Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DECOMMISSIONING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Closure of the Fast Flux Test Facility: Current Status and Future Plans

The Fast Flux Test Facility (FFTF) was a 400 MWt sodium cooled fast reactor designed and constructed in the 1970's. The original purpose of the facility was to develop and test advanced fuels and materials for the liquid metal fast breeder reactor program. The facility operated very successfully from 1982 through 1992, fulfilling its original mission as well as other identified missions. However, in 1993 the Department of Energy concluded that there was no longer a need for the FFTF and thus ordered that it be shut down. Following eight years of additional study of potential new missions, the final decision to shut down the facility was made in 2001. (During this eight year period the plant was maintained in a condition to allow safe and efficient shut down or restart). The complete closure of the FFTF consists of the following phases: - Deactivation - removal/stabilization of hazards to allow long-term storage (2001-2009); - Surveillance and maintenance - minimum cost compliant storage (2010-2015); - Decontamination and decommissioning (2016-2024). All of the FFTF fuel has been removed from the site except the sodium-bonded fuel that is destined for transportation to Idaho National Laboratory for final disposition. The sodium-bonded fuel had metallic sodium inside of the fuel pin to increase the heat transfer from the fuel pellet to the clad in order to reduce pellet centerline temperature. Three hundred and seventy-six (376) fuel assemblies have been washed (sodium removed) and transferred to storage at other Hanford locations. The majority of the spent fuel is stored in interim storage casks designed for a 50 year storage life, holding seven assemblies each. All sodium systems have been drained and the sodium stored under an inert gas blanket at ambient temperature in a Sodium Storage Facility at the FFTF site. This facility consists of four large tanks and associated piping. The main contaminants are sodium-22, cesium-137 and tritium. The sodium-potassium (NaK) that was used as an intermediate cooling fluid in several FFTF systems has been drained and removed or flushed to sodium systems where it became mixed with the sodium. The in-containment hot cell has minimal sodium contamination, is currently inerted with argon and is being used for loading of the T-3 transportation cask with the sodium-bonded fuel for transportation to Idaho National Laboratory. The majority of the fuel handling machines are still operational and being used for loading the sodium-bonded fuel into the T-3 casks. This equipment will be shut down immediately following completion of shipment of the sodium-bonded fuel. The majority of hotel systems are still operating. Four of the eight 400-ton chillers have been shut down and four of the cooling towers have been shut down. The argon system is operational and supplying gas for sodium systems cover gas, in-containment hot cell atmosphere and fuel handling systems. The nitrogen system remains in service supplying cover gas to the demineralized water system and fire suppression systems. Eleven of the facilities nineteen transformers containing polychlorinated biphenyls (PCBs) have been removed and significant re-routing of power has been performed to support the long term minimum cost surveillance mode. Future plans include the complete deactivation, the long-term surveillance and maintenance, the sodium disposition and the decontamination and decommissioning The most complex and costly activity during the decontamination and decommissioning phase will be the removal of the 'residual sodium' in the sodium systems. It was impractical to remove the residual sodium during the systems draining evolution. It is estimated that approximately 24,000 liters (6,400 gallons) remain within the systems. The complexity of design of the FFTF exceeds any sodium facility in the United States in which sodium removal has occurred. There are a total of 21 miles of sodium piping in the FFTF as well as three large vessels (the reactor vessel and two spent fuel pool vessels) that will require partial disassembly and drilling in order react/remove remaining sodium.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Port Radium Canada's Original Radium/Uranium Mine, The Complete Story of Canada's Historic Radium/Uranium Mine, 1932 to 2012 - 13159

This paper provides the life story of Canada's original radium/uranium mine. In addition to the history of operations, it discusses the unique and successful approach used to identify the key issues and concerns associated with the former radium, uranium and silver mining property and the activities undertaken to define the remedial actions and subsequent remedial plan. The Port Radium Mine site, situated approximately 275 km north of Yellowknife on the east shore of Great Bear Lake, Northwest Territories, was discovered in 1930 and underground mining began in 1932. The mine operated almost continuously from 1932 to 1982, initially for recovery of radium, then uranium and finally, for recovery of silver. Tailings production totaled an estimated 900,000 tons and 800,000 tons from uranium and silver processing operations respectively. In the early days of mining, Port Radium miners were exposed to radon and associated decay product levels (in Working Level Months of exposure - WLM) hundreds of times greater than modern standards. The experience of the Port Radium miners provides important contribution to understanding the risks from radon. While the uranium mine was originally decommissioned in the early 1960's, to the standards of the day, the community of Deline (formerly Fort Franklin) had concerns about residual contamination at the mine site and the potential effects arising from use of traditional lands. The Deline people were also concerned about the possible risks to Deline Dene arising from their work as ore carriers. In the late 1990's, the community of Deline brought these concerns to national attention and consequently, the Government of Canada and the community of Deline agreed to move forward in a collaborative manner to address these concerns. The approach agreed to was to establish the Canada-Deline Uranium Table (CDUT) to provide a joint process by which the people of Deline could have their concerns expressed and addressed. A great deal of work was done through the CDUT, including efforts to assess site environment and safety issues in the context of modern reclamation standards. In addition to the environmental and remediation studies, an assessment of historic exposures of Deline ore carriers to radiation and a follow-up epidemiological feasibility study were performed. SENES Consultants Limited (SENES) carried out the dose reconstruction for the Port Radium miners in the 1990's, was the environmental consultant to the CDUT from 2000 to 2005, developed the Remedial Action Plan (RAP), engineering plans and specifications for decommissioning the Port Radium mine and vicinity sites in 2005/6, supervised the remedial works in 2007 and carried out the long term post closure monitoring from 2008 to 2012. Our firsthand experience from working cooperatively with the CDUT provides insights into effective decommissioning of historic contaminated sites. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Remediation of the FGMSP at Sellafield: The First Transfer of Bulk Sludge - 17133

