Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “NEW JOBS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Introduction to the Consortium for Monitoring, Technology, and Verification (MTV) [Slides]

Our mission is to develop new technologies that detect and deter nuclear proliferation activities while training the next generation of nuclear professionals. The three technical thrust areas are: 1. Fundamentals of nuclear and particle physics, 2. Signals and source terms for nuclear nonproliferation, and 3. Nuclear explosion. There are opportunities for collaborations with university faculty, possible student and post-doc work, and posting job ads. Further, MTV hosts various workshops, symposiums.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

The Bipartisan Infrastructure Law Provides Opportunities for Water Power Across Several Programs

President Biden signed the Infrastructure Investment and Jobs Act into law on November 15, 2021. The $1.2 trillion deal, commonly called the Bipartisan Infrastructure Law (BIL), is a long-term investment in the nation’s infrastructure, workers, families, and competitiveness. The investment is historic for the U.S. Department of Energy (DOE), which will receive more than $62 billion from the BIL to stand up 60 new programs, including 16 demonstration and 32 deployment programs, and expand funding for 12 existing research, development, demonstration, and deployment programs. The BIL-funded programs outlined in this fact sheet are most relevant for hydropower and marine energy.

BIL↗

Spray Foam Exterior Insulation with Stand-Off Furring - New York

IBACOS and Green Homes America 1 (GHA) collaborated with the New York State Energy Research and Development Authority (NYSERDA) Advanced Buildings Program to research a variation of a commercial curtain wall assembly for residential construction as part of a comprehensive whole-house deep energy retrofit (DER) package. The advantages of this strategy include minimizing the physical connections to each individual existing wall stud, using closedcell spray foam to encapsulate existing siding materials including lead paint, and creating a vented rain screen assembly to promote drying. As Moore (2011) states, "Closed-cell foam acts as air-sealing, insulation, and secondary drainage plane..." Field installations on a limited number of houses indicate that the incremental cost when installed as part of a typical siding and window replacement job adds approximately $10/ft2 of wall area. 2 x 4 framing members were attached to the wall at band joists and top plates using "L" clips, and spray foam was used to insulate the wall after the framing was installed. Windows were installed as the framing was put up, including extension jambs. Key lessons learned include the following: (1) The installed cost of the spray foam system was comparable to the installed cost of the rigid foam and furring strips. (2) Spray foam should be applied in such a way that it locks the framing members in place before the remaining foam is installed in the field of the wall. The spray foam has a tendency to move the new wall framing as it expands. Best practice is to "picture frame" the wall framing with spray foam and then apply the spray foam in the field of each bay. (3) Variations in the existing siding conditions must be accounted for when attaching the ledger boards and wall framing. A best practice is to uniformly shim the ledger boards off the walls so the new framing is a uniform distance from the ledger boards and the inside surface of the interior framing. This is important primarily for window and door installation and the associated extension jambs and trim. (4) From a sequencing perspective, it is advantageous to replace the windows at the same time as the exterior walls are being built. This requires a crew that can perform a number of different tasks (e.g., framing, flashing, window install, trim carpentry) and does not lend itself to subcontracting this approach piecemeal (e.g., framing subcontractor, window installer, drainage plane installer, trim carpenter). (5) Application of the brackets and associated fastener screws was more time consuming than anticipated. (6) It is important for the spray foam contractor to perform all preparatory work, which in this case included placing plastic over the windows and exposed foundation to minimize or eliminate the possibility of damage due to overspray.

Array↗

Advances and Enhancements in the Fabric for Frontier Experiments Project at Fermilab

The FabrIc for Frontier Experiments (FIFE) project within the Fermilab Scientific Computing Division is charged with integrating offline computing components into a common computing stack for the non-LHC Fermilab experiments, supporting experiment offline computing, and consulting on new, novel workflows. We will discuss the general FIFE onboarding strategy, the upgrades and enhancements in the FIFE toolset, and plans for the coming year. These enhancements include: expansion of opportunistic computing resources (including GPU and high-performance computing resources) available to experiments; assistance with commissioning computing resources at European sites for individual experiments; StashCache repositories for experiments; enhanced job monitoring tools; and a custom workflow management service. Additionally we have completed the first phase of a Federated Identity Management system to make it easier for FIFE users to access Fermilab computing resources.

