Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LOCATION CLOSURE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Analysis of Impacts of Terminal Restrictions on Departures in D10 TRACON

The D10 – Dallas-Fort Worth Terminal Radar Approach CONtrol (TRACON) is an air traffic facility that controls and manages aircraft and airspace that consists of multiple airports located in the North Texas area. From an air traffic management standpoint, one of the main challenges in the D10 TRACON is the departure fix capacity as multiple airports compete for resources. This problem is magnified when en route demand/capacity imbalance and inclement weather around the TRACON reduce the capacity at the terminal fixes. This leads to multiple, dynamic Traffic Management Initiative (TMI) restrictions being issued by the Air Traffic Control (ATC) on departing flights. This, in turn, propagates delay to the surface of each airport within the metroplex. The NASA Airspace Technology Demonstration 2 (ATD-2) Phase 3 is deployed in D10 to demonstrate new technologies developed to manage the Integrated Arrival, Departure, and Surface (IADS) traffic in a metroplex environment where multiple airports are interacting and sharing resources at the terminal boundary. This paper uses the ATD-2 terminal restriction data collected in the D10 TRACON to quantify the impact of restrictions on the demand, analyze the relation between terminal restrictions and departure taxi time on airport surface, and establish relationships between restrictions and surface delay. We found that the restrictions on departure flights have a direct adverse effect on departure excess taxi time on the airport surface.

ATD-2↗

Savannah River Site Footprint Reduction Results under the American Recovery and Reinvestment Act - 13302

The Savannah River Site (SRS) is an 802 square-kilometer United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina, managed and operated by Savannah River Nuclear Solutions. Construction of SRS began in the early 1950's to enhance the nation's nuclear weapons capability. Nuclear weapons material production began in the early 1950's, eventually utilizing five production reactors constructed to support the national defense mission. Past operations have resulted in releases of hazardous constituents and substances to soil and groundwater, resulting in 515 waste sites with contamination exceeding regulatory thresholds. More than 1,000 facilities were constructed onsite with approximately 300 of them considered radiological, nuclear or industrial in nature. In 2003, SRS entered into a Memorandum of Agreement with its regulators to accelerate the cleanup using an Area Completion strategy. The strategy was designed to focus cleanup efforts on the 14 large industrial areas of the site to realize efficiencies of scale in the characterization, assessment, and remediation activities. This strategy focuses on addressing the contaminated surface units and the vadose zone and addressing groundwater plumes subsequently. This approach streamlines characterization and remediation efforts as well as the required regulatory documentation, while enhancing the ability to make large-scale cleanup decisions. In February 2009, Congress approved the American Reinvestment and Recovery Act (ARRA) to create jobs and promote economic recovery. At SRS, ARRA funding was established in part to accelerate the completion of environmental remediation and facility deactivation and decommissioning (D and D). By late 2012, SRS achieved 85 percent footprint reduction utilizing ARRA funding by accelerating and coupling waste unit remediation with D and D of remnant facilities. Facility D and D activities were sequenced and permitted with waste unit remediation activities to streamline regulatory approval and execution. Achieving footprint reduction fulfills the Government's responsibility to address legacy contamination; allows earlier completion of legally enforceable compliance agreement milestones; and enables future potential reuse of DOE resources, including land and infrastructure for other missions. Over the last 3.5 years significant achievements were met that contributed to footprint reduction, including the closure of 41 waste units (including 20 miles of radiologically contaminated stream) and decommissioning of 30 facilities (including the precedent setting in situ closure of two former production reactors, the first in the DOE Complex). Other notable achievements included the removal of over 39,750 cubic meters of debris and 68,810 cubic meters of contaminated soils, including 9175 cubic meters of lead-contaminated soil from a former site small arms testing range and treatment of 1,262 cubic meters of tritium-laden soils and concrete using a thermal treatment system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Soil Desiccation Treatability Testing at BC Waste Disposal Cribs

During Hanford’s production period, low-level waste products generated from chemical processing of uranium fuel rods were discharged directly to the ground through a system of cribs and trenches located in the 200-BC-1 Operable Unit (OU). The site consists of 6 cribs and 20 trenches that received more than 117,000 m3 of radioactive liquid waste discharged to the soil. These unlined infiltration galleries held volumes of liquid waste while it seeped into the ground, with the understanding that the 100 m (330 ft) thick vadose zone in the area would effectively capture the effluent and prevent groundwater impacts. A conceptual model showing the operation of cribs and trenches is shown in Figure 1. Data show effluent from the 26 cribs and trenches containing about 410 curies of Technetium-99 (Tc-99) is primarily located between 30 m and 70 m (98 ft and 230 ft) depth (Corbin et al., 2005; Ward et al., 2004). Despite no evidence indicating that the contamination has reached the groundwater at BC cribs and trenches, the mobility of Tc-99 had been demonstrated in laboratory tests and was recognized as a threat to groundwater at the site. Using data from numerical models, laboratory analyses, field investigations, and information on historical discharges, the EPA and Ecology identified Tc-99 and U contamination of the vadose zone as a remediation priority. The U.S. DOE was notified by EPA and Ecology regarding risks associated with Tc-99 contamination in a letter requesting development of a strategy for improved methods to understand the nature and extent of vadose zone contamination, specifically Tc-99, and to develop remedial options for addressing such contamination. To develop the appropriate technology for characterizing, remediating, and monitoring the deep vadose zone Tc-99 contamination, the U.S. DOE worked with the EPA and Ecology to create a Treatability Test Plan under a Remedial Investigation/Feasibility Study (RI/FS) for the Hanford 200 Areas. Under this RI/FS, it was determined that a treatability test for soil desiccation should be carried out as it was identified as a promising in-situ treatment technology for mitigating risks posed by Tc-99 contamination to the groundwater table. The BC Cribs and Trenches site was identified as a representative site for Tc-99 and U contamination and selected for the soil desiccation treatability test. In this chapter, we summarize the overlying regulatory framework of RI/FS and treatability tests and illustrate how development and experimentation supported the evaluation of selected remedies. We briefly discuss the RI/FS for the 200 Areas of the Hanford Site and focus on the soil desiccation treatability testing performed at the BC cribs and trenches site under the Deep Vadose Zone Treatability Test Plan for the Hanford Central Plateau (DVZ-TT). The DVZ-TT is one component of the remedial investigation/feasibility study for the Hanford 200 Areas and represents the underlying regulatory framework that drives site operations towards records of decision and site closure.