The very first bulk transfers of radioactive sludge have commenced from one of the most hazardous nuclear plants in Europe, using equipment and systems researched, designed, installed and commissioned by Jacobs as part of the ACKtiv alliance. Sellafield is a nuclear fuel reprocessing and decommissioning site, close to the village of Seascale on the coast of the Irish Sea in Cumbria, England. Sellafield incorporates the original nuclear reactor site at Windscale, which is currently undergoing decommissioning, and dismantling, and Calder Hall, the world's first nuclear power generating reactor. The first nuclear facilities were built in the 1940's.The First Generation Magnox Storage Pond (FGMSP) dates back to the 1950's as part of the UK's expanding nuclear programme and was constructed to store, cool and prepare used Magnox nuclear fuel for recycling into new fuel. It urgently needs to be emptied of 1500 cubic metres of radioactive sludge. In this paper we describe the work undertaken by Jacobs to deliver a very challenging programme of work to provide the capability to remove sludge from the pond. The FGMSP Retrievals Project was awarded in March 2007 to supply equipment and services for the removal of sludge and miscellaneous waste from the First Generation Magnox Storage Pond at Sellafield. The Project is being executed by ACKtiv Nuclear (Jacobs, Carillion and Atkins) of which Jacobs is a 40% stakeholder. ACKtiv Nuclear is a mature Joint Venture and has been operating continuously and successfully since 2002, the oldest JV still in operation on Sellafield Site. The roots of the JV can be traced back to the 1980's. The Project covers all project phases from front-end engineering through detailed design, procurement, installation and commissioning support. The Project places huge emphasis on off-Site testing and has several facilities for both installation and integrated testing. This proves equipment prior to installation in a radioactive environment. The Project has achieved success and recognition including winning the 2014 and 2015 Sellafield Business Excellence awards, as well as numerous internal Jacobs awards. The Project achieved a major decommissioning milestone in March 2016. Since the installation of a 31 m pipe-bridge in 2012, using a 1200 te mobile crane surrounded by several other facilities with nuclear inventory, the Project has successfully installed the sludge retrieval and effluent system into the FGMSP. This 4 year programme of work included 2 booster pump platforms, sludge recovery tooling, hoses, umbilicals and a deluge skip wash box which were all trialled and proven off-Site prior to installation in the pond. This milestone to commence transfer of sludge to modern stainless steel containment is a major step forward in the hazard reduction of the facility.The presentation will cover the installation of the pond de-sludging equipment, the innovations deployed that ensured that the milestone was achieved under budget and ahead of schedule, as well the benefits to the facility, the Site and the nuclear industry. It will also examine the challenges that needed to be overcome such as high dose, contamination, limited working times and space constraints. The presentation will describe why the work is of national Importance and conclude with the achievement of commencement of bulk sludge transfer to a modern facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization and D and D of PET Cyclotron and Radioisotope Production Facility - 17536

The State University of New York at Buffalo is in the process of the decontamination and decommissioning (D and D) of a cyclotron and radioisotope production facility located in Parker Hall on the South Campus. Many unique characterization activities are needed for compliant waste packaging, transportation, and disposal. In addition to the cyclotron used for successful production of radioisotopes, the facility features hot cells and glove boxes used for the purification and conditioning of the final product. Many challenges exist for the decommissioning of the cyclotron and the radioisotope production facility. These challenges include the proper characterization and management of the cyclotron, its associated equipment, and the remaining facility. Slightly activated concrete constitutes the majority of the remaining radioactive materials to be disposed of during the decommissioning. Challenges for this project include; - Regulatory interface between the New York Department of Health (NYDOH) and the New York Department of Environmental Conservation (DEC) for license closure; - Characterization of the cyclotron, its support equipment and the activated vault areas; - The most cost effective disposal options and the Data Quality Objectives needed for the various disposal options. The paper primarily focuses on challenges for characterization of the cyclotron and the remaining radioisotope production facility at the University at Buffalo. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EDF industrial strategy for the management of radioactive waste - 15204

