Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “June 2010”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Elevated Aerosol Layers and Their Radiative Impact over Kanpur During Monsoon Onset Period

Accurate information about aerosol vertical distribution is needed to reduce uncertainties in aerosol radiative forcing and its effect on atmospheric dynamics. The present study deals with synergistic analyses of aerosol vertical distribution and aerosol optical depth (AOD) with meteorological variables using multisatellite and ground-based remote sensors over Kanpur in central Indo-Gangetic Plain (IGP). Micro-Pulse Lidar Network-derived aerosol vertical extinction (sigma) profiles are analyzed to quantify the interannual and daytime variations during monsoon onset period (May-June) for 2009-2011. The mean aerosol profile is broadly categorized into two layers viz., a surface layer (SL) extending up to 1.5 km (where sigma decreased exponentially with height) and an elevated aerosol layer (EAL) extending between 1.5 and 5.5 km. The increase in total columnar aerosol loading is associated with relatively higher increase in contribution from EAL loading than that from SL. The mean contributions of EALs are about 60%, 51%, and 50% to total columnar AOD during 2009, 2010, and 2011, respectively. We observe distinct parabolic EALs during early morning and late evening but uniformly mixed EALs during midday. The interannual and daytime variations of EALs are mainly influenced by long-range transport and convective capacity of the local emissions, respectively. Radiative flux analysis shows that clear-sky incoming solar radiation at surface is reduced with increase in AOD, which indicates significant cooling at surface. Collocated analysis of atmospheric temperature and aerosol loading reveals that increase in AOD not only resulted in surface dimming but also reduced the temperature (approximately 2-3 C) of lower troposphere (below 3 km altitude). Radiative transfer simulations indicate that the reduction of incoming solar radiation at surface is mainly due to increased absorption by EALs (with increase in total AOD). The observed cooling in lower troposphere in high aerosol loading scenario could be understood as a dynamical feedback of EAL-induced stratification of lower troposphere. Further, the observed radiative effect of EALs increases the stability of the lower troposphere, which could modulate the large-scale atmospheric dynamics during monsoon onset period. These findings encourage follow-up studies on the implication of EALs to the Indian summer monsoon dynamics using numerical models.

aerosol vertical distribution↗

Holbrook Substation Superconductor Cable System, Long Island, New York: Final Report ~ Volume 1 [Slides]

The LIPA Superconductor project broke ground on July 4, 2006, was first energized on April 22, 2008 (Earth Day) and was commissioned on June 25, 2008. Since commissioning, up until early March, 2009, there were numerous refrigeration events that impacted steady state operations. This led to the review of the alarms that were being generated and a rewrite of the program logic in order to decrease the hypersensitivity surrounding these alarms. The high temperature superconductor (HTS) cable was energized on March 5, 2009 and ran uninterrupted until a human error during a refrigeration system switchover knocked the cable out of the grid in early February 2010. The HTS cable was in the grid uninterrupted from March 5, 2009 to February 4, 2010. Although there have been refrigeration events (propagated mainly by voltage sags/surges) during this period, the system was able to automatically switch over from the primary to the backup refrigeration system without issue as required during this period. On February 4, 2010, when switching from the backup over to the primary refrigeration system, two rather than one liquid nitrogen pumps were started inadvertently by a human error (communication) causing an overpressure in the cable cooling line. This in turn activated the pressure relief valve located in the grounding substation. The cable was automatically taken out of the grid without any damage to the components or system as a result of signals sent from the AMSC control cabinet to the LIPA substation. The cable was switched back into the grid again on March 16, 2010 without incident and has been operational since that time. Since switching from the backup to the primary is not an automatic process, a recent improvement was added to the refrigeration operating system to allow remote commands to return the system from backup to primary cooling. This improvement makes the switching procedure quicker since travel to the site to perform this operation is no longer necessary and safer since it is now a programmed procedure versus the former written procedure that was still subject to human variation in the process.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

