Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Engineering Design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Liquid metal walls

Here, the plasma performance of fusion devices depends strongly on the chosen wall materials. Solid plasma-facing components (PFCs) are predominantly used in present devices, and are the most investigated candidates for fusion designs. High-Z materials such as tungsten (W) are the leading solid PFC material candidates. To date, a material choice that scales to steady-state reactor conditions has not been identified. Moreover, if plasma transient events such as edge-localized modes and disruptions cannot be altogether avoided or sufficiently mitigated, the projected peak heat and particle loads far exceed the power exhaust capabilities of solids. Liquid metal (LM) PFCs represent an intrinsic self-healing boundary that are both resilient to surface damage from transients, and that could handle high steady-state heat and particle fluxes. Flowing LM PFCs can be designed to remove “slag,” the buildup of material erosion due to plasma-material interactions, including charge exchange sputtering in the main chamber. Further, LM offer the prospect to manage hydrogenic species otherwise retained in the PFCs, which is important from a safety and inventory standpoint. The two most promising LMs are lithium (Li) and tin (Sn), although Sn–Li eutectics may be considered. While Sn offers a higher temperature window with low vapor pressure and low hydrogen retention, Li offers the prospect of enhanced energy confinement and higher acceptable core contamination limits, and this section focuses on Li PFCs. An LM PFC development research program developed LM PFC concepts for a nuclear fusion device via engineering design calculations, single-effect experiments, and staged prototypical experiments. A self-consistent design window was identified with liquid Li flow speeds ~5–10 m/s; plasma contamination was negligible for predicted Li evolution rates. While these preconceptual designs hold promise, there is substantial R&D needed to advance the technical readiness levels of LM PFCs for application to fusion power plants.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Controlling the distribution of microbially induced calcite precipitation in the subsurface

Microbially induced calcite precipitation (MICP) has gained interest as an environmentally friendly method for a number of subsurface applications, including consolidation of granular materials, modification of permeability, metal and radionuclide immobilization, self-healing of concrete, etc. MICP relies on microorganisms that when provided with appropriate nutrients create chemical conditions conducive to calcite precipitation. A major challenge is controlling and predicting spatial distribution of precipitates, whether the target be uniform or nonuniform (e.g., in specific strata or locations) deposition. The spatial distribution depends on calcite precipitation kinetics, the kinetics of the biological and chemical reactions that generate the required Ca2+ and carbonate, locations and phase association of the microbial catalyst, and timing of the arrival of amendments introduced into the medium; the latter depends on hydraulic boundary conditions and medium properties (porosity, permeability). We present results from a field experiment where we sought to induce uniform precipitation relying only on indigenous microorganisms and calcium within an approximately 3 meter thick saturated zone between two wells located 4 meters apart. We employed a continuous recirculation design; water extracted from the downgradient well was amended with urea and molasses and re-injected into the upgradient well for 12 days and the aqueous chemistry and microbiology was monitored for 419 days. Measurements of substrates and products, and isotopic data for DIC all indicated desired reactions were stimulated within the zone and downstream, during active recirculation and afterward. The results could be reasonably simulated by postulating that the recirculation resulted in homogeneous aqueous geochemistry within the entire zone, that a metabolic lag time persisted during the recirculation period, and that native ureolytic microorganisms were all attached.While alternative scenarios cannot be ruled out, the data and model support that spatial distribution of urolytic calcite precipitation can be manipulated by engineering design, although still constrained by site hydrogeology.

58 GEOSCIENCES↗

FY25 Ion Exchange Processing for the West Area Risk Management (WARM) Project

The West Area Risk Management (WARM) Project was established to enable near-term retrieval and pretreatment of tank waste from Hanford’s 200 West Area and to support deployment of an ion exchange (IX) system capable of producing cesium-depleted supernate suitable for offsite treatment and disposal. The WARM experimental campaign was designed to provide key data for design and operational planning of the 200 W IX system, which plans to utilize crystalline silicotitanate (CST) as the active media for cesium removal. This report documents a comprehensive FY25 experimental campaign designed to produce key technical data required for design and operational planning of the WARM IX system. Testing includes assessing Cs and Sr breakthrough performance in a 4-column system, Cs capacity batch contact testing, phosphate precipitation assessments, reduced-hydroxide feed displacement evaluation, and Sr speciation impacts on Sr removal. The experimental results provide detailed trends in Cs and Sr loading behavior, breakthrough performance across a 4-column staged IX system, distribution profiles within CST beds, and projections of operational flowrates relative to Waste Acceptance Criteria (WAC) limits. Batch contact testing established equilibrium partitioning behavior for the S1–S5 simulants and characterized how matrix chemistry influenced Cs sorption onto CST. Additionally, further evaluations on waste matrix as it pertains to precipitation potential were also determined. Collectively, these datasets support engineering design choices for WARM system throughput and pretreatment planning.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DASSH-F: Subchannel Based Thermal Analysis

