Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “IMPLEMENTATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Implementation of Human System Integration Workshop at NASA for Human Spaceflight

The human is a key element in the complex system of systems underlying space exploration missions. As a critical system, its operating bands and requirements need to be characterized and integrated with other systems. Optimal integration of the human system with hardware and software elements has an impact on multiple aspects of mission execution, including human health and performance, risk mitigation, effective design and functionality, enhanced safety, and reduced lifecycle costs. The field of Human Systems Integration (HSI) represents an interdisciplinary and comprehensive cross-cutting approach encompassing technical and management processes for integrating human as a system consideration and objective within and across all other system components and multiple domains. In addition to human activities, HSI covers training, operations and support dimensions. Moreover, HSI is an essential enabler to systems engineering practice, emphasizing human system aspects toward optimizing fully integrated system of systems performance while systematically infusing the needs of all users during the earliest stages of development. Consistent with the National Space Exploration Campaign, NASA is developing the Gateway, a lunar orbiting platform that will serve as astronaut habitat, support transit to deep space, validate new technologies and systems, and function as a science laboratory and communications hub, among other uses. It is an essential element of a phase that will extend human exploration into deep space through evolvable infrastructure and advanced technology, supporting assembly and logistics of other exploration architecture elements. In an effort to explore the current status and forward plan of HSI implementation in the mission (system of systems) lifecycle, the HSI Employee Resource Group conducted an HSI workshop using the Gateway Program as a case study. It revealed how different organizations at the Johnson Space Center incorporate HSI in their processes in preparation for the development and operation of the Gateway. The workshop focused on HSI methodology for implementation of the six NASA HSI domains: Human Factors Engineering, Operations Resources, Habitability and Environment, Maintainability and Supportability, Safety, and Training. Results from the workshop are reported on this paper, as well as some historical background of HSI at NASA, and the success in using an Employee Resource Group to promote technical knowledge. The authors hope that this information can be used to disseminate best practices for translational applications to other space exploration systems.

Silva-Martinez, Jackelynne↗

Implementation of Human System Integration Workshop at NASA for Human Spaceflight

The human is a key element in the complex system of systems underlying space exploration missions. As a critical system, its operating bands and requirements need to be characterized and integrated with other systems. Optimal integration of the human system with hardware and software elements has an impact on multiple aspects of mission execution, including human health and performance, risk mitigation, effective design and functionality, enhanced safety, and reduced lifecycle costs. The field of Human Systems Integration (HSI) represents an interdisciplinary and comprehensive cross-cutting approach encompassing technical and management processes for integrating human as a system consideration and objective within and across all other system components and multiple domains. In addition to human activities, HSI covers training, operations and support dimensions. Moreover, HSI is an essential enabler to systems engineering practice, emphasizing human system aspects toward optimizing fully integrated system of systems performance while systematically infusing the needs of all users during the earliest stages of development. Consistent with the National Space Exploration Campaign, NASA is developing the Gateway, a lunar orbiting platform that will serve as astronaut habitat, support transit to deep space, validate new technologies and systems, and function as a science laboratory and communications hub, among other uses. It is an essential element of a phase that will extend human exploration into deep space through evolvable infrastructure and advanced technology, supporting assembly and logistics of other exploration architecture elements. In an effort to explore the current status and forward plan of HSI implementation in the mission (system of systems) lifecycle, the HSI Employee Resource Group conducted an HSI workshop using the Gateway Program as a case study. It revealed how different organizations at the Johnson Space Center incorporate HSI in their processes in preparation for the development and operation of the Gateway. The workshop focused on HSI methodology for implementation of the six NASA HSI domains: Human Factors Engineering, Operations Resources, Habitability and Environment, Maintainability and Supportability, Safety, and Training. Results from the workshop are reported on this paper, as well as some historical background of HSI at NASA, and the success in using an Employee Resource Group to promote technical knowledge. The authors hope that this information can be used to disseminate best practices for translational applications to other space exploration systems.