2011 Annual Ecological Survey: Pacific Northwest National Laboratory Site

The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) oversees and manages the DOE contract for the Pacific Northwest National Laboratory (PNNL), a DOE Office of Science multi-program laboratory located in Richland, Washington. PNSO is responsible for ensuring that all activities conducted on the PNNL site comply with applicable laws, policies, and DOE Orders. The DOE Pacific Northwest Site Office Cultural and Biological Resources Management Plan (DOE/PNSO 2008) addresses the requirement for annual surveys and monitoring for species of concern and to identify and map invasive species. In addition to the requirement for an annual survey, proposed project activities must be reviewed to assess any potential environmental consequences of conducting the project. The assessment process requires a thorough understanding of the resources present, the potential impacts of a proposed action to those resources, and the ultimate consequences of those actions. The PNNL site is situated on the southeastern corner of the DOE Hanford Site, located at the north end of the city of Richland in south-central Washington. The site is bordered on the east by the Columbia River, on the west by Stevens Drive, and on the north by the Hanford Site 300 Area (Figure 1). The environmental setting of the PNNL site is described in Larson and Downs (2009). There are currently two facilities on the PNNL site: the William R. Wiley Environmental Molecular Sciences Laboratory and the Physical Sciences Facility. This report describes the annual survey of biological resources found on the undeveloped upland portions of the PNNL site. The annual survey is comprised of a series of individual field surveys conducted on various days in late May and throughout June 2011. A brief description of the methods PNNL ecologists used to conduct the baseline surveys and a summary of the results of the surveys are presented. Appendix A provides a list of plant and animal species identified in the upland areas of the PNNL site in 2011. Efforts in 2011 to control noxious weed populations (comprising plant species designated as Class B noxious weeds by the Washington State Noxious Weed Control Board) discovered in 2009 and initially treated with herbicides in 2010 are described in Appendix B.

54 ENVIRONMENTAL SCIENCES↗

PACE and the Federal Housing Finance Agency (FHFA)

The FHFA regulates Fannie Mae, Freddie Mac, and the 12 Federal Home Loan Banks (the government-sponsored enterprises - GSEs). On June 18, 2009, James B. Lockhart III, then Director of FHFA, released a letter expressing concern about the negative impact of energy loan tax assessment programs (ELTAPs) - also known as Property Assessed Clean Energy (PACE) programs - on both the housing finance system and homeowner program participants. Subsequently, a number of PACE proponents responded to the concerns laid out in the FHFA letter. In early Fall 2009, word circulated that FHFA was planning to follow its June letter with guidance to other agencies, possibly including Fannie Mae and Freddie Mac, discouraging them from buying loans on properties subject to PACE-type assessment liens. This triggered a second round of stakeholder letters, several of which were addressed to President Obama. On October 18, 2009, the White House, in what some believe was an attempt to obviate the need for FHFA guidance, released a Policy Framework for PACE Financing Programs that outlined best practices guidance for homeowner and lender protection. As of February 2010, FHFA and the GSEs have agreed to monitor PACE programs and work with stakeholders and the Administration to consider additional guidance beyond the Policy Framework and to collect more information on PACE program efficacy and risks. A summary of the communications timeline and highlights of the communications are provided.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Surgically Implanted JSATS Micro-Acoustic Transmitters Effects on Juvenile Chinook Salmon and Steelhead Tag Expulsion and Survival, 2010

