Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Commissioning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Commissioning of the Mu2e Data AcQuisition System and the Vertical Slice Test of the Straw Tracker

The report discusses the commissioning of the DAQ system of the Mu2e experiment. We studied how the tracker works and especially the tracker readout. We used a generator to send pulses and we tried to understand the output and non-output of the DTC, in order to validate the event and run format and all the failure modes. In section one, we describe Charged Lepton Flavour Violation, the main purpose of Mu2e, in section two we describe Mu2e experiment. Section three presents the tracker description and readout, meanwhile section four the DAQ system and event building. In section five, we start explaining the analysis we have done on events and all the failure modes we discovered. In section six, we have done an analysis of the logger and boardreader rate, we validated the generator frequency in section seven and studied the number of hits in function of the channel number in section eight. To conclude we investigated the channel to channel time differences in section nine and in section ten we explain our Monte Carlo simulation, reproducing ROCs readout.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Commissioning of the trigger system for the ICARUS T600 LAr-TPC detector in SBN Program

The ICARUS experiment at Fermilab is the far detector of the Short Baseline Neutrino Program (SBN), aimed at studing the neutrino oscillation to find a fourth type of neutrino, called sterile neutrino. A key component for this detector is the trigger system, which aims to identify and isolate the physical interactions from the background events. In this framework my internship program was dedicated to the development of trigger logic and trigger inhibit mechanism in order to select the genuine neutrino interaction and to guarantee a correct functioning of the readout system. These two steps, that represent a part of the commissioning of the trigger system, were implemented with LabVIEW Software. The obtained results are a fundamental step towards a succesful activation of the detector in the next few months.

43 PARTICLE ACCELERATORS↗

Pre-Commissioning of the Wide-Dynamic Range Halo Monitor to be Installed in the FERMILAB MI-8 Line

The beam halo can contribute to beam losses in accelerators and is very difficult to measure. With an increase in beam intensity following the PIP-II upgrade at Fermilab, the beam losses are expected to be higher with some coming from the beam halo. Therefore, it is important to measure the sources of beam halo to minimize the beam losses. A modified Halo Monitor developed by J-PARC will be installed in Fermilab MI-8 transfer line to measure the beam halo. In this paper, an update on the beam profile monitor fabrication is covered. The updates include the location selection for the Halo Monitor in the MI-8 transfer line, shielding options for instrumentation, and the next steps in commissioning.

Babacan, B. [IIT, Chicago; Fermilab]↗

Augmenting LLM-Based Agents for Improved Performance in Pentesting and Commissioning Operational Technology in Critical Infrastructure

Artificial intelligence (AI), and more specifically large language models (LLMs) have the potential for use in penetration testing (“pentesting”) against devices, networks, and computer systems in information technology (IT). We explore the possibility of extending pentesting from IT systems to operational technology (OT) systems, which are more obscure than IT systems in their protocols and design. A challenge therefore exists when applying pretrained LLMs to OT systems as corpora are likely to underrepresent OT systems in comparison to other more prevalent systems. We evaluate augmentations of LLMs with various methods, especially retrieval augmented generation (RAG), to improve performance of the LLMs in the OT domain. In addition to pentesting, some of the testing of these OT devices may include commissioning to ensure that the newly installed devices work correctly. Our framework may also be applied in such cases.

97 MATHEMATICS AND COMPUTING↗

Commissioning of the IOTA Proton Injector

The IOTA Proton Injector (IPI) at the Fermilab Accelerator Science and Technology facility (FAST) is a machine capable of delivering up to 14 mA pulses of protons at 2.5 MeV to the Integrable Optics Test Accelerator (IOTA) ring. Its construction was completed in the fall of 2025, followed by a successful commissioning run scheduled to conclude at the end of May 2026. It operates alongside the existing electron injector beamline to facilitate further beam physics research and continued development of novel accelerator technologies at the IOTA ring. This report details the current operational profile, known challenges, and future plans for the proton program development at FAST.

Romanov, A. [Fermilab] (ORCID:0000000287065709)↗

Vital area identification for U.S. Nuclear Regulatory Commission nuclear power reactor licensees and new reactor applicants.

U.S. Nuclear Regulatory Commission nuclear power plant licensees and new reactor applicants are required to provide protection of their plants against radiological sabotage, including the placement of vital equipment in vital areas. This document describes a systematic process for the identification of the minimum set of areas that must be designated as vital areas in order to ensure that all radiological sabotage scenarios are prevented. Vital area identification involves the use of logic models to systematically identify all of the malicious acts or combinations of malicious acts that could lead to radiological sabotage. The models available in the plant probabilistic risk assessment and other safety analyses provide a great deal of the information and basic model structure needed for the sabotage logic model. Once the sabotage logic model is developed, the events (or malicious acts) in the model are replaced with the areas in which the events can be accomplished. This sabotage area logic model is then analyzed to identify the target sets (combinations of areas the adversary must visit to cause radiological sabotage) and the candidate vital area sets (combinations of areas that must be protected against adversary access to prevent radiological sabotage). Any one of the candidate vital area sets can be selected for protection. Appropriate selection criteria will allow the licensee or new reactor applicant to minimize the impacts of vital area protection measures on plant safety, cost, operations, or other factors of concern.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

OVERVIEW OF THE U.S. DEPARTMENT OF ENERGY AND NUCLEAR REGULATORY COMMISSION PERFORMANCE ASSESSMENT APPROACHES: CEMENTITIOUS BARRIERS PARTNERSHIP

