Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Launch operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Development of the ARIES parachute system

The design and testing of a two-stage parachute system to recover a space telescope weighing up to 2000 pounds is described. The system consists of a 15-ft dia ribbon parachute reefed to 50% for 10 seconds and a 73-ft dia paraform or cross second stage reefed to 10% for 10 seconds. The results of eight drop tests and one operational rocket launched flight and recovery are presented. A successful operational recovery of a 1600-lb NASA space telescope was conducted. The payload was launched by a second stage Minuteman rocket to an altitude of about 300 miles above sea level.

Pepper, W. B.↗

Overview od STS ground operations/orbiter turnaround STS-1 through STS-7

A review of STS-1 processing is presented as a reference for Shuttle processing time and the magnitude of the associated modifications, discrepancies, technical requirements, and ground systems activities. STS-1 processing provided the basis from which a plan to perform operational turnaround was established. Turnaround processing for Launch and Landing are treated separately to depict more clearly the progress made to reduce turnaround time and manhours expended. Turnaround time was reduced from 187 days for STS-2 to 60 days for STS-7 and landing turnaround was reduced from 14 days to 5 days. Modifications were reduced from 114 to 51. Requirements changes for launch readiness verification were reduced from 536 to 107. Special tests or inspections were reduced from 292 to 52. Anomalies resolved concurrent with processing were reduced from 13,000 to 4,000. Integration in the Vehicle Assembly Building (VAB) is about 10 percent of the flow, and Launch Pad operations comprise 40 percent of the turnaround. The work force has matured and has demonstrated the capability to perform planned and contingency operations. The turnaround program is fast approaching the goal of becoming operational.

Schwartz, R.↗

The early Earth Observing System reference handbook: Earth Science and Applications Division missions, 1990-1997

Prior to the launch of the Earth Observing System (EOS) series, NASA will launch and operate a wide variety of new earth science satellites and instruments, as well as undertake several efforts collecting and using the data from existing and planned satellites from other agencies and nations. These initiatives will augment the knowledge base gained from ongoing Earth Science and Applications Division (ESAD) programs. This volume describes three sets of ESAD activities -- ongoing exploitation of operational satellite data, research missions with upcoming launches between now and the first launch of EOS, and candidate earth probes.

Source record↗

Safety on Earth From MARSS

ENSCO, Inc., developed the Meteorological and Atmospheric Real-time Safety Support (MARSS) system for real-time assessment of meteorological data displays and toxic material spills. MARSS also provides mock scenarios to guide preparations for emergencies involving meteorological hazards and toxic substances. Developed under a Small Business Innovation Research (SBIR) contract with Kennedy Space Center, MARSS was designed to measure how safe NASA and Air Force range safety personnel are while performing weather sensitive operations around launch pads. The system augments a ground operations safety plan that limits certain work operations to very specific weather conditions. It also provides toxic hazard prediction models to assist safety managers in planning for and reacting to releases of hazardous materials. MARSS can be used in agricultural, industrial, and scientific applications that require weather forecasts and predictions of toxic smoke movement. MARSS is also designed to protect urban areas, seaports, rail facilities, and airports from airborne releases of hazardous chemical substances. The system can integrate with local facility protection units and provide instant threat detection and assessment data that is reportable for local and national distribution.

Source record↗

Preparations for the Launch, Cruise, and Orbital Operations Phases of the Psyche Mission

“Psyche: Journey to a Metal World” was selected in 2017 as the 14th mission in NASA’s Discovery program. The mission uses an electric propulsion (EP) system to rendezvous with and orbit the large metal asteroid (16) Psyche. Spacecraft development is a hybrid approach with deep-space avionics provided by the Jet Propulsion Laboratory (JPL) and a solar electric propulsion chassis based on Maxar’s 1300-series GEO communications satellites. The payload suite is comprised of a magnetometer, multispectral imager, and gamma ray & neutron spectrometer science instruments and the Deep Space Optical Communications advanced technology demonstration.The spacecraft is currently in the final integration and test phase to support a planned launch period open in August 2022. With under a year until liftoff, final pre-liftoff preparations are underway for the mission’s major in-flight Phases. The Launch Phase is the mission’s only critical event as the vehicle autonomously deploys the solar arrays and delivers the spacecraft to a safe state. Following a planned 70-day Initial Checkout Phase, the spacecraft thrusts with the EP system through the majority of a 3.5-year Cruise Phase, which includes a Mars gravity assist, to rendezvous with (16) Psyche. The Approach Phase uses optical navigation while continuing to thrust with the EP engines to deliver the spacecraft into orbit. Orbital Operations are baselined for 20 months as the spacecraft steps through four progressively lower orbital altitudes to study the largest M-type asteroid in the solar system.