Mangel, Adam R.↗

FY19 Status of the Full Circumference Examination of the Inner Container Closure Weld Region for Selected 3013 DE Containers

One of the main focus areas of the 3013 Surveillance Program is a thorough evaluation of the inner container closure weld region (ICCWR) opened for destructive examination (DE). As part of the protocol to investigate the corrosion in the ICCWR a laser confocal microscope (LCM) is used to perform close visual examination of the surface and measurements of corrosion features on the surface. In FY17, DE containers from FY13 through FY16 were evaluated to select candidates for a full circumference analysis of the ICCWR. In FY18, the selected DE containers for full circumference evaluation (FCE) were processed according to the ICCWR protocol and LCM data collection was completed for the full circumference only for FY15 DE07. In FY19 the remaining DE containers were completed. The ICCWR protocol was completed as follows: (1) the FCE containers were sectioned into quarters and the weld removed to access the ICCWR; (2) a series of images of the ICCWR full circumference were taken using a stereo microscope and assembled into panoramic views; (3) SEM/EDS analysis performed on selected sections showed what is most likely corrosion products on the surface and chlorides randomly dispersed; (4) the presence of chlorides was also confirmed with ion chromatography of citric acid washes, in which FY15 DE07 and FY16 DE05 showed a significant amount of chlorides with FY15 DE08 showing the less amount of chlorides; (5) dye penetrant examination was performed on the interior and exterior surfaces of all the sidewall sections but reveled no relevant indication of surface-breaking defects, (6) finally, as described above, the full circumference examination of the ICCWR by LCM was completed. The three ICCWRs show general and localized corrosion on the surface. However, FY15 DE08 show more areas with agglomerated pits in Zones 2 and 3 than the other two DEs. The major suspect corrosion events were observed for FY15 DE07 on Sections C1 and C2 and for FY15 DE08 on Section C2. These events correspond to suspect cracks or crack-like features identified with a unique name to easily refer to each feature. FY15 DE07 shows a crack-like feature, identified as Acrux, in Section C1 and three features in Section C2 identified as Bellatrix, Cursa Minor and Cursa Major. Acrux and Bellatrix are located at the boundary of Zone 2 and Zone 3. Cursa Minor and Cursa Major are in Zone 2. FY15 DE08 shows two crack-like features, identified as Denebola and Draco, in Section C2. Both features are located at the boundary of Zone 2 and Zone 3. However, gas analysis and statistical evaluation of the gas compositions and pressures via GEST analyses suggest that leakage between the OI and IC volumes was unlikely. Additional characterization and analysis will be performed on the locations where the cracks were found.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MH-1A Sturgis Decommissioning and Dismantlement - 20281

The U.S. Army Corps of Engineers (USACE) with its prime contractor, Aptim Federal Services, LLC (APTIM), recycled 5,260 metric tons (11.6 million pounds) of material from Sturgis Barge (Sturgis) during the Decommissioning and Dismantlement of the MH-1A nuclear power reactor. The overall objective of the project was to reduce residual radioactivity associated with MH-1A to levels that permitted release of Sturgis for dismantlement and termination of the Army Reactor Office permit. By effectively applying waste hierarchy's three Rs - reduce, reuse and recycle - the Sturgis project not only minimized the amount of waste that required disposal at landfills, but also reduced the potential for long-term environmental liability emanating from these landfills. The project team completed the physical decommissioning efforts in June 2018 in Galveston, TX. In September 2018, radiological surveys were completed to demonstrate the vessel could be released for shipbreaking. Sturgis was towed from Galveston, TX to Brownsville, TX in late September 2018. Shipbreaking, dismantlement and recycling efforts began in early October 2018 and were completed on 15 March 2019. As part of the decommissioning effort in Galveston, the team shipped 69 shipments (860 metric tons) of low-level radioactive waste and radioactive components to the Waste Control Specialist (WCS) facility in Andrews TX for disposal. Certain radioactive components had to be transferred to the Department of Energy prior to placing the materials into the Federal Waste Facility located within WCS. However, most of the radioactive waste was characterized, profiled, approved and managed under the WCS permitted radioactive waste exemption process authorized and implemented by the Texas Commission on Environmental Quality (TCEQ) and the Radioactive Materials Division. This allows LLRW and LLMW to be shipped as regulated waste and then upon receipt at WCS through satisfying the relevant waste acceptance criteria the waste is exempted and placed into the WCS RCRA permitted cell. An additional 35 shipments (544 metric ton) of contaminated hazardous waste water were transported to U.S. Ecology in Robstown, TX for treatment/disposal. An additional 36 shipments (500 metric tons) of non-hazardous wastewater was sent to Republic Waste Services' facility in Fresno, TX. The disposal of these materials required close coordination with State of Texas regulators. During decommissioning, the project team recycled approximately 270 metric tons (600,000 pounds) of lead and steel. As part of the dismantlement in Brownsville, TX the team recycled approximately 5,000 metric tons (11 million pounds) of ferrous and non-ferrous material, limiting our disposal requirements to about 180 metric tons (400,000 pounds) of material (<4% from entire shipbreaking activity). Although the primary hazard being mitigated by this project was radiological, recycling was always a priority for the project. The team strived to achieve sustainability goals as we implemented this one of a kind project. Scrap metal recycling has a large positive impact on the environment and can also favorably impact project disposal costs. Steel is among the most recycled material in the world. Nearly 40% of the world's steel production is made from scrap. Recycling steel also requires 75% less energy than producing it from raw materials. By using recycled steel rather than virgin materials, 2.33 kg of carbon emissions are eliminated per kg of steel [1]. The project recycled more than 4,500 metric tons (10 million pounds) of steel, which eliminated about 10,400 metric tons (23 million pounds) of CO{sub 2}. By implementing a recycling initiative for the Sturgis project, the team was able to realize cost avoidance for disposal of scrap, cost savings from the metals recycled, plus the project provided benefits to the environment through our recycling efforts. Once the dismantlement was complete, the team prepared a detailed decommissioning closure report, which allowed for the termination of the Army Reactor Decommissioning Permit. While it not only reduced any potential long-term environmental liability, this project to decommission and dismantle a floating nuclear power plant is truly unprecedented - it is a prime example of the USACE mission which is: 'Engineering solutions for the Nation's toughest challenges'. This unique, one of a kind, historical power plant was never designed to be taken apart, and the available information about its construction was lacking in many details. The hazards that required mitigation dictated a painstaking and deliberate process in order to avoid any release to the environment and the community, and to protect the health and safety of the workers involved while keeping the waste hierarchy's three R's - reduce, reuse and recycle at the forefront. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

25 years of environmental remediation in the general separations area of the Savannah river site: lessons learned about what worked and what did not work in soil and groundwater cleanup - 15270

