Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Construction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Launch Complex 39B, SWMU 009, 2023 Performance Monitoring and Air Sparge Expansion Construction Completion Report, Kennedy Space Center, Florida

The 2023 Performance Monitoring and Construction Completion Report (PM-CCR) presents the findings, observations, and results for Air Sparging (AS) operations and expansion activities, as well as sitewide groundwater monitoring for Launch Complex 39B (LC39B), Solid Waste Management Unit (SWMU) 009, at Kennedy Space Center (KSC), Florida. The reporting period for activities covered under this PM-CCR is from January 1, 2023, to December 31, 2023. At LC39B, AS operations began in 2017 in the area west of the launch pad, in the liquid oxygen (LOX) tank area located northwest of the launch pad, and in an area outside of the perimeter fence to protect nearby Outstanding Florida Waters (OFW). The LC39B AS system was installed with 279 AS wells to depths ranging from 23 to 60 feet below land surface (bls), including the sump, correlating to top of screen depths ranging from 20 to 57 feet bls. In December 2022, a total of 22 AS wells were abandoned to support launch pad crane operations, and in November 2023, the system was expanded with five additional AS wells installed to 13 or 17 feet bls near the LOX tank. The remedial objective of the LC39B AS Interim Measure (IM) is to actively decrease concentrations of contaminants of concern (COCs) in groundwater, specifically trichloroethene (TCE), cis-1,2-Dichloroethene (cDCE), and vinyl chloride (VC), to less than their respective Natural Attenuation Default Concentrations (NADCs), so LC39B can transition into a Long-Term Monitoring (LTM) program. This PM-CCR presents the following information for LC39B: • AS system operations and maintenance (O&M) (Year 7 of operation) from January 2023 to December 2023, to include AS trailer relocation in March 2023 and subsequent replacement and re-start in June 2023. • Construction completion details for AS system expansion, which included installation of five new AS wells and one new monitoring well in November 2023. As part of expansion activities, soil samples were also collected for petroleum analysis; no exceedances were identified, and no further investigation for petroleum is warranted. • Performance monitoring results for groundwater sampling events conducted in May/June 2023 (30 wells) and November 2023 (31 wells) in the AS IM area and in the Low Concentration Plume (LCP) areas located north and east of the launch pad for volatile organic compound (VOC) analysis. • Sampling results for one monitoring well, LOX-IW0012S, which is sampled for aluminum on an annual basis (May/June 2023). This well was resampled in November 2023 for both total and dissolved aluminum. Due to a communication error with the laboratory, the May/June 2023 sample was analyzed for total aluminum only. • Groundwater sampling results for per- and polyfluoroalkyl substances (PFAS) collected from seven monitoring wells during the May/June 2023 event to further investigate the Former Sewage Treatment Plant #6 and Percolation Pond area, west of the launch pad. O&M and performance monitoring results show that the AS system at LC39B is operating as designed and meeting performance criteria. Overall runtime was 45 percent (%) during the reporting period (January to December), but the operational runtime was 78% during the timeframe when the system could run (June to December). The most significant downtime contributor was post-launch crane operations following the Artemis launch on November 16, 2022, which lasted until June 2023. During that timeframe, the AS trailer at LC39B was relocated to another KSC remediation site (Wilson Corners) and was subsequently replaced with the AS trailer from the Paint & Oil Locker (POL) remediation site at KSC to resume AS system operations. Performance monitoring results in the AS IM and LCP areas continue to show reduction in COC concentrations over time when compared to baseline levels. In 2023, only one monitoring well (MW0048) detected a COC exceeding its NADC (VC at 740 micrograms per liter [µg/L]), which marks the baseline result for this new well installed during system expansion. Across the rest of the site, VC concentrations have declined or remained stable during the 2023 sampling events. Excluding MW0048, the highest VC result in 2023 was during the May/June sampling event with a concentration of 63 µg/L at MW0032, which is located near MW0048 and the AS expansion area by the LOX tank. TCE was detected in select monitoring wells in the IM area in 2023, but only two locations exceeded the State of Florida Groundwater Cleanup Target Level (GCTL): MW0032 (21 µg/L in May/June 2023 and 9.1 µg/L in November 2023) and MW0036 (5.0 µg/L in November 2023). MW0036 is also located near the LOX tank, on the north side, where the AS system is still operational (Zone Z4). cDCE and trans-1,2-dichloroethene concentrations were less than laboratory method detection limits or their respective GCTLs in all wells sampled in 2023. Near the OFW located northwest of the launch complex, all COC concentrations were less than laboratory method detection limits from monitoring wells (MW0039, MW0040, and LOXTA0002S) sampled in 2023. Aluminum results from LOX-IW0012S, which has been sampled routinely since 2006, detected a total aluminum concentration of 3,900 µg/L during the May/June 2023 sampling event. Results from the November 2023 event detected 5,700 µg/L for total aluminum and 5,500 µg/L for dissolved aluminum. These concentrations slightly decreased from the previous year but remain relatively consistent with historical detections. Aluminum will continue to be sampled on an annual basis at this well as results still exceed the GCTL of 200 µg/L and the Upper Limit of the KSC Background Concentration of 280 µg/L. PFAS results detected nine different PFAS compounds (out of 32 analyzed) from seven wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). All seven samples collected resulted in concentrations less than the FDEP Provisional GCTLs for both PFAS compounds; no exceedances were observed. PFOS and PFOA also have assigned United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 nanograms per liter (ng/L). None of the PFOS results exceeded the USEPA MCLs. PFOA was detected in two samples above the USEPA MCL at concentrations of 5.8 ng/L (ECS-IW0009I) and 5.5 ng/L (ECS-IW0009S). Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the seven wells. PFAS compounds without FDEP Provisional GCTLs or USEPA MCLs were screened against USEPA RSLs. No other detections exceeded their respective USEPA RSLs. Additional PFAS sampling will be conducted as part of a future PFAS Site Assessment. Based on O&M activities and performance monitoring, the following is recommended for LC39B: • Continue with Year 8 AS system operation within Zone Z4, which includes the AS expansion area. Zone Z3, which has been off since 2018, should remain off as no rebound has been observed. Zones Z1 and Z2, which were turned off at the end of 2022, will remain shut down as monitoring well results have consistently been below GCTLs or have low-level detections with stable or decreasing trends (Meeting Minute 2402-M10, Decision 2402-D30). • Continue with performance monitoring in 2024 with the same monitoring well network as 2023, except with the addition of MW0048 in both semi-annual events. Baseline concentrations for this well were collected during the November 2023 performance monitoring event. Semi-annual sampling should be planned for the May 2024 and November 2024 timeframes (Meeting Minute 2402-M10, Decision 2402-D31). • Continue sampling monitoring well, LOX-IW0012S, for aluminum (total and dissolved) on an annual basis in May 2024. It is also recommended to re-develop this well prior to the next sampling event (Meeting Minute 2402-M10, Decision 2402-D32). The above recommendations for LC39B were presented at the February 2024 KSCRT Meeting, with Team consensus reached on the path forward. The contents of this PM-CCR were also presented at this meeting.