The DASSH thermal analysis code is designed to rapidly allow a reactor design engineer to obtain flow rates requirements that satisfy peak temperature constraints in the domain. The advantage of using DASSH over a hand calculation is that it has a more rigorous treatment of the pin power distribution and coolant heat transfer within an assembly and between assemblies. The advantage of using DASSH over a conventional 3D subchannel code or a computational fluid dynamics code (CFD) is that it can obtain the desired solution in a matter of minutes in serial with minor computer memory needs. The DASSH methodology is virtually identical to SUPERENERGY-2 with additional functionalities taken from follow on work to SUPERENERGY-2 done at ANL in the 1980s. DASSH today is an integral component of the Argonne Fast Reactor analysis suite for reactor design work. DASSH obtains the power distribution from a coupled neutron-gamma heating calculation in GAMSOR (including DIF3D) at each time point of a companion fuel cycle analysis calculation with REBUS. The domain in DASSH assumes a hexagonal grid typical for fast reactors with much of the geometry information taken from the DIF3D model. DASSH assumes the assemblies that are loaded into each grid position are ducted to control the coolant flow. Considerable detail is given on the subchannel formulation of DASSH in this document. Much of the formulation and design of the code builds upon research done by previous authors with little new investigation. Thus the decisions made in developing the subchannel model used in DASSH have their origins over 50 years ago. Much of the heat transfer methodology in DASSH is built upon correlations for both the coolant mixing and heat transfer coefficients for pins and ducts. DASSH is thus not a rigorous treatment of a given problem, but a rapid assessment of the temperature field that has known limitations with respect to an experimental measurement or CFD calculation. The DASSH input and output are detailed along with usage of the software. The DASSH output provides tables of evaluated material properties and key coolant and pin temperature results. DASSH can create Python scripts that generate domain summary pictures. DASSH can also generate assembly temperature maps and VTK output files which allow the DASSH solution to be visualized. As the primary purpose of the DASSH software is to compute the coolant and fuel pin temperature distribution for a given model of a reactor, much of the output focus is giving the user quick summary tables needed to assess the performance of a given orifice flow specification. The present version of DASSH has a crude orifice search capability and an efficient orifice flow search capability. The flow search tries to meet user specified constraints for 1) peak 2-sigma clad midwall temperature, 2) peak coolant temperature, and 3) desired bulk outlet temperature. There are many development shortcomings in DASSH detailed in this document, but this version is functional for modern analysis needs. This document serves as the manual for the Fortran based DASSH software that was developed to replace the Python version of DASSH developed as part of the VTR program.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The in-silico lab-on-a-chip: petascale and high-throughput simulations of microfluidics at cell resolution

We present simulations of blood and cancer cell separation in complex microfluidic channels with subcellular resolution, demonstrating unprecedented time to solution, performing at 65.5% of the available 39.4 PetaInstructions/s in the 18, 688 nodes of the Titan supercomputer. These simulations outperform by one to three orders of magnitude the current state of the art in terms of numbers of simulated cells and computational elements. The computational setup emulates the conditions and the geometric complexity of microfluidic experiments and our results reproduce the experimental findings. These simulations provide sub-micron resolution while accessing time scales relevant to engineering designs. We demonstrate an improvement of up to 45X over competing state-of-the-art solvers, thus establishing the frontiers of simulations by particle based methods. Our simulations redefine the role of computational science for the development of microfluidics –- a technology that is becoming as important to medicine as integrated circuits have been to computers.