The Savannah River Site, which is owned and administered by the US Department of Energy, covers approximately 900 square kilometers. The General Separation Area is located in the center of the site and includes: radioactive material chemical separations facilities, radioactive waste tank farms, radioactive seepage basins, and the radioactive waste burial grounds. Radioactive wastes were disposed in the General Separation Area from the mid-1950's through the mid-1990's. Operations at the F Canyon began in 1954 and at H Canyon began in 1955. Waste water disposition to the F and H Seepage Basins began soon after operations started in the canyons. The Old Radioactive Waste Burial Ground began operations in 1952 to manage solid waste that could be radioactive from all the site operations, and ceased receiving waste in 1972. The Mixed Waste Management Facility and Low Level Radioactive Waste Disposal Facility received radioactive solid waste from 1969 until 1995. Environmental legislation enacted in the 1970's through 1990's led to changes in waste management and environmental cleanup practices. The US Congress passed the Clean Air Act in 1970 and the Clean Water Act in 1972; the Resource Conservation and Recovery Act was enacted in 1976; the Comprehensive Environmental Response Compensation, and Liability Act was enacted by Congress in 1980; and the Federal Facilities Compliance Act was signed into law in 1992. Environmental remediation at the Savannah River Site essentially began with a 1987 Settlement Agreement between the Savannah River Site and the State of South Carolina. The site manages several of the larger groundwater remedial activities under the Resource Conservation and Recovery Act for facilities recognized early on as environmental problems. All subsequent remediation projects are managed under a tri-party agreement (Department of Energy, Environmental Protection Agency, and South Carolina Department of Health and Environmental Control) through the Federal Facilities Agreement. Environmental remediation activities during the past 25 years have stabilized and capped seepage basins as well as consolidated and capped waste units and burial grounds in the General Separation Area. Groundwater activities include: pump and treat systems in the groundwater, installation of deep subsurface barrier systems to manage groundwater flow, in situ chemical treatments in the groundwater, and captured contaminated groundwater discharges at the surface for management in a forest irrigation system. Concentrations of contaminants in the aquifers beneath the General Separation Area and in surface water streams in the General Separation Area have decreased over the past 25 years. Closure of 65 waste sites and 4 Resource Conservation and Recovery Act facilities has been successfully accomplished. Environmental clean-up has progressed to the stage where most of the work involves monitoring, optimization, and maintenance of existing remedial systems. Many lessons have been learned in the process of remediating the General Separations Area. Geo-textile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive and enhanced natural processes to address contamination are much more cost effective than pump and treat systems. Forest irrigation can be very effective in water management situations with non-accumulative contaminants such as tritium and volatile organic contaminants. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

25 Years Of Environmental Remediation In The General Separations Area Of The Savannah River Site: Lessons Learned About What Worked And What Did Not Work In Soil And Groundwater Cleanup

The Savannah River Site (SRS) is owned and administered by the US Department of Energy (DOE). SRS covers an area of approximately 900 square kilometers. The General Separation Area (GSA) is located roughly in the center of the SRS and includes: radioactive material chemical separations facilities, radioactive waste tank farms, a variety of radioactive seepage basins, and the radioactive waste burial grounds. Radioactive wastes were disposed in the GSA from the mid-1950s through the mid-1990s. Radioactive operations at the F Canyon began in 1954; radioactive operations at H Canyon began in 1955. Waste water disposition to the F and H Seepage Basins began soon after operations started in the canyons. The Old Radioactive Waste Burial Ground (ORWBG) began operations in 1952 to manage solid waste that could be radioactive from all the site operations, and ceased receiving waste in 1972. The Mixed Waste Management Facility (MWMF) and Low Level Radioactive Waste Disposal Facility (LLRWDF) received radioactive solid waste from 1969 until 1995. Environmental legislation enacted in the 1970s, 1980s, and 1990s led to changes in waste management and environmental cleanup practices at SRS. The US Congress passed the Clean Air Act in 1970, and the Clean Water Act in 1972; the Resource Conservation and Recovery Act (RCRA) was enacted in 1976; the Comprehensive Environmental Response Compensation, and Liability Act (CERCLA) was enacted by Congress in 1980; the Federal Facilities Compliance Act (FFCA) was signed into law in 1992. Environmental remediation at the SRS essentially began with a 1987 Settlement Agreement between the SRS and the State of South Carolina (under the South Carolina Department of Health and Environmental Control - SCDHEC), which recognized linkage between many SRS waste management facilities and RCRA. The SRS manages several of the larger groundwater remedial activities under RCRA for facilities recognized early on as environmental problems. All subsequent environmental remediation projects tend to be managed under tri-party agreement (DOE, Environmental Protection Agency, and SCDHEC) through the Federal Facilities Agreement. During 25 years of environmental remediation SRS has stabilized and capped seepage basins, and consolidated and capped waste units and burial grounds in the GSA. Groundwater activities include: pump and treat systems in the groundwater, installation of deep subsurface barrier systems to manage groundwater flow, in situ chemical treatments in the groundwater, and captured contaminated groundwater discharges at the surface for management in a forest irrigation system. Over the last 25 years concentrations of contaminants in the aquifers beneath the GSA and in surface water streams in the GSA have dropped significantly. Closure of 65 waste sites and 4 RCRA facilities has been successfully accomplished. Wastes have been successfully isolated in place beneath a variety of caps and cover systems. Environmental clean-up has progressed to the stage where most of the work involves monitoring, optimization, and maintenance of existing remedial systems. Many lessons have been learned in the process. Geotextile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive, enhanced natural processes to address groundwater contamination are much more cost effective than pump and treat systems. SRS operated two very large pump and treat systems at the F and H Seepage Basins to attempt to limit the release of tritium to Fourmile Branch, a tributary of the Savannah River. The systems were designed to extract contaminated acidic groundwater, remove all contamination except tritium (not possible to remove the tritium from the water), and inject the tritiated groundwater up-gradient of the source area and the plume. The concept was to increase the travel time of the injected water for radioactive decay of the tritium. The two systems were found to be non-effective and potentially mobilizing more contamination. SRS invested approximately $50 million in construction and approximately $100 million in 6 years of operation. The H Seepage Basin pump and treat system was replaced by a series of subsurface barriers that alters the groundwater velocity; the F Seepage Basin pump and treat system was replaced by subsurface barriers forming a funnel and gate augmented by chemical treatment within the gates. These replacement systems are mostly passive and cost approximately $13 million to construct, and have reduced the tritium flux to Fourmile Branch, in these plumes, by over 70%. SRS manages non-acidic tritiated groundwater releases to Fourmile Branch from the southwest plume of the MWMF with a forest irrigation system. Tritiated water is captured with a sheetpile dam below the springs that caused releases to Fourmile Branch. Water from the irrigation pond is pumped to a filter plant prior to irrigation of approximately 26 hectares of mixed forest and developing pine plantation. SRS has almost achieved a 70% reduction in tritium flux to the Branch from this plume. The system cost approximately $5 million to construct with operation cost of approximately $500K per year. In conclusion, many lessons have been learned in 25 years of relatively aggressive remedial activities in the GSA. Geotextile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive, enhanced natural processes to address groundwater contamination are much more cost effective than pump and treat systems. In water management situations with non-accumulative contaminants (tritium, VOCs, etc.) irrigation in a forest setting can be very effective.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radioactive contamination from 1920-50's at an urban site of the New York City and interim remedial action - 15630