Hart, William↗

Design the support rather than support the design

Recommendations are presented for reducing the operational cost of the Space Shuttle. Operational cost drivers at the launch site are identified by examining Shuttle operational data collected over the past two and a half years, and arguments are presented for incorporating support and maintainability criteria in the design process. It is also shown that the increased application of automation to evaluate systems and conduct operations will provide ways to reduce launch operations costs in addition to other benefits, such as increasing the speed of the total checkout, reducing manpower requirements, reducing the possibility of human error, and minimizing documentation changes.

Scholz, Arthur L.↗

Advanced Launch System (ALS): Electrical actuation and power systems improve operability and cost picture

To obtain the Advanced Launch System (ALS) primary goals of reduced costs and improved operability, there must be significant reductions in the launch operations and servicing requirements relative to current vehicle designs and practices. One of the primary methods for achieving these goals is by using vehicle electrical power system and controls for all actuation and avionics requirements. A brief status review of the ALS and its associated Advanced Development Program is presented to demonstrate maturation of those technologies that will help meet the overall operability and cost goals. The electric power and actuation systems are highlighted as a specific technology ready not only to meet the stringent ALS goals (cryogenic field valves and thrust vector controls with peak power demands to 75 hp), but also those of other launch vehicles, military and civilian aircraft, lunar/Martian vehicles, and a multitude of commercial applications.

Sundberg, Gale R.↗

Advanced launch system (ALS) - Electrical actuation and power systems improve operability and cost picture

To obtain the Advanced Launch System (ALS) primary goals of reduced costs and improved operability, there must be significant reductions in the launch operations and servicing requirements relative to current vehicle designs and practices. One of the primary methods for achieving these goals is by using vehicle electrrical power system and controls for all aviation and avionics requirements. A brief status review of the ALS and its associated Advanced Development Program is presented to demonstrate maturation of those technologies that will help meet the overall operability and cost goals. The electric power and actuation systems are highlighted as a sdpecific technology ready not only to meet the stringent ALS goals (cryogenic field valves and thrust vector controls with peak power demands to 75 hp), but also those of other launch vehicles, military ans civilian aircraft, lunar/Martian vehicles, and a multitude of comercial applications.

Sundberg, Gale R.↗

Classification of Small Negative Lightning Reports at the KSC-ER

The NASA Kennedy Space Center (KSC) and Air Force Eastern Range (ER) operate an extensive suite of lightning sensors because Florida experiences the highest area density of ground strikes in the United States, with area densities approaching 16 fl/sq km/yr when accumulated in 10x10 km (100 sq km) grids. The KSC-ER use data derived from two cloud-to-ground (CG) lightning detection networks, the "Cloud-to-Ground Lightning Surveillance System" (CGLSS) and the U.S. National Lightning Detection Network (TradeMark) (NLDN) plus a 3-dimensional lightning mapping system, the Lightning Detection and Ranging (LDAR) system, to provide warnings for ground operations and to insure mission safety during space launches. For operational applications at the KSC-ER it is important to understand the performance of each lightning detection system in considerable detail. In this work we examine a specific subset of the CGLSS stroke reports that have low values of the negative inferred peak current, Ip, i.e. values between 0 and -7 kA, and were thought to produce a new ground contact (NGC). When possible, the NLDN and LDAR systems were used to validate the CGLSS classification and to determine how many of these reported strokes were first strokes, subsequent strokes in a pre-existing channel (PEC), or cloud pulses that the CGLSS misclassified as CG strokes. It is scientifically important to determine the smallest current that can reach the ground either in the form of a first stroke or by way of a subsequent stroke that creates a new ground contact. In Biagi et al (2007), 52 low amplitude, negative return strokes ([Ip] < or = 10 kA) were evaluated in southern Arizona, northern Texas, and southern Oklahoma. The authors found that 50-87% of the small NLDN reports could be classified as CG (either first or subsequent strokes) on the basis of video and waveform recordings. Low amplitude return strokes are interesting because they are usually difficult to detect, and they are thought to bypass conventional lightning protection that relies on a sufficient attractive radius to prevent "shielding failure" (Golde, 1977). They also have larger location errors compared to the larger current events. In this study, we use the estimated peak current provided by the CGLSS and the results of our classification to determine the minimum Ip for each category of CG stroke and its probability of occurrence. Where possible, these results are compared to the findings in the literature.

Ward, Jennifer G.↗

X-33, Demonstrating Revolutionary Operations for VentureStar(TM)

The X-33, reusable space plane technology demonstrator is on course to begin the flights of the X-33 by the end of 2002 that will serve as a basis for industry and government decisions that could lead to VentureStar(Trademark). Lockheed Martin has placed the VentureStar LLC in it's Space Company and is now competing in an industry wide effort that will permit NASA to select a Second Generation RLV source by 2005. This move provides the focus for firm business planning needed to enable the decision by the time X-33 flies in mid 2002 and possibly with upgraded technologies a year or so later. The operations concept for the X-33 is an integration of launch vehicle and aircraft operations approaches. VentureStar is a Single Stage To Orbit (SSTO) and will therefore enable a new approach to Space Launch Operations that is more "aircraft like" and can produce substantially lower operating costs over current systems. NASA's initiatives over the past several years in Reusable Launch Vehicles (RLV) have had as a primary objective to demonstrate technologies that will result in significant reduction in costs of space access. Further, the end objective is to commercialize the development and operations of the next generation RLV. Hence, the X-33 and its operations demonstration is a major contributor to that next generation system.

Austin, Robert E.↗

Solar power satellite. System definition study. Part 1, volume 3: Construction, transportation and cost analyses

Concepts developed for both LEO and GEO construction of photovoltaic and thermal engine satellites are analyzed. Topics discussed include: satellite construction; crew scheduling; crew jobs and organizations; operator productivity rating; constructability rating; transportation systems for cargo launch, refueling operations, personnel transport, and orbit transfer; collision analysis, cost analysis, and radiation evironment and effects.

Source record↗

The cesium bombardment engine north-south stationkeeping experiment on ATS-6

Two one-millipound-thrust cesium-bombardment ion thrusters have been developed and integrated on the ATS-F spacecraft for the purpose of demonstrating compatible north-south stationkeeping of a synchronous communication satellite. In addition to the two flight units, an identical system is undergoing extended testing on the ground to demonstrate operating lifetime. On July 17, 1974, approximately 50 days after launch, preliminary operation of one of the thrusters was begun. Completely successful operation was achieved on the first run. In addition to verifying operation, the principal accomplishments were the demonstration of a total absence of interference with the complete array of spacecraft-to-ground communication links and the verification of the predicted spacecraft operating potential of approximately -10 volts. Subsequent attempts to operate the same thruster have not been successful and an investigation of possible explanations is underway.

Hunter, R. E.↗

Near-Optimal Operation of Dual-Fuel Launch Vehicles

A near-optimal guidance law for the ascent trajectory from earth surface to earth orbit of a fully reusable single-stage-to-orbit pure rocket launch vehicle is derived. Of interest are both the optimal operation of the propulsion system and the optimal flight path. A methodology is developed to investigate the optimal throttle switching of dual-fuel engines. The method is based on selecting propulsion system modes and parameters that maximize a certain performance function. This function is derived from consideration of the energy-state model of the aircraft equations of motion. Because the density of liquid hydrogen is relatively low, the sensitivity of perturbations in volume need to be taken into consideration as well as weight sensitivity. The cost functional is a weighted sum of fuel mass and volume; the weighting factor is chosen to minimize vehicle empty weight for a given payload mass and volume in orbit.

Ardema, M. D.↗

Kennedy launch processing system

Airline operations approach to Cape Kennedy launch processing system for reduced hardware and operational costs of shuttle support

Parsons, W. E.↗