Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Event planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Joint operations planning for space surveillance missions on the MSX satellite

The Midcourse Space Experiment (MSX) satellite, sponsored by BMDO, is intended to gather broad-band phenomenology data on missiles, plumes, naturally occurring earthlimb backgrounds and deep space backgrounds. In addition the MSX will be used to conduct functional demonstrations of space-based space surveillance. The JHU/Applied Physics Laboratory (APL), located in Laurel, MD, is the integrator and operator of the MSX satellite. APL will conduct all operations related to the MSX and is charged with the detailed operations planning required to implement all of the experiments run on the MSX except the space surveillance experiments. The non-surveillance operations are generally amenable to being defined months ahead of time and being scheduled on a monthly basis. Lincoln Laboratory, Massachusetts Institute of Technology (LL), located in Lexington, MA, is the provider of one of the principle MSX instruments, the Space-Based Visible (SBV) sensor, and the agency charged with implementing the space surveillance demonstrations on the MSX. The planning timelines for the space surveillance demonstrations are fundamentally different from those for the other experiments. They are generally amenable to being scheduled on a monthly basis, but the specific experiment sequence and pointing must be refined shortly before execution. This allocation of responsibilities to different organizations implies the need for a joint mission planning system for conducting space surveillance demonstrations. This paper details the iterative, joint planning system, based on passing responsibility for generating MSX commands for surveillance operations from APL to LL for specific scheduled operations. The joint planning system, including the generation of a budget for spacecraft resources to be used for surveillance events, has been successfully demonstrated during ground testing of the MSX and is being validated for MSX launch within the year. The planning system developed for the MSX forms a model possibly applicable to developing distributed mission planning systems for other multi-use satellites.

Stokes, Grant↗

Addressing the Need for Independence in the CSE Model

Abstract Information system security risk, defined as the product of the monetary losses associated with security incidents and the probability that they occur, is a suitable decision criterion when considering different information system architectures. Risk assessment is the widely accepted process used to understand, quantify, and document the effects of undesirable events on organizational objectives so that risk management, continuity of operations planning, and contingency planning can be performed. One technique, the Cyberspace Security Econometrics System (CSES), is a methodology for estimating security costs to stakeholders as a function of possible risk postures. In earlier works, we presented a computational infrastructure that allows an analyst to estimate the security of a system in terms of the loss that each stakeholder stands to sustain, as a result of security breakdowns. Additional work has applied CSES to specific business cases. The current state-of-the-art of CSES addresses independent events. In typical usage, analysts create matrices that capture their expert opinion, and then use those matrices to quantify costs to stakeholders. This expansion generalizes CSES to the common real-world case where events may be dependent.

99 GENERAL AND MISCELLANEOUS↗

Space Station Freedom operations planning

The Space Station Freedom program is developing an operations planning structure which assigns responsibility for planning activities to three tiers of management. The strategic level develops the policy, goals and requirements for the program over a five-year horizon. Planning at the tactical level emphasizes program integration and planning for a two-year horizon. The tactical planning process, architecture, and products have been documented and discussed with the international partners. Tactical planning includes the assignment of user and system hardware as well as significant operational events to a time increment (the period of time from the arrival of one Shuttle to the manned base to the arrival of the next). Execution-level planning emphasizes implementation, and each organization produces detailed plans, by increment, that are specific to its function.

Accola, Anne L.↗

Assembly flow simulation of a radar

A discrete event simulation model has been developed to predict the assembly flow time of a new radar product. The simulation was the key tool employed to identify flow constraints. The radar, production facility, and equipment complement were designed, arranged, and selected to provide the most manufacturable assembly possible. A goal was to reduce the assembly and testing cycle time from twenty-six weeks. A computer software simulation package (SLAM 2) was utilized as the foundation for simulating the assembly flow time. FORTRAN subroutines were incorporated into the software to deal with unique flow circumstances that were not accommodated by the software. Detailed information relating to the assembly operations was provided by a team selected from the engineering, manufacturing management, inspection, and production assembly staff. The simulation verified that it would be possible to achieve the cycle time goal of six weeks. Equipment and manpower constraints were identified during the simulation process and adjusted as required to achieve the flow with a given monthly production requirement. The simulation is being maintained as a planning tool to be used to identify constraints in the event that monthly output is increased. 'What-if' studies have been conducted to identify the cost of reducing constraints caused by increases in output requirement.