The former Wolff-Alport Chemical Company operated at the location in densely populated urban area in Queens, New York, between 1920 to about 1954. The company imported, stored on-site and processed monazite sand ores from the Belgium Congo. The extracted refined products enriched in rare-earth metals were sold on the commercial market. The process residues, rich in thorium and its progeny, were originally disposed of directly to the city sewer line and probably on-site also. The site's buildings are currently occupied by the auto shops, corner delicatessen store, light construction company, ice maker/distributor, and two residential apartments. Preliminary site investigations found multiple areas with elevated levels of direct gamma radiation with the maximum reported rates of 22 micro-sievert/hour (2.2 milli-rem/hour) at surface level and 40 micro-sievert/hour (4 milli-rem/hour) inside sewer manhole access. The thoron (Rn-220) gas air concentration in outdoor areas was reported reaching 13.5 kBq/m{sup 3} (366 pCi/L) and the radon (Rn-222) gas air concentrations was reported exceeding 148 Bq/ m{sup 3} (4 pCi/L) in some buildings. The dose assessments indicated that, under realistic scenarios, some members of the public were likely to receive the radiation exposure from this contamination in excess of the New York City and Nuclear Regulatory Commission general public radiation dose limit of 1 milli-sievert /yr (100 milli-rem/yr). The interim remedial action was planned and conducted by the U.S. Environmental Protection Agency (U.S. EPA) Region 2 in close cooperation with the New York City and New York State in 2012-13. The purpose of the action was to take necessary interim measures to reduce annual public dose below limit of 1 milli-sievert/yr (100 milli-rem/yr) and reduce radon gas concentration levels in impacted indoor spaces below U.S. EPA Action Level for residencies of 148 Bq/ m{sup 3} (4 pCi/L). In order to achieve these goals, the following actions were taken: detailed radiological and occupancy surveys; development of realistic exposure scenarios; dose assessments; installation of the fence and gates around the 'backyard' portion of the site; vegetation removal; development and detailed assessment of the radiation shielding options; application of the multilayer radiation shielding in some buildings, portions of the sidewalk and unpaved areas; mitigation of radon/thoron gas entry point; and installation of the radon mitigation system in one of the buildings. The preliminary post-action analyses indicated that the action goal would likely be achieved. The interim remedial action was conducted in a tight urban setting; it has significantly reduced public health risk from radiation without closure of businesses that continued operating within the site perimeter. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Statistical Analysis of Tank 5 Floor Sample Results (U)

Sampling has been completed for the characterization of the residual material on the floor of Tank 5 in the F-Area Tank Farm at the Savannah River Site (SRS), near Aiken, SC. The sampling was performed by Savannah River Remediation (SRR) LLC using a stratified random sampling plan with volume-proportional compositing. The plan consisted of partitioning the residual material on the floor of Tank 5 into three non-overlapping strata: two strata enclosed accumulations, and a third stratum consisted of a thin layer of material outside the regions of the two accumulations. Each of three composite samples was constructed from five primary sample locations of residual material on the floor of Tank 5. Three of the primary samples were obtained from the stratum containing the thin layer of material, and one primary sample was obtained from each of the two strata containing an accumulation. This report documents the statistical analyses of the analytical results for the composite samples. The objective of the analysis is to determine the mean concentrations and upper 95% confidence (UCL95) bounds for the mean concentrations for a set of analytes in the tank residuals. The statistical procedures employed in the analyses were consistent with the Environmental Protection Agency (EPA) technical guidance by Singh and others [2010]. Savannah River National Laboratory (SRNL) measured the sample bulk density, nonvolatile beta, gross alpha, and the radionuclide1, elemental, and chemical concentrations three times for each of the composite samples. The analyte concentration data were partitioned into three separate groups for further analysis: analytes with every measurement above their minimum detectable concentrations (MDCs), analytes with no measurements above their MDCs, and analytes with a mixture of some measurement results above and below their MDCs. The means, standard deviations, and UCL95s were computed for the analytes in the two groups that had at least some measurements above their MDCs. The identification of distributions and the selection of UCL95 procedures generally followed the protocol in Singh, Armbya, and Singh [2010]. When all of an analyte's measurements lie below their MDCs, only a summary of the MDCs can be provided. The measurement results reported by SRNL are listed, and the results of this analysis are reported. The data were generally found to follow a normal distribution, and to be homogenous across composite samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of the Tank 5F Final Characterization Samples-2011 (U)

The Savannah River National Laboratory (SRNL) was requested by SRR to provide sample preparation and analysis of the Tank 5F final characterization samples to determine the residual tank inventory prior to grouting. Two types of samples were collected and delivered to SRNL: floor samples across the tank and subsurface samples from mounds near risers 1 and 5 of Tank 5F. These samples were taken from Tank 5F between January and March 2011. These samples from individual locations in the tank (nine floor samples and six mound Tank 5F samples) were each homogenized and combined in a given proportion into 3 distinct composite samples to mimic the average composition in the entire tank. These Tank 5F composite samples were analyzed for radiological, chemical and elemental components. Additional measurements performed on the Tank 5F composite samples include bulk density and water leaching of the solids to account for water soluble species. With analyses for certain challenging radionuclides as the exception, all composite Tank 5F samples were analyzed and reported in triplicate. The target detection limits for isotopes analyzed were based on customer desired detection limits as specified in the technical task request documents. SRNL developed new methodologies to meet these target detection limits and provide data for the extensive suite of components. While many of the target detection limits were met for the species characterized for Tank 5F, as specified in the technical task request, some were not met. In a few cases, the relatively high levels of radioactive species of the same element or a chemically similar element precluded the ability to measure some isotopes to low levels. The Technical Task Request allows that while the analyses of these isotopes is needed, meeting the detection limits for these isotopes is a lower priority than meeting detection limits for the other specified isotopes. The isotopes whose detection limits were not met in all cases included the following: Al-26, Sn-126, Sb-126, Sb-126m, Eu-152 and Cf-249. SRNL, in conjunction with the plant customer, reviewed all these cases and determined that the impacts were negligible.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utilization of the St. Peter Sandstone in the Illinois Basin for CO2 Sequestration