In France, EDF is in charge of electronuclear power operation since the sixties and consequently has to manage radioactive waste. Radioactive waste management is based on the control of each industrial step, taking into account the classification by activity level and radioactive half life. The main steps are to limit waste quantities at the generation stage, sort out non-rad and recoverable items from the waste, recycle, treat and package the radioactive waste as soon as it is generated, limit the use of interim storage, prepare and achieve as soon as reasonably practicable conditioning and disposal. EDF aims to empower operators in charge of NPP operating and of decommissioning and to centralize interfaces with the stakeholders in order to pool management routes and to guarantee the consistency of our industrial policy. The French regulatory framework for the management of radioactive waste and material is set by the French 2006 planning Act, in line with the European Directive. The legal framework structures interactions between EDF and the regulatory bodies (Nuclear Safety Authority, General Directorate for Energy and Climate), the French National Radioactive Waste Management Agency (ANDRA) and other waste producer (mainly AREVA Company and CEA). Regarding short lived waste, management routes are in current operation for the large majority of this waste generated both by power plants in service and during decommissioning. EDF is working on new management route for metallic materials knowing the future evolution of deposits is the field of large refit and decommissioning activities. Regarding long lived waste, disposal development represents a major stake for EDF. EDF contributes to design studies of the geological disposal center and collaborates with ANDRA for the acceptance of future national waste disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance improvement and human resources transition management in D and D projects - 15440

Power generation and other nuclear facilities production is mainly characterized by stable working environment, with continuous efforts for improvement based on previous achievements, constant workload, foreseeable and established organizational hierarchy; and generation of cash. In contrary to normal production - when phasing down the facility for final shutdown, decommissioning and dismantling - one has to manage a new, highly dynamic working environment, with decreasing workload, new skills required; and consumption of cash. The key to successful transition is to recognize the need for establishing an explicit performance improvement program with an effective change management process in order to address this profound evolution as early as possible in the project. AREVA owns and operates large nuclear material processing facilities. This includes the responsibility for their end of life up to final Decommissioning and Dismantling (D and D). Faced with this transitional challenge, AREVA took example from well-known management methods (Lean Management, 6 Sigma, TPM...) successfully applied by the non-nuclear production industry with the corresponding philosophy of Operational Excellence. These methods were adapted to the specifics of nuclear decommissioning projects. Furthermore, specific computerized tools were developed to assist managers in implementing measures for re-deploying, re-training and re-qualifying personnel as well as re-organizing the work structure while maintaining safety and social consensus. Significant improvements in the dismantling works as well as in the management of generated waste were achieved early after start of the implementation of the performance improvement programs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary evaluation of removing used nuclear fuel from shutdown sites - 15568

A preliminary evaluation of removing spent nuclear fuel (SNF) from 12 shutdown nuclear power reactor sites was conducted. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, and San Onofre. The evaluation was divided into four components: (1) characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory, (2) a description of the on-site infrastructure and conditions relevant to transportation of SNF and GTCC waste, (3) an evaluation of the near-site transportation infrastructure and experience relevant to shipping transportation casks containing SNF and GTCC waste, including identification of gaps in information, and (4) an evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. Every site was found to have at least one off-site transportation mode option for removing its SNF and GTCC waste; some have multiple options. Experience removing large components during reactor decommissioning provided an important source of information used to identify the transportation mode options for the sites. Especially important in conducting the evaluation were site visits, through which information was obtained that would not have been available otherwise. Extensive photographs taken during the site visits proved to be particularly useful in documenting the current conditions at or near the sites. It is expected that additional site visits will be conducted to add to the information presented in the evaluation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites - An Update - 16057

An updated preliminary evaluation of removing spent nuclear fuel (SNF) from 13 shutdown nuclear power reactor sites was conducted. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, and Vermont Yankee. The evaluation was divided into four components: (1) characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory, (2) a description of the on-site infrastructure and conditions relevant to transportation of SNF and GTCC waste, (3) an evaluation of the near-site transportation infrastructure and experience relevant to shipping transportation casks containing SNF and GTCC waste, including identification of gaps in information, and (4) an evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. Every site was found to have at least one off-site transportation mode option for removing its SNF and GTCC waste; some have multiple options. Experience removing large components during reactor decommissioning provided an important source of information used to identify the transportation mode options for the sites. Especially important in conducting the evaluation were site visits, through which information was obtained that would not have been available otherwise. Extensive photographs taken during the site visits proved to be particularly useful in documenting the current conditions at or near the sites. It is expected that additional site visits will be conducted to add to the information presented in the evaluation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New High-Throughput Measurement Systems for Radioactive Wastes Segregation and Free Release - 16166

The European Metrology Research Program (EMRP) is a coordinated research-and-development program that pursues the closer integration of national research programs. The EMRP Metrology for Decommissioning Nuclear Facilities 'MetroDecom' Joint Research Project ENV54 (JRP ENV54), a 36-month project started in September 2014, delivers research products addressing all aspects of the decommissioning process. This includes the characterization of waste materials present on the decommissioning site, pre-selection prior to free release or repository acceptance measurement, free-release measurement, the measurement of waste packages thermal power prior to the repository storage, and the monitoring of stored wastes and repositories in the very long term. This paper describes the track record of two JRP ENV54 working packages, which address the measurement facilities for pre-selection of waste materials prior to measurement for repository acceptance or possible free release (segregation measurement system); and free release (free release measurement system), based on a single standardized concept characterized by unique, patented lead-free shielding. The key objective is to improve the throughput, accuracy, reliability, modularity and mobility of segregation and free-release measurement. This will result in more reliable decision-making with regard to the safe release and disposal of radioactive wastes into the environment and, resulting in positive economic outcomes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing Low-Level Waste at Dounreay - 16269