Rutherford, W. C.↗

Who Did the Ethanol Tax Credit Benefit? An Event Analysis of Subsidy Incidence

At the end of 2011, the Volumetric Ethanol Excise Tax Credit (VEETC), which had subsidized the blending of ethanol in gasoline, was allowed to expire. During its tenure, the subsidy was the subject of intense scrutiny concerning who benefited from its existence. Using commodity price data, we estimate the subsidy incidence accruing to corn farmers, ethanol producers, gasoline blenders, and gasoline consumers around the time of expiration. Our empirical approach contributes methodologically to the event studies literature by analyzing futures contract prices (as opposed to spot prices) when possible. Ultimately, we find compelling evidence that, at the date of VEETC expiration, ethanol producers captured about 25 cents of the 45 cents subsidy per gallon of ethanol blended. We find suggestive, albeit inconclusive, evidence that a portion of this benefit (about 5 cents per gallon) was passed further upstream from ethanol producers to corn farmers. Most of the remainder seems most likely to have been captured by the blenders themselves. On the petroleum side, we find no evidence that oil refiners captured any part of the subsidy. We also find no evidence that the subsidy was passed downstream to gasoline consumers in the form of lower gasoline prices.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Natural Language Processing for Text Based Event Extraction: Identifying Events of Interest Related to Worldwide State-Sponsored Civil Nuclear Power

Beginning in FY20, SRNL was funded by the National Nuclear Security Administration’s Office of Defense Nuclear Non-Proliferation Research and Development to develop a prototype natural language processing/natural language understating machine learning-based modeling and analysis pipeline to extract and forecast events of interest from massive open data sources. The working hypothesis within the approach is that contextual shifts in key words and phrases act as indicators of events of interest over time. Therefore, by identifying points in time where contextual shifts occur, events of interest can be extracted along with explicit and implicit connections of entities and activities. The development of the preliminary prototype pipeline proved successful, meriting further testing of the pipeline on more broad topical domains and in a worldwide data environment. Therefore, SRNL, in collaboration with the Sanghani Center for Artificial Intelligence and Data Analytics at Virginia Tech, have continued development with a test case of identifying events of interest related to worldwide state-sponsored civil nuclear power in open data sources. In the first year of this follow-on effort, the team has curated domain-specific data corpuses using an automated scheme and applied the modeling and analysis pipeline. This robust, focused, and efficient approach consists of an ensemble of analyses applied to time dependent word embedding models that are trained on the data corpuses. In this report, the team has demonstrated the capability of the existing pipeline (as development has continued in parallel) by exploring several specific case-studies centered around Rosatom’s international activities regarding the planning, construction, operation, and/or shutdown of nuclear reactors. A basic timeline events has been generated by manually cataloging known “milestone” events that have occurred at reactors in Turkey, Finland, Hungary, and Egypt and compared with the output of the modeling pipeline. In this approach, the team has characterized the lead time using the prototype pipeline, as well as the ability to capture relevant information, which proved 100% successful. A deep dive example of the Akkuyu reactor (Turkey) is presented that shows the breadth of information that can be captured using the approach. In this case study, events were extracted pertaining to the planning/construction of Akkuyu including protests from the population, information campaigns in response to the protests, forged regulatory documents and lawsuits, budgetary/shareholder information, geopolitical tensions, and the various construction milestones. This has demonstrated the pipeline’s utility as a research aid or real-time event extraction tool, where summary-level information and detailed text extractions from millions of articles or Tweets across long time periods can be generated with significantly less effort than current techniques.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