Silva-Martinez, Jackelynne↗

Evaluation of Electrical System Requirements for Implementing Turbine Electrified Energy Management

Turbine Electrified Energy Management (TEEM) is a concept concerned with the management of energy in an electrified propulsion system. The management of energy in the hybrid-electric architecture has potential to benefit the turbomachinery and the aircraft it powers. The concept is particularly useful for improving operability during transient operation and could be leveraged to design a better performing engine. The concept utilizes electric machines coupled to the engine shafts and an electric power distribution system that includes energy storage. A controller is used to decide when and how energy is moved around the electrified propulsion system, particularly when considering energy conversion between mechanical and electrical forms. Prior work has shown that the electric machines can be used to supply/or extract supplemental power to/from the engine shafts to improve their operability and achieve or enable propulsion efficiency and performance benefits. However, the previous studies did not consider the practical constraints of the electrical machines and energy storage devices that are required for implementing the TEEM system architecture concept. This paper presents an integrated engine and electrical system model that is used to evaluate the electrical system requirements. The model captures the physics of the conceptual, Advanced Geared Turbofan 30,000lbf (AGTF30) engine, which features advanced technologies such as a compact gas turbine and a variable area fan nozzle. For this work, the engine is augmented with electrical system components that allow for the implementation of the TEEM concept. The evaluation presented suggests the potential of the TEEM concept to provide performance benefits for a turbofan engine.

hybrid electric propulsion↗

Implementation of a Matrix Crack Spacing Parameter in a Continuum Damage Mechanics Finite Element Model

Continuum Damage Mechanics (CDM) based progressive damage and failure analysis (PDFA) methods have demonstrated success in a variety of finite element analysis (FEA) implementations. However, the technical maturity of CDM codes has not yet been proven for the full design space of composite materials in aerospace applications. CDM-based approaches represent the presence of damage by changing the local material stiffness definitions and without updating the original mesh or element integration schemes. Without discretely representing cracks and their paths through the mesh, damage in models with CDM-based materials is often distributed in a region of partially damaged elements ahead of stress concentrations. Having a series of discrete matrix cracks represented by a softened region may affect predictions of damage propagation and, thus, structural failure. This issue can be mitigated by restricting matrix damage development to discrete, fiber-aligned rows of elements; hence CDM-based matrix cracks can be implemented to be more representative of discrete matrix cracks. This paper evaluates the effect of restricting CDM matrix crack development to discrete, fiber-aligned rows where the spacing of these rows is controlled by a user-defined crack spacing parameter. Initially, the effect of incrementally increasing matrix crack spacing in a unidirectional center notch coupon is evaluated. Then, the lessons learned from the center notch specimen are applied to open-hole compression finite element models. Results are compared to test data, and the limitations, successes, and potential of the matrix crack spacing approach are discussed.

Hyder, Imran↗

Implementation of Multidomain Unified Forward Operators (UFO) Within the Joint Effort for Data Assimilation Integration (JEDI): Ocean Applications

The Joint Effort for Data assimilation Integration (JEDI) is a collaborative development led by the Joint Center for Satellite Data Assimilation (JCSDA) in conjunction with NASA, NOAA and the Department of Defense (NAVY and Air Force). The (Sea-Ice Ocean and Coupled Assimilation) SOCA as one of the JCSDA projects, focuses on the application of JEDI to marine data assimilation. One of the goals of SOCA is to make use of surface-sensitive radiances to constrain sea-ice and upper ocean fields (e.g., salinity, temperature, sea-ice fraction, sea-ice temperature, etc.). The first elements toward an ocean/atmosphere coupled data assimilation capability within JEDI, with a focus on supporting and developing the assimilation of radiance observations sensitive to the ocean and atmosphere has been implemented. The direct radiance assimilation of surface sensitive microwave radiances focusing on Global Precipitation Measurement (GPM) Imager (GMI) for the SST Constraint and Soil Moisture Active Passive (SMAP) for the Sea Surface Salinity (SSS) has been the main focus. Also, in UFO the capability to calculate the cool skin layer depth and skin temperature has been implemented similar to the GEOS-5. It has been tested with GMI sea surface temperature retrievals. This is important because Satellite and in-situ observations of the Sea-Surface Temperature (SST) show high variability, including a diurnal cycle and very thin, cool skin layer in contact with the atmosphere, and Incorporating a realistic skin SST is essential for atmosphere-ocean coupled data assimilation.

