Flexible Superconducting Interconnects Realized by Electrodeposition of Rhenium on an Aerosol Jet Printed Seed Layer
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
This project aimed to develop technologies that can potentially enable free-standing thin (<80 μm) wafer in today’s manufacturing lines with high production yield, and thereby reduce capex barriers of silicon photovoltaics cells and modules. One of the major benefits is that thin wafer dramatically reduces the amount of polysilicon required. As a result, it can lead to reduction in the capital expenditures associated with polysilicon refining and wafer fabrication, which together are more than half of the total capital expenditure to manufacture Si PV module. We focused our efforts on developing the tools needed to enable high yield fabrication of wafer, cell, and module with thin silicon wafers. However, as the wafer thickness reduces, the major challenge is that wafer breakage increases significantly. Three technological areas were explored in this project to improve the production yield of the silicon wafer, namely detection of edge cracks via dark-field near-infrared (NIR) scattering; (2) wafer handling using controlled temperature profiles; (3) manufacturable low-stress cell interconnection for multiwire. First, the formation of wafer cracks in submillimeter length is one of the reasons that causes wafer breakages. Crack detection tools are needed to enable us to locate and track the wafer crack during manufacturing, so that we can improve the process to reduce initialization. The state-of-the-art crack detection technique cannot fulfill the need for measuring submillimeter edge cracks detrimental for thin wafers. The prototype developed in this project demonstrates the scanning of microcracks near wafer edges. With a semi-automatic laboratory setup, the submillimeter cracks were reliably detected near the edges in multi-Si wafers. The smallest detectable crack is 200 µm in length in slow scans; and submillimeter cracks are detected in high-throughput scans at the scan speed of >0.5 m/s, which is compatible with the inline detection of a manufacturing line at least 1 sec/wafer. This detection limit is a significant advancement in comparison to the benchmarked industrial tool. Second, wafer handling with the well-controlled temperature profile was thought to be the solution to reduce crack initiation and propagation during the manufacturing. However, without crack detection being widely adopted in production line, we did not find a strong industrial pull toward this technology. We did an initial literature survey and then diverted our efforts to the other tasks. Third, the innovation on low-stress multi-wire interconnection tackles a fundamental problem in the standard interconnection scheme. The standard over-under “zig-zag” interconnection induces a significant amount of stress into the soldering point on the cell whenever PV module is under stress, e.g., thermal cycling, transportation, and installation. Therefore, the interconnection process was re-designed in this project to allow for significant movement between adjacent solar cells, e.g., due to thermal expansion, without building up stresses on the solar cells or solder joints. The new interconnection method with the cross-connect wire also simplifies the tabbing and stringing process by replacing the standard over-under method with an off-cell interconnect from top to bottom. A manual tabbing and stringing tool for this new process was prototyped in the lab to demonstrate the fabrication of this new interconnection design. During the test with brass sheets as our “testing cells”, it was found that the mechanical cycling test only broke the interconnection after more than 50,000 cycles, which is equivalent to more than 130 years of the day-and-night thermal cycles. Lastly, throughout the project, we continuously analyzed the PV market with techno-economic analysis to identify the opportunity for thin Si adoption. Even though the drastic cost reduction has already happened in the past five years, our analysis results indicated that we can still save quite significantly in both manufacturing cost and factory capex, Particularly, in order to grow the PV manufacturing capacity to multi-terawatt level, reducing the thickness of silicon wafer is one of the most effective ways to quickly reduce factory capex, and sustain the high growth rate. The technologies developed in this project are readily available to provide some assistances in tackling the production yield problem.
Bulk-power grid connection is an emerging bottleneck to the entry of wind, solar, and storage but has been understudied due to a lack of data. We create and analyze two novel interconnection datasets with more than 38,000 project-level observations that provide new information documenting interconnection challenges in the United States. Active grid connection requests are more than double the total installed capacity of the US power plant fleet (2,600 vs. 1,280 GW). The time required to secure a connection has increased by 70% over the last decade, and withdrawal rates remain high at 80%, suggesting a constrained transmission system that jeopardizes energy transition targets. Wide distributions of interconnection costs indicate the inherent uncertainty of the interconnection process. Interconnection requests that identify large transmission upgrades tend to withdraw from the process. These findings suggest the need for interconnection reforms, tighter links between long-term transmission planning and project-level interconnection processes, and more interconnection outcome transparency.