This project is part of a larger project co-funded by the United States Department of Energy (US DOE) under cooperative agreement DE-FE0002068 from 12/08/2009 through 9/31/2014. The study is to evaluate the potential of formations within the Cambro-Ordovician strata above the Mt. Simon Sandstone as potential targets for carbon dioxide (CO2) sequestration in the Illinois and Michigan Basins. This report evaluates the potential injectivity of the Ordovician St. Peter Sandstone. The evaluation of this formation was accomplished using wireline data, core data, pressure data, and seismic data acquired through funding in this project as well as existing data from two additional, separately funded projects: the US DOE funded Illinois Basin – Decatur Project (IBDP) being conducted by the Midwest Geological Sequestration Consortium (MGSC) in Macon County, Illinois, and the Illinois Industrial Carbon Capture and Sequestration (ICCS) Project funded through the American Recovery and Reinvestment Act (ARRA), which received a phase two award from DOE. This study addresses the question of whether or not the St. Peter Sandstone may serve as a suitable target for CO2 sequestration at locations within the Illinois Basin where it lies at greater depths (below the underground source of drinking water (USDW)) than at the IBDP site. The work performed included numerous improvements to the existing St. Peter reservoir model created in 2010. Model size and spatial resolution were increased resulting in a 3 fold increase in the number of model cells. Seismic data was utilized to inform spatial porosity distribution and an extensive core database was used to develop porosity-permeability relationships. The analysis involved a Base Model representative of the St. Peter at “in-situ” conditions, followed by the creation of two hypothetical models at in-situ + 1,000 feet (ft.) (300 m) and in-situ + 2,000 ft. (600 m) depths through systematic depthdependent adjustment of the Base Model parameters. Properties for the depth shifted models were based on porosity versus depth relationship extracted from the core database followed by application of the porosity-permeability relationship. Each of the three resulting models were used as input to dynamic simulations with the single well injection target of 3.2 million tons per annum (MTPA) for 30 years using an appropriate fracture gradient based bottom hole pressure limit for each injection level. Modeling results are presented in terms of well bottomhole pressure (BHP), injection rate profiles, and three-dimensional (3D) saturation and differential pressure volumes at selected simulation times. Results suggest that the target CO2 injection rate of 3.2 MTPA may be achieved in the St. Peter Sandstone at in-situ conditions and at the in-situ +1,000 ft. (300 m) depth using a single injector well. In the latter case the target injection rate is achieved after a ramp up period which is caused by multi-phase flow effects and thus subject to increased modeling uncertainty. Results confirm that the target rate may not be achieved at the in-situ +2,000 ft. (600 m) level even with multiple wells. These new modeling results for the in-situ case are more optimistic than previous modeling results. This difference is attributed to the difference in methods and data used to develop model permeability distributions. Recommendations for further work include restriction of modeling activity to the in-situ +1,000 ft. (300 m) and shallower depth interval, sensitivity and uncertainty analysis, and refinement of porosity and permeability estimates through depth and area selective querying of the available core database. It is also suggested that further modeling efforts include scope for evaluating project performance in terms of metrics directly related to the Environmental Protection Agency (EPA) Class VI permit requirements for the area of review (AoR) definition and post injection site closure monitoring.

Will, Robert↗

Analysis of the Tank 5f Final Characterization Samples-2011

The Savannah River National Laboratory (SRNL) was requested by SRR to provide sample preparation and analysis of the Tank 5F final characterization samples to determine the residual tank inventory prior to grouting. Two types of samples were collected and delivered to SRNL: floor samples across the tank and subsurface samples from mounds near risers 1 and 5 of Tank 5F. These samples were taken from Tank 5F between January and March 2011. These samples from individual locations in the tank (nine floor samples and six mound Tank 5F samples) were each homogenized and combined in a given proportion into 3 distinct composite samples to mimic the average composition in the entire tank. These Tank 5F composite samples were analyzed for radiological, chemical and elemental components. Additional measurements performed on the Tank 5F composite samples include bulk density and water leaching of the solids to account for water soluble species. With analyses for certain challenging radionuclides as the exception, all composite Tank 5F samples were analyzed and reported in triplicate. The target detection limits for isotopes analyzed were based on customer desired detection limits as specified in the technical task request documents. SRNL developed new methodologies to meet these target detection limits and provide data for the extensive suite of components. While many of the target detection limits were met for the species characterized for Tank 5F, as specified in the technical task request, some were not met. In a few cases, the relatively high levels of radioactive species of the same element or a chemically similar element precluded the ability to measure some isotopes to low levels. The Technical Task Request allows that while the analyses of these isotopes is needed, meeting the detection limits for these isotopes is a lower priority than meeting detection limits for the other specified isotopes. The isotopes whose detection limits were not met in all cases included the following: Al-26, Sn-126, Sb-126, Sb-126m, Eu-152 and Cf-249. SRNL, in conjunction with the plant customer, reviewed all these cases and determined that the impacts were negligible.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of the Tank 5F Final Characterization Samples-2011 (U)

The Savannah River National Laboratory (SRNL) was requested by SRR to provide sample preparation and analysis of the Tank 5F final characterization samples to determine the residual tank inventory prior to grouting. Two types of samples were collected and delivered to SRNL: floor samples across the tank and subsurface samples from mounds near risers 1 and 5 of Tank 5F. These samples were taken from Tank 5F between January and March 2011. These samples from individual locations in the tank (nine floor samples and six mound Tank 5F samples) were each homogenized and combined in a given proportion into 3 distinct composite samples to mimic the average composition in the entire tank. These Tank 5F composite samples were analyzed for radiological, chemical and elemental components. Additional measurements performed on the Tank 5F composite samples include bulk density and water leaching of the solids to account for water soluble species. With analyses for certain challenging radionuclides as the exception, all composite Tank 5F samples were analyzed and reported in triplicate. The target detection limits for isotopes analyzed were based on customer desired detection limits as specified in the technical task request documents. SRNL developed new methodologies to meet these target detection limits and provide data for the extensive suite of components. While many of the target detection limits were met for the species characterized for Tank 5F, as specified in the technical task request, some were not met. In a few cases, the relatively high levels of radioactive species of the same element or a chemically similar element precluded the ability to measure some isotopes to low levels. The Technical Task Request allows that while the analyses of these isotopes is needed, meeting the detection limits for these isotopes is a lower priority than meeting detection limits for the other specified isotopes. The isotopes whose detection limits were not met in all cases included the following: Al-26, Sn-126, Sb-126, Sb-126m, Eu-152 and Cf-249. SRNL, in conjunction with the plant customer, reviewed all these cases and determined that the impacts were negligible.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Appurtenance Influence on Type III Hanford Single-Shell Tank Structural Integrity