Deborah M Wilson↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

Extrusion-based Additive Manufacturing of Regolith-Filled Shape Memory Vitrimer Composite for Lunar Construction

The National Aeronautics and Space Administration (NASA) is visiting the moon again. This time, the objective is to explore establishing a permanent lunar base. To achieve both longterm human habitation on the moon and future deep space travel, it is crucial to make the most of the in-situ resources and build autonomous systems on the moon to support the construction of a lunar habitat. NASA’s In-situ Resource Utilization (ISRU) program aims to minimize the need to ship heavy prefabricated structures, reducing cost and enhancing sustainability. Here, we developed an economical extrusion method for printing lunar regolith-based composites using shape memory vitrimer as a binder. A rheological study is conducted to determine the extrudability of the composite with different regolith weight percentages. Several characterizations were conducted on the composites. The as-printed composites exhibited compressive and flexural strengths of 73.32 MPa and 156.59 MPa, respectively, and good impact tolerance. The composite maintained 57.92% of its mechanical properties even after the second crack healing cycle. The composites also exhibit shape fixity ratio of 90.02% and shape recovery ratio of 83.46%. The simple synthesis method, sustainability, and good thermomechanical properties make the 3D printed composite an ideal material for lunar construction applications.

Kingsley Yeboah Gyabaah↗

Machine Learning for Advanced Building Construction: Preprint

High-efficiency retrofits can play a key role in reducing carbon emissions associated with buildings if processes can be scaled-up to reduce cost, time, and disruption. Here we demonstrate an artificial intelligence/computer vision (AI/CV)- enabled framework for converting exterior build scans and dimensional data directly into manufacturing and installation specifications for overclad panels. In our workflow point clouds associated with LiDAR-scanned buildings are segmented into a facade feature space, vectorized features are extracted using an iterative random-sampling consensus algorithm, and from this representation an optimal panel design plan satisfying manufacturing constraints is generated. This system and the corresponding construction process is demonstrated on a test facade structure constructed at the National Renewable Energy Laboratory (NREL). We also include a brief summary of a techno-economic study designed to estimate the potential energy and cost impact of this new system.