The purpose of this study was to evaluate survival model assumptions associated with a concurrent study - Acoustic Telemetry Evaluation of Dam Passage Survival and Associated Metrics at John Day, The Dalles, and Bonneville Dams, 2010 by Thomas Carlson and others in 2010 - in which the Juvenile Salmonid Acoustic Telemetry System (JSATS) was used to estimate the survival of yearling and subyearling Chinook salmon (Oncorhynchus tshawytscha) and steelhead (O. mykiss) migrating through the Federal Columbia River Power System (FCRPS). The micro-acoustic transmitter used in these studies is the smallest acoustic transmitter model to date (12 mm long x 5 mm wide x 4 mm high, and weighing 0.43 g in air). This study and the 2010 study by Carlson and others were conducted by researchers from the Pacific Northwest National Laboratory and the University of Washington for the U.S. Army Corps of Engineers, Portland District, to meet requirements set forth by the 2008 FCRPS Biological Opinion. In 2010, we compared survival, tag burden, and tag expulsion in five spring groups of yearling Chinook salmon (YCH) and steelhead (STH) and five summer groups of subyearling Chinook salmon (SYC) to evaluate survival model assumptions described in the concurrent study. Each tagging group consisted of approximately 120 fish/species, which were collected and implanted on a weekly basis, yielding approximately 600 fish total/species. YCH and STH were collected and implanted from late April to late May (5 weeks) and SYC were collected and implanted from mid-June to mid-July (5 weeks) at the John Day Dam Smolt Monitoring Facility. The fish were collected once a week, separated by species, and assigned to one of three treatment groups: (1) Control (no surgical treatment), (2) Sham (surgical implantation of only a passive integrated transponder [PIT] tag), and (3) Tagged (surgical implantation of JSATS micro-acoustic transmitter [AT] and PIT tags). The test fish were held for 30 days in indoor circular tanks at the Bonneville Dam Juvenile Monitoring Facility. Overall mortality ranged weekly from 45 to 72% for YCH, 55 to 83% for STH, and 56 to 84% for SYC. The high background mortality in all groups and species made it difficult to discern tag effects. However, for YCH, STH, and SYC, the Tagged treatment groups had the highest overall mean mortality - 62%, 79%, and 76%, respectively. Fungal infections were found on 35% of all fish. Mean tag burden for the Tagged treatment group was relatively low for YCH (1.7%) and moderate for SYC (4.2%), while STH had a very low mean tag burden (0.7%). Tag burden was significantly higher in the Tagged treatment group for all species when compared to the Sham treatment group because of the presence of two tags. Surgeon performance did not contribute to the difference in mortality between the Sham and Tagged treatment groups. Tag expulsion from fish that survived to the end of the 30-day experiment was low but occurred in all species, with only two PIT tags and one AT lost, one tag per species. The high background mortality in this experiment was not limited to a treatment, temperature, or month. The decreased number of surviving fish influenced our experimental results and thus analyses. For future research, we recommend that a more natural exposure to monitor tag effects and other factors, such as swimming ability and predator avoidance, be considered to determine the effects of AT- and PIT- implantation on fishes.