The interim stabilized Hanford Single Shell Tanks (SSTs) are currently undergoing a state of the art analysis to assess the structural integrity of the waste storage tanks, for cleanup and closure operations, considering their adverse thermal histories and an updated seismic hazard for the Hanford Site near Richland, Washington. The SSTs contain a variety of ancillary pits, piping, piping supports, risers, equipment, and penetrations known as appurtenances. These appurtenances may alter the structural response and ultimately could affect the structural integrity of the SSTs. An important challenge to the structural analysis of the SSTs is determining the impact of these appurtenances on structural integrity. To achieve this, the various appurtenances were reviewed and bounding appurtenance configurations for SST Types II and III tank designs were analyzed using finite element software. The bounding configurations for the Type II tanks considered four heavy offset pits with a central pit with and without a 36-inch diameter central post-construction penetration and four 42-inch diameter offset penetrations. The bounding configuration for the Type III tanks is a tank with two heavy offset pits and one heavy central pit. For each bounding configuration two finite element models are developed: a seismic analysis model and a thermal and operating loads analysis (TOLA) model. The TOLA models include a Type II or III thermal history, concrete cracking and thermal degradation, reinforcement yielding, and soil plasticity. Additionally, operating loads such as internal waste pressure and concentrated and distributed soil surface loads are applied to the TOLA model. The seismic model treats the tank concrete as linear elastic based on the present day degraded concrete properties. Also, in the seismic model the soil is treated as linear elastic while special techniques are used in the soil above the tank dome and along the tank wall to avoid soil arching and achieve the proper soil pressure on the tank walls. Seismic time histories (in the horizontal and vertical directions) are applied to the seismic model. The American Concrete Institute (ACI) has code requirements for nuclear safety-related concrete structures (ACI-349-06) that are used to evaluate the structural integrity of the SSTs. ACI-349-06 recommends evaluating factored load combinations against reduced tank section capacities to account for both loading and material uncertainties. From both the TOLA and seismic models the structural demands (forces and moments) are extracted from sections throughout the tank under the appropriate load combinations. These demands are compared against the ACI-349-06 capacities at each of the sections. This ratio of demand to capacity is reported as a measure of structural integrity. The Type II and Type III appurtenances configurations are found to increase the demand to capacity ratios in local regions near the appurtenances. Away from the appurtenances the influence on structural integrity is minor. A comparison of the Type II and III results show that even though the Type II offset pits weight less, they have a larger impact on the structural integrity of the tanks due to their locations. Finally, lessons learned from the Type II and Type III appurtenance analysis, and their application to the more complex Type IV structural integrity analysis, will be discussed.

appurtenances↗

Synthesis of Post-fire Monitoring Activities in the Great Basin Desert, Mojave Desert, and Transition Zones

In the deserts of the American Southwest, fire return intervals of centuries to millennia are being replaced by fire return intervals of decades. This increased burn frequency has implications for post-closure management and long-term stewardship for Soils Corrective Action Units (CAUs) and Corrective Action Sites (CASs) on the Nevada National Security Site (NNSS), Tonopah Test Range, and Nevada Test and Training Range for which the U.S. Department of Energy (DOE), Environmental Management-Nevada (EM-NV) is responsible. For many CAUs and CASs, where closure-in-place alternatives were implemented or are being considered, there is a chance that these sites could burn over while they still pose a risk to the environment or human health given the long half-lives of some of the radionuclide contaminants of concern (COCs) (Shafer et al., 2007; Shafer and Gomes, 2009). Although it would have been ideal to conduct a fire-related study at a radionuclide contaminated site on the NNSS to determine how contaminated soils are transported post-fire, it was more practical to examine fires in environments analogous to where Soils Activity CAUs and CASs exist. Therefore, a series of studies were initiated at three radiologically uncontaminated analog sites to better understand the possible effects of wildfire on erosion and sediment transport by wind and water should vegetation at contaminated sites burn at the NNSS. The studies took place at the sites of the Gleason Fire, a prescribed burn that occurred near Ely, Nevada, which is in the Great Basin ecoregion; the White Rock Fire that occurred near Mesquite, Nevada, which is in the Mojave Desert ecoregion; and the Jacob Fire that occurred near Hiko, Nevada, in the transitional zone between the Great Basin Desert and the Mojave Desert. Each site was representative of one of the three ecoregions found on the NNSS. Erosion and vegetation characteristics were measured multiple times post-fire on both burned and unburned test plots at these study sites to compare and monitor the effects of fire over time. However, at the Mojave Desert site, there was an additional burn from nearly 25 years ago that was also compared with the more recent burned areas from 2013. Also, the time elapsed after the fire and the time when sampling began differed among the ecoregions. For example, at the Great Basin site, samples were collected prior to the fire and less than one month after the fire, whereas data collected at the Mojave Desert site did not occur until 22 months after the fire. The differences between the sample measurements and the time that elapsed after the fire may contribute to the variability in the data and the interpretations of the data. Runoff and water erosion were quantified through a series of rainfall and runoff simulation tests in which controlled amounts of water were delivered to the soil surface. Runoff data were collected from different microhabitats (e.g., undercanopies, interspace soils, ridges, and drainage areas). The data showed soil hydrophobicity (i.e., water repellency) on the Great Basin site for up to 12 months after the fire. The soil structure remained changed and weaker on the burned areas compared with the unburned areas for the three-year study period. Although runoff data at both the Great Basin site and transition zone site were highly variable, the post-fire runoff potential did not generally increase at either location after three years of monitoring. Mojave runoff did not differ much between fire ages or between burned and unburned areas, possibly because of the amount of vegetation growing on all three surfaces and because the fire intensity was likely lower relative to other ecoregions due to the amount of space between plants. Additionally, the measurements conducted on the Mojave fire occurred several years after the fire had burned and not within several months of the burn, which may also account for the lack of differences in runoff between burned and unburned locations. Wind erosion was assessed and quantified with a Portable In-Situ Wind ERosion Lab (PI-SWERL) on both the burned and unburned soils of different microhabitats (e.g., ridges, drainages, interspaces between plants, and plant undercanopies). Estimates of emissions (e.g., particulate matter with aerodynamic diameters less than or equal to 10 micrometers, or PM10) at different wind speeds were collected and filter samples were analyzed for chemical composition. The measurements among the fires were similar and the results of the wind erosion measurements indicate that there were seasonal influences on many parameters, but the potential for PM10 windblown dust emissions was higher on burned areas compared with unburned areas. Among the burned areas, drainages produced the most dust emissions, whereas burned ridges were the least emissive. Emissions at the Mojave site and transition zone site were similar between burned and unburned areas approximately three years after the respective fires. Emissions remained much greater on burned soils at the Great Basin site. However, site selection may have also contributed to the differences of emissions among the three study locations. Post-fire vegetation responses were documented for three years following each fire in different microhabitats (e.g., ridge, drainage, undercanopy, and interspace) at the Great Basin and transition zone sites. In 2013, at the Mojave fire site, random permanent plots were established in newly burned areas, areas that burned approximately 25 years ago, and an unburned control area. At each fire site, the regeneration of native plant species dominated the burned areas, but invasive annual grasses were present at each fire site. During the course of each three-year study, the invasive annual grasses increased in density or percentage at both the Great Basin and transition fire sites but not at the Mojave site, where annual invasive grasses remained high throughout the study period. However, the chronosequence data from the Mojave site indicate a transition to different invasive grass species with time. The post-burn vegetation at all three ecoregions is still in the early stages of succession, and shrub size should increase over time and shrub density should decrease over time. However, the recovery of the plant communities to pre-burn compositions may not occur for decades or centuries, or may not occur because of changes in climate and the presence of invasive annual grasses. Results from the three study locations suggested that contaminated soils on the NNSS that experienced wildfire had the potential for soil erosion and transport of contaminated soils. Both wind and soil runoff studies indicated that locations in the Great Basin and transition zone ecoregions were more susceptible to erosion than the Mojave Desert ecoregion, but the highest levels of erosion occurred during the early portions of the study (the first 24 months) and the Mojave Desert was not measured until 22 months after the burn. Additionally, data from the Great Basin indicated deeper soils may increase susceptibility to wind erosion. Historically, the Great Basin and transition zone ecoregions burned more frequently than the Mojave Desert because of fuel abundance and connectivity—and they continue to burn more frequently, particularly after the introduction of invasive grasses (Davies and Nafus, 2013). However, both ecoregions and the transition zone have burned with extensive, high-severity fires when certain weather and fuel conditions are met. For example, the high abundance and productivity of annual grasses and forbs—which are usually produced by above average winter precipitation—combined with early spring and summer warm, dry conditions. Future climate scenarios predict increased temperatures, variable to reduced precipitation, and larger, more extreme wildfires throughout western North America. These predictions suggest that future fires on the NNSS could increase in frequency, intensity, and severity similar to their analog ecosystems throughout the Great Basin and Mojave Desert (Dennison et al., 2014; Abatzoglou andWilliams, 2016; Westerling, 2016).