AdaNET Dynamic Software Inventory (DSI) prototype component acquisition plan

A component acquisition plan contains the information needed to evaluate, select, and acquire software and hardware components necessary for successful completion of the AdaNET Dynamic Software Inventory (DSI) Management System Prototype. This plan will evolve and be applicable to all phases of the DSI prototype development. Resources, budgets, schedules, and organizations related to component acquisition activities are provided. A purpose and description of a software or hardware component which is to be acquired are presented. Since this is a plan for acquisition of all components, this section is not applicable. The procurement activities and events conducted by the acquirer are described and who is responsible is identified, where the activity will be performed, and when the activities will occur for each planned procurement. Acquisition requirements describe the specific requirements and standards to be followed during component acquisition. The activities which will take place during component acquisition are described. A list of abbreviations and acronyms, and a glossary are contained.

Hanley, Lionel↗

Integrated System for Autonomous Science

The New Millennium Program Space Technology 6 Project Autonomous Sciencecraft software implements an integrated system for autonomous planning and execution of scientific, engineering, and spacecraft-coordination actions. A prior version of this software was reported in "The TechSat 21 Autonomous Sciencecraft Experiment" (NPO-30784), NASA Tech Briefs, Vol. 28, No. 3 (March 2004), page 33. This software is now in continuous use aboard the Earth Orbiter 1 (EO-1) spacecraft mission and is being adapted for use in the Mars Odyssey and Mars Exploration Rovers missions. This software enables EO-1 to detect and respond to such events of scientific interest as volcanic activity, flooding, and freezing and thawing of water. It uses classification algorithms to analyze imagery onboard to detect changes, including events of scientific interest. Detection of such events triggers acquisition of follow-up imagery. The mission-planning component of the software develops a response plan that accounts for visibility of targets and operational constraints. The plan is then executed under control by a task-execution component of the software that is capable of responding to anomalies.

Chien, Steve↗

Assessment of Critical Events Corridors through Multivariate Cascading Outages Analysis

Massive blackouts of electrical power systems in North America over the past decade has focused increasing attention upon ways to identify and simulate network events that may potentially lead to widespread network collapse. This paper summarizes a method to simulate power-system vulnerability to cascading failures to a supplied set of initiating events synonymously termed as Extreme Events. The implemented simulation method is currently confined to simulating steady state power-system response to a set of extreme events. The outlined method of simulation is meant to augment and provide a new insight into bulk power transmission network planning that at present remains mainly confined to maintaining power system security for single and double component outages under a number of projected future network operating conditions. Although one of the aims of this paper is to demonstrate the feasibility of simulating network vulnerability to cascading outages, a more important goal has been to determine vulnerable parts of the network that may potentially be strengthened in practice so as to mitigate system susceptibility to cascading failures. This paper proposes to demonstrate a systematic approach to analyze extreme events and identify vulnerable system elements that may be contributing to cascading outages. The hypothesis of critical events corridors is proposed to represent repeating sequential outages that can occur in the system for multiple initiating events. The new concept helps to identify system reinforcements that planners could engineer in order to 'break' the critical events sequences and therefore lessen the likelihood of cascading outages. This hypothesis has been successfully validated with a California power system model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Human Exploration of the Moon and Mars: Space Radiation Data, Modeling and Instrumentation Needs