Unified Forward Operators (UFO)↗

Unified Analysis of Aerospace Structures through Implementation of Rapid Tools into a Stress Framework

Rapid structural analysis tools have become an important part of the design cycle for aerospace companies for the last several decades. As these tools have been developed over time, there is often little consideration for shared software infrastructure between the tools, which makes design and analysis cumbersome due to a lack of commonality in input and output data and reporting, as well as poor traceability of results. Under the Rapid Tools task of the Advanced Composites Consortium (ACC), four aerospace tools were recently implemented or enhanced in the HyperSizer stress framework and then evaluated by this consortium of industry and government organizations. The framework provides an automated software environment for executing the rapid tools for analysis and sizing, quantifying margins of safety for thousands of load cases, and generating reports in support of FAA certification. This paper describes the process by which the tools were enhanced or implemented in the stress framework under the ACC project, and the evaluation conducted by industry consortium members.

Craig S Collier↗

2019 Corrective Measures Implementation and Intermim Measures Annual Status Report: Summary of Biosparge System Operation and Maintenance, and Interim Groundwater Monitoring Mobile Launch Platform / Vehicle Assembly Building Area (SWMU 056) Kennedy Space Center, Florida

This report presents a summary of the Corrective Measures Implementation (CMI) and Interim Measure (IM) implementation activities that occurred from May 2019 through December 2019 at the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, Solid Waste Management Unit 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida.

MOBILE LAUNCH PLATFORM / VEHICLE ASSEMBLY BUILDING↗

Former Central Heat Plant, SWMU 045 Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) presents detailed design elements for the air sparging (AS) Interim Measure (IM) design provided in the IM Work Plan (IMWP) within the High Concentration Plume (HCP) at the Former Central Heat Plan (CHP) located at Kennedy Space Center (KSC), Florida. The IMWP presented an approach to implement an AS IM to reduce chlorinated volatile organic compound concentrations to concentrations that facilitate a transition to long-term monitoring. CHP has been designated Solid Waste Management Unit 045 under KSC’s Resource Conservation and Recovery Act Corrective Action Program.

Christopher J Pike↗

Implementing distributed operations : a comparison of two Deep Space Missions

Two very different deep space exploration missions—Mars Exploration Rover and Cassini—have made use of distributed operations for their science teams. In the case of MER, the distributed operations capability was implemented only after the prime mission was completed, as the rovers continued to operate well in excess of their expected mission lifetimes; Cassini, designed for a prime mission of four years, had planned for distributed operations from its inception. The rapid command turnaround timeline of MER, as well as many of the operations features implemented to support it, have proven to be conducive to distributed operations. These features include: a single science team leader during the tactical operations timeline, highly integrated science and engineering teams, processes and file structures designed to permit multiple team members to work in parallel to deliver sequencing products, web-based spacecraft status and planning reports for team-wide access, and near-elimination of paper products from the operations process.

Larsen, Barbara↗

Preliminary Design and Implementation of the Baseline Digital Baseband Architecture for Advanced Deep Space Transponders

This article investigates and identifies the baseline design and implementation of the digital baseband architecture for advanced deep space transponders. Trade studies on the selection of the number of bits for the analog-to-digital converter (ADC) and optimum sampling schemes are presented. In addition, the proposed optimum sampling scheme is analyzed in detail. Descriptions of possible implementations for the digital baseband (or digital front end) and digital phase-locked loop (DPLL) for carrier tracking are also described.

Deep↗

Developing and Implementing a Process to Verify and Validate the NASA InSight Mission’s Instrument Command Products

The NASA InSight Mars lander is a roboticspacecraft which is investigating the interior structure of Marsthrough a series of seismological measurements andexperiments. Much of the commanding of activities performedby the instruments was done using ‘blocks’ – reusable functionswritten in Virtual Machine Language stored onboard thespacecraft– and sequences (series of commands) that werecreated by teams to operate their instruments. It was vital thatthese blocks and sequences (collectively called commandproducts) be thoroughly examined prior to onboard executionusing a comprehensive test program to reduce risk to thespacecraft and instruments and ensure smooth operations onthe surface of Mars. The Verification and Validation (V&V)process that was designed and implemented during the monthsleading up to InSight’s launch and landing successfullyuncovered a number of issues that could have causedoperational delays or impacted hardware. The process alsohelped adapt ground tools to better model onboard activities,create operational principles to avoid unintended consequencesduring flight, and generate a reference database for commandproduct use during operations. This allowed InSight to meet itssurface operations goals in the desired timeframe. This paperdescribes the development, implementation and results ofInSight’s command product V&V process, its contribution tomission success, and challenges faced.