Dounreay Site Restoration Limited (DSRL) is the site licence company responsible for the clean-up and demolition of Britain's former centre of fast reactor research and development. The Dounreay site requires facilities to dispose of up to 175,000 cubic metres of low level waste (LLW) that has been and will continue to be generated during the decommissioning and restoration of the site. In May 2014, construction of two new vaults for the disposal of LLW at Dounreay was completed, including the necessary roads, infrastructures and services, followed by an encapsulation plant in September 2014. The vaults are located immediately to the northeast of the Dounreay licensed site, on NDA-owned land. The facilities are for disposal of the solid LLW generated at Dounreay and the adjacent Vulcan site only. In 2004, following consultation with stakeholders and members of the public, Dounreay issued the 'Best Practicable Environmental Option (BPEO) Report' on the management of Dounreay LLW. This report assessed potential management options for LLW against a range of criteria, including technical, environmental, cost, health and safety issues. The study was conducted in line with best practice and involved consultation with a range of people, including the local community and organisations with an interest in radioactive waste management. The recommendations and conclusions from the study provided the basis for the 'Dounreay Solid LLW Overall Strategy', which was published in March 2005. A fundamental component of this strategy was the development of new below-ground disposal vaults for LLW at Dounreay. Siting the vaults on land at Dounreay avoids any need to transport the LLW away from Dounreay on public roads. Disposal at Dounreay therefore satisfies the proximity principle of managing the waste at source. Disposal at Dounreay is also consistent with UK Government Policy on LLW management, the Scottish Government's Radioactive Waste Management Policy and the Nuclear Decommissioning Authority's (NDA's) strategy on management of LLW from the UK nuclear industry. A planning application was initially lodged with the Highland Council in June 2006. The period for the determination of this application was extended to allow the Scottish Environment Protection Agency (SEPA) sufficient time to assess fully the supporting Environmental Safety Case (ESC). The planning application was re-activated in May 2008, and planning permission was granted by Highland Council in April 2009. The planning permission included 26 conditions on DSRL, covering a wide range of environmental issues such as construction noise/dust, traffic, visual impact and also a condition to develop a community fund aimed at socio-economic development of the area around the Dounreay site. After undertaking the necessary detailed design work, construction of the phase one vaults commenced in November 2011 by principal contractor, Graham Construction. Work was undertaken on both vaults simultaneously, excavating around 243,000 m{sup 3} of rock. When excavation was complete, steel reinforcement was placed and concrete poured to construct the floor slabs. This was followed by the construction of the reinforced walls and then the installation of the steel support structure and materials that form the roof. Mechanical and electrical installation then followed, in parallel with the construction of the vault apron, ramps and access roads. A pumping system and control building was also constructed to remove groundwater from around the vaults to allow the vaults to be kept dry while they are being filled with waste. A layer of excavated material, approximately 3 m thick, was placed across the existing ground surface between the vaults and the coast, to ensure the water table lies well below the new ground surface after closure of the vaults, and that any future trace contaminated groundwater flows out to the sea rather than to the soil zone. This layer is referred to in project documents as the 'enhanced geosphere'. After disposals are completed and the vaults are closed, this layer will be joined to the capping over the vaults so that the ensemble merges visually with the surrounding landscape. The original vegetation and soil mix will be returned as far as is practicable. An encapsulation plant has been constructed to fill the LLW containers with grout prior to disposal in the vault, similar to the process used at the national Low-Level Waste Repository facility (LLWR), near Drigg in Cumbria. The plant has the capacity to grout up to four containers per day. The grout fills voids in the container and helps provide chemical conditions in the vault that limit the release of radionuclides in the far future, after the vault has been penetrated by groundwater. On April 24 2015, active commissioning began at the Encapsulation Plant and LLW Vaults. Half-height ISO containers packed with low level waste are currently being filled with grout and disposed of in the LLW Vault. Also packaged Demolition Low Level Waste (DLLW) is being processed and disposed of in the Demolition Low Level Waste Vault. To date over 2500 packages of DLLW and 70 containers LLW have been disposed of. Completion of construction and the start of operating the Phase One vaults and encapsulation plant are fundamental to the successful and efficient decommissioning of the Dounreay site, upon which many millions of pounds of investment and hundreds of jobs rely.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Packaging for Transport of the ILW-LL of EDF First Generation Power Plant Dismantling - 16517

EDF has a first generation decommissioning plan involving different types of reactors: Heavy Water Reactor, Natural Uranium and Gas Cooled Reactor, Fast Neutron Reactor and Chooz-A the first Pressurized Water Reactor (PWR) of the French decommissioning plan. The dismantling of these first generation reactors produces various types of radioactive waste, the most radioactive of them being the intermediate-level long-lived waste (ILW LL). After cutting and/or extraction from the reactors, these ILW LLs have to be transported to the EDF Conditioning and Storage Facility for Activated Waste ICEDA where they will be temporarily stored until a final depository solution is built. To transport these irradiated and contaminated metallic wastes, EDF decided to give ROBATEL Industries the responsibility of designing a new B- type package and obtaining the associated approval from the French Nuclear Safety Authority (ASN). A lot of issues had to be overcome to comply with the nuclear transport regulations and answer the ASN and its technical support IRSN's questions. Among them, was the difficulty to have a single type of package to transport unblocked waste coming from reactors of different technologies, sites in different stages of decommissioning and using different methods of waste production, conditioning and control. In the end, EDF had to apply for a specific approval for each dismantling site. These difficulties, some other technical issues encountered, and the decision to get first an approval for the transport of Chooz A's ILW LLs, are described here. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A National Disposal Facility for Radioactive Waste for Iraq - 16610