Engineered barriers including cementitious barriers are used at sites disposing or contaminated with low-level radioactive waste to enhance performance of the natural environment with respect to controlling the potential spread of contaminants. Drivers for using cementitious barriers include: high radionuclide inventory, radionuclide characteristics (e.g., long half-live, high mobility due to chemical form/speciation, waste matrix properties, shallow water table, and humid climate that provides water for leaching the waste). This document comprises the first in a series of reports being prepared for the Cementitious Barriers Partnership. The document is divided into two parts which provide a summary of: (1) existing experience in the assessment of performance of cementitious materials used for radioactive waste management and disposal and (2) sensitivity and uncertainty analysis approaches that have been applied for assessments. Each chapter is organized into five parts: Introduction, Regulatory Considerations, Specific Examples, Summary of Modeling Approaches and Conclusions and Needs. The objective of the report is to provide perspective on the state of the practice for conducting assessments for facilities involving cementitious barriers and to identify opportunities for improvements to the existing approaches. Examples are provided in two contexts: (1) performance assessments conducted for waste disposal facilities and (2) performance assessment-like analyses (e.g., risk assessments) conducted under other regulatory regimes. The introductory sections of each section provide a perspective on the purpose of performance assessments and different roles of cementitious materials for radioactive waste management. Significant experience with assessments of cementitious materials associated with radioactive waste disposal concepts exists in the US Department of Energy Complex and the commercial nuclear sector. Recently, the desire to close legacy facilities has created a need to assess the behavior of cementitious materials for applications in environmental remediation and decontamination and decommissioning (D&D) applications. The ability to assess the use and benefits of cementitious materials for these applications can significantly affect decisions related to cleanup activities. For example the need for costly remedial actions may not be necessary if existing or new cementitious barriers were adequately represented. The sections dealing with regulatory considerations include summaries of the different regulations that are relevant for various applications involving cementitious materials. A summary of regulatory guidance and/or policies pertaining to performance assessment of cementitious materials and sensitivity and uncertainty analyses is also provided in the following chapters. Numerous examples of specific applications are provided in each report. The examples are organized into traditional waste disposal applications (performance assessments), applications related to environmental remediation and D&D, and reactor and spent fuel related assessments. Sections that discuss specific facilities or sites contain: (1) descriptions of the role of the cementitious barriers or sensitivity/uncertainty analysis, (2) parameter assumptions and conceptual models, and (3) a relative discussion of the significance in the context of the assessment. Examples from both the U.S. Department of Energy Sites and the U.S. Nuclear Regulatory Commission are provided to illustrate the variety of applications and approaches that have been used. In many cases, minimal credit was taken for cementitious barriers. However, in some of those cases, benefits of being able to take credit for barriers were identified. The examples included: (1) disposal facilities (vaults, trenches, tank closures, cementitious waste forms and containers, etc.), (2) environmental remediation (old disposal facilities), (3) reactor and large structure decommissioning, and (4) spent fuel pools. These examples were selected to provide a perspective on the various needs, capabilities to model cementitious barriers, and use of sensitivity and uncertainty analysis and were not intended to include all cementitious barriers used in all low-level waste related PAs. The summary section in each report/chapter provides an overview of important considerations for the examples and compares and contrasts the different approaches that have been used. For example, specific time dependent physical processes (changes in hydraulic conductivity) and chemical processes (partitioning coefficients, and solubility coefficients) are identified and compared. The summary section also identifies key needs for future assessments. The Cementitious Barriers Partnership was established to address the key needs related to the use of cementitious barriers - waste forms, containment structures, physical stabilization fill materials.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Independent Verification and Validation Of SAPHIRE 8 Risk Management Project Number: N6423 U.S. Nuclear Regulatory Commission

This report provides an evaluation of the risk management. Risk management is intended to ensure a methodology for conducting risk management planning, identification, analysis, responses, and monitoring and control activities associated with the SAPHIRE project work, and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

99 GENERAL AND MISCELLANEOUS↗

Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

99 GENERAL AND MISCELLANEOUS↗

Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

99 GENERAL AND MISCELLANEOUS↗

Overview and Commissioning Status of the UCLA MITHRA Facility

Presented here are the first results of commissioning of the S-Band hybrid photoinjector and laser systems at the new accelerator and light source facility, MITHRA, at UCLA. The radiation bunker and capabilities of the facility are described with motivation for detailed measurement of beam parameters explained. Following thorough characterization of the photoinjector, a 1.5 m linac is to be installed and experiments up to 30 MeV will begin. These will include experiments in basic plasma physics, space plasma, terahertz production in dielectric structures, and inverse Compton scattering and applications for the X-rays produced.

Williams, Oliver (ORCID:0000000255874982)↗

LSST Commissioning Camera

The LSST Commissioning Camera (LSSTComCam) was mounted on the Simonyi Survey Telescope in August 2022 and observed for seven weeks in late 2024 until it was removed from the telescope in December 2024. It is a smaller, fully functional version of LSSTCam, with only the central raft of 9 4k x 4k CCDs (all ITL sensors) and comprising 144 megapixels. Every CCD has 16 amplifiers, each reading 1 million pixels. LSSTComCam was designed to enable end-to-end testing of the observatory’s systems, including data acquisition, image processing, and observatory operations.

79 ASTRONOMY AND ASTROPHYSICS↗

Actions to implement the recommendations of the Presidential Commission on the Space Shuttle Challenger Accident. Report to the President

The status of the implementation of the recommendations of the Presidential Commission on the Space Shuttle Challenger Accident is reported. The implementation of recommendations in the following areas is detailed: (1) solid rocket motor design; (2) shuttle management structure, including the shuttle safety panel and astronauts in management; (3) critical item review and hazard analysis; (4) safety organization; (5) improved communication; (6) landing safety; (7) launch abort and crew escape; (8) flight rate; and (9) maintenance safeguards. Supporting memoranda and communications from NASA are appended.

Source record↗