Cloutier, Kyle↗

Components Cleaning Facility, SWMU 030 Eastern High-Concentration Plume Area Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) presents detailed design elements and coordination specifics to implement an air sparging (AS) Interim Measure (IM) to remediate groundwater at the Components Cleaning Facility (CCF), Eastern High Concentration Plume (HCP) Area located at Kennedy Space Center (KSC), Florida. The objective of the CCF East IM is to remediate groundwater where trichloroethene, cis-1,2-dichloroethene, and vinyl chloride concentrations exceed Florida Department of Environmental Protection Natural Attenuation Default Criteria (NADC) (identified as the HCP) via AS and to transition to monitored natural attenuation. CCF has been designated Solid Waste Management Unit 030 under KSC’s Resource Conservation and Recovery Act Corrective Action Program.

James Lloyd↗

Europa Clipper Mission: Onward to Implementation!

Europa, the fourth largest moon of Jupiter, is believed to be one of the best places in the solar system to look for extant life beyond Earth, and the Europa Clipper Mission is preparing to investigate. Now entering the fifth year of life as a formal project, the Europa Clipper Mission has completed its major design phase and is preparing for implementation. The mission envisions sending a flight system, consisting of a spacecraft equipped with a payload of NASA-selected scientific instruments, to execute numerous flybys of Europa while in Jupiter orbit. The mission is being formulated and implemented by a joint Jet Propulsion Laboratory (JPL) and Applied Physics Laboratory (APL) Project team. At the Project Preliminary Design Review (PDR) in August 2018, it was determined that the unique integration of the REASON instrument’s antennas with the spacecraft’s solar arrays required additional time for maturity and review. The required maturity was demonstrated, and in June 2019 the Clipper Mission passed its Delta Preliminary Design Review, and formal confirmation for entry into Phase C was announced by NASA in August 2019. The earliest launch opportunity is now in July 2023, one year later than originally planned. The Project is now working toward its Critical Design Review in May 2020. This paper will describe the progress of the Europa Clipper Mission since January 2019, including maturation of the spacecraft, subsystem and instrument designs, the beginning of fabrication of engineering models and the first flight models, planning for the verification & validation phase, and planning for operations.

Jackson, Maddalena↗

Efficient Implementation for Unitary Coupled Cluster State Preparation for Near-Term Quantum Computers

Unitary coupled cluster theory (UCC) is a common wave function ansatz for quantum simulation of molecular electronic structure using the variational quantum eigenvalue solver (VQE). Even for small molecules using a double-ζ basis, the number of variational parameters required to minimize the electronic energy (i.e., optimize the circuit) is large and beyond the reach of current quantum computers. For example, a circuit simulating C2 using the UCCSD ansatz and the cc-pVDZ basis set with frozen-core will require over 10,000 variational parameters and a Hilbert space of over 10^8 determinants. To make progress on simulating such molecular systems on near-term quantum computers, we explore how much of the optimization can be approximately prepared with classical simulation while reducing the number of optimization steps performed on a quantum device. Recently, Chen, Cheng, and Freericks [J. Chem. Theory Comput. 2021, 17, 841-847] presented an algorithm for the factorized form of the UCC ansatz that allows for efficient UCC optimizations on classical hardware. We flip the algorithm around and use it to prepare approximate quantum circuits for systems that require a large number of qubits to represent. We will present results from our implementation and discuss strategies for incorporating this implementation for algorithms involving near-term quantum computers.

J Wayne Mullinax↗

NASA’s Revised Planetary Protection Policy and Implementation

NASA has updated its planetary protection policy and implementation approach in response to advances in scientific understanding of solar system targets, upcoming mission opportuni-ties for exploration and sample return, and the private sector’s emerging capability to plan missions to Earth’s Moon and Mars. In September 2021, the NASA Procedural Requirements NPR 8715.24, entitled “Planetary Protection Provisions for Robotic Extraterrestrial Missions” was released which repositions planetary protection in existing NASA mission and program management structures, introduces risk-informed decision making, expands on key roles and responsibilities for both programmatic and the Oÿce of Safety and Mission Assurance, updates the categorization process and streamlines the planetary protection documentation approval and schedule. NASA is working on a more detailed technical standard to accompany NPR 8715.24 which will include the detailed technical requirements to address organic contamina-tion, inadvertent impact avoidance, biological control and management, end of mission disposal and restricted Earth-Return sample safety and assurance. This report to the COSPAR com-munity will describe the current NASA planetary protection policy and its alignment with the revised COSPAR planetary protection policy. NASA’s plans for updating the supporting “Handbook for Implementing Planetary Protection Technical Requirements” and future policies for addressing planetary protection of crewed missions will also be presented.