13 HYDRO ENERGY↗

2011 Mound Site Groundwater Plume Rebound Exercise and Follow-Up - 13440

The Mound Site facility near Miamisburg, Ohio, opened in 1948 to support early atomic weapons programs. It grew into a research, development, and production facility performing work in support of the U.S. Department of Energy (DOE) weapons and energy programs. The plant was in operation until 1995. During the course of operation, an onsite landfill was created. The landfill was located over a finger of a buried valley aquifer, which is a sole drinking water source for much of the Miami Valley. In the 1980's, volatile organic compounds (VOCs) were discovered in groundwater at the Mound site. The site was placed on the National Priorities List on November 21, 1989. DOE signed a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Federal Facility Agreement with the U.S. Environmental Protection Agency (EPA) and the Ohio Environmental Protection Agency. The agreement became effective in October 1990. The area that included the landfill was designated Operational Unit 1 (OU-1). In 1995, a Record of Decision was signed that called for the installation and operation of a pump and treatment (P and T) system in order to prevent the VOCs in OU-1 groundwater from being captured by the onsite water production wells. In addition to the P and T system, a soil vapor extraction (SVE) system was installed in 1997 to accelerate removal of VOCs from groundwater in the OU-1 area. The SVE system was successful in removing large amounts of VOCs and continued to operate until 2007, when the amount of VOCs removed became minimal. A rebound study was started in February 2003 to determine how the groundwater system and contaminants would respond to shutting down the P and T system. The rebound test was stopped in February 2004 because predetermined VOC threshold concentrations were exceeded down-gradient of the landfill. The P and T and SVE systems were restarted after the termination of the rebound test. In 2006, the remediation of the Mound site was completed and the site was declared to be protective of human health and the environment, as long as the institutional controls are observed. The institutional controls that apply to the OU-1 area include provisions that no soil be allowed to leave the site, no wells be installed for drinking water, and the site may be approved only for industrial use. The onsite landfill with the operating CERCLA remedy remained. However, the Mound Development Corporation lobbied Congress for funds to remediate the remaining onsite landfill to allow for property reuse. In 2007 DOE received funding from Congress to perform non-CERCLA removal actions at OU-1 to excavate the site sanitary landfill. In 2009, DOE received American Recovery and Reinvestment Act funding to complete the project. Excavation of the landfill occurred intermittently from 2006 through 2010 and the majority of the VOC source was removed; however, VOC levels near the P and T system remained greater than the EPA maximum contaminant levels (MCLs). Presently, groundwater is contained using two extraction wells to create a hydraulic barrier to prevent down-gradient migration of VOC-impacted groundwater. Since the primary contamination source has been removed, the feasibility of moving away from containment to a more passive remedy, namely monitored natural attenuation (MNA), is being considered. A second rebound study was started in June 2011. If contaminant and groundwater behavior met specific conditions during the study, MNA would be evaluated and considered as a viable alternative for the groundwater in the OU-1 area. From June through December 2011, the second rebound study evaluated the changes in VOC concentrations in groundwater when the P and T system was not in operation. As the study progressed, elevated concentrations of VOCs that exceeded predetermined trigger values were measured along the down-gradient boundary of the study area, and so the P and T system was restarted. It was determined that a discrete area with VOC concentrations greater than the MCLs was present in groundwater down-gradient of the extraction wells. The source was not identified, but the contamination was thought not to be caused by residually contaminated soil beneath the former landfill. The data collected so far supports the consideration of MNA as a viable alternative to hydraulic containment. Additional investigations are being performed to identify possible sources or pathways of VOCs in groundwater that may be contributing to the elevated VOC levels measured down-gradient of the extraction well system. Data from this additional investigation will be used to determine whether the VOCs detected down-gradient of the hydraulic boundary are the result of residual soil contamination, a previously unknown contribution of VOC-contaminated water entering the groundwater outside the capture zone of the extraction wells, or a pulse of VOC-contaminated groundwater from the OU-1 landfill that occurred during the rebound study. (authors)

54 ENVIRONMENTAL SCIENCES↗

Micro-earthquake signal analysis and hypocenter determination around Lokon volcano complex

Mount Lokon is one of five active volcanoes which is located in the North Sulawesi region. Since June 26{sup th}, 2011, standby alert set by the Center for Volcanology and Geological Hazard Mitigation (CVGHM) for this mountain. The Mount Lokon volcano erupted on July 4{sup th}, 2011 and still continuously erupted until August 28{sup th}, 2011. Due to its high seismic activity, this study is focused to analysis of micro-earthquake signal and determine the micro-earthquake hypocenter location around the complex area of Lokon-Empung Volcano before eruption phase in 2011 (time periods of January, 2009 up to March, 2010). Determination of the hypocenter location was conducted with Geiger Adaptive Damping (GAD) method. We used initial model from previous study in Volcan de Colima, Mexico. The reason behind the model selection was based on the same characteristics that shared between Mount Lokon and Colima including andesitic stratovolcano and small-plinian explosions volcanian types. In this study, a picking events was limited to the volcano-tectonics of A and B types, hybrid, long-period that has a clear signal onset, and local tectonic with different maximum S – P time are not more than three seconds. As a result, we observed the micro-earthquakes occurred in the area north-west of Mount Lokon region.