Radioactive waste resulted in the past in Iraq from a number of nuclear activities and facilities all of them seriously damaged or destroyed during the Gulf war. The task of decommissioning such facilities and managing the resulting waste is being supported by the International Atomic Energy Agency (IAEA), the European Union (EU), and the United States (US). A national policy for radioactive waste management for Iraq has been drafted by the Ministry of Science and Technology (MoST); a draft strategy for radioactive waste management implementation is in preparation. In this framework, Iraq is considering locating a radioactive waste disposal facility at the Al-Tuwaitha site, near the capital city of Bagdad. In the framework of its Instrument for Nuclear Safety Cooperation the EU has recently started a cooperation project named 'Feasibility Study, Basic Design, and Engineering Design of an Engineered Radioactive Waste Disposal Facility' for Iraq (Project IQ4.01/11). The project aims at producing the design of a repository for the radioactive waste resulting from the decommissioning activities and from the continuing use of radioisotopes in medicine and the oil and gas industry in the country. The contract for this cooperation project was awarded by the European Commission in April 2015 to the consortium of two international engineering companies, Nukem Technologies Engineering Services GmbH and DBE Technology GmbH, both of Germany, and Javys a.s., the national waste management agency of Slovakia. The planned Iraqi near-surface repository is constrained by the complex security conditions in the country. This has led to the decision of using whenever possible the Al-Tuwaitha site, were most of the waste is located, as the repository location. The project work will therefore focus on assessing whether and which part of the waste expected to result from the decommissioning and remediation activities is amenable for surface disposal in an appropriately engineered facility. In addition, careful review of the site characteristics shall provide enough elements to justify and validate the political decision of disposing of the waste in Al Tuwaitha. Thereafter, the project work will focus on the conceptual and later the engineering design of the repository. Finally, a Safety Analysis will provide the basis for regulatory decisions about the further steps for realization of the Iraqi final disposal facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NORM in Building Materials: A Case Study in Releasing and Disposing of Building Debris within the DOE System - 18123

In 2013, the Office of Management and Budget issued Memorandum 2013-02, clarifying its 'Freeze the Footprint' policy. Memorandum 2013-02 requires that all federal agencies maintain or reduce their total square footage, within each subsequent year, from a FY2012 baseline. Memorandum 2013-02 also requires that total square footage remain constant with respect to the type/intended use of a building. At Los Alamos National Laboratory (LANL), this means that new construction cannot occur without demolition of equivalent (both in type and square footage) building(s). Since 2013, decommissioning and demolition of aging, unused facilities at LANL has increased. In 2016, the TA16-280 building complex was scheduled for demolition. TA16-280 is a former high explosives (HE) processing facility that consists of six buildings connected to each other via weatherproof walkways. It was constructed in the 1950's and has been subsequently used for HE shipping, receiving, and storage. Interviews with radiation protection staff suggest that some of the buildings within the complex may have been used to store depleted uranium metal parts in a non-dispersible form. It is LANL policy to conduct decommissioning surveys for radioactive materials when building history cannot confirm that a structure is radiologically non-impacted. LANL follows the Multi-Agency Radiation Survey and Assessment of Materials and Equipment (MARSAME) process to develop its surveys and clear structures from radiological control. After clearance, a structure may be dispositioned as non-regulated waste, at a significant cost savings compared to regulated disposition pathways such as low-level waste. MARSAME measurements conducted in the 16-280 complex were elevated compared to reference measurements of surrogate materials, and a majority of the survey units failed to pass indistinguishable from background (IFB), which is LANL's unregulated clearance criteria. Further measurements conducted both in situ and in the laboratory indicated the presence of naturally-occurring thorium in several building materials including: poured concrete, the glaze atop ceramic blast tiles, and the porcelain enamel on the exterior of blast-proof ceiling lamps. Other than naturally-occurring thorium, there were no elevated radionuclide concentrations detected in building materials. It should be noted that there was no history of thorium use in the 16-280 complex, and the material in question was in all cases fixed to and within the building materials in question. Except in certain specific cases, such material is exempt from regulation under the Atomic Energy Act of 1954 [3], as amended, and is therefore exempt from regulation under the Nuclear Regulatory Commission, the Department of Energy, and agreement state regulatory frameworks. Despite this regulatory exemption, disposition of material from the 16-280 complex proved to be challenging, principally because local industrial landfills stipulate 'No radioactive material' in their Waste Acceptance Criteria. This disconnect between what is regulated and what is disposable creates a situation where some DOE sites find it easier to disposition property as Low Level Waste in lieu of pursuing a non-regulated disposition pathway. This presentation will explore the specifics of the 16-280 decommissioning project as well as the implications of the release/disposition disconnect for naturally occurring radioactive material and project planning at LANL. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Highly Active Cells in Preparation for Post Operational Clean Out at Sellafield - 18139