Herner, Kenneth↗

Unique Methodologies for Nano/Micro Manufacturing Job Training Via Desktop Supercomputer Modeling and Simulation

This project establishes an initiative in high speed (Teraflop)/large-memory desktop supercomputing for modeling and simulation of dynamic processes important for energy and industrial applications. It provides a training ground for employment of current students in an emerging field with skills necessary to access the large supercomputing systems now present at DOE laboratories. It also provides a foundation for NIU faculty to quantum leap beyond their current small cluster facilities. The funding extends faculty and student capability to a new level of analytic skills with concomitant publication avenues. The components of the Hewlett Packard computer obtained by the DOE funds create a hybrid combination of a Graphics Processing System (12 GPU/Teraflops) and a Beowulf CPU system (144 CPU), the first expandable via the NIU GAEA system to ~60 Teraflops integrated with a 720 CPU Beowulf system. The software is based on access to the NVIDIA/CUDA library and the ability through MATLAB multiple licenses to create additional local programs. A number of existing programs are being transferred to the CPU Beowulf Cluster. Since the expertise necessary to create the parallel processing applications has recently been obtained at NIU, this effort for software development is in an early stage. The educational program has been initiated via formal tutorials and classroom curricula designed for the coming year. Specifically, the cost focus was on hardware acquisitions and appointment of graduate students for a wide range of applications in engineering, physics and computer science.

Kimball, Clyde↗

Solar heating and hot water system installed at Municipal Building complex, Abbeville, South Carolina

Information on the solar energy system installed at the new municipal building for the City of Abbeville, SC is presented, including a description of solar energy system and buildings, lessons learned, and recommendations. The solar space heating system is a direct air heating system. The flat roof collector panel was sized to provide 75% of the heating requirement based on an average day in January. The collectors used are job-built with two layers of filon corrugated fiberglass FRP panels cross lapped make up the cover. The storage consists of a pit filled with washed 3/4 in - 1 1/2 in diameter crushed granite stone. The air handler includes the air handling mechanism, motorized dampers, air circulating blower, sensors, control relays and mode control unit. Solar heating of water is provided only those times when the hot air in the collector is exhausted to the outside.

Source record↗

Hydrogen's Expanding Role in the Energy System

Realizing the vision of H2@Scale will require research and investment in efficient hydrogen production methods and upgraded infrastructure. Advances in hydrogen production will allow new applications, such as steelmaking, biofuels production, and fuel cell electric vehicles, to thrive. H2@Scale is a U.S. Dept. of Energy (DOE) initiative that brings together stakeholders to advance affordable hydrogen production, transport, storage, and utilization in multiple energy sectors. H2@Scale will improve the resiliency and reliability of the energy supply chain, increase the competitiveness of U.S. manufacturing, create jobs, and reduce emissions, thereby improving environmental sustainability. Hydrogen has a unique ability to transfer energy across time and economic sectors. The electric grid was designed so that the generated load varies with changes in demand. However, wind and solar power technologies can only generate electricity when each resource is available, making it more difficult to balance the grid. Because hydrogen production can be a large-scale controllable load, it can help address that challenge. Hydrogen can serve as a clean feedstock for diverse applications within the transportation, process industries, and energy sectors. This article describes hydrogen production, application, and infrastructure opportunities. The first part of the article discusses hydrogen production and describes current costs and potential cost reductions that could be enabled by research and development (R&D). The second section discusses key applications that take advantage of hydrogen's chemical properties and its potential as an energy carrier. The final section of the article describes the current hydrogen infrastructure and how it must grow to meet the H2@Scale vision.