58 GEOSCIENCES↗

Long-term monitoring of the black hole candidate Swift J1753.5–0127 with INTEGRAL/SPI

The black hole candidate (BHC) Swift J1753.5–0127 went into outburst in 2005 June. Rather than fade into quiescence as most BHC transients do, it has remained in a low hard spectral state for most of the ∼9 years after its outburst. Its persistent emission during the hard state is reminiscent of the black hole Cyg X-1 and the BHCs 1E 1740.7–2942 and GRS 1758–258. Thus far, hard X-ray/soft gamma-ray results have mainly focused on the 2005 flare, with a few additional observations during 2007. Here, we present results from INTEGRAL/SPI observations from 2005–2010 spanning the 22–650 keV energy range. Spectral analysis shows a weak high-energy excess (∼2.9σ) above a cutoff power-law model that is well fit by a power law, suggesting an additional spectral component. Observations of Cyg X-1, 1E 1740.7–2942, and GRS 1758–258 have shown similar spectra requiring an additional high-energy component. The SPI results are compared to previously reported results for Swift J1753.5–0127 as well as observations of other sources.

79 ASTRONOMY AND ASTROPHYSICS↗

20 Year Daily Average Modeled Velocity and Discharge for Openwater Season at Five Communities on Kuskokwim River, Alaska

This dataset includes modeled velocity and discharge at five communities in the middle Kuskokwim River region: Aniak, Chuathbaluk, Crooked Creek, Red Devil and Stony River. Modeled velocities and discharge represent daily averages calculated for the openwater season (OWS) from June 1 - October 18 over the 20 year period 2000-2019 using the raw data described below and included in this archive; full details of methodology are described in (Brown et al. submitted to Renewable Energy). Raw data inputs to inform the modeling process include in-situ measurements of 1) discharge with an acoustic Doppler current meter (ADCP, 600kHz Workhorse Rio Grande by Teledyne RD Instruments) and a global positioning receiver (GPS, Trimble 5700, 5800 and R8) utilizing Real Time Kinematic (RTK) GPS mode over 1-2 days at each site in 2009 or 2010 (Ravens 2014), and 2) river stage with a water level logger (HOBO U20-001-01 by Onset) over 2-9 weeks at each site (Ravens 2014), 3) in addition to a 20 year long-term discharge record collected at the USGS stream gage site in Crooked Creek (USGS 2016). Raw data (discharge and stage) are included in this archive for two additional communities: Lower Kalskag and Sleetmute, where modeled velocities were not calculated due to equipment failure or loss. The USGS stream gage data at Crooked Creek (USGS 2016) and stream gage methodology (Turnipseed and Sauer 2010) are publicly available online, so the data are not duplicated here.

16 TIDAL AND WAVE POWER↗

Status of Precise Orbit Determination for Jason-2 Using GPS

The JASON-2 satellite, launched in June 2008, is the latest follow-on to the successful TOPEX/Poseidon (T/P) and JASON-I altimetry missions. JASON-2 is equipped with a TRSR Blackjack GPS dual-frequency receiver, a laser retroreflector array, and a DORIS receiver for precise orbit determination (POD). The most recent time series of orbits computed at NASA GSFC, based on SLR/DORIS data have been completed using both ITRF2005 and ITRF2008. These orbits have been shown to agree radially at 1 cm RMS for dynamic vs SLRlDORIS reduced-dynamic orbits and in comparison with orbits produced by other analysis centers (Lemoine et al., 2010; Zelensky et al., 2010; Cerri et al., 2010). We have recently upgraded the GEODYN software to implement model improvements for GPS processing. We describe the implementation of IGS standards to the Jason2 GEODYN GPS processing, and other dynamical and measurement model improvements. Our GPS-only JASON-2 orbit accuracy is assessed using a number of tests including analysis of independent SLR and altimeter crossover residuals, orbit overlap differences, and direct comparison to orbits generated at GSFC using SLR and DORIS tracking, and to orbits generated externally at other centers. Tests based on SLR and the altimeter crossover residuals provide the best performance indicator for independent validation of the NASAlGSFC GPS-only reduced dynamic orbits. For the ITRF2005 and ITRF2008 implementation of our GPS-only obits we are using the IGS05 and IGS08 standards. Reduced dynamic versus dynamic orbit differences are used to characterize the remaining force model error and TRF instability. We evaluate the GPS vs SLR & DORIS orbits produced using the GEODYN software and assess in particular their consistency radially and the stability of the altimeter satellite reference frame in the Z direction for both ITRF2005 and ITRF2008 as a proxy to assess the consistency of the reference frame for altimeter satellite POD.