Computer Science↗

DASSH-F: Subchannel Based Thermal Analysis

The DASSH thermal analysis code is designed to rapidly allow a reactor design engineer to obtain flow rates requirements that satisfy peak temperature constraints in the domain. The advantage of using DASSH over a hand calculation is that it has a more rigorous treatment of the pin power distribution and coolant heat transfer within an assembly and between assemblies. The advantage of using DASSH over a conventional 3D subchannel code or a computational fluid dynamics code (CFD) is that it can obtain the desired solution in a matter of minutes in serial with minor computer memory needs. The DASSH methodology for pin lattice models is virtually identical to SUPERENERGY-2 with additional functionalities taken from follow on work to SUPERENERGY-2 done at ANL in the 1980s. DASSH today is an integral component of the Argonne Fast Reactor analysis suite for reactor design work. DASSH obtains the power distribution from a coupled neutron-gamma heating calculation in GAMSOR (including DIF3D) at each time point of a companion fuel cycle analysis calculation with REBUS. The domain in DASSH assumes a hexagonal grid typical for fast reactors with much of the geometry information taken from the DIF3D model. DASSH assumes the assemblies that are loaded into each grid position are ducted to control the coolant flow. The user can alternatively provide their own geometry and power profile instead of inheriting it from DIF3D. Considerable detail is given on the subchannel formulation of DASSH in this document. Much of the formulation and design of the code builds upon research done by previous authors with little new investigation. Thus the decisions made in developing the subchannel model used in DASSH have their origins over 50 years ago. Much of the heat transfer methodology in DASSH is built upon correlations for both the coolant mixing and heat transfer coefficients for pins and ducts. DASSH is thus not a rigorous treatment of a given problem, but a rapid assessment of the temperature field that has known limitations with respect to an experimental measurement or CFD calculation. The DASSH input and output are detailed along with usage of the software. The DASSH output provides tables of evaluated material properties and key coolant and pin temperature results. DASSH can create Python scripts that generate domain summary pictures. DASSH can also generate assembly temperature maps and VTK output files which allow the DASSH solution to be visualized. As the primary purpose of the DASSH software is to compute the coolant and fuel pin temperature distribution for a given model of a reactor, much of the output focus is giving the user quick summary tables needed to assess the performance of a given orifice flow specification. The present version of DASSH has a crude orifice search capability and a sufficient orifice flow search capability. The flow search tries to meet user specified constraints for 1) peak 2-sigma clad temperature, 2) peak coolant temperature, and 3) desired bulk outlet temperature. This document serves as the manual for the Fortran based DASSH software that was developed to replace the Python version of DASSH developed as part of the VTR program.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Stand-Alone Dynamic System Simulation of a Fissile Solution System

Dynamic system simulations (DSS) of fissile solution systems (FSS) have been performed at Los Alamos National Laboratory (LANL) for several years. DSS have been designed and executed using the DESIRE (Direct Executing Simulation in Real Time) system, a platform ideal for expert system modelers, as it allows for direct mathematical specification of a model, and facilities for performing experiments and analyses with the model. Models built in DESIRE have been compared to historical data from several historic aqueous homogeneous reactors (AHR) showing close agreement between experimental data and model estimates. Historical systems modeled include: SUPO (Super Power), an AHR that operated at Los Alamos National Laboratory from 1951 to 1974; SILENE, which was operated by CEA at Valduc, France until 2011; KEWB (Kinetics Experiment Water Boiler) A-2 and B-5 cores, operated by North American Atomics during the 1960’s and 1970’s. SUPO is considered a benchmark for steady-state operations, SILENE for pulse, and KEWB as confirmatory for both modes. However, there are some simulation tasks that are not well-suited to DESIRE model implementation. These tasks include engineering design and analysis and providing a hardware simulator backend. It has been determined that executable simulation models would better suit these purposes, hence a process for converting DESIRE simulation models to executable simulation models was designed and implemented, and several models have been converted. DESIRE simulation models are converted to C++ executable models by an automated process. The conversion process is quick, accurate and repeatable, giving confidence that converted models will perform as well as the original DESIRE models. Extensive testing on the SUPO and accelerator driven subcritical system models has shown that the executable models perform almost identically to the DESIRE models. All major trends and events are simulated with excellent agreement and the steady-state results typically agree within a small fraction of a percent (always better than 0.1% and generally better than 0.01% agreement).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

High-Luminosity Large Hadron Collider (HL-LHC) : Preliminary Design Report

The Large Hadron Collider (LHC) is one of the largest scientific instruments ever built. Since opening up a new energy frontier for exploration in 2010, it has gathered a global user community of about 7,000 scientists working in fundamental particle physics and the physics of hadronic matter at extreme temperature and density. To sustain and extend its discovery potential, the LHC will need a major upgrade in the 2020s. This will increase its luminosity (rate of collisions) by a factor of five beyond the original design value and the integrated luminosity (total collisions created) by a factor ten. The LHC is already a highly complex and exquisitely optimised machine so this upgrade must be carefully conceived and will require about ten years to implement. The new configuration, known as High Luminosity LHC (HL-LHC), will rely on a number of key innovations that push accelerator technology beyond its present limits. Among these are cutting-edge 11-12 tesla superconducting magnets, compact superconducting cavities for beam rotation with ultra-precise phase control, new technology and physical processes for beam collimation and 300 metre-long high-power superconducting links with negligible energy dissipation. The present document describes the technologies and components that will be used to realise the project and is intended to serve as the basis for the detailed engineering design of HL-LHC.

43 PARTICLE ACCELERATORS↗

Collimation System

Chapter 5 in High-Luminosity Large Hadron Collider (HL-LHC) : Preliminary Design Report. The Large Hadron Collider (LHC) is one of the largest scientific instruments ever built. Since opening up a new energy frontier for exploration in 2010, it has gathered a global user community of about 7,000 scientists working in fundamental particle physics and the physics of hadronic matter at extreme temperature and density. To sustain and extend its discovery potential, the LHC will need a major upgrade in the 2020s. This will increase its luminosity (rate of collisions) by a factor of five beyond the original design value and the integrated luminosity (total collisions created) by a factor ten. The LHC is already a highly complex and exquisitely optimised machine so this upgrade must be carefully conceived and will require about ten years to implement. The new configuration, known as High Luminosity LHC (HL-LHC), will rely on a number of key innovations that push accelerator technology beyond its present limits. Among these are cutting-edge 11-12 tesla superconducting magnets, compact superconducting cavities for beam rotation with ultra-precise phase control, new technology and physical processes for beam collimation and 300 metre-long high-power superconducting links with negligible energy dissipation. The present document describes the technologies and components that will be used to realise the project and is intended to serve as the basis for the detailed engineering design of HL-LHC.

43 PARTICLE ACCELERATORS↗

Energy Deposition and Radiation to Electronics

Chapter 10 in High-Luminosity Large Hadron Collider (HL-LHC) : Preliminary Design Report. The Large Hadron Collider (LHC) is one of the largest scientific instruments ever built. Since opening up a new energy frontier for exploration in 2010, it has gathered a global user community of about 7,000 scientists working in fundamental particle physics and the physics of hadronic matter at extreme temperature and density. To sustain and extend its discovery potential, the LHC will need a major upgrade in the 2020s. This will increase its luminosity (rate of collisions) by a factor of five beyond the original design value and the integrated luminosity (total collisions created) by a factor ten. The LHC is already a highly complex and exquisitely optimised machine so this upgrade must be carefully conceived and will require about ten years to implement. The new configuration, known as High Luminosity LHC (HL-LHC), will rely on a number of key innovations that push accelerator technology beyond its present limits. Among these are cutting-edge 11-12 tesla superconducting magnets, compact superconducting cavities for beam rotation with ultra-precise phase control, new technology and physical processes for beam collimation and 300 metre-long high-power superconducting links with negligible energy dissipation. The present document describes the technologies and components that will be used to realise the project and is intended to serve as the basis for the detailed engineering design of HL-LHC.

43 PARTICLE ACCELERATORS↗

11 T Dipole for the Dispersion Suppressor Collimators

Chapter 11 in High-Luminosity Large Hadron Collider (HL-LHC) : Preliminary Design Report. The Large Hadron Collider (LHC) is one of the largest scientific instruments ever built. Since opening up a new energy frontier for exploration in 2010, it has gathered a global user community of about 7,000 scientists working in fundamental particle physics and the physics of hadronic matter at extreme temperature and density. To sustain and extend its discovery potential, the LHC will need a major upgrade in the 2020s. This will increase its luminosity (rate of collisions) by a factor of five beyond the original design value and the integrated luminosity (total collisions created) by a factor ten. The LHC is already a highly complex and exquisitely optimised machine so this upgrade must be carefully conceived and will require about ten years to implement. The new configuration, known as High Luminosity LHC (HL-LHC), will rely on a number of key innovations that push accelerator technology beyond its present limits. Among these are cutting-edge 11-12 tesla superconducting magnets, compact superconducting cavities for beam rotation with ultra-precise phase control, new technology and physical processes for beam collimation and 300 metre-long high-power superconducting links with negligible energy dissipation. The present document describes the technologies and components that will be used to realise the project and is intended to serve as the basis for the detailed engineering design of HL-LHC.

43 PARTICLE ACCELERATORS↗

Machine Layout and Performance

Chapter 2 in High-Luminosity Large Hadron Collider (HL-LHC) : Preliminary Design Report. The Large Hadron Collider (LHC) is one of the largest scientific instruments ever built. Since opening up a new energy frontier for exploration in 2010, it has gathered a global user community of about 7,000 scientists working in fundamental particle physics and the physics of hadronic matter at extreme temperature and density. To sustain and extend its discovery potential, the LHC will need a major upgrade in the 2020s. This will increase its luminosity (rate of collisions) by a factor of five beyond the original design value and the integrated luminosity (total collisions created) by a factor ten. The LHC is already a highly complex and exquisitely optimised machine so this upgrade must be carefully conceived and will require about ten years to implement. The new configuration, known as High Luminosity LHC (HL-LHC), will rely on a number of key innovations that push accelerator technology beyond its present limits. Among these are cutting-edge 11-12 tesla superconducting magnets, compact superconducting cavities for beam rotation with ultra-precise phase control, new technology and physical processes for beam collimation and 300 metre-long high-power superconducting links with negligible energy dissipation. The present document describes the technologies and components that will be used to realise the project and is intended to serve as the basis for the detailed engineering design of HL-LHC.

43 PARTICLE ACCELERATORS↗

RF Systems

Chapter 4 in High-Luminosity Large Hadron Collider (HL-LHC). The Large Hadron Collider (LHC) is one of the largest scientific instruments ever built. Since opening up a new energy frontier for exploration in 2010, it has gathered a global user community of about 7,000 scientists working in fundamental particle physics and the physics of hadronic matter at extreme temperature and density. To sustain and extend its discovery potential, the LHC will need a major upgrade in the 2020s. This will increase its luminosity (rate of collisions) by a factor of five beyond the original design value and the integrated luminosity (total collisions created) by a factor ten. The LHC is already a highly complex and exquisitely optimised machine so this upgrade must be carefully conceived and will require about ten years to implement. The new configuration, known as High Luminosity LHC (HL-LHC), will rely on a number of key innovations that push accelerator technology beyond its present limits. Among these are cutting-edge 11-12 tesla superconducting magnets, compact superconducting cavities for beam rotation with ultra-precise phase control, new technology and physical processes for beam collimation and 300 metre-long high-power superconducting links with negligible energy dissipation. The present document describes the technologies and components that will be used to realise the project and is intended to serve as the basis for the detailed engineering design of HL-LHC.

43 PARTICLE ACCELERATORS↗

High-Luminosity Large Hadron Collider (HL-LHC). Technical Design Report V. 0.1

The Large Hadron Collider (LHC) is one of the largest scientific instruments ever built. Since opening up a new energy frontier for exploration in 2010, it has gathered a global user community of about 7,000 scientists working in fundamental particle physics and the physics of hadronic matter at extreme temperature and density. To sustain and extend its discovery potential, the LHC will need a major upgrade in the 2020s. This will increase its instantaneous luminosity (rate of collisions) by a factor of five beyond the original design value and the integrated luminosity (total collisions created) by a factor ten. The LHC is already a highly complex and exquisitely optimised machine so this upgrade must be carefully conceived and will require about ten years to implement. The new configuration, known as High Luminosity LHC (HL-LHC), relies on a number of key innovations that push accelerator technology beyond its present limits. Among these are cutting-edge 11-12 tesla superconducting mag-nets, compact superconducting cavities for beam rotation with ultra-precise phase control, new technology and physical processes for beam collimation and 100 metre-long high-power superconducting links with negligible energy dissipation. The present document describes the technologies and components that will be used to realise the project and is intended to serve as the basis for the detailed engineering design of HL-LHC.

43 PARTICLE ACCELERATORS↗

Enabling Production of Low Carbon Emissions Steel through CO 2 Capture from Blast Furnace Gases at Cleveland Cliffs’ 5 mtpa Steel Plant at Burns Harbor, Indiana

Dastur International Inc. has prepared a DOE-funded Pre-front-end engineering design (Pre-FEED) study to capture up to 2.8 mtpa of CO 2 from the available Blast Furnace (BF) gases at the Burns Harbor steel plant operated by Cleveland Cliffs in Burns Harbor, Indiana. The project consists of an amine solvent based pre-combustion carbon capture system, along with a unique BF gas conditioning process which significantly optimizes the project design and architecture in terms of higher volumes (2.8 mtpa vis-à-vis 1.6 mtpa without conditioning) & concentration (32 vol% in conditioned gas vs. 22% in raw BF gas) of CO 2 , which can be captured using a single train, resulting in reduced size and capital cost of the CO 2 capture island, and improved overall economics on a $\$$/tCO 2 captured basis.

42 ENGINEERING↗

Pilot Test of Novel Electrochemical Membrane System for Carbon Dioxide Capture and Power Generation (Final Report)

The goal of this U.S. Department of Energy (DOE) sponsored project under cooperative agreement DE-FE0026580 is to verify that Fuel Cell Energy’s (FCE) Electrochemical Membrane (ECM)-based Combined Electric Power and Carbon Separation (CEPACS) system can achieve at least 90% carbon dioxide (CO 2 ) capture rate from Pulverized Coal (PC) power plant flue gas with 95% CO2 purity at a cost of electricity (COE) 30% less than baseline CO 2 capture approaches. To progress towards the DOE’s ultimate carbon capture program goals, the specific objectives of Budget Period 1 (BP1) of the project are to perform a preliminary Techno-Economic Analysis (TEA) and Environmental, Health and Safety (EH&S) Risk Assessment study, as well as to complete the detailed design of a pilot-scale ECM-based CEPACS system. This final technical report summarizes the results of the preliminary TEA and EH&S assessment of an ECM-based CEPACS system designed to capture and compress >90% of CO 2 from the flue gas of a reference 550 MW (net AC) Pulverized Coal (PC) Supercritical Steam Cycle Plant. Also included in this report is a summary of the detailed design for a pilot 3 MWe (flue gas equivalent) ECM-based CEPACS system designed to capture ≥90% of CO 2 from a PC plant flue gas slipstream and produce high-purity (≥95%) CO 2 . The pilot system is designed to process a slipstream of flue gas from the Unit 5 coal-fired boiler at the James M. Barry Electric Generating Station (Plant Barry). Plant Barry is located in Bucks, Alabama and is owned and operated by Alabama Power Company, a subsidiary of Southern Company. The TEA shows that the ECM-based CO 2 capture technology has an economic advantage over the existing CO 2 capture technology and meets the DOE’s cost target and performance goals for post-combustion CO 2 capture. The EH&S study includes the identification and quantification of the emissions from the CEPACS system. Properties of the waste including reactivity, flammability, corrosivity and toxicological effects are discussed along with the methods for minimization/elimination where applicable. The study shows that no major EH&S issues are expected to hinder commercialization of the ECM technology for large scale carbon capture applications. The detailed Front End Engineering Design (FEED) package for FCE’s MW-class ECM-based CO 2 capture pilot system is complete. It is designed in accordance with the project objectives and is now at a point where equipment/component procurement, skid final design and fabrication, and site preparation activities can begin in a follow-on project phase.

20 FOSSIL-FUELED POWER PLANTS↗

Assessing and Enabling Trustworthy Predictions for High-Consequence Decisions

Predictions from physics-based computational models provide critical information to inform high consequence decisions, e.g., engineering design decisions. The ability to assess the reliability of such predictions is therefore critical. However, to date, reliability assessment rely heavily on expert judgment and qualitative arguments. This report details the efforts of LDRD 233072 to develop quantitative methods to assess reliability of model predictions, especially in the context of simplifying assumptions that can impact their reliability.

42 ENGINEERING↗

Hybrid Capture for Net-Negative Emissions

The Energy & Environmental Research Center, in partnership with the U.S. Department of Energy and North Dakota ethanol producer Red Trail Energy, LLC (RTE), completed an initial engineering design (IED) for a potential hybrid capture system at the RTE CCS (carbon capture and storage) site. The RTE CCS Project is currently operating a CO2 capture facility, adjacent to the RTE ethanol facility in western North Dakota, and injecting the CO2 more than a mile below RTE property for permanent storage. This novel process would add capturing CO2 produced from natural gas boilers to the existing bioprocessing capture system to achieve a net-negative CO2 emissions industrial process at commercial scale (~310,000 tonnes/yr CO2). Initial findings of the IED showed the hybrid system to be technically viable with a moderate estimated cost of $55/tonne CO2 captured for the hybrid system. A cradle-to-gate life cycle assessment (LCA) was also conducted, showing preliminary net-negative carbon emissions potential anticipated from implementing a hybrid CCS system at a commercial scale. Recommended next steps toward potential implementation include hybrid capture system demonstration testing for detailed engineering and LCA model comparisons with low-carbon fuel incentive programs for financial support.

01 COAL, LIGNITE, AND PEAT↗