building retrofits↗

Machine Learning for Advanced Building Construction

High-efficiency retrofits can play a key role in reducing carbon emissions associated with buildings if processes can be scaled-up to reduce cost, time, and disruption. Here we demonstrate an artificial intelligence/computer vision (AI/CV)-enabled framework for converting exterior build scans and dimensional data directly into manufacturing and installation specifications for overclad panels. In our workflow point clouds associated with LiDAR-scanned buildings are segmented into a facade feature space, vectorized features are extracted using an iterative random-sampling consensus algorithm, and from this representation an optimal panel design plan satisfying manufacturing constraints is generated. This system and the corresponding construction process is demonstrated on a test facade structure constructed at the National Renewable Energy Laboratory (NREL). We also include a brief summary of a techno-economic study designed to estimate the potential energy and cost impact of this new system.

build scans↗

The Construction of the sPHENIX Detector and Status of Its Commissioning

sPHENIX is the first new major detector at RHIC in over twenty years. It is designed for pioneering studies of the Quark Gluon Plasma and Cold QCD phenomena using high-pT jet and heavy flavor probes with a broad kinematic reach and a capability to take large statistics sets of A+A, p+p and p+A data. sPHENIX construction was completed in April 2023. It was commissioned and took first Au+Au data in the RHIC 2023 Run. This paper describes the details of the detector design, challenges of sPHENIX construction, progress on the commissioning and first data from the RHIC 2023 run.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Thermally Anisotropic Building Envelope Integration into Panelized Metal Construction: Laboratory Evaluation in Guarded Hot Box

The Thermally Anisotropic Building Envelope (TABE) is an active building envelope system that can exchange thermal energy with a storage medium to reduce the building’s energy demand. TABE redirects thermal energy along thin conductive layers in the building envelope to hydronic loops that are connected to thermal energy storage (TES), where it will be available to offset future energy demand when the conditions are favorable. TABEs can also be connected with a geothermal loop to reduce the building’s heating and cooling loads. Due to the importance of thermally conductive metal layers to TABE function, this technology has potential for easy adoption into panelized metal construction. In this study, we illustrate the construction process of prototype metal panels containing TABE and the laboratory evaluation in Oak Ridge National Laboratory’s rotatable guarded hot box. The thermal performance of the prototype panel was assessed for both baseline and operational cases and the total heat flow extracted from the panel by TABE was quantified.

Howard, Daniel↗

Mu2e Tracker Electronics - Construction of a Straw Tracker

The Mu2e experiment, currently under construction at the Fermi National Accelerator Laboratory (FNAL) in Batavia, Illinois, is a particle physics experiment designed to detect Charged Lepton Flavor Violation (CLFV) via muon-to-electron conversion, a process beyond the Standard Model (BSM). One of the primary Mu2e detectors is the Straw Tracker, whose purpose is to measure the momentum of the electron, identify the signal, and reject background. The straw tubes are being read out by a total of 20,736 preamplifiers (preamps) within 36 planes that make up the Tracker. In this presentation, the installation of electronics into the Tracker, the implementation of anti-oscillation copper clips, and the process of installing fully constructed planes into the frame will be discussed in depth.

Lynch, Alec [UC, Berkeley]↗

Design and Construction of a High-Resolution Hodoscope for the GlueX Experiment with High-Statistics Analysis of the p0, ¿, and ¿1 Photoproduction Cross Sections from the RadPhi Experiment

Differential cross sections for forward-angle photoproduction of p0, ¿, and ¿ 1 pseudoscalar mesons were measured using data from the RadPhi experiment conducted in Hall B at Jef ferson Lab. RadPhi utilized a tagged bremsstrahlung photon beam incident on a stationary 9Be target, with a detector system configured to trigger on a recoil proton in coincidence with multiple neutral showers in the calorimeter. Events were reconstructed and subjected to kinematic constraints, with background suppressed via sideband subtraction guided by Monte Carlo modeling of background contributions. Cross sections were extracted over the photon energy range 4.4– 5.4 GeV and binned in invariant momentum transfer t, providing measurements from one of the first high-statistics experiments of forward ¿ and ¿1 pro duction from a nuclear target at these energies. Acceptance corrections were applied using a detailed GEANT-based simulation of the detector geometry and response. The resulting cross sections are consistent with 2020 CLAS results, when scaled by the number of protons in beryllium, and show broad agreement with other data and theoretical models. In parallel, a high-resolution photon tagger detector, the Tagger Microscope (TAGM), was designed, constructed, and commissioned for the GlueX experiment in Hall D at Jefferson Lab. The TAGM was developed to provide high-rate tagging capability in the coherent bremsstrahlung peak by detecting post-bremsstrahlung electrons across a one GeV range along the focal plane of the tagging spectrometer. The detector consists of a 5ˆ102 array of 2ˆ2 mm2 square BCF-20 plastic scintillating fibers thermally fused to BCF-98 light guide fibers optically coupled to silicon photomultipliers. These fibers are mounted in a precision machined framework enabling fine positional adjustments to maintain precise alignment with post-bremsstrahlung electron trajectories, while ensuring mechanical rigidity, thermal stability, optical isolation, minimal inactive area, and radiation shielding for electronics. The construction effort involved extensive testing of fiber quality, light transmission, thermal fusing, radiation hardness, and defect analysis using SEM and EDX techniques. Following its installation and commissioning, the TAGM became a critical component of the GlueX beamline, enabling high-rate tagging essential for studies of hybrid mesons and gluonic ex citations.