Melachroinos, S.↗

Gamma-Ray Burst Polarimeter aboard IKAROS

A GRB polarimeter was launched by H-IIA on 21 May in 2010 at JAXA Tanegashima Space Center. A GRB polarization is the best key to understand mechanism of GRB prompt emissions and also to understand the geometry of magnetic fields. The standard GRB fireball models predict the synchrotron radiation of them, thus a high degree of polarization is expected, if the magnetic field-lines are coaligned. Previously, a few of the GRB polarization detections were reported. Although they used the Compton scattering method, but their measurements were non-coincidence mode. This made their reports were somewhat unclear. This time, our detector works fully in the coincidence mode to avoid the confusion. On 21 June, GAP is switched on and the first GRB was detected on 7 July but not yet well calibrated.

79 ASTRONOMY AND ASTROPHYSICS↗

Trip Report-Produced-Water Field Testing

Los Alamos National Laboratory (LANL) conducted field testing of a produced-water pretreatment apparatus with assistance from faculty at the Texas A&M University (TAMU) protein separation sciences laboratory located on the TAMU main campus. The following report details all of the logistics surrounding the testing. The purpose of the test was to use a new, commercially-available filter media housing containing modified zeolite (surfactant-modified zeolite or SMZ) porous medium for use in pretreatment of oil and gas produced water (PW) and frac-flowback waters. The SMZ was tested previously in October, 2010 in a lab-constructed configuration ('old multicolumn system'), and performed well for removal of benzene, toluene, ethylbenzene, and xylenes (BTEX) from PW. However, a less-expensive, modular configuration is needed for field use. A modular system will allow the field operator to add or subtract SMZ filters as needed to accommodate site specific conditions, and to swap out used filters easily in a multi-unit system. This test demonstrated the use of a commercial filter housing with a simple flow modification and packed with SMZ for removing BTEX from a PW source in College Station, Texas. The system will be tested in June 2012 at a field site in Pennsylvania for treating frac-flowback waters. The goals of this test are: (1) to determine sorption efficiency of BTEX in the new configuration; and (2) to observe the range of flow rates, backpressures, and total volume treated at a given flow rate.

42 ENGINEERING↗

First data from DM-Ice17

We report the first analysis of background data from DM-Ice17, a direct-detection dark matter experiment consisting of 17 kg of NaI(Tl) target material. It was codeployed with IceCube 2457 m deep in the South Pole glacial ice in December 2010 and is the first such detector operating in the Southern Hemisphere. The background rate in the 6.5–8.0 keV ee region is measured to be 7.9 ± 0.4 counts/day/keV/kg. This is consistent with the expected background from the detector assemblies with negligible contributions from the surrounding ice. The successful deployment and operation of DM-Ice17 establishes the South Pole ice as a viable location for future underground, low-background experiments in the Southern Hemisphere. Furthermore, the detector assembly and deployment are described here, as well as the analysis of the DM-Ice17 backgrounds based on data from the first two years of operation after commissioning, July 2011–June 2013.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Temperature of the Troposphere [in State of the Climate in 2018]

The 2018 annual global lower troposphere temperature (LTT; surface to ~10km) ranked third to seventh highest as monitored by radiosondes since 1958 and satellites since 1979 according to nine datasets examined for this analysis. (As noted in Section 2b1, the 2018 global average surface temperature was fourth highest.) A weak La Niña event extending into early 2018 suppressed the global LTT in the 2018 boreal winter and spring. In comparison, the tropical Pacific exhibited higher-than-average temperatures in boreal autumn, indicating the eventual initiation of a weak El Niño at the end of 2018 that contributed to higher-than-average temperatures in the following seasons in 2019. Among the nine datasets, the 2018 anomaly ranged from +0.23°C to +0.47°C relative to the 1981–2010 average and was ~0.3°C lower than the record warm year of 2016.