On January 14, 2004 President Bush announced the Vision for Space Exploration, a program for long-term human and robotic exploration of the solar system which will include a return of humans to the moon not later than 2020, followed by human missions to Mars. Since this announcement, NASA has been developing plans and mission architectures for these human missions as well as robotic precursor missions. Among the critical needs for research and development in support of this Vision are investigations on the ionizing radiation environment and development of instrumentation to guide NASA in managing the radiation exposure of the crew during the manned missions. For mission planning, models are needed for a reference worst-case solar energetic particle event and a reference worst-case galactic cosmic ray environment. During Lunar missions it will be necessary to carefully manage the radiation exposure of the crew in real time because of the variability of the radiation environment due to solar activity. In particular, prompt warnings will be needed when large solar energetic particle events occur. Accurate predictions will also be needed of the particle flux and flux history at the moon to support critical mission management decisions. A new generation of dosimeters and radiation monitors will also be needed to accompany the crew. These instruments must return data in real time so that they can be used in the critical decisions that must be made if a large solar energetic particle event occurs. This is especially true if it occurs during a lunar excursion. A substantial radiation exposure on extended lunar missions and Mars missions comes from galactic cosmic rays. This exposure must be mitigated by radiation shielding and other measures. During Mars missions the galactic cosmic ray exposure occurs primarily during the cruse phase between the Earth and Mars. This is especially true for opposition class missions. These missions would typically last -430 days with only 30-90 days on Mars. Solar energetic particle events are less of a concern on Mars because of its greater distance from the Sun (approximately 1.5 AU) and the partial protection afforded by its atmosphere (approximately 20 grams per square centimeter). The talk will describe the current plans for future human missions to Earth orbit, the Moon and Mars. The needs for data and models of the radiation environment and radiation detectors to support these missions will be discussed.

Adams, James H.↗

SU-E-T-273: Do Task Group External Beam QA Recommendations Guarantee Accurate Treatment Plan Dose Delivery?

Purpose: AAPM task groups 40/142 have provided an invaluable set of goals for physicists designing QA programs, attempting to standardize what would otherwise likely be a highly variable phenomenon across institutions. However, with the complexity of modalities such as VMAT, we hypothesize that following these guidelines to the letter might still allow unacceptable dose discrepancies. To explore this hypothesis we simulated machines bordering on QA acceptability, and calculated the effect on patient plans. Methods: Two errant machines were simulated in Aria/Eclipse, each just within task group criteria for output, percent depth dose, beam profile, gantry and collimator rotations, and jaw and MLC positions. One machine minimized dose to the PTV (machine A) and the other maximized dose to the OARs (machine B). Clinical treatment plans (3-phase prostate, n=3; hypofractionated lung, n=1) were calculated on these machines and the dose distributions compared. A prostate case was examined for contribution of error sources and evaluated using delivery QA data. Results: The prostate plans showed mean decreases in target D95 of 9.9% of prescription dose on machine A. On machine B, The rectal and bladder V70Gy each increased by 7.1 percentage points, while their V45Gy increased by 16.2% and 15.0% respectively. In the lung plan, the target D95 decreased by 12.8% and the bronchial tree Dmax increased by 21% of prescription dose, on machines A and B. One prostate plan showed target dose errors of 3.8% from MLC changes, 2% from output, ∼3% from energy and ∼0.5% from other factors. This plan achieved an 88.4% gamma passing rate using 3%/3mm using ArcCHECK. Conclusion: In the unlikely event that a machine exhibits all maximum errors allowed by TG 40/142, unacceptably large changes in dose delivered are possible especially in highly modulated VMAT plans, despite the machine passing routine QA.