Overview The Capacity Expansion Regional Feasibility (CERF) model is an open-source geospatial python package that provides new power plant locations at a 1km resolution. The model ingests U.S. state or regional-scale electricity system capacity expansion plans, such as those produced by the Global Change Analysis Model (GCAM-USA), and identifies feasible, site-specific locations for individual new power plants (renewable and non-renewable). CERF combines high-resolution geospatial suitability analyses with an economic algorithm that selects individual plant siting locations based on grid interconnection costs and the locational marginal value of new generation. The model incorporates a wide range of dynamic constraints and opportunities, such as protected lands, population density, existing infrastructure, and water availability. This dataset provides CERF power plant siting results for IM3 Phase 2 simulations across eight different scenarios for the Western US through 2055. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States (see, https://tgw-data.msdlive.org/). These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 CERF siting results in this dataset correspond to capacity expansion plans in the GCAM-USA IM3 Phase 2 simulation data and are available for each of the above scenarios. Data Details Temporal Range: 2015-2055 in 5-year timesteps. Note that 2015 is the experiment base year and 2020 and beyond represent model simulation years. Spatial Range: Plant locations are provided for the eleven states in the Western US including Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming. Spatial Resolution: 1 km-squared, provided in x and y coordinates Geospatial Projection: Albers Equal Area Conic (ESRI:102003) File Type: csv The dataset contains subdirectories for each of the eight scenarios described in the overview. Each scenario folder contains two subfolders with the following information: 1. Power Plant Data This directory contains a single .csv file of power plant locations for both pre-existing (non-CERF sited plants in operation in 2015) and new (CERF-sited) power plants across the temporal range along with additional CERF model output parameters for CERF-sited plants. Plant with a siting year earlier than 2020 correspond to facilities that are operational leading into the first timestep CERF simulation. For a more detailed description of CERF model output parameters, see the CERF model documentation. Note that the cerf_plant_id parameter is unique within each scenario file but not across scenario files. Parameter Descriptions scenario - Name of scenario cerf_plant_id - Unique siting identifier cerf_sited - If True, indicates that plant was sited by CERF model. If False, indicates pre-existing facility region_name - Name of region (state) tech_id - Technology ID tech_name - Full generation technology name inclusive of cooling type (if applicable) and additional characteristics tech_simple - Simplified generation technology type unit_size_mw - Power plant unit size (MW) xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) index - Index position in the flattend 2D array buffer_in_km - Exclusion buffer around site (km) sited_year - Year of siting retirement_year - Year of retirement lmp_zone - Locational marginal price (LMP) zone ID locational_marginal_price_usd_per_mwh - Locational marginal price ($/MWh) generation_mwh_per_year - Generation output (MWh/yr) operating_cost_usd_per_year - Cost of plant operations ($/yr) net_operational_value - Net operational value based on LMP and and operating costs ($/yr) interconnection_cost - Cost of interconnection for transmission & gas pipeline (if applicable) net_locational_cost -- Difference of interconnection cost and operating value ($/yr) capacity_factor_fraction - Capacity factor (fraction) carbon_capture_rate_fraction - Carbon capture rate (fraction) fuel_co2_content_tons_per_btu - Fuel CO2 content (tons/Btu) fuel_price_usd_per_mmbtu - Fuel price ($/MMBtu) fuel_price_esc_rate_fraction - Fuel price escalation rate (fraction) heat_rate_btu_per_kWh - Heat rate (Btu/kWh) lifetime_yrs - Technology lifetime for annuity (years) operational_life_yrs - Operational lifetime for retirement (years) variable_om_usd_per_mwh - Variable operation and maintenance costs of yearly capacity use ($/MWh) variable_om_esc_rate_fraction - Variable operation and maintenance costs escalation rate (fraction) carbon_tax_usd_per_ton - Carbon tax ($/ton) carbon_tax_esc_rate_fraction - Carbon tax escalation rate (fraction) 2. Storage Data This directory contains information on new and pre-existing energy storage facilities operational in each timestep along with various storage operational parameters. The 2015 timestep provides pre-existing energy storage data and corresponds with facilities that are operational leading into the first model simulation timestep. Note that coordinates in the storage files correspond to the interconnection point on the grid (substation location), not individual energy storage locations. Energy storage is added in a cumulative process at each given interconnection point. That is, each individual file provides the total operational storage capacity interconnected to the specified substation for the given timestep, inclusive of previously installed storage at that location and new storage installed in that timestep at that location. Parameters scenario - Name of scenario timestep - Simulation timestep name - Unique storage identifier s_typ - Type of energy storage technology (battery or pumped storage hydro) s_node - Node ID of interconnecting substation xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) charge_rate - Maximum charge rate (power capacity) of storage system (MW) discharge_rate - Maximum discharge rate (power capacity) of storage system (MW) duration - Duration of storage system (hours) max_SoC - Allowed maximum state of charge (energy capacity) of storage system (MWh) min_SoC -Allowed minimum state of charge (energy capacity) of storage system (MWh) charge_eff - Efficiency of charge (fraction between 0 and 1) discharge_eff - Efficiency of discharge (fraction between 0 and 1) Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program.