The Highly Active Liquor Evaporation and Storage (HALES) Plant at Sellafield receives highly active (HA) raffinate liquors from the Magnox and Thermal Oxide (THoRP) Reprocessing Plants. These liquors are concentrated through evaporation into Highly Active Liquor (HAL), conditioned and stored in HALES before immobilisation in glass in the Waste Vitrification Plant (WVP). Reprocessing operations at Sellafield are nearing completion and hence these liquor feeds will soon cease. Therefore, HALES is starting its planning and preparation phases for Post Operational Clean Out (POCO) and decommissioning. POCO is a transitional phase between operations and decommissioning and encompasses activities undertaken to remove residual inventory and activity from the facility. Key drivers for POCO include risk and hazard reduction and facilitating subsequent decommissioning activities (including potential surveillance and maintenance or care and maintenance regimes). Characterization is a critical enabler for development and implementation of effective POCO. In addition to the key drivers above characterization within HALES will be used to: - Define the start and end points of POCO (radiological condition, inventory sources and location, configuration, etc.); - Develop and technically underpin the wash out strategy (volumes, rates, reagent types, etc.; - Monitor the effectiveness of POCO activities (reduction in inventory/activity, points of diminishing return, confirmation of end points for POCO). There are a number of significant challenges that present to characterization of the HALES facilities. Perhaps the most significant of these is the radiological status of the facility. HALES is an HA facility meaning that the high dose rates limit not only the technology selection for characterization (i.e. those with a very high radiation tolerance) but also place constraints on the access and deployment for the selected technology. Additionally, parts of the facility are circa 60 years old which brings its own challenges such as poor quality construction drawings and limited operational knowledge. Finally, limited sampling capability and minimal data regarding historic operations has resulted in uncertainties that will need to be addressed in order to undertake POCO as efficiently and effectively as possible. The solution to this challenge requires a novel and innovative approach and an example of this is the technique which is described in this paper. This is a radiometric characterization technique which utilizes remotely deployed dosimetry to determine the activity distribution within the vessels of interest to POCO. The results to date have been extremely promising, and the ability to produce concise visual representation of these results has already begun to facilitate better informed discussions around the POCO of the facility. It is expected that in the future this technique will be applicable to other areas of Sellafield which face similar characterization challenges. This paper presents a summary of the development and implementation of the solution along with the results obtained so far. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Crickets{sup TM} and Curies: Lessons Learned from the Steel Industry - 18221

The global nuclear power industry, and to a lesser extent, the decommissioning and demolition of old nuclear weapons plants, obviously present challenges to those in the radioactive waste management field. Some if not many of these challenges have already been dealt with, and resolved, in the steel industry, including its recycling component. This paper presents proven state-of-the-art radiation detection systems used in steel and related recycling facilities, emphasizing current, reliable and flexible technologies for characterization, volume reduction, and remote handling of recyclable solid wastes contaminated and, just as important, not contaminated, with a wide range of radioactive isotopes. It will also cover features of remotely operated waste handling equipment effective in reducing or eliminating exposure of workers engaged in decontamination and demolition work on active and/or inactive nuclear installations. The industry group identified above has a long-standing policy regarding any radioactivity in potentially recyclable as well as waste materials it receives: if it is detected, it is rejected. The US Steel Manufacturers Association (SMA) put it this way in one of their Public Policy Statements: 'SMA members have not, and will not, accept scrap that is known to be radioactively contaminated' (emphasis included in the original) (1). This policy, adopted around the globe, obviously has major implications for decommissioning and demolition projects. To put it bluntly, if rad-contaminated metal, concrete, or other materials are sent to a facility for possible recycling, reuse or even disposal, they may well be rejected. If so, the materials will be returned to the generator--at the generator's cost-and a new solution will have to be found. This also results in additional costs for the generator. Facilities in the steel making and metal recycling industries have access to, and routinely count on, a wide range of proven detection technologies and techniques for monitoring incoming shipments and sorting the materials in them. The approaches range from using sensitive handheld instruments for pinpointing and isolating small devices such as isotope-containing gauges and radium dials all the way up to technologies effective for large volumes and weights of contaminated construction and demolition material. In this latter realm, the most suitable, robust, and field-proven system for decommissioning and demolition work is a radiation detection system fitted to a grappling and/or magnetic device, known as the Crickets{sup TM} technology, which automatically scans bulk material with no added effort or time in material handling operations. Highly versatile, a Crickets{sup TM} system can be put to work on any material-handling system, including grapples handling volumes ranging from 1 up to 18 cubic yards, while detecting radioactivity in real-time over a very wide dose range, from nSv to Sv levels. Other field-proven real-time measuring radiation detection devices can be fixed to conveyor belts with traverse speeds up 3 meters/second, also measuring in real time and over the same dose range, allowing both recyclable and waste materials with a pre-set level of radioactivity to be diverted off the belt. Finally, there are highly sensitive radiation portal installations for detecting radiation from materials being transported by vehicles, including those with roll-offs, dump trailers, and other containers, again in real-time and for the same dose ranges. For vehicles, the speed must be carefully controlled-the vehicles need to travel from 5 to 10 km/h through the scanning zone to ensure that maximum detection capability is maintained. When radiation detection systems at recycling and steel making facilities detect radioactive material in an incoming shipment, these facilities have a zero tolerance for accepting the cargo. Therefore, it is imperative that material from a demolition operation that is slated to be sent for recycling or other reuse be checked at the point of demolition at similar detection levels to avoid possible rejection later of a shipment because of its radioactivity. In addition to measuring overall radiation levels (for example, total gamma), when necessary, combinations of different radiation detection media can be used to detect the presence and intensities of specific isotopes such as U-235, Cs-137, Co-60, Am-241, etc., again in real-time and over a similar dose range. These detection technologies can be fixed or transportable. More important for the rad-waste management profession, this overall systems approach can be tailored and adapted during use on-site in any dismantling, demolition or remediation project, to allow materials to be thoroughly scanned before being released to the recycling stream for reuse, or to appropriate long-term storage and disposal facilities. Potentially recyclable materials with contamination such as steel beams and rebar will set off alarms at recycling facilities, resulting in unnecessary added expenses to the generator, primarily due to increased transportation costs, time delays and additional rad-waste handling and disposal charges. Additionally, there are situations where relatively lightly contaminated materials, once identified and appropriately characterized, can be reused in new construction applications, such as concrete from demolition being used in the base layer for roads or recycled steel used for repair or construction of bridges. In other cases, specific smaller volumes can be sent to specialized rad-waste disposal sites. These radiation detection systems can also be custom tailored to ensure proper handling and disposition of contaminated materials destined for reuse in specific applications where, for example, acceptable levels of radioactivity in NORM or TENORM can be reused or safely disposed of. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel reports session