60 APPLIED LIFE SCIENCES↗

Autonomous Medical Care for Exploration

The goal of Autonomous Medical Care (AMC) is to ensure a healthy, well-performing crew which is a primary need for exploration. The end result of this effort will be the requirements and design for medical systems for the CEV, lunar operations, and Martian operations as well as a ground-based crew health optimization plan. Without such systems, we increase the risk of medical events occurring during a mission and we risk being unable to deal with contingencies of illness and injury, potentially threatening mission success. AMC has two major components: 1) pre-flight crew health optimization and 2) in-flight medical care. The goal of pre-flight crew health optimization is to reduce the risk of illness occurring during a mission by primary prevention and prophylactic measures. In-flight autonomous medical care is the capability to provide medical care during a mission with little or no real-time support from Earth. Crew medical officers or other crew members provide routine medical care as well as medical care to ill or injured crew members using resources available in their location. Ground support becomes telemedical consultation on-board systems/people collect relevant data for ground support to review. The AMC system provides capabilities to incorporate new procedures and training and advice as required. The on-board resources in an autonomous system should be as intelligent and integrated as is feasible, but autonomous does not mean that no human will be involved. The medical field is changing rapidly, and so a challenge is to determine which items to pursue now, which to leverage other efforts (e.g. military), and which to wait for commercial forces to mature. Given that what is used for the CEV or the Moon will likely be updated before going to Mars, a critical piece of the system design will be an architecture that provides for easy incorporation of new technologies into the system. Another challenge is to determine the level of care to provide for each mission type. The level of care refers to the amount and type of care one will render based on perceived need and ability. This is in contrast to the standard of care which is the benchmark by which that care is provided. There are certainly some devices and procedures that have unique microgravity or partial gravity requirements such that terrestrial methods will not work. For example, performing CPR on Mars cannot be done in exactly the same way as on Earth because the reduced gravity causes too large a reduction in the forces available for effective compression of the chest. Likewise, fluid behavior in microgravity may require a specialized water filtration and mixing system for the creation of intravenous fluids. This paper will outline the drivers for the design of the medical care systems, prioritization and planning techniques, key system components, and long term goals.

Johnson-Throop, Kathy A.↗

Soil Sample Plan in Support of the Site 300 Explosives Waste Treatment Facility Ecological Risk Assessment Pursuant to the Hazardous Waste Facility Permit, Part V, Special Condition #14 a-f. August 2020

The Department of Toxic Substances Control issued the Final Hazardous Waste Facility Permit to Lawrence Livermore National Laboratory, Site 300 in 2017. As part of the continual process to ensure waste treatment emissions are not impacting ecological receptors, LLNL analyzed soil samples in the vicinity of the Explosive Waste Treatment Facility (EWTF) Burn Units (i.e., Burn Cage and Burn Pan) and the Detonation Pad. Soil samples were analyzed by EPA Solid Waste 846 Methods for furans, explosives, metals, and semivolatile compounds. In all samples, furans, explosives, and semi-volatile organic compounds were not detected. Metals were detected at concentrations below background levels. This soil sample plan will sample the same four downwind areas of the Burn Units and the same downwind areas of the Detonation, as well as including four new sample locations. The four new locations will be located to the northeast and southwest of the Burn Units and Detonation (as shown in Figure 3). The constituents to be analyzed are in Tables 2 and 3. Perchlorate was not identified as a constituent of concern in the 2007 Soil Sampling Plan. However, for this plan, all soil samples will be analyzed for perchlorate. After completion of the sampling event, a soil sample report will be submitted to DTSC in accordance with requirements specified in the Hazardous Waste Facility Permit, Part V, Special Conditions 16 a-f. This proposed soil sampling plan will be fully implemented no later than one year after receiving DTSC approval, in accordance with the Hazardous Waste Facility Permit, Part V, Special Condition 15.

54 ENVIRONMENTAL SCIENCES↗

Shuttle free-flying teleoperator system experiment definition. Volume 3: program development requirements

The planning data are presented for subsequent phases of free-flying teleoperator program (FFTO) and includes costs, schedules and supporting research and technology activities required to implement the free-flying teleoperator system and associated flight equipment. The purpose of the data presented is to provide NASA with the information needed to continue development of the FFTO and integrate it into the space shuttle program. The planning data describes three major program phases consisting of activities and events scheduled to effect integrated design, development, fabrication and operation of an FFTO system. Phase A, Concept Generation, represents a study effort directed toward generating and evaluating a number of feasible FFTO experiment system concepts. Phase B, Definition, will include preliminary design and supporting analysis of the FFTO, the shuttle based equipment and ground support equipment. Phase C/D, Design, Development and Operations will include detail design of the operational FFTO, its integration into the space shuttle, hardware fabrication and testing, delivery of flight hardware and support of flight operations. Emphasis is placed on the planning for Phases A and B since these studies will be implemented early in the development cycle. Phase C/D planning is more general and subject to refinement during the definition phase.