GE Research and its partner GE Renewables have proposed the use of an interface converter solution to increase the penetration of small to medium-sized CHP (1MWe to 20MWe) into distribution grids and improve their flexibility and grid support capability. Indeed, the proposed interface converter solution thanks to presence of the grid-ready inverter, allows to streamline the compliance to grid codes requirements, reduce the interconnection delays and costs and ultimately one of the main barriers for CHP adoption by commercial and industrial facilities. An additional benefit provided by the interface converter is the use of the grid-ready inverter for reactive power which eliminates the need of sizing the generator for that capability. These two benefits highly favor the economic feasibility of converter-interfaced CHP. Five user cases, each in one of the leading U.S states for CHP potential reported by the DOE in its estimation of the U.S Technical Potential of CHP, were selected to compare the economic performances of converter-interfaced CHP as compared with directly-coupled. They include a college campus in California, a hospital in New York, a water reclamation plant in Texas, a hotel in Minnesota, and a large office building in Pennsylvania. Results showed that, the presence of the interface converter allows to increase the return on investment (ROI) by 0.5 to 2 percentage points in most of the cases (4 of 5). Indeed, the interface converter by shortening the interconnection process allows to accelerate revenues while reducing interconnection costs. Added to the reduced cost of the required generator these savings trade favorably the capital cost of the converter. The analysis also showed that the profitability of the converter-interfaced CHP is highly sensitive to the energy price, interconnection delay, and converter cost. However, it appears that if the interface converter can shorten the interconnection process by at least 6 months, adopting this solution will be more economically viable than directly-coupled configuration in almost all the +23,000 sites of the U.S Technical Potential CHP. The evaluation of the benefits of a converter-interfaced CHP also showed that it enables higher ROI when coupled with other distributed energy resources (DER) such as battery energy systems (BESS) or solar photovoltaic (PV). Indeed, in those scenario, the grid-ready inverter included in the interface converter eliminates the need of separate inverters if DC-coupling is used. On the technical performance, it has been verified that the presence of the interface converter allows to reduce by 70% to 80% the CHP short-circuit contribution to grid faults. This not only reduces the mechanical and thermal stresses exposed to the CHP electrical components but also increases the grid hosting capacity which ultimately enables higher penetrations CHP. Another key benefit of the interface converter validated with hardware-in-the-loop simulations and testing is its superior capability for reactive power support. Indeed, using a power hardware testbed with two +700kW inverters configured in back-to-back, a microgrid controller and actual facilities loads it was demonstrated that the presence of the interface converter can help maintain a power factor near ~1 or regulate the voltage to ~1.0pu at the point of common coupling. This benefit can be highly valuable if in the future, due to higher penetration of renewable distributed energy resources (DER), utilities start billing demand charge based on kVA instead of kW as currently. It was also validated that converter-interfaced CHP can dispatch heat and power commands and seamlessly switch between the two modes while consistently controlling the power factor or voltage at PCC. Indeed, the power hardware testing showed that grid-connected converter-interfaced CHP can follow either the power or heat demand while maintaining a unity power factor at converter output. This research proved that the adoption of an interface converter as the solution for interconnection of CHP system into the distribution grid can greatly improve the economic feasibility of small to medium-sized CHP as well as the plant power quality, flexibility and resiliency. Additionally, it allows increased penetrations of CHP into the distribution grid, extends their grid support capability, and facilitates the integration of BESS and PV DER by streamlining their collocation within the same facilities. This ultimately provides an opportunity for commercial and small industrial facilities in the U.S to accelerate their energy transition thanks to the high energy efficiency of CHP systems and its reliable, flexible, and resilient microgrid operation when interconnected with an interface converter.