McIntyre, James [Univ. of Connecticut, Storrs, CT ↗

Modular Multi-family Construction: A Field Study of Energy Code Compliance and Performance through Offsite Prefabrication

Prefabrication in a controlled, factory setting may improve the energy code compliance and energy performance of modular buildings compared to traditional site-built buildings. To test this premise, the work detailed in this DOE-funded commercial field study (EE0009082) compares the energy code compliance of 25 modular and 30 site-built multifamily buildings under construction in Los Angeles, San Francisco, Philadelphia and Seattle representing climate zones 3B, 3C, 4A and 4C respectively. This dataset includes full data on 20 modular and site-built buildings and partial data on 35 modular and site-built buildings that had started prior to or were completed after the 18-month data collection period. This study also compares the post-occupancy energy performance or energy use intensity (EUI) of an additional 23 modular multifamily buildings and 128 site-built multifamily buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Point containment algorithms for constructive solid geometry with unbounded primitives

Here, we present several algorithms for evaluating point containment in constructive solid geometry (CSG) trees with unbounded primitives. Three algorithms are presented based on postfix, prefix, and infix notations of the CSG binary expression tree. We show that prefix and infix notations enable short-circuiting logic, which reduces the number of primitives that must be checked during point containment. To evaluate the performance of the algorithms, each algorithm was implemented in the OpenMC Monte Carlo particle transport code, which relies on CSG to represent solid bodies through which subatomic particles travel. Two sets of tests were carried out. First, the execution time to generate a rasterized image of a 2D slice of three CSG models of varying complexity was measured. Use of both prefix and infix notations offered significant speedup over the postfix notation that has traditionally been used in particle transport codes, with infix resulting in a 6 x reduction in execution time relative to postfix for a model of a tokamak fusion device. We then measured the execution time of neutron transport simulations of the same three models using each of the algorithms. The results and performance improvements reveal the same trends as for the rasterization test, with a 5.52 x overall speedup using the infix notation relative to the original postfix notation in OpenMC for the tokamak model.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Bioremediation of copper in sediments from a constructed wetland ex situ with the novel bacterium Cupriavidus basilensis SRS

The H-02 constructed wetland was designed to remove metals (primarily copper and zinc) to treat building process water and storm water runoff from multiple sources associated with the Tritium Facility at the DOE-Savannah River Site, Aiken, SC. The concentration of Cu and Zn in the sediments has increased over the lifetime of the wetland and is a concern. A bioremediation option was investigated at the laboratory scale utilizing a newly isolated bacterium of the copper metabolizing genus Cupriavidus isolated from Tim’s Branch Creek, a second-order stream that eventually serves as a tributary to the Savannah River, contaminated with uranium and other metals including copper, nickel, and mercury. Cupriavidus basilensis SRS is a rod-shaped, gram-negative bacterium which has been shown to have predatory tendencies. The isolate displayed resistance to the antibiotics ofloxacin, tetracycline, ciprofloxacin, select fungi, as well as Cu 2+ and Zn 2+ . Subsequent ribosomal sequencing demonstrated a 100% confidence for placement in the genus Cupriavidus and a 99.014% match to the C. basilensis type strain. When H-02 wetland samples were inoculated with Cupriavidus basilensis SRS samples showed significant (p < 0.05) decrease in Cu 2+ concentrations and variability in Zn 2+ concentrations. Over the 72-h incubation there were no significant changes in the inoculate densities (10 6 –10 8 cells/ML) indicating Cupriavidus basilensis SRS resiliency in this environment. This research expands our understanding of the Cupriavidus genus and demonstrates the potential for Cupriavidus basilensis SRS to bioremediate sites impacted with heavy metals, most notably copper.

54 ENVIRONMENTAL SCIENCES↗

Construction of a New MgB 2 Coating System for 1.3-GHz Superconducting RF Cavities at LANL

After many years of evaluating MgB 2 films prepared with various techniques for the application to superconducting radio-frequency (SRF) cavities, we have decided to build a system to coat full-size 1.3-GHz elliptical cavities. This paper describes the design and construction of the system. Additionally, we briefly describe experimental results with a small system and first tests with the new large system. In conclusion, we were able to obtain superconducting samples with a T c of up to 38 K with the small system, but we have not been able to get any superconducting samples with the new system yet.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