Source record↗

Climate science to inform adaptation policy: Heat waves over India in the 1.5°C and 2°C warmer worlds

Developing a better scientific understanding of anthropogenic climate change and climate variability, especially the prediction/projection of climate futures with useful temporal and geographical resolution and quantified uncertainties, and using that knowledge to inform adaptation planning and action will become crucially important in the coming years. Generating such policy-relevant knowledge may be particularly important for developing countries such as India. It is with this backdrop that, in this paper, we analyze future heat waves in India by using observations and a large number of model simulations of historical, + 1.5 °C, and + 2.0 °C warmer worlds. In both the future scenarios, there is an increased probability of heat waves during June and July when the Indian monsoon is in full swing and humidity is high, which makes the heat events even more of a health risk. While the highest temperatures in heat waves may not increase much in future climates, the duration and areal extent of the heat waves will most likely increase, leading to the emergence of new heat wave-prone zones in India. The results indicate that the joint frequencies of the longest duration and large area events could be nearly threefold greater in the + 1.5 °C and fivefold greater in the + 2.0 °C future scenarios compared to historical simulations. Thus, overall, the study indicates a substantial increase in the risk of heat events that typically elicit warnings from forecasters. The likely widespread and persistent nature of heat wave events in the future, as revealed by this study, will require planning and adaptation measures beyond the short-term disaster planning frameworks currently in place. Exploring what these measures might look like is beyond the scope of this study, but it underlines the importance of developing climate knowledge with high temporal and geographical resolution capable of informing adaptation policy and planning.

+1.5 °C and +2.0 °C↗

Targeting safety improvements through identification of incident origination and detection in a near-miss incident learning system

Purpose: Radiation treatment planning involves a complex workflow that has multiple potential points of vulnerability. This study utilizes an incident reporting system to identify the origination and detection points of near-miss errors, in order to guide their departmental safety improvement efforts. Previous studies have examined where errors arise, but not where they are detected or applied a near-miss risk index (NMRI) to gauge severity. Methods: From 3/2012 to 3/2014, 1897 incidents were analyzed from a departmental incident learning system. All incidents were prospectively reviewed weekly by a multidisciplinary team and assigned a NMRI score ranging from 0 to 4 reflecting potential harm to the patient (no potential harm to potential critical harm). Incidents were classified by point of incident origination and detection based on a 103-step workflow. The individual steps were divided among nine broad workflow categories (patient assessment, imaging for radiation therapy (RT) planning, treatment planning, pretreatment plan review, treatment delivery, on-treatment quality management, post-treatment completion, equipment/software quality management, and other). The average NMRI scores of incidents originating or detected within each broad workflow area were calculated. Additionally, out of 103 individual process steps, 35 were classified as safety barriers, the process steps whose primary function is to catch errors. The safety barriers which most frequently detected incidents were identified and analyzed. Finally, the distance between event origination and detection was explored by grouping events by the number of broad workflow area events passed through before detection, and average NMRI scores were compared. Results: Near-miss incidents most commonly originated within treatment planning (33%). However, the incidents with the highest average NMRI scores originated during imaging for RT planning (NMRI = 2.0, average NMRI of all events = 1.5), specifically during the documentation of patient positioning and localization of the patient. Incidents were most frequently detected during treatment delivery (30%), and incidents identified at this point also had higher severity scores than other workflow areas (NMRI = 1.6). Incidents identified during on-treatment quality management were also more severe (NMRI = 1.7), and the specific process steps of reviewing portal and CBCT images tended to catch highest-severity incidents. On average, safety barriers caught 46% of all incidents, most frequently at physics chart review, therapist’s chart check, and the review of portal images; however, most of the incidents that pass through a particular safety barrier are not designed to be capable of being captured at that barrier. Conclusions: Incident learning systems can be used to assess the most common points of error origination and detection in radiation oncology. This can help tailor safety improvement efforts and target the highest impact portions of the workflow. The most severe near-miss events tend to originate during simulation, with the most severe near-miss events detected at the time of patient treatment. Safety barriers can be improved to allow earlier detection of near-miss events.