Coatings play key roles in solid oxide fuel cell (SOFC) stack durability. For example, diffusion barrier coatings on Cr-containing interconnect and balance of plant (BOP) components protect electrodes from Cr poisoning over the long operational lifetimes (>10,000 hours) of the fuel cell stack. Common defects in coatings, such as cracks, pinholes, and porosity, result in a failure to protect the electrodes, resulting in shorter operational lifetime and thus higher cost. It is very unlikely, even in the best coating process, that all these defects can be mitigated, hence identifying critical defects in parts, and removing defective parts from production before they can damage the stack, becomes paramount. Furthermore, these quality control techniques must be operational in the production/assembly line (in-line), i.e., high throughput and non-destructive, and cost effective. Redox Power Systems, LLC (Redox) together with the National Renewable Energy Laboratory (NREL) developed much needed high throughput, in-line metrology techniques for protective coatings. The overall goal of the project is to lower cost while increasing robustness, reliability, and endurance of SOFC stacks. To accomplish this, we had several objectives, including: to identify key coating and substrate defects that lead to coating failure through the use of detailed characterization methods (e.g., microscopy, XRD, EDS, electrochemistry); to assess capabilities of in-line metrology techniques, e.g., optical profilometry (Redox) and thermography (NREL), to probe these defects, or evidence thereof; demonstrate long-term performance of “defect-free” protective coatings, as identified by in-line metrology, in solid oxide fuel cell (SOFC) stack operation. In the first part of this project, the ability to identify key defects expected to lead to coating and SOFC degradation using in-line metrology tools were evaluated. Coated interconnect samples with controlled defect types and populations were tested under conditions similar to SOFC operation, followed by detailed post-test analysis to reveal the defects responsible for observed degradation. In the second part of the project, the optimal in-line metrology techniques and methodologies were used to map the defect distribution in full-size interconnects with critical defects intentionally allowed to exist in some cases. These interconnects underwent SOFC testing for extended periods (up to ~3,000 hours) followed by post-test analysis to evaluate the effectiveness of in-line metrology techniques in mitigating MCO coating related degradation. Key accomplishments in this project included the following: Demonstrated ASR of < 0.05 ohm-cm 2 at 650 °C for 1,000 hours with low defect (determined by in-line metrology) interconnect samples (average ASR=37 milliohms-cm 2 after over 1,000 hours). Demonstrated that low defect coatings on interconnects (as screened using in-line metrology) have low volatilization of chromium at ~650 °C for 1,000 hours as detected using Cr-getter material (< 5 at% increase above baseline); 1022 hour duration tests under humidified, elevated temperature (750 °C rather than 650 °C) compared a base case against different coating thicknesses. Demonstrated capability to identify initial key defects of interest with in-line metrology techniques using up to 8 cm by 10 cm having coatings with and without intentional defects of interest using thermal imaging and optical profilometry. Correlated key defects identified using metrology techniques with observed coating performance (e.g., ASR and Cr volatility). Conducted several 4 cm by 4 cm cell tests using MCO-interconnects that were pre-screened using some of the metrology techniques developed in the project (e.g., optical profilometry). An analysis of ASR measurements were able to show that defect-free coatings resulted in the anticipated performance in the cell tests.