This section brings together the reports of the 31 panel sessions listed below: - Avoiding the Human Capital Cliff in the DOE (PS22); - Implementing Technically-Based Cleanup; US DOE Balancing Regulatory and Fiscal Complexity (PS24); - United Kingdom - Remediation of Sellafield Legacy Ponds and Silos (PS25); - Aligning Decision-Making to Deliver Timely Results in Large Clean-up Programs (PS38); - Transition to Government Owned-Contractor Operated Site at Canadian Nuclear Laboratories (PS39); - Emerging Middle East Nuclear States' Status and Plans (PS40); - NPP Panel on Waste Management (PS41); - Robotics - International Innovations in Robotic Decommissioning Technology (PS43); - Fukushima Panel (1/2): Japan Fukushima Daiichi Decommissioning Update (PS54); - Fukushima Panel (2/2): Update on the Revitalization of Fukushima and the Surrounding Area (PS55); - US DOE LLW On-Site Disposal: LLW Disposal Facility Federal Review Group Review Process (PS56); - Challenges in DOE HLW Tank Management: Facility Start-up and Waste Disposition (PS57); - Waste Management Planning for Utility Small Modular Reactors (PS58); - US Nuclear Power Plant Waste Management - LLW Disposal Issues (PS59); - DOE-EM Robotics and Emerging Technologies Road-map (4/8) (PS60); - Graduating Students and New Scientists and Engineers - Wants and Needs - Are Companies Even Listening? (PS63); - U.S. Nuclear Robotics: Yesterday, Today, Tomorrow (5/8) (PS74); - US DOE Mixed Waste: Proposals for Dealing with Problematic Waste Streams and Policy Changes (PS76); - Current and Emerging US NRC LLW Regulatory Topics (PS77); - Agency Perspectives (US and International) on the Use of Risk and Dose Assessment Tools (PS80); - Progress on Deep Repository Programs Around the World (PS81); - US DOE Procurement and Contracting Opportunities (PS82); - Collaboration across Borders to Deliver Cleanup and Decommissioning Challenges (PS93a); - DOE Mission Success through Application of Practices and Solutions (PS94); - Challenges in Cask Certification - International Perspectives (PS96); - Robotics: Leveraging Innovations in Science and Technology to Benefit Safety Performance (PS98); - DOE Panel: DOE EM Featured Office - Portsmouth/Paducah Project Office (PS109); - Robotics: Lessons Learned from Industrial Robotics Deployment that can be Applied to the Nuclear Field (PS110a); - Roundtable: DOE Radioactive Management - Energy Facility Contractors Group - Waste Management Working Group (EFCOG WMWG) (PS118); - Thursday Topical Session 'Management of Used Nuclear Fuel: Will the United States Reengage and Align with International Efforts' (PS124); - Remotely Operated Vehicles for Emergency, Disaster, and Operational Upset Response (PS125)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling of Lead-210 Data Documents Benefits in Proactively Understanding TENORM Deposition - 18515