08 HYDROGEN↗

Recharging Michigan: A123 Systems

Investing in Detroit is paying off for A123 systems, a Boston based battery technology company. With the help of Recovery Act funding through the Department of Energy, they've been able to open two new factories, employ and retrain over 1000 area residents and propel the commercialization of next generation electric vehicles.

25 ENERGY STORAGE↗

Marketing Remote Sensing Data for North Pacific Fisheries Development and Management

Fish poaching, drug trafficking, ocean dumping, and other illegal activities are important problems on the high seas and in national economic zones. The primary thrust of the EOCAP II project, "Marketing Remote Sensing Data for North Pacific Fisheries Development and Management", was to use space-based sensors to improve the effectiveness of marine monitoring, control, and surveillance (MCS). Our initial objectives were to concentrate on the development of MCS tools using Advanced Very High Resolution Radiometry (AVHRR) and Synthetic Aperture Radar (SAR) data. Although we have successfully completed development of an initial version of our SAR-based monitoring tool (OmniVision), project activity has resulted in a much broader application of space-based assets to marine applications. Based in part on work commenced within EOCAP II, a new company, Ocean and Coastal Environmental Sensing, Inc. (OCENS), has been launched and the development of several new software products outside of the MCS arena initiated. One of those products, SeaStation, is near completion with a Fall, 1995 release date. Equity investment in OCENS now totals $70,000-with an additional amount being sought in the first round of financing. One of the pre-eminent objectives of EOCAP II is to make contributions to the US economy and job growth through the expansion of commercial uses of remotely sensed data. OCENS and the software products it is introducing into marine and coastal zone markets responds to this primary object*e. EOCAP II funding leveraged the market and technical know-how of OCENS founders into smart products that benefit marine and coastal zone users. Although technical difficulties and geopolitical shifts damaged the commercial feasibility of initial project objectives, the flexibility of the EOCAP II program now permits long-term business success. This in no small part stems from the fact that the EOCAP program recognizes the realities of small and start-up businesses and does not attempt to force these conditions to fit the apparent needs of big government. Instead, EOCAP works with those who know their market best in order to produce successful products and expanding businesses.

Source record↗

Simulated hydrological dynamics and coupled iron redox cycling impact methane production in an Arctic soil: Modeling Archive

This Modeling Archive is in support of an NGEE Arctic publication "Simulated hydrological dynamics and coupled iron redox cycling impact methane production in an Arctic soil" in the Journal of Geophysical Research-Biogeosciences. We simulated biogeochemical cycling in arctic soils using the PFLOTRAN geochemical model combined with measurements from previous NGEE Arctic incubations of polygonal permafrost soils in northern Alaska (Zheng et al., 2018). Simulated iron cycling, carbon dioxide production, and methane production were compared with incubation measurements and the parameterized model was then used to simulate coupled iron and carbon cycling over repeated oxic-anoxic cycles at different levels of carbon substrate availability and pH. The most recent data version (2.0) in the archive incorporates changes to the model and simulations as suggested by reviewers during the manuscript review process. These changes include an updated parameterization of the model; a new set of simulations omitting the iron cycle for direct evaluation of how iron cycle processes affect modeled outcomes; and a set of simulations testing different scenarios of carbon substrate availability in addition to scenarios of initial soil pH. This archive contains simulation code, model output, and analysis code for PFLOTRAN simulations. All scripts are python except the batch script for submitting multiprocessor jobs. Note that the model also requires compiled versions of the Alquimia interface and the NGEE Arctic fork of the PFLOTRAN geochemical simulator (see the README_INSTALL document for basic instructions). The Output directory contains eight data files in netCDF format generated by the model. The Next-Generation Ecosystem Experiments: Arctic (NGEE Arctic), was a 10-year research effort (2012-2022) to reduce uncertainty in Earth System Models by developing a predictive understanding of carbon-rich Arctic ecosystems and feedbacks to climate. NGEE Arctic was supported by the Department of Energy's Office of Biological and Environmental Research. The NGEE Arctic project had two field research sites: 1) located within the Arctic polygonal tundra coastal region on the Barrow Environmental Observatory (BEO) and the North Slope near Utqiagvik (Barrow), Alaska and 2) multiple areas on the discontinuous permafrost region of the Seward Peninsula north of Nome, Alaska. Through observations, experiments, and synthesis with existing datasets, NGEE Arctic provided an enhanced knowledge base for multi-scale modeling and contributed to improved process representation at global pan-Arctic scales within the Department of Energy's Earth system Model (the Energy Exascale Earth System Model, or E3SM), and specifically within the E3SM Land Model component (ELM).