54 ENVIRONMENTAL SCIENCES↗

Saltstone SDU6 Modeling Study

A new disposal unit, designated as Saltstone Disposal Unit 6 (SDU6), is being designed for support of site accelerated closure goals and salt waste projections identified in the new Liquid Waste System Plan. The unit is a cylindrical disposal cell of 375 ft in diameter and 43 ft in height, and it has a minimum 30 million gallons of capacity. SRNL was requested to evaluate the impact of an increased grout placement height on the flow patterns radially spread on the floor and to determine whether grout quality is impacted by the height. The primary goals of the work are to develop the baseline Computational Fluid Dynamics (CFD) model and to perform the evaluations for the flow patterns of grout material in SDU6 as a function of elevation of grout discharge port and grout rheology. Two transient grout models have been developed by taking a three-dimensional multiphase CFD approach to estimate the domain size of the grout materials radially spread on the facility floor and to perform the sensitivity analysis with respect to the baseline design and operating conditions such as elevation height of the discharge port and fresh grout properties. For the CFD modeling calculations, air-grout Volume of Fluid (VOF) method combined with Bingham plastic and time-dependent grout models were used for examining the impact of fluid spread performance for the initial baseline configurations and to evaluate the impact of grout pouring height on grout quality. The grout quality was estimated in terms of the air volume fraction for the grout layer formed on the SDU6 floor, resulting in the change of grout density. The study results should be considered as preliminary scoping analyses since benchmarking analysis is not included in this task scope. Transient analyses with the Bingham plastic model were performed with the FLUENT TM code on the high performance parallel computing platform in SRNL. The analysis coupled with a transient grout aging model was performed by using ANSYS-CFX code in the parallel computing platform in Mercer University. Recommended operational guidance was developed assuming that local shear rates and flow patterns related to radial spread along the SDU floor can be used as a measure of grout performance and spatial dispersion affected by the grout height and viscosity. The main conclusions drawn from the grout modeling and calculations are as follows: • The 5 ft height baseline results show that when the 150 gpm grout flow with a 5 Pa yield stress and a 60 cp viscosity is poured down through a 3 inch discharge port, the grout is spread radially up to about 64 ft distance from the pouring center after 2 hours’ pouring time. The air volume fraction of the grout layer is about 29% at 5 minutes’ transient time, and it is reduced by about 9% in 2 hours’ pouring time, resulting in the grout density consisting of about 80% grout and 20% air volume fractions. • The sensitivity results show that when the discharge port is located at a higher position, a larger amount of air is trapped inside the layer formed below the discharge port at the early transient time of less than 30 minutes because of the higher impinging momentum of the grout flow on the floor, resulting in the formation of less smooth layer. • The results clearly indicate that the radial spread for the 43 ft discharge port is about 10% faster than that of the 5 ft discharge port for the early transient period of 5 minutes. However, for the pouring time longer than half an hour, the discharge port height does not affect the radial distance spread on the disposal floor. • When grout quality is related to grout volume fraction, the grout volume fraction for the 43 ft discharge port has lower volume fraction than the 5 ft discharge port for the transient period of the first 5 minutes. However, for the pouring time longer than half an hour, the discharge port height does not affect the grout volume fraction for the layer accumulated on the disposal floor. • A modified Bingham plastic model coupled with time-dependent viscosity behavior was developed for conducting the initial scoping calculations to assess the impact of fluid residence time on radial spreading and basic flow patterns. • The results for the transient viscosity model show that when grout material becomes more viscous, the thickness of the grout layer accumulated on the floor becomes higher, but the radial distance spread on the horizontal floor becomes smaller. The early transient results for the grout density with about 32% air volume fractions are in reasonable agreement with those of the idealized Bingham plastic model. • It is recommended that the current models developed here be benchmarked against the experimental results for critical applications of the modeling results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