A computer-implemented method of generating randomized electrical interconnects for an electronic circuit comprises steps of receiving a netlist of nodes of electronic components to be connected, each connection of nodes forming an electrical interconnect; determining a list of one or more path directions for each electrical interconnect; determining a plurality of path direction distances for each electrical interconnect; generating a plurality of segments for each electrical interconnect, each segment having one path direction and a length which are selected at random; calculating a sum of the lengths of all of the segments in each path direction each time a segment is generated for each electrical interconnect; removing one path direction from the list of path directions when a first condition is met; and stopping the generating a plurality of segments for each electrical interconnect when a second condition is met.
A computer-implemented method of generating randomized electrical interconnects for an electronic circuit comprises steps of receiving a netlist of nodes of electronic components to be connected, each connection between the nodes forming an electrical interconnect; determining a list of one or more path directions for each electrical interconnect; determining a plurality of path direction distances for each electrical interconnect; generating a plurality of segments for each electrical interconnect, each segment having one path direction and a length which are selected at random; calculating a sum of the lengths of all of the segments in each path direction each time a segment is generated for each electrical interconnect; removing one path direction from the list of path directions when a first condition is met; and stopping the generating a plurality of segments for each electrical interconnect when a second condition is met.
A computer-implemented method of generating randomized electrical interconnects for an electronic circuit comprises steps of receiving a netlist of nodes of electronic components to be connected, each connection between the nodes forming an electrical interconnect; determining a list of one or more path directions for each electrical interconnect; determining a plurality of path direction distances for each electrical interconnect; generating a plurality of segments for each electrical interconnect, each segment having one path direction and a length which are selected at random; calculating a sum of the lengths of all segments of the plurality of segments in each path direction each time a segment is generated for each electrical interconnect; removing one path direction from the list of path directions when a first condition is met; and stopping the generating a plurality of segments for each electrical interconnect when a second condition is met.
Electromigration (EM) is a phenomenon whereby the flow of current in metal wires moves the underlying atoms, potentially inducing electronic interconnect failures. The continued decrease in commercial lithographically defined feature sizes means that EM presents an increasing risk to the reliability of modern electronics. To mitigate these risks, it is important to look for novel mechanisms to extend lifetime without forfeiting miniaturization. Typically, only the overall increase in the interconnect resistance and failure voltage are characterized. However, if the current flows non-uniformly, spatially resolving the resulting hot spots during electromigration aging experiments may provide better insights into the fundamental mechanisms of this process. Here in this study, we focus on aluminum interconnects containing asymmetric reservoir and void pairs with contact pads on each end. Such reservoirs are potential candidates for self-healing. Thermoreflectance imaging was used to detect hot spots in electrical interconnects at risk of failure as the voltage was gradually increased. It reveals differential heating with increasing voltage for each polarity. We find that while current flow going from a constriction to a reservoir causes a break at the void, the identical structure with the opposite polarity can sustain higher current (J = 21 × 10 6 A/cm 2 ) and more localized joule heating and yet is more stable. Ultimately, a break takes place at the contact pad where the current flows from narrow interconnect to larger pads. In summary, thermoreflectance imaging with submicron spatial resolution provides valuable information about localized electromigration evolution and the potential role of reservoirs to create more robust interconnects.
