This paper presents a networked hardware-in-the-loop (HIL) simulation system for modeling large-scale power systems. Researchers have developed many HIL test systems for power systems in recent years. Those test systems can model both microsecond-level dynamic responses of power electronic systems and millisecond-level transients of transmission and distribution grids. By integrating individual HIL test systems into a network of HIL test systems, we can create large-scale power grid digital twins with flexible structures at required modeling resolution that fits for a wide range of system operating conditions. This will not only significantly reduce the need for field tests when developing new technologies but also greatly shorten the model development cycle. In this paper, we present a networked OPAL-RT based HIL test system for developing transmission-distribution coordinative Volt-VAr regulation technologies as an example to illustrate system setups, communication requirements among different HIL simulation systems, and system connection mechanisms. Impacts of communication delays, information exchange cycles, and computing delays are illustrated. Simulation results show that the performance of a networked HIL test system is satisfactory.

Xie, Fuhong↗

Coordinated Ramping Product and Regulation Reserve Procurements in CAISO and MISO using Multi-Scale Probabilistic Solar Power Forecasts (Pro2R)

How can probabilistic solar forecasts lower costs and improve reliability for independent system operator (ISO) markets? We tackle this question in three steps. First, we enhance an existing solar forecasting system to provide well-calibrated hours-ahead probabilistic forecasts. We then relate the degree of uncertainty in those forecasts to error distributions for net load ramps for the California ISO (CAISO) using statistical and machine learning methods. Projected net load errors conditioned on solar uncertainty are translated into flexible ramp requirements that therefore reflect real-time meteorological and solar conditions, improving on typical ISO procedures. Finally, a multi-period look-ahead production cost model quantifies how conditional ramp requirements can a) decrease operating costs by lowering requirements compared to often conservative unconditional methods, and b) reduce generation scarcity events and consequently improve reliability by increasing flexibility requirements at times when unconditional forecast-based requirements understate actual ramp uncertainty. In addition to the products just described (quantification of solar uncertainty, its translation into requirements for ramp capability product, and quantification of the benefits of more accurate ramp requirements), this project also developed a visualization system that alerts system operators of ramp and uncertainty conditions within the network based on solar forecasts. The system is called Resource Forecast and Ramp Visualization for Situational Awareness (RaVIS). These four products represent significant advances in the state-of-the-art of probabilistic solar forecasting, development of weather-informed reserve requirements, production costing methods for estimating the benefits of more accurate reserve requirements, and visualization of system status, respectively. Yet the products are also practical and can be immediately implemented, potentially enabling system operators to save millions of dollars in ramp product procurement costs per year.

14 SOLAR ENERGY↗

The targeted heating and current drive applications for the ITER electron cyclotron system

We present a 24 MW Electron Cyclotron (EC) system operating at 170 GHz and 3600 s pulse length is to be installed on ITER. The EC plant shall deliver 20 MW of this power to the plasma for Heating and Current Drive (H&CD) applications. The EC system is designed for plasma initiation, central heating, current drive, current profile tailoring, and Magneto-hydrodynamic control (in particular, sawteeth and Neo-classical Tearing Mode) in the flat-top phase of the plasma. A preliminary design review was performed in 2012, which identified a need for extended application of the EC system to the plasma ramp-up, flattop, and ramp down phases of ITER plasma pulse. The various functionalities are prioritized based on those applications, which can be uniquely addressed with the EC system in contrast to other H&CD systems. An initial attempt has been developed at prioritizing the allocated H&CD applications for the three scenarios envisioned: ELMy H-mode (15 MA), Hybrid (~12 MA), and Advanced (~9 MA) scenarios. In conclusion, this leads to the finalization of the design requirements for the EC sub-systems.

42 ENGINEERING↗

Tevatron Beam Halo Collimation System: Design, Operational Experience and New Methods

Collimation of proton and antiproton beams in the Tevatron collider is required to protect CDF and D0 detectors and minimize their background rates, to keep irradiation of superconducting magnets under control, to maintain long-term operational reliability, and to reduce the impact of beam-induced radiation on the environment. In this article we briefly describe the design, practical implementation and performance of the collider collimation system, methods to control transverse and longitudinal beam halo and two novel collimation techniques tested in the Tevatron.

43 PARTICLE ACCELERATORS↗

An Integrated Framework for Effective Management of Delivery Risk in Electricity Markets: From Batteries to Insurance and Beyond

Net load imbalances due to imperfect day-ahead forecasts can cause variability in real-time electricity prices and higher system operations costs. We propose a novel market product called Flexibility Options that allow participants to hedge uncertainty by buying flexibility from flexible resources. Simulations show that flexibility options can reduce total system operating costs by up to 15% and can reduce variability in market participant revenues. To better quantify the flexibility that DER aggregators can provide, we develop DER flexibility scores that account for asset flexibility and uncertainty from occupant behavior and weather. Preliminary results show that realistic sets of DERs have significant variability in flexibility and uncertainty metrics.

delivery risk↗