THREE-DIMENSIONAL THERMAL MODELING ANALYSIS OF CST MEDIA FOR THE SMALL ION EXCHANGE PROJECT

The Small Column Ion Exchange (SCIX) project is designed to accelerate closure of High Level Waste (HLW) tanks at the Savannah River Site (SRS). The SRS tanks store HLW in three forms: sludge, saltcake, and supernate. An in-tank ion exchange process is being designed to treat supernate and dissolved saltcake waste. Through this process, radioactive cesium from the salt solution is adsorbed into Crystalline Silicotitanate (CST) ion exchange media packed within a flow-through column. A packed column loaded with radioactive cesium generates significant heat from radiolytic decay. The waste supernate solution within the ion exchange bed will boil around 120 C. Solution superheating above the boiling point within the column could lead to violent hazardous energy releases. System heating from loaded CST is also of concern in other process modules, such as the waste tank. Due to tank structural integrity concerns, the wall temperature limit for the SRS waste tanks is 100 C. The transfer of cesium-loaded CST to the tank could result in localized hot spots on the tank floor and walls which may exceed this limit. As a result, thermal modeling calculations have been conducted to predict the maximum temperatures achievable both in the column and in the waste tank. As specified in the associated Technical Task Plan, one objective of the present work was to compute temperature distributions within the ion exchange column module under accident scenarios including loss of salt solution flow through the bed and loss of coolant system flow. The column modeling domain and the scope of the calculations in this case were broadened relative to previous two-dimensional calculations to include vertical temperature distributions within the packed bed of ion exchange media as well as the upper column plenum region containing only fluid. The baseline design conditions and in-column modeling domain for the ion-exchange column module are shown in Figure 1. These evaluations assumed the maximum bounding cesium loading considered possible based on current knowledge regarding CST media and the anticipated feed compositions. Since this cesium loading was considerably higher than the nominal loading conditions in SRS waste, cases with lower loading were also evaluated. Modeling parameters were the same as those used previously unless otherwise indicated. The current model does not capture multi-phase cooling mechanisms operative when solution boiling occurs. This feature is conservative in the sense that it does not account for the large cooling effects associated with phase transfer. However, the potential transfer of heat to the plenum region associated with vertical bubble ascension through the column during boiling is also neglected. Thermal modeling calculations were also performed for the entire waste storage tank for the case where loaded and ground CST was transferred to the tank. The modeling domain used for the in-tank calculations is provided in Figure 2. The in-tank domain is based on SRS Tank 41, which is a Type-IIIA tank. Temperature distributions were evaluated for cylindrical, ground CST mounds located on the tank floor. Media grinding is required prior to vitrification processing of the CST in the SRS Defense Waste Processing Facility (DWPF). The location of the heat source region on the tank floor due to the accumulation of CST material was assumed to be just under the grinder. The shape of the CST mound was assumed to be cylindrical. This shape is believed to be most representative of the actual mound shape formed in the tank, given that submersible mixing pumps will be available for media dispersion. Alternative configurations involving other geometrical shapes for the CST mound were evaluated in the previous work. Sensitivity analysis for the in-tank region was performed for different amounts of CST media. As was the case for the in-column model, the in-tank model does not include multi-phase cooling mechanisms operative when solution boiling occurs. The in-column and the in-tank evaluations incorporated recently updated maximum cesium loading levels calculated using the current SCIX feed compositions, which resulted in significantly higher cesium loading than previously calculated. The calculations were conducted to ensure conservative predictions for the maximum temperatures achievable using the current baseline design. The degree of conservatism was reduced for in-column calculations relative to the previous work by using a three-dimensional modeling approach and selecting parameters which were nearer to expected conditions. The degree of conservatism for the in-tank calculations was also reduced by lowering the soil penetration depth below the tank from 150 to 20 feet. The primary goals of the extended thermal modeling effort were to determine whether fluid boiling or superheating are possible within the column module and to determine the maximum floor temperatures within the tank loaded with spent CST.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing Low-Level Waste at Dounreay - 16269

Dounreay Site Restoration Limited (DSRL) is the site licence company responsible for the clean-up and demolition of Britain's former centre of fast reactor research and development. The Dounreay site requires facilities to dispose of up to 175,000 cubic metres of low level waste (LLW) that has been and will continue to be generated during the decommissioning and restoration of the site. In May 2014, construction of two new vaults for the disposal of LLW at Dounreay was completed, including the necessary roads, infrastructures and services, followed by an encapsulation plant in September 2014. The vaults are located immediately to the northeast of the Dounreay licensed site, on NDA-owned land. The facilities are for disposal of the solid LLW generated at Dounreay and the adjacent Vulcan site only. In 2004, following consultation with stakeholders and members of the public, Dounreay issued the 'Best Practicable Environmental Option (BPEO) Report' on the management of Dounreay LLW. This report assessed potential management options for LLW against a range of criteria, including technical, environmental, cost, health and safety issues. The study was conducted in line with best practice and involved consultation with a range of people, including the local community and organisations with an interest in radioactive waste management. The recommendations and conclusions from the study provided the basis for the 'Dounreay Solid LLW Overall Strategy', which was published in March 2005. A fundamental component of this strategy was the development of new below-ground disposal vaults for LLW at Dounreay. Siting the vaults on land at Dounreay avoids any need to transport the LLW away from Dounreay on public roads. Disposal at Dounreay therefore satisfies the proximity principle of managing the waste at source. Disposal at Dounreay is also consistent with UK Government Policy on LLW management, the Scottish Government's Radioactive Waste Management Policy and the Nuclear Decommissioning Authority's (NDA's) strategy on management of LLW from the UK nuclear industry. A planning application was initially lodged with the Highland Council in June 2006. The period for the determination of this application was extended to allow the Scottish Environment Protection Agency (SEPA) sufficient time to assess fully the supporting Environmental Safety Case (ESC). The planning application was re-activated in May 2008, and planning permission was granted by Highland Council in April 2009. The planning permission included 26 conditions on DSRL, covering a wide range of environmental issues such as construction noise/dust, traffic, visual impact and also a condition to develop a community fund aimed at socio-economic development of the area around the Dounreay site. After undertaking the necessary detailed design work, construction of the phase one vaults commenced in November 2011 by principal contractor, Graham Construction. Work was undertaken on both vaults simultaneously, excavating around 243,000 m{sup 3} of rock. When excavation was complete, steel reinforcement was placed and concrete poured to construct the floor slabs. This was followed by the construction of the reinforced walls and then the installation of the steel support structure and materials that form the roof. Mechanical and electrical installation then followed, in parallel with the construction of the vault apron, ramps and access roads. A pumping system and control building was also constructed to remove groundwater from around the vaults to allow the vaults to be kept dry while they are being filled with waste. A layer of excavated material, approximately 3 m thick, was placed across the existing ground surface between the vaults and the coast, to ensure the water table lies well below the new ground surface after closure of the vaults, and that any future trace contaminated groundwater flows out to the sea rather than to the soil zone. This layer is referred to in project documents as the 'enhanced geosphere'. After disposals are completed and the vaults are closed, this layer will be joined to the capping over the vaults so that the ensemble merges visually with the surrounding landscape. The original vegetation and soil mix will be returned as far as is practicable. An encapsulation plant has been constructed to fill the LLW containers with grout prior to disposal in the vault, similar to the process used at the national Low-Level Waste Repository facility (LLWR), near Drigg in Cumbria. The plant has the capacity to grout up to four containers per day. The grout fills voids in the container and helps provide chemical conditions in the vault that limit the release of radionuclides in the far future, after the vault has been penetrated by groundwater. On April 24 2015, active commissioning began at the Encapsulation Plant and LLW Vaults. Half-height ISO containers packed with low level waste are currently being filled with grout and disposed of in the LLW Vault. Also packaged Demolition Low Level Waste (DLLW) is being processed and disposed of in the Demolition Low Level Waste Vault. To date over 2500 packages of DLLW and 70 containers LLW have been disposed of. Completion of construction and the start of operating the Phase One vaults and encapsulation plant are fundamental to the successful and efficient decommissioning of the Dounreay site, upon which many millions of pounds of investment and hundreds of jobs rely.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