54 ENVIRONMENTAL SCIENCES↗

GEWEX (Global Energy and Water Exchanges Project): Surface Radiation Budget (SRB) Release 4 Integrated Product (IP4) - Algorithm Theoretical Basis Document and Evaluation

The World Climate Research Programme’s (WCRP) Global Energy and Water Exchanges (GEWEX) program is an integrated program of research, observations, and science activities with the mission to “Observe, understand and model the hydrological cycle and energy fluxes in the Earth’s atmosphere and at the surface.” Since the public release in 2010 of SRB Release 3, GEWEX reorganized to formulate the Data and Assessments Panel (GDAP) aimed at performing community assessments of the long-term global data products with focus on integrating various data products to address issues in the closing of the global energy and water cycles. SRB Release 4 Intergrated Product (Rel4-IP) integrates data products from the cloud, aerosol, atmosphere, ocean surface, and land surface projects within GDAP to produce a long-term time series of Top-of-Atmosphere (TOA) and surface radiative estimates. This Algorithm Theoretical Basis Document (ATBD) describes the various inputs, algorithms and resulting top-of-atmosphere and surface flux products that span from July 1983 through June 2017. Comparisons of the TOA flux products are made to overlapping CERES data products when possible. The surface radiative flux products are assessed relative to the globally distribution Baseline Surface Radiation Network measurements sites. Variability of the various products are compared to ERBE and CERES during overlapping time periods. The variability of the product show excellent correspondent to CERES during overlap years and improved statistical agreement with surface measurements. This document also discusses known issues with the data products to help the user understand the uncertainty and known issues.

Surface radiation budget↗

The INFODEM Information Centre at CEA Marcoule: A Unique Information Tool in Europe About Nuclear Decommissioning - 16217

In September 2014, the French Alternative Energies and Atomic Energy Commission (CEA) inaugurated a unique information center focused on decommissioning of its nuclear facilities. This facility, named INFODEM information center, is inside the main building of the G1 nuclear reactor at Marcoule, a nuclear site in the south of France with world-recognized expertise in decommissioning. Constructed in the 1950's, the G1 reactor was the first industrial-scale reactor for plutonium production in France; it was also used to produce electricity. Operations ceased in 1968, and it was progressively dismantled (through removal of fuel and main components) and placed in monitoring status. In the 1980s, mockups of fuel cycle process equipment were built under a temporary mission to support development activities for the La Hague reprocessing plant. When that ended, further dismantling occurred, and during 1996 through 2010, the site established itself as a reference example for worldwide nuclear dismantling activities. In 2012, the project to establish an information center at the reactor began, targeting three main audiences: the public, agency personnel and politicians, and technical professionals. Considerable thought went into the facility design, to address the interests and information needs of these three audiences. The INFODEM concept extended over 800 square meters (about 960 square yards), to host an informative tour addressing several major themes: CEA's D and D strategy, programs, skills, tools and methodologies and 'everyday life' on decommissioning projects. Illustrating its unique value and considerable success, INFODEM received the Public Information Prize from the French Nuclear Energy Society (SFEN) in June 2015. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Review of Time-Series Data for the Agra Interim Measure, Fall 2013

The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility at Agra, Kansas, from the 1950s to the early 1970s. No structures remain on the property, and the land is used for agricultural purposes, specifically wheat production. The property is currently owned by the Kyle Railroad Co. and is leased to Mr. Herb VanEaton. The Pro-Ag Marketing grain storage facility is directly south of the former CCC/USDA facility. In 1985, carbon tetrachloride was detected in groundwater samples collected from Agra public water supply wells PWS-3 and PWS-4, located approximately 2,000 ft south of the former CCC/USDA facility and approximately 1,800 ft south of the Pro-Ag Marketing Facility, at levels below the maximum contaminant level of 5.0 μg/L. In 1986, in response to an increase in carbon tetrachloride to 12 μg/L in well PWS-3, the city was required to remove both PWS-3 and PWS-4 from service. The Agra public water supply system is served by three other wells (PWS-1, PWS-2, and PWS-5) that are outside the area of contamination. In 2005, the Environmental Science Division of Argonne National Laboratory conducted a comprehensive investigation of potential contaminant source areas at Agra, on behalf of the CCC/USDA. Data collected during the 2005 investigation identified three primary source areas for the carbon tetrachloride contamination (Argonne 2006). One source is located on the former CCC/USDA property, and the other two sources are on property owned by Pro-Ag Marketing. In 2008-2009, to address the carbon tetrachloride contamination detected on its former property, the CCC/USDA initiated source area cleanup as an interim measure (IM) in accord with the document Interim Measure Work Plan/Design for Agra, Kansas (IMWP/D; Argonne 2008). The cleanup employs five large-diameter boreholes (LDBs) that were excavated by auger drilling. The purposes of these borings were to (1) physically remove soils impacted by carbon tetrachloride from the most contaminated area for treatment by onsite land farming and (2) provide locations for the installation of coupled soil vapor extraction (SVE) and air sparging (AS) wells to facilitate in situ treatment of the remaining carbon tetrachloride in the soils and groundwater. Construction data for the SVE wells, the AS wells, and groundwater and soil gas observation points installed to monitor the progress of the cleanup (as reported on the Kansas Review of Time-Series Data for the Agra Interim Measure 1-2 Version 01, 10/24/13 WWC-5 forms for these installations) are summarized in Table 1.1. The locations of the wells are shown in Figure 1.1. The IMWP/D was approved by the Kansas Department of Health and Environment in November 2008 (KDHE 2008), and operation of the SVE/AS systems began in May 2009. With the approval of the KDHE (2009), landfarming operations to treat the contaminated soils excavated from the LDBs were completed on October 12, 2010. Since start-up, the IM activities have been documented periodically (Argonne 2009a,b,c; Argonne 2010a,b,c,d, 2011a,b,c, 2012, 2013a,b), in accord with the requirements of the KDHEapproved IMWP/D (Argonne 2008). Each of the reports primarily summarizes the operations and maintenance of the SVE and AS equipment and the results of sampling of the groundwater, soil gas, and system effluents for analyses for volatile organic compounds (VOCs) over a specific 3- to 6-month period. Hence, the focus is the incremental performance of the IM. To complement these documents, this report provides a broader perspective by examining the collective data acquired since start-up on May 29, 2009, and through June 2013. The objectives of this approach are to evaluate possible longer-term trends in (1) the operational characteristics of the remedial systems and (2) the corresponding responses in the subsurface environment and their potential relationships to the progress of the cleanup. To facilitate this investigation, time-series diagrams have been developed to illustrate key parameter data for the SVE and AS systems, as well as sampling and additional supporting data obtained from the monitoring program. An overview of the information compiled is in Section 2. In Section 3, observations drawn from these data are discussed. The principal findings of the evaluation and recommendations for consideration are summarized in Sections 4 and 5, respectively.

54 ENVIRONMENTAL SCIENCES↗

Winter and Breeding Bird Surveys at Los Alamos National Laboratory Progress Report for 2010 to 2012

Los Alamos National Security, LLC (LANS) biologists on the Resources Management Team at Los Alamos National Laboratory (LANL) initiated a multi-year monitoring program for migratory birds in Fiscal Year (FY) 2011 to implement the Biological Resources Management Plan and to comply with Federal laws, Executive Orders, and regulations related to migratory birds. The objective of this on-going study is to monitor patterns and trends of bird abundance and richness over time at LANL. LANS biologists completed a second year of surveys in the winter of 2011 and the summer of 2012. Four habitat types were surveyed for this project and they included 1) mixed conifer forest, 2) ponderosa pine forest, 3) pinyon-juniper woodland and 4) riparian/wetland. Transects were 2.0 to 2.5 kilometers (km) in length and contained nine survey points spaced approximately 250 meters (m) apart. Winter surveys took place in each of the four habitat types in December, January, and February. The summer breeding bird surveys were conducted in each of the four habitat types in May, June, and July.

Basic Biological Sciences(59)↗