The main objective of this report is to provide an overview of select U.S. utility methodologies for performing high-penetration photovoltaic (HPPV) system planning and impact studies. This report covers the Federal Energy Regulatory Commission's orders related to photovoltaic (PV) power system interconnection, particularly the interconnection processes for the Large Generation Interconnection Procedures and Small Generation Interconnection Procedures. In addition, it includes U.S. state interconnection standards and procedures. The procedures used by these regulatory bodies consider the impacts of HPPV power plants on the networks. Technical interconnection requirements for HPPV voltage regulation include aspects of power monitoring, grounding, synchronization, connection to the overall distribution system, back-feeds, disconnecting means, abnormal operating conditions, and power quality. This report provides a summary of mitigation strategies to minimize the impact of HPPV. Recommendations and revisions to the standards may take place as the penetration level of renewables on the grid increases and new technologies develop in future years.
The intent of this document is to support local authorities governing interconnection requirements in adopting the most current requirements for interconnecting distributed energy resources (DERs) to the electric distribution system, as specified in the Institute of Electrical and Electronics Engineers Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces (IEEE Std 1547-2018 ). To create interconnection rules that successfully address policy goals, market trends, and technical requirements, electric service regulators need to be well informed of DER integration considerations. Interconnection processes and technical issues often overlap; the two are not easily segregated, and they are often considered and evaluated concurrently within the context of interconnection rulemaking. Accordingly, this document addresses both the technical issues and related process considerations.
This report covers microgrids as a special application of distributed energy resources (DERs) in Puerto Rico. This is one of a series of reports describing the U.S. Department of Energy (DOE) multi-laboratory efforts undertaken. To ensure the sustainable, long-term recovery of Puerto Rico's electric power grid from hurricanes Maria and Irma and to build capacity to manage future potential natural disasters in the most secure and resilient way, DOE convened experts from multiple national laboratories to develop a comprehensive set of data, models, analytic tools, and studies, considering inputs from a wide variety of stakeholder groups, to support technically sound recommendations for Puerto Rico's energy investment decisions. In Phase 1 of the multi-laboratory effort to support Puerto Rico's recovery, the National Renewable Energy Laboratory (NREL) provided the utility company Puerto Rico Electric Power Authority (PREPA) recommendations for a new framework of interconnection standards to accelerate the integration of utility-scale, transmission-connected, renewable electrical generation and energy storage that ensure cross-technology compatibility and enable high deployment levels without compromising grid reliability, safety, or security (https://www.nrel.gov/docs/fy19osti/73848.pdf). In Phase 2, NREL published a report focused on the interconnection of distributed energy resources (DERs) to the electric distribution system in Puerto Rico (https://www.nrel.gov/docs/fy21osti/77127.pdf). This report familiarized the reader with Puerto Rico's distribution infrastructure and operational practices and procedures that are relevant to DER interconnection. The report also provided considerations for streamlining the interconnection process given the expected increase in deployments resulting from Puerto Rico's renewable portfolio standard goal of 100% renewables by 2050. Accordingly, the report identifies considerations and concerns associated with the increase in intermittent generation, strategies for DER interconnection best practices, and the potential use of the latest technological solutions identified in the latest revision of the Institute of Electrical and Electronics Engineers 1547-2018 interconnection standard. Additionally, the report identified ways to improve the physical resiliency of installed DERs. This task describes how distributed energy systems may participate in and contribute to improving the resiliency of Puerto Rico's energy infrastructure in the future. This report presents an analysis of the Puerto Rico grid to illustrate the possible different microgrid and minigrid scenarios. The capability to form sustained microgrids and minigrids has the potential to provide a high level of resiliency during disturbances on the grid. DERs, on the other hand, have the capability to aid in the microgrid operation by providing grid support as well as grid-forming functionality. Other tasks in Phase 3 include voltage regulation in distribution networks using DERs and transmission-and-distribution co-simulation.