Elaine Seasly↗

On the Implementation and Further Validation of a Time Domain Boundary Element Method Broadband Impedance Boundary Condition

A time domain boundary integral equation with Burton-Miller reformulation is presented for acoustic scattering by surfaces with liners in a uniform mean flow. The Ingard-Myers impedance boundary condition is implemented using a broadband multipole impedance model and converted into time domain differential equations to augment the boundary integral equation. The coupled integral-differential equations are solved numerically by a March-On-in-Time (MOT) scheme. While the Ingard-Myers condition is known to support Kelvin-Helmholtz instability due to its use of a vortex sheet interface between the flow and the liner surface, it is found that by neglecting a second derivative term in the current time domain impedance boundary condition formulation, the instability an be effectively suppressed in computation. The proposed formulation and implementation are validated using a NASA Langley Research Center Grazing Flow Impedance Tube (GFIT) experimental dataset with satisfactory results. Moreover, a minimization procedure for finding the poles and coefficients of the broadband multiple impedance model is formulated in this paper by which, unlike the commonly used vector-fitting method, passivity of the model is ensured. Numerical tests show the proposed minimization approach is effective for modeling liners that are commonly used in aeroacoustic applications.

Time Domain Impedance Boundary Condition↗

NASA Plans for In Situ Resource Utilization (ISRU) Development, Demonstration, and Implementation

The United States (US) National Aeronautics and Space Administration’s (NASA) Artemis Moon to Mars program has four major goals: (1) Returning Americans to the Moon: 1st Woman & 1st Person of Color, (2) Learning to live and work on the Moon, (3) Translating lessons learned so that the United States has capabilities and operational experience for a mission to Mars, and (4) Inspires the next generation of explorers, researchers, scientists, and engineers worldwide. Overarching all of this, the NASA Artemis program also continues to follow Space Policy Directive One (SPD-1) which directs the US to lead an innovative and sustainable exploration program with commercial and international partners. A major objective to achieve the Artemis program goals and SPD-1 is to understand and characterize the resources that exist at these destinations, and to learn how to utilize these resources for sustained human exploration and the commercialization of space. This ability, commonly known as In Situ Resource Utilization (ISRU), involves any hardware or operation that harnesses and utilizes local resources to create products and services for robotic and human explo-ration. The NASA ISRU program is focused on the production of mission consumables and com-modities to enable sustained human exploration, such as rocket propellants, life support consuma-bles, fuel cell reactants, feedstock for manufacturing and construction, and nutrients for food and plant growth. In particular, propellants make up a significant fraction of the mass launched from Earth, are critical to mission success, and can reduce the cost for reusable transportation. Important for enabling long term surface stays, greater independence from Earth, and growing lunar infra-structure are the abilities to perform construction and manufacturing from in situ-derived metals and materials to create and expand on the infrastructure and reduce the logistical resupply needed for sustained surface and space operations. To achieve these ISRU capabilities, NASA, in partner-ship with industry, academia, and international partners has initiated a multi-faceted program which involves (i) Determining Customer Needs (Type and Quantity of Commodities), (ii) supporting ground Development of Hardware and Systems until Ready for Lunar Flight, (iii) utilize Commer-cial Lunar Payload Services (CLPS) flights to fly resource assessment missions with the Science Mission Directorate (SMD), and public-private partnership (PPP) ISRU demonstrations of critical technologies and processes, and (iv) performing commercial-led end-to-end ‘Pilot’ Plant production of commodities and demonstration of usage at a scale and duration that minimizes or eliminates risk for full implementation of ISRU-derived commodities in mission critical applications. This paper will discuss the technologies, mission studies, and accomplishments achieved to date for the ISRU multi-faceted program, and plans for continued ground development and flight missions to reduce the risk of full ISRU implementation.

In situ resource utilization↗

From Correct Specifications to Automatically Verified Implementations

Creating formally verified implementations of software can be time-consuming and difficult. This presentation details this process, and the attempts at easing the level of difficulty and human interaction. It begins by discussing the verification of an implementation of the Compact Position Reporting algorithm, which was an involved and manual process, and goes on to show the advances made since.

Mariano M. Moscato↗