60 APPLIED LIFE SCIENCES↗

Initial Report of a Prospective Dosimetric and Clinical Feasibility Trial Demonstrates the Potential of Protons to Increase the Therapeutic Ratio in Breast Cancer Compared With Photons

Purpose: To compare dosimetric endpoints between proton therapy (PT) and conventional radiation and determine the feasibility of PT for regional nodal irradiation (RNI) in women with breast cancer. Methods and Materials: From 2012 to 2014, 18 women (stage IIA-IIIB) requiring RNI prospectively enrolled on a pilot study. Median age was 51.8 years (range, 42-73 years). The cohort included breast-conserving therapy (BCT) and mastectomy patients and right- and left-sided cancers. Treatment targets and organs at risk were delineated on computed tomography scans, and PT and conventional plans were developed. Toxicity was prospectively recorded using Common Terminology Criteria for Adverse Events version 4.0. A Wilcoxon signed-rank sum test compared the dose-volume parameters. The primary endpoint was a reduction in cardiac V5. Results: Median follow-up was 20 months (range, 2-31 months). For all patients, the PT plan better met the dosimetric goals and was used for treatment. Proton therapy alone was used for 10 patients (9 postmastectomy, 1 after BCT) and combined proton–photon in 8 (6 BCT, 2 postmastectomy with immediate expander reconstruction). Proton therapy improved coverage of level 2 axilla (P=.0005). Adequate coverage of internal mammary nodes was consistently achieved with PT (median D95, 50.3 Gy; range, 46.6-52.1 Gy) but not with conventional radiation therapy (median D95, 48.2 Gy; range, 40.8-55 Gy; P=.0005). Median cardiac V5 was 0.6% with PT and 16.3% with conventional radiation (P<.0001). Median ipsilateral lung V5 and V20 were improved with PT (median V5 35.3% vs 60.5% [P<.0001]; and median V20, 21.6% vs 35.5% [P<.0001]). Grade 3 dermatitis developed in 4 patients (22%), which was the only grade 3 toxicity. No grade 4+ toxicities developed. Conclusion: Proton therapy for RNI after mastectomy or BCT significantly improves cardiac dose, especially for left-sided patients, and lung V5 and V20 in all patients without excessive acute toxicity. Proton therapy simultaneously improves target coverage for the internal mammary nodes and level 2 axilla, which may positively impact long-term survival in breast cancer patients.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Developing health-based pre-planning clearance goals for airport remediation following a chemical terrorist attack: Decision criteria for multipathway exposure routes

In the event of a chemical terrorist attack on a transportation hub, post-event remediation and restoration activities necessary to attain unrestricted facility re-use and re-entry could require hours to multiple days. While timeframes are dependent on numerous variables, a primary controlling factor is the level of pre-planning and decision-making completed prior to chemical release. What follows is the second of a two-part analysis identifying key considerations, critical information and decision criteria to facilitate post-attack and post-decontamination consequence management activities. Decision criteria analysis presented here provides first-time, open-literature documentation of multi-pathway, health-based remediation exposure guidelines for selected toxic industrial compounds, chemical warfare agents, and agent degradation products for pre-planning application in anticipation of a chemical terrorist attack. Guideline values are provided for inhalation and direct ocular vapor exposure routes as well as percutaneous vapor, surface contact, and ingestion. Target populations include various employees as well as transit passengers. This work has been performed as a national case study conducted in partnership with the Los Angeles International Airport and The Bradley International Terminal. All recommended guidelines have been selected for consistency with airport scenario release parameters of a one-time, short-duration, finite airborne release from a single source followed by compound-specific decontamination.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