In 2023 additional electricity transmission would have provided the most value for links that crossed between grid interconnection regions in the United States (the Western Interconnection, the Eastern Interconnection, the Texas Interconnection) or crossed between system operator regions within the same interconnection. Many multi-interconnection or multi-region links had values of greater than $\$20$/MWh, or up to $\$175$ million/yr per 1 GW expanded transmission (subject to limits to the depth of the market at each side of the link). In contrast, many links within regions, or between regions in the northeast, had relatively low values in 2023, following the overall decline in wholesale electricity prices in 2023 compared with 2021-2022. The most valuable link in 2023, at $\$61$ /MWh, was between Texas and the Southwest. Multiple events in 2023 (high natural gas prices in the western U.S., and high summer temperatures in Texas and the Southwest) were observed to have driven this high value. Of particular note, high prices in Texas occurred at a largely distinct set of hours from high prices in the Southwest, helping to drive up the value of transmission in total and demonstrating significant value to both regions. This example demonstrates the unique value of transmission (compared to other solutions, such as building local generation resources) in delivering benefits to multiple regions given its ability to connect areas of the country that inevitably face differing circumstances.
This project, funded by the US Department of Energy’s Solar Energy Technologies Office (SETO), focused on the operation of microgrids as a coordinated network. The primary objective, which was successfully achieved, was to develop both control strategies and hardware solutions to support the resilient and efficient operation of networked microgrids with high solar penetration. The work was structured around the following four main tasks: • Development of distributed and scalable optimization algorithms for AC-coupled networked microgrids. • Design and implementation of a novel DC interconnection hardware to enable precise power exchange between microgrids. • Laboratory operational validation of the developed technologies using 480 V testbeds and commercially available hardware. • Field operational validation of the complete solution in Adjuntas, Puerto Rico, interconnecting two kW-scale, split-phase microgrids of Casa Pueblo’s microgrids. This project addressed multiple technical challenges across the domains of optimization, control, hardware interconnection, and protection. One of its key contributions was delivering tangible, real-world solutions for networking microgrids. In contrast to purely theoretical or simulation-based work, this project included full-scale hardware operational validation both in the lab and in the field. The work conducted as part of this project—in collaboration with the University of Puerto Rico; the University of Tennessee, Knoxville; the University of Central Florida; and Casa Pueblo—has advanced the state of the art in networked microgrids. Key contributions include the development of distributed control strategies, practical solutions for real-world implementation challenges, and the introduction of a novel DC interlink approach for microgrid interconnection. The project featured both laboratory and field validation using commercial off-the-shelf components. The field deployment successfully validated that a group of microgrids can operate in a coordinated manner, enabling precise power flow between systems and mutual support during extreme events. This project resulted in 15 journal publications and 15 conference papers; 5 graduate students and 15 undergraduate students were supported. The codes of distributed optimization and forecasting were made open-source through OSTI.gov for distributed optimization and forecasting. All the publications are available in the ORNL-hosted project landing page. The DC interlink with state-of-charge balancing control was operationally validated in Adjuntas by interconnecting two real-world, 240 V split-phase microgrids. To the best knowledge of the team, this represents the first operational validation of AC microgrids interconnected via DC-interlinks. As a culmination of this project, a follow-on grant was awarded to support the technology transfer of the distributed optimization framework to a commercial microgrid controller, Stellar Edge, developed by the California-based company New Sun Road.
A method of making a molten sodium battery is disclosed. A first metallic interconnect frame having a first interconnect vent hole is provided. A second metallic interconnect frame having a second interconnect vent hole is also provided. An electrolyte plate having a cathode vent hole and an anode vent hole is interposed between the metallic interconnect frames. The metallic interconnect frames and the electrolyte plate are sealed thereby forming gaseous communication between an anode chamber through the anode vent hole and gaseous communication between a cathode chamber through the cathode vent hole.
An electrochemical cell unit comprises a first electrochemical cell comprising a first oxidant electrode and a first fuel electrode, and a second electrochemical cell comprising a second oxidant electrode and a second fuel electrode. An interconnect interposed between the first electrochemical cell and the second electrochemical cell. The interconnect comprises an interconnect main body defining a longitudinal channel along a longitudinal axis thereof. The interconnect main body includes a plurality of corrugations defining a plurality of fuel channels on a first surface of the interconnect main body facing the first electrochemical cell, and a plurality of oxidant channels on a second surface of the interconnect main body facing the second electrochemical cell. Each of the plurality of fuel channels and the plurality of oxidant channel positioned around the longitudinal channel.