Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CONSTRUCTION INDUSTRY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Savannah River Site Footprint Reduction Results under the American Recovery and Reinvestment Act - 13302

The Savannah River Site (SRS) is an 802 square-kilometer United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina, managed and operated by Savannah River Nuclear Solutions. Construction of SRS began in the early 1950's to enhance the nation's nuclear weapons capability. Nuclear weapons material production began in the early 1950's, eventually utilizing five production reactors constructed to support the national defense mission. Past operations have resulted in releases of hazardous constituents and substances to soil and groundwater, resulting in 515 waste sites with contamination exceeding regulatory thresholds. More than 1,000 facilities were constructed onsite with approximately 300 of them considered radiological, nuclear or industrial in nature. In 2003, SRS entered into a Memorandum of Agreement with its regulators to accelerate the cleanup using an Area Completion strategy. The strategy was designed to focus cleanup efforts on the 14 large industrial areas of the site to realize efficiencies of scale in the characterization, assessment, and remediation activities. This strategy focuses on addressing the contaminated surface units and the vadose zone and addressing groundwater plumes subsequently. This approach streamlines characterization and remediation efforts as well as the required regulatory documentation, while enhancing the ability to make large-scale cleanup decisions. In February 2009, Congress approved the American Reinvestment and Recovery Act (ARRA) to create jobs and promote economic recovery. At SRS, ARRA funding was established in part to accelerate the completion of environmental remediation and facility deactivation and decommissioning (D and D). By late 2012, SRS achieved 85 percent footprint reduction utilizing ARRA funding by accelerating and coupling waste unit remediation with D and D of remnant facilities. Facility D and D activities were sequenced and permitted with waste unit remediation activities to streamline regulatory approval and execution. Achieving footprint reduction fulfills the Government's responsibility to address legacy contamination; allows earlier completion of legally enforceable compliance agreement milestones; and enables future potential reuse of DOE resources, including land and infrastructure for other missions. Over the last 3.5 years significant achievements were met that contributed to footprint reduction, including the closure of 41 waste units (including 20 miles of radiologically contaminated stream) and decommissioning of 30 facilities (including the precedent setting in situ closure of two former production reactors, the first in the DOE Complex). Other notable achievements included the removal of over 39,750 cubic meters of debris and 68,810 cubic meters of contaminated soils, including 9175 cubic meters of lead-contaminated soil from a former site small arms testing range and treatment of 1,262 cubic meters of tritium-laden soils and concrete using a thermal treatment system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nondestructive Evaluation of Concrete: Elastic Property Imaging Through Full Waveform Inversion

Concrete is a major construction material worldwide and plays a crucial role in the nuclear industry. The elastic properties of concrete are prone to change and degrade while in service, as it is often subjected to extreme operational and environmental conditions. An accurate evaluation of concrete's elastic properties is thus essential to ensure structural integrity and safety. This is especially true for concrete in nuclear power plants, where irradiation effects significantly impact concrete mechanical properties. There are various methods to assess these properties, with ultrasound-based techniques showing high potential due to their nondestructive nature, cost-effectiveness, and safety. While several nondestructive evaluation methods exist, most rely on idealizations such as assuming homogeneous material and plane wavefronts. In this work, we address these issues by introducing an ultrasound-based nondestructive method aimed at reconstructing spatially varying images of concrete mechanical properties. By accurately modeling wave physics, including scattering and reflection, we overcome several of the aforementioned idealizations and aim to utilize the full waveform for imaging material properties through depth, resulting in more reliable images. Full waveform inversion (FWI) was first introduced by geophysicists to reconstruct subsurface elastic property images. The goal is to minimize the difference between simulated and recorded wavefield signals, often through gradient-based optimization algorithms. While FWI is primarily conducted using the acoustic approximation of the wave equation, few works focus on elastic FWI, where the goal is to reconstruct images of not only the pressure wave speed but also the shear wave speed and density (or their equivalents). This work explores the potential of using elastic FWI to predict concrete mechanical properties as an initial effort for a more accurate monitoring of concrete conditions in service. Reconstructing images of different elastic parameters enables more specificity and accurate condition diagnosis. This paper will detail this approach and provide examples demonstrating the effectiveness of elastic FWI in reconstructing comprehensive maps of concrete mechanical properties.

42 - ENGINEERING↗

The Accident at Fukushima: What Happened?

At 2:46 PM, on the coast of the Pacific Ocean in eastern Japan, people were spending an ordinary afternoon. The earthquake had a magnitude of 9.0, the fourth largest ever recorded in the world. Avery large number of aftershocks were felt after the initial earthquake. More than 100 of them had a magnitude of over 6.0. There were very few injured or dead at this point. The large earthquake caused by this enormous crustal deformation spawned a rare and enormous tsunami that crashed down 30-40 minutes later. It easily cleared the high levees, washing away cars and houses and swallowing buildings of up to three stories in height. The largest tsunami reading taken from all regions was 40 meters in height. This tsunami reached the West Coast of the United States and the Pacific coast of South America, with wave heights of over two meters. It was due to this tsunami that the disaster became one of a not imaginable scale, which saw the number of dead or missing reach about 20,000 persons. The enormous tsunami headed for 15 nuclear power plants on the Pacific coast, but 11 power plants withstood the tsunami and attained cold shutdown. The flood height of the tsunami that struck each power station ranged to a maximum of 15 meters. The Fukushima Daiichi Nuclear Power Plant Units experienced the largest and the cores of three reactors suffered meltdown. As a result, more than 160,000 residents were forced to evacuate, and are still living in temporary accommodation. The main focus of this presentation is on what happened at the Fukushima Daiichi, and how station personnel responded to the accident, with considerable international support. A year after the Fukushima Daiichi accident, Japan is in the process of leveraging the lessons learned from the accident to further improve the safety of nuclear power facilities and regain the trust of society. In this connection, not only international organizations, including IAEA, and WANO, but also governmental organizations and nuclear industry representatives from various countries, have been evaluating what happened at Fukushima Daiichi. Support from many countries has contributed to successfully stabilizing the Fukushima Daiichi Nuclear Power Station. International cooperation is required as Japan started along the long road to decommissioning the reactors. Such cooperation with the international community would achieve the decommissioