Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Analytical investigation of critical phenomena in MHD power generators

Critical phenomena in the Arnold Engineering Development Center (AEDC) High Performance Demonstration Experiment (HPDE) and the U.S. U-25 Experiment, are analyzed. The performance of a NASA specified 500 MW(th) flow train is analyzed. Critical phenomena analyzed include: Hall voltage overshoots; optimal load schedules; parametric dependence of the electrode voltage drops; boundary layer behavior; near electrode phenomena with finite electrode segmentation; current distribution in the end regions; scale up rules; optimum Mach number distribution; and the effects of alternative cross sectional shapes.

Source record↗

Runway Scheduling for Charlotte Douglas International Airport

This paper describes the runway scheduler that was used in the 2014 SARDA human-in-the-loop simulations for CLT. The algorithm considers multiple runways and computes optimal runway times for departures and arrivals. In this paper, we plan to run additional simulation on the standalone MRS algorithm and compare the performance of the algorithm against a FCFS heuristic where aircraft avail of runway slots based on a priority given by their positions in the FCFS sequence. Several traffic scenarios corresponding to current day traffic level and demand profile will be generated. We also plan to examine the effect of increase in traffic level (1.2x and 1.5x) and observe trends in algorithm performance.

runway scheduling↗

Orbit transfer vehicle engine study, phase A extension. Volume 2A: Study results

Engine trade studies and systems analyses leading to a baseline engine selection for advanced expander cycle engine are discussed with emphasis on: (1) performance optimization of advanced expander cycle engines in the 10 to 20K pound thrust range; (2) selection of a recommended advanced expander engine configuration based on maximized performance and minimized mission risk, and definition of the components for this configuration; (3) characterization of the low thrust adaptation requirements and performance for the staged combustion engine; (4) generation of a suggested safety and reliability approach for OTV engines independent of engine cycle; (5) definition of program risk relationships between expander and staged combustion cycle engines; and (6) development of schedules and costs for the DDT&E, production, and operation phases of the 10K pound thrust expander engine program.

Source record↗

Advanced Communications Technology Satellite (ACTS). Phase 1: Industrial/academic experimenters

This report presents the work done at Arizona State University under the ACTS Experimenters Program. The main thrust of the Program was to develop experiments to test, evaluate, and prove the commercial worthiness of the ACTS satellite which is scheduled for launch in 1993. To accomplish this goal, meetings were held with various governmental, industrial, and academic units to discuss the ACTS satellite and its technology and possible experiments that would generate industrial interest and support for ASU's efforts. Several local industries generated several experiments of their own. The investigators submitted several experiments of educational, medical, commercial, and technical value and interest. The disposition of these experimental proposals is discussed in this report.

Maisel, James E.↗

NASA Discovery Program Workshop

The purpose of the workshop was to review concepts for Discover-class missions that would follow the first two missions (MESUR-Pathfinder and NEAR) of this new program. The concepts had been generated by scientists involved in NASA's Solar System Exploration Program to carry out scientifically important investigations within strict guidelines -- $150 million cap on development cost and 3 year cap on development schedule. Like the Astrophysics Small Explorers (SMEX), such 'faster and cheaper' missions could provide vitality to solar system exploration research by returning high quality data more frequently and regularly and by involving many more young researchers than normally participate directly in larger missions. An announcement of opportunity (AO) to propose a Discovery mission to NASA is expected to be released in about two years time. One purpose of the workshop was to assist Code SL in deciding how to allocate its advanced programs resources. A second, complimentary purpose was to provide the concept proposers with feedback to allow them to better prepare for the AO.

Source record↗

ASK Talks With Judy Stokley

In the summer of 1997, Judy Stokley took over as Program Director of the Air-to-Air Joint System Project Office (JSPO) at Eglin Air Force Base in Florida. As the JSPO Program Director, she directed much of her attention to reforming the Advanced Medium Range Air to Air Missile (AMRAAM) program, which had been operational since 1991 and was presently being produced for the Air Force, Navy, Marine Corps, and many international customers. Upon careful analysis of the program, she found it rife with problems. Two of the most pressing included a bloated Average Unit Procurement Cost and an Air Force mandated draw down plan that had not been met. In this interview, following her presentation at the Fourth NASA Masters Forum of Program and Project Managers in Dallas last February, Stokley discusses some of the difficulties she experienced in carrying out the AMRAAM reforms. Stokley is presently Air Force Program Executive Officer for Weapons in Washington, D.C. She is responsible for the cost, schedule, and technical performance of a portfolio of air-to-air and air-to-ground weapons programs. These programs represent the leading edge of weapons technology, including developing the next generation of precision-guided munitions -- 'smart' bombs -- and air superiority missiles.

Stokley, Judy↗

Life Science Research in Outer Space: New Platform Technologies for Low-Cost, Autonomous Small Satellite Missions

We develop integrated instruments and platforms suitable for economical, frequent space access for autonomous life science experiments and processes in outer space. The technologies represented by three of our recent free-flyer small-satellite missions are the basis of a rapidly growing toolbox of miniaturized biologically/biochemically-oriented instrumentation now enabling a new generation of in-situ space experiments. Autonomous small satellites (~ 1 50 kg) are less expensive to develop and build than fullsize spacecraft and not subject to the comparatively high costs and scheduling challenges of human-tended experimentation on the International Space Station, Space Shuttle, and comparable platforms. A growing number of commercial, government, military, and civilian space launches now carry small secondary science payloads at far lower cost than dedicated missions; the number of opportunities is particularly large for so-called cube-sat and multicube satellites in the 1 10 kg range. The recent explosion in nano-, micro-, and miniature technologies, spanning fields from telecommunications to materials to bio/chemical analysis, enables development of remarkably capable autonomous miniaturized instruments to accomplish remote biological experimentation. High-throughput drug discovery, point-of-care medical diagnostics, and genetic analysis are applications driving rapid progress in autonomous bioanalytical technology. Three of our recent missions exemplify the development of miniaturized analytical payload instrumentation: GeneSat-1 (launched: December 2006), PharmaSat (launched: May 2009), and O/OREOS (organism/organics exposure to orbital stresses; scheduled launch: May 2010). We will highlight the overall architecture and integration of fluidic, optical, sensor, thermal, and electronic technologies and subsystems to support and monitor the growth of microorganisms in culture in these small autonomous space satellites, including real-time tracking of their culture density, gene expression, and metabolic activity while in the space environment. Flight data and results will be presented from GeneSat-1, which tracked gene expression levels of GFP-labeled E. coli and from PharmaSat, which monitored the dose dependency of an antifungal agent against S. cerevisiae. The O/OREOS SESLO instrument, which will study the effects of radiation and microgravity upon the viability and growth characteristics of B. subtilis and the halophile Halorubrum chaoviatoris for periods of 0 - 6 months in space, will be described as well. The ongoing expansion of the small satellite toolbox of biological technologies will be summarized.

Ricco, Antonio J.↗

Airborne Trajectory Management (ABTM): A Blueprint for Greater Autonomy in Air Traffic Management

The aviation users of the National Airspace System (NAS) - the airlines, General Aviation (GA), the military and, most recently, operators of Unmanned Aircraft Systems (UAS) - are constrained in their operations by the design of the current paradigm for air traffic control (ATC). Some of these constraints include ATC preferred routes, departure fix restrictions and airspace ground delay programs. As a result, most flights cannot operate on their most efficient business trajectories and a great many flights are delayed even getting into the air, which imposes a significant challenge to maintaining efficient flight and network operations. Rather than accepting ever more sophisticated scheduling solutions to accommodate the existing constraints in the airspace, a series of increasingly capable airborne technologies, integrated with planned improvements in the ground system through the Federal Aviation Administration (FAA) Next Generation Air Traffic Management System (NextGen) programs, could produce much greater operational flexibility for flight path optimization by the aviation system users. These capabilities, described in research coming out of NASA's Aeronautics Research Mission Directorate, can maintain or improve operational safety while taking advantage of air and ground NextGen technologies in novel ways. The underlying premise is that the nation's physical airspace is still abundant and underused, and that the delays and inefficient flight operations resulting from artificial structure in airspace use and procedural constraints on those operations may not be necessary for safe and efficient flight. This article is not an indictment of today's NAS or the people who run it. Indeed, it is an exceptional achievement that Air Traffic Management (ATM) - the complex human/machine conglomeration of communications, navigation and surveillance equipment and the rules and procedures for controlling traffic in the airspace - has both the capacity and enables the degree of efficiency in air travel that it does. But it is also true that sixty years of the "radar religion" (i.e., reliance on radar-based command and control) has produced several generations of ATM system operators and researchers who believe that introducing automation within the existing functional structure of ATM is the only way to "modernize" the system. Even NextGen, which began as a proposal for "transformational" change in the way ATC is performed, has morphed over the last decade and a half to become just the inclusion of Global Positioning System (GPS) for navigation, Automatic Dependent Surveillance Broadcast (ADS-B) for surveillance, and Data Communications (Data Comm) for communications, while still operating in rigidly structured airspace with human controllers being responsible for separation and traffic flow management (TFM) within defined sectors of airspace, using the same horizontal separation standards that have been in use since raw primary radar was introduced in the 1950s. No system as massive as the current NAS ATM can be replaced with a better system while simultaneously meeting the transportation and other aviation needs of the nation. A new generation of more flexible operations must emerge and yet coexist in harmony with the current operation (i.e., share the same airspace without segregation), thereby enabling a long-term transformation to take place in the way increasing numbers of flights are handled. Market forces will be the ultimate driver of this transformation, and investment realities mandate that real benefits must accrue to the first operators to adopt these new capabilities. In fact, the kinds of missions envisioned in the emerging world of UAS operations, unachievable under conventional ATM, demand that this transformation take place. Airborne Trajectory Management (ABTM) is proposed as a series of transformational steps leading to vastly increased flexibility in flight operations and capacity in the airspace to accommodate many varied airspace uses while improving safety. As will be described, ABTM enables the gradual emergence of a new paradigm for user-based trajectory management in ATM that brings tangible benefits to equipped operators at every step while leveraging the air and ground investments of NextGen. There are five steps in this ABTM transformation.1 NASA has extensively studied the first and last of these steps, and a roadmap of increasing capabilities and benefits is proposed for bridging between these operational concepts.

Cotton, William B.↗

The noise dose range of the X-59 estimated from propagation simulations

NASA’s X-59 aircraft will soon be flown in a series of low-boom community noise surveys across the USA. Community test experimental designs will include noise dose schedules, which require an estimate of the noise dose range that X-59 can produce. To determine the dose range, propagation simulations using NASA’s PCBoom code were completed using CFD-generated X-59 C612A near-field pressure data for an on-design condition (Mach 1.4 at 53,200 feet) and two off-design conditions (Mach 1.4 at 46,000 ft and Mach 1.3 at 43,000 ft). Near-field data at four cardinal aircraft headings were propagated through one year of realistic atmospheric profiles from the Climate Forecast System Version 2 database at several USA locations. Statistics of the mean and range of the Perceived Level (PL) of the booms in the inner 40 km of each carpet as well as the carpet width were computed. Results indicate the typical inner carpet mean PL is approximately 70-87 dB depending on the aircraft condition. The typical PL range across the inner carpet is 6-8 dB (on-design) and 5-13 dB (off-designs). The carpet widths ranged from 32-55 km. Understanding these quantities for various flight and atmospheric conditions is important for planning X-59 community noise surveys.

X-59↗

Micro-rollback and self-recovery synthesis

A new approach to high level synthesis with micro-rollback and self-recovery method is presented. The objective of this approach is to generate a reliable system from the behavioral descriptions. The approach is formulated as a rollback point insertion problem based on the probability function of being inserted rollback points after the given CDFG is scheduled. This function allows us not only to search the problem space efficiently but also to avoid the exhaustive search.

Jeon, Byung Wook↗

Study and Demonstration of Planning and Scheduling Concepts for the Earth Observing System Data and Information System

The University of Colorado's Laboratory for Atmospheric and Space Physics (CU/LASP) along with the Goddard Space Flight Center (GSFC) and the Jet Propulsion Laboratory (JPL) designed, implemented, tested, and demonstrated a prototype of the distributed, hierarchical planning and scheduling system comtemplated for the Earth Observing System (EOS) project. The planning and scheduling prototype made use of existing systems: CU/LASP's Operations and Science Instrument Support Planning and Scheduling (OASIS-PS) software package; GSFC's Request Oriented Scheduling Engine (ROSE); and JPL's Plan Integrated Timeliner 2 (Plan-It-2). Using these tools, four scheduling nodes were implemented and tied together using a new communications protocol for scheduling applications called the Scheduling Applications Interface Language (SAIL). An extensive and realistic scenario of EOS satellite operations was then developed and the prototype scheduling system was tested and demonstrated using the scenario. Two demonstrations of the system were given to NASA personnel and EOS core system (ECS) contractor personnel. A comprehensive volume of lessons learned was generated and a meeting was held with NASA and ECS representatives to review these lessons learned. A paper and presentation on the project's final results was given at the American Institute of Aeronautics and Astronautics Computing in Aerospace 9 conference.

Davis, Randal↗

Development of Gravity Sensitive Plant Cells (Ceratodon) in Microgravity

Protonemata of the moss Ceratodon are tip-growing cells that grow up in the dark. This cell type is unique compared to cells in almost any other organism, since the growth of the plant cell itself is completely oriented by gravity. Thus, both the processes of gravity sensing and the gravity response occur in the same cell. Gravity sensing appears to rely upon amyloplasts (starch-filled plastids) that sediment. This sedimentation occurs in specific zones and plastid zonation is complex with respect to plastid morphology, distribution, and gravity. Microtubules restrict the extent of plastid sedimentation (i.e., they are load-bearing). Light also is important since apical cells have a phytochrome-based positive phototropism, light quality influences plastid zonation and sedimentation (photomorphogenesis), and red light suppresses gravitropism at higher but not lower light intensities. Many of these processes were examined in a 16 day spaceflight experiment, "SPM-A" space moss" or "SPAM)) on STS-87 that landed in December, 1997. The work described here involves the definition of a second flight experiment that builds upon the data and questions arising from STS-87. Effort was directed towards further definition of an experiment for the Shuttle (dubbed "SOS" for "Son of SPAM"). Our current target is STS 107 that is scheduled to fly in January 2001. This definition addressed two goals of the STS107 experiment. The goals of the current experiment were to determine whether the cytoskeleton plays a role in maintaining and generating an apical (non-random) plastid distribution in microgravity and to determine the development and extent of clockwise spiral tip-growth in microgravity.

Sack, Fred D.↗

Managing Risk on a Technology Development Project/Advanced Mirror System Demonstrator

The risk management study applied to the Advanced Mirror System Demonstrator (AMSD), a precursor mirror technology development for the Next Generation Space Telescope (NGST) is documented. The AMSD will be developed as a segment of a lightweight primary mirror system that can be produced at a low cost and with a short manufacturing schedule. The technology gained from the program will support the risk mitigation strategy for the NGST, as well as other government agency space mirror programs.

Byberg, Alicia↗

Meteorological Satellites and Their Data

This paper presents an overview of the meteorological satellite programs that have been evolving from 1958 to the present and reviews plans for the future meteorological and environmental satellite systems that are scheduled to be placed into service in the early 1980's. The development of the TIROS family of weather satellites, including TIROS, ESSA, ITOS/NOAA, and the present TIROS-N (the third-generation operational system) is summarized. The contribution of the Nimbus and ATS technology satellites to the development of the operational polar-orbiting and geostationary satellites is discussed. Included are descriptions of both the TIROS-N and the DMSP payloads currently under development to assure a continued and orderly growth of these systems into the 1980's.

Vaughn, W.↗

Astrobee: A Free Flying Robot Enabling Technology Demonstrations

The Astrobee Project has developed next-generation free-flying robots to operate inside the ISS. Three Astrobee Free Flyers reached the ISS in April 2019and are currently hosting a variety of users while completing the commissioning phase.Commissioning is scheduled to complete in July 2020.

Astrobee Free-Flyer Robotics↗

Calibration Inter-Comparison of MODIS and VIIRS Reflective Solar Bands Using Lunar Observations

Multispectral band observations from Terra and Aqua MODIS, launched in December 1999 and May 2002, respectively, and from SNPP and NOAA-20 VIIRS, launched in November 2011 and October 2017, respectively, have continuously enabled a broad range of applications and studies of the Earth system and its changes via a set of geophysical and environmental parameters. The quality of MODIS and VIIRS science and environmental data products relies strongly on the calibration accuracy and stability of individual sensors, as well as their calibration consistency, especially for the data products generated using observations from sensors across different platforms. Both MODIS and VIIRS instruments carry a similar set of on-board calibrators for their on-orbit calibration. Besides, lunar observations are regularly scheduled and implemented in support of their reflective solar bands (RSB) calibration, especially their long-term stability monitoring. In this paper, we provide an overview of MODIS and VIIRS solar and lunar calibration methodologies applied for the RSB on-orbit calibration, and describe the approach developed for their calibration inter-comparisons using lunar observations, including corrections for the effects caused by differences in the relative spectral response and adopted solar spectra between individual sensors. The MODIS and VIIRS calibration inter-comparison results derived from their regularly scheduled lunar observations are presented and discussed, including associated uncertainties and a comparison with those derived using the Earth-view targets. Also discussed are remaining challenges in lunar calibration and inter-comparison for the Earth-observing sensors, as well as on-going efforts for future improvements.

Multispectral band↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