Radioactive decay of naturally occurring Radon-222 present in just-produced natural gas can lead to deposition of its radiogenic daughter, Lead-210, and subsequent radiogenic progeny within natural gas handling, treatment, and distribution facilities. Worker safety issues and disposal challenges arise when these accumulate to radiologically problematic activity levels. This is due to the 22.3-year half-life of Lead-210, allowing for multi-decade period of accumulation to occur and to persist, even after facility operations have ceased. Due to the far shorter half-lives of Lead-210 radiogenic progeny, especially that of Polonium-210, secular equilibrium within the Lead-210-Bismuth-210-Polonium-210 decay chain is quickly approached during facility operations and achieved after facility operations end. Lead-210 that accumulates in pipe scale can complicate any subsequent intrusive facility modifications, such as disassembly and dismantlement, potentially exposing workers to adverse radioactivity and impeding recycling and/or disposal of radiologically impacted equipment or other material. Experience has shown it is not strictly the presence of Lead-210 that is problematic but rather its 'unexpected' presence when this Technologically Enhanced Naturally Occurring Radioactive Material (TENORM) is discovered during intrusive work not incorporating radiological health and safety and material handling plans. Conversely, when implementing a program that proactively considers the potential for Lead-210, this form of TENORM simply becomes another 'special waste' that can be safely, efficiently, and effectively addressed during a decommissioning effort, without associated adverse worker exposures, project cost over-runs, and schedule delays. This paper will discuss how proactive radioactive scanning quickly and safely identified Lead-210 and its radiogenic progeny within a natural gas sweetening and compressor station located in northern Montana, a portion of which was undergoing decommissioning, aiding in safe and compliant material handling and recycling. The location of this operation necessitated that the decommissioning program be completed on schedule to prevent weather-related impacts due to the onset of adverse winter conditions. Further, the radioactive data acquired during this project will be shown to provide important insight into historic behavior of Lead-210 in terms of its disposition and its more recent decay. From these data, it became possible to back-model the average activity of Radon-222 within the natural gas being processed during the life of the operation, how the estimated Radon-222 activity within the processed natural gas conformed to measured Radon-222 at various other natural gas fields, and how this information can be leveraged in developing safe and successful plans for future intrusive work at this and companion site operations. This presentation will also note the apparent preferential accumulation of Lead-210 within both rubber-based materials, such as gaskets and seals, and grease-based products found within natural gas flow lines. Thoughts regarding processes that may lead to this finding will be explored. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sensing and Sampling of Trace Contaminations by a Dexterous Hexrotor UAV at Nuclear Facilities - 18600

Safe and efficient cleanups are a priority for decontamination and decommissioning of nuclear facilities. The contaminations of byproducts and wastes in such nuclear facilities pose a serious problems while decommissioning, to both the operators and public. Sensing these contaminations and cleaning them is an essential part of the safety procedures. The contaminations might range from low-energy to high-energy byproducts. Sensing these byproducts would require contact based or non-contact based sensing, based on its energy levels. Byproducts such as americium, are low-energy which makes it difficult to sense and sample without contact. Therefore, the workers need to physically swab the surfaces to collect the samples of these contaminations. These tasks pose a great danger for the safety of the human workers which includes the risk to reach greater heights, exposure to the radiation and sampling the entire building. A robotic solution is much more desirable in these cases, where the worker can safely handle the contaminations from a safe area. Use of robotic technologies inside these hazardous environments ensures the safety and enhances the performance. The more suitable robotic solution for reaching great heights and covering large areas of nuclear facilities, are aerial vehicles. Multi-rotor unmanned aerial vehicle (UAV) are chosen for their ability to hover at a position and also fly around in confined spaces. Quadrotors are a common choice of multi-rotor UAVs both research and industry because of its ease to fly and commercial availability. For the applications during the cleanups we need the UAV to not only hover and fly in confined spaces, but also interact with the physical world. Despite of quadrotor's advantages, they are not a best suit as they can't interact with the physical world. The tasks involving physical interactions would require the UAV to apply arbitrary forces and torques in all six degrees of freedom (DOF). As quadrotors are under-actuated and non-holonomic in motion, they cannot exert all the required forces. At Collaborative Robotics Lab, Purdue University, we developed a novel multi-rotor UAV solution, Dexterous Hexrotor, which can exert arbitrary forces and torques in all six DOF, independently and instantaneously. This enables the UAV platform to quickly respond to the external disturbances and precisely hold its position during the mission. The Dexterous Hexrotor serves as a robotic tool for the workers to perform sensing and sampling during the cleanups. Workers can operate Dexterous Hexrotor manually and/or semi-autonomously with human intervention. Manual control requires the worker to fly the Dexterous Hexrotor using a remote control. So the workers should possess knowledge on flying the UAV and to perform physical interaction. A semiautonomous Dexterous Hexrotor requires human input to some extent and requires very less knowledge of flying. The autonomy is designed to operate in flight mode and sampling mode. In flight mode, Dexterous Hexrotor takes off from a 'safe' area, reaches the desired altitude, and fly autonomously towards a sampling point. This sampling point is the target position specified on the 2D reference map. This mode also includes navigation towards the sampling point, avoiding the obstacles in the constrained environment. After reaching a stopping point, Dexterous Hexrotor waits for the human input for a target location to swab and collect samples. The Dexterous Hexrotor is now in sampling mode and waits for the human input. The human operator selects the swabbing location through the live streaming video from onboard camera. Through visual servoing, aided by the map, the UAV will move closer towards the target position. It then transitions to the impact control scheme to perform physical interaction with the wall and collects samples. Once the sample is collected, it autonomously returns back to the takeoff position in 'safe' area for the analysis by mass spectrometry. In this paper, we majorly focus on the physical interaction strategy and the required components which enables the autonomy. Decommissioning of nuclear facilities requires decontamination inside the entire buildings. Decontamination of nuclear facilities involves sensing and sampling the huge buildings, long shafts, etc. Sampling the entire facility is not possible due to the limitation in Dexterous Hexrotor's flight time. But this can be achieved by using a swarm of Dexterous Hexrotors to cover larger areas. The onboard robotic arm can be designed based on the applications such as cleaning, applying sealants, etc. The modularity of the design allows us to switch components as per the requirements of the task. These kind of robotic solutions functioning as tools for the workers, aims to make the work environment safer and playful. (authors)

42 ENGINEERING↗