54 ENVIRONMENTAL SCIENCES↗

STS-114: Crew Interviews: 1. Jim Kelly 2. Charlie Camarda

1) STS-114 Pilot James Kelly mentions his primary job as the Pilot is to back up Commander Eileen Collins all through the flight. James discusses in detail his robotics operations for all of the extravehicular activities and spacewalk work, as well as moving the logistics module back and forth, onto the station and back in the payload bay. He shares his thoughts on the Columbia, the STS-114 mission as a new chapter in space exploration, and the International Space Station. 2) STS-114 Mission Specialist Charlie Camarda discusses his major role in the mission, his feelings for this being his first Space Shuttle flight; shares his thoughts on the Columbia; mentioned that STS-114 is a baby step to what is needed to do for the next step in space exploration, and gave some examples on how the International Space Station can help pave the path to future space exploration.

Source record↗

Laser Safety: A Laser Alignment Practical Training Course

SLAC National Accelerator Laboratory has developed a Laser Alignment Practical Training Course as one of its core laser safety classes. The course is taught to small groups of up to three students and takes 1-3 hours to complete. This practical course is not a substitute for site-specific On-the-Job Training; it does, however, provide a good introduction in core laser safety practices that can be broadly applied. Alignment and diagnostic tasks are performed with low power lasers. Students learn safe alignment and diagnostic techniques and how to avoid common mistakes that might lead to an accident. The class is taught by laser supervisors, enabling them to assess the skill level of new laser personnel and determine the subsequent level of supervision needed. The course has six alignment tasks. For each task, discussion points are given for the instructor to review with the students. The optics setup includes different wavelength lasers, a beam expander, mirrors, irises, a periscope, a beam-splitting polarizer and a diffraction grating. Diagnostic tools include viewing cards, an IR viewer and a ccd camera. Laser eyewear is available to block some laser wavelengths in the setup.

43 PARTICLE ACCELERATORS↗

TCF - Sustainable Well Cement for Geothermal, Thermal Recovery, and Carbon Storage wells

Primary cementing is the most important operation performed on a subterranean well. Cement, placed in the annulus between the casing and the formations, serves as a hydraulic seal preventing fluids and gas migrations, protecting steel casing from corrosion, and supporting the well structure. Poor cementing jobs can be directly responsible for wells not reaching their full capacity, casing corrosion, compromised well integrity and, in the worst-case scenarios, well collapse. Geothermal, thermal recovery, and carbon storage wells offer environments that are especially difficult for cements to survive while the required lifespan of these wells can be years. In these wells currently used cements cannot provide durable well integrity, and new solutions are necessary. The necessity of stabilizing the electric grid, increasing its flexibility, and providing energy on demand will further expand the market of durable cement solutions for applications in high-temperature underground reservoir thermal energy storage wells (HT RTES). The design challenges of special cement systems for such wells originate from chemistry limitations of currently used well cements, aggressive environments, temperature and repeated shock conditions associated with them, and very weak formations that are not uncommon in these wells. During the last 70 years the most common systems for thermal-well construction have been Ordinary Portland Cement (OPC) (absolute majority of the wells), silica-lime system, and high aluminum cement-containing formulations. The major issues of calcium-silicate hydrates, that form during the hydration of OPC resulting in hardened material, are their poor chemical resistance to acids due to the calcium interactions with acid anions followed by its eventual dissolution, even in mild acids, such as carbonic acid from CO 2 dissolution, and inadequate bonding to the steel causing serious casing corrosion problems (Sugama & Pyatina, 2019). Performance of OPC-based cement may be significantly improved with organic additives; however, those are limited by their temperature stability. An alternative to calcium-silicate cement was developed by BNL and commercialized by Halliburton as ThermaLock TM cement. Calcium-aluminate-phosphate-based chemistry of the material allowed overcoming acid-resistance problems of OPC, especially in CO 2 -rich geothermal environments. In 2012-2015, building upon this experience, BNL developed Thermal Shock Resistant Cement (TSRC) with the support of Geothermal Technology Office (GTO) of DOE. TSRC has high-temperature stable chemistry, superior properties of cement-metal casing bond and corrosion protection (4-times better than currently used OPC-based formulation), significantly outperforms common well-cements in thermal-shock tests, has self-healing properties, and like ThermaLock TM is CO 2 resistant incorporating carbonate ions into stable hydrates (Gill et al., 2012).

15 GEOTHERMAL ENERGY↗

Dryden Flight Research Center Critical Chain Project Management Implementation

In Fiscal Year 2011 Dryden Flight Research Center (DFRC) implemented a new project management system called Critical Chain Project Management (CCPM). Recent NASA audits have found that the Dryden workforce is strained under increasing project demand and that multi-tasking has been carried to a whole new level at Dryden. It is very common to have an individual work on 10 different projects during a single pay period. Employee surveys taken at Dryden have identified work/life balance as the number one issue concerning employees. Further feedback from the employees indicated that project planning is the area needing the most improvement. In addition, employees have been encouraged to become more innovative, improve job skills, and seek ways to improve overall job efficiency. In order to deal with these challenges, DFRC management decided to adopt the CCPM system that is specifically designed to operate in a resource constrained multi-project environment. This paper will discuss in detail the rationale behind the selection of CCPM and the goals that will be achieved through this implementation. The paper will show how DFRC is tailoring the CCPM system to the flight research environment as well as laying out the implementation strategy. Results of the ongoing implementation will be discussed as well as change management challenges and organizational cultural changes. Finally this paper will present some recommendations on how this system could be used by selected NASA projects or centers.

Hines, Dennis O.↗

NRIC Asset Suite Engineering and Operations Data Integration Plan

The National Reactor Innovation Center (NRIC), established by the U.S. Department of Energy (DOE) in August 2019, accelerates the demonstration and deployment of advanced nuclear energy through its mission to inspire stakeholders and the public, empower innovators, and deliver successful outcomes through efficient coordination of partners and resources. NRIC is a national program led by Idaho National Laboratory (INL), enabling collaborators to harness the world-class capabilities of the U.S. National Laboratory System. Committed to demonstrating advanced reactors by the end of 2025, NRIC is designed to bridge the gap between research, development, and the marketplace to help convert some of the Nation’s most promising advanced nuclear reactors into commercial applications by 2030. To meet these needs, NRIC is developing two reactor demonstration test beds at Idaho National Laboratory (INL), the Laboratory for Operation and Testing in the United States (LOTUS) and the Demonstration and Operation of Microreactor Experiments (DOME) test bed. Each test bed involves the modification of existing facilities at INL’s Materials and Fuels Complex (MFC). Retrofitting these facilities to accommodate novel reactors, as well as subsequent but similar NRIC projects, is a non-trivial engineering task and is expected to generate a significant amount of new and revised documentation. Leveraging digital engineering practices, this documentation will be managed in a purpose-built data management tool to facilitate origination, review, and approval while coordinating with the design contractor. The subsequent upload and review of documentation to INL’s existing document control system comprises a long and unnecessarily manual task. An opportunity exists to automate this upload process and save job-hours while continuing to adhere to INL/MFC document management procedures.

99 GENERAL AND MISCELLANEOUS↗

Commercialization of New Carbon Fiber Materials Based on Sustainable Resources for Energy Applications

Oak Ridge National Laboratory (ORNL) and GrafTech International have collaborated to develop and demonstrate the performance of high temperature thermal insulation prototypes made from lignin-based carbon fibers. This project will potentially lead to the first commercial application of lignin-based carbon fibers (LBCF). The goal of the commercial application is to replace expensive, Chinese-sourced isotropic pitch carbon fibers with lower cost carbon fibers made from a domestically sourced, bio-derived (renewable) feedstock. LBCF can help recapture jobs that were previously exported to China while resolving a supply chain vulnerability and reducing the production cost for GrafTechs high temperature thermal insulation. The performance of the LBCF prototypes was measured and found to be comparable to that of the current commercial product. During production of the insulation prototypes, ORNL and GrafTech demonstrated lignin compounding/pelletization, fiber production, heat treatment, and compositing at scales far surpassing those previously demonstrated in LBCF R&D or production. A plan was developed for the commercialization of LBCF thermal insulation, with key milestones including qualification of multiple scalable lignin sources in 2013, tons-scale production and field testing by customers in 2014, and product launch as soon thereafter as production capabilities can be constructed and commissioned.

carbon fiber↗

Cyberguardians and STEM Warriors (Final Technical Report (FTR))

In the past decade, solar power, with and without energy storage has become the fastest growing source of energy generation in the world. In the U.S., solar employment more than doubled from 105,145 jobs in 2011 to 255,037 jobs in 2021, four times faster than the U.S. job growth rate overall. These factors, combined with technology advancements, creates a skills gap that puts tremendous stress on society to deliver the workers to fill the open job requisitions. The Cyberguardians and STEM Warriors project (Cyberguardians) was designed to address the trained-worker shortage in the energy industry in three ways: 1) by developing educational curriculum that addresses DER technology changes; 2) by delivering curriculum to prospective workers, including military veterans and their families, via universities, community colleges, and vocational training outlets; and 3) introducing individuals who have completed training to employers that can hire them. Cyberguardians exceeded its curriculum goals by producing 27 academic units of university-accredited material (12 total courses) covering energy fundamentals, smart inverters, Distributed Energy Resource (DER) data communication, cybersecurity, standardization, certification, data analytics, and IEEE 1547 standard topics. The North American Board of Certified Energy Practitioners (NABCEP) also accredited the material for use in their credential program. Seven instructors were recruited and trained, and six academic institutions (University of California San Diego, State University of New York, North Carolina State University, Harper Community College, Green Village Academy, and the SunSpec Alliance) were enlisted, meeting program goals. All course material was published under the Creative Commons license and made available royalty free, thus providing a long-lasting public benefit. The program’s outreach program vastly exceeded program goals and incorporated the efforts of 13 outreach partners (11 of which are veteran focused), an advisory board representing 15 companies, webinars and 10’s of thousands of email messages sent to prospective students and hiring managers. Despite these efforts, the global pandemic depressed anticipated program participation by about a third. Still, a total of 396 students enrolled and 289 completed the courses and were accredited. The job applicant task achieved similar results (111 realized vs a 174 goal) but reported job placement was weaker at (9 realized vs. a 51 goal). The Cyberguardians program fills a critical void for cost-effective, royalty-free curriculum and training pertaining to DER technologies and cybersecurity that prospective energy workers must possess to be effective in the 21 st century. On this basis alone, the investment of taxpayer funds will pay dividends for years to come.

14 SOLAR ENERGY↗

Innovations in Advanced Materials and Metals Manufacturing Project (IAM2)

This project, under the Jobs and Innovation Accelerator Challenge, Innovations in Advanced Materials and Metals Manufacturing Project, contracted with Cascade Energy to provide a shared energy project manager engineer to work with five different companies throughout the Portland metro grant region to implement ten energy efficiency projects and develop a case study to analyze the project model. As a part of the project, the energy project manager also looked into specific new technologies and methodologies that could change the way energy is consumed by manufacturers—from game-changing equipment and technology to monitor energy use to methodologies that change the way companies interact and use their machines to reduce energy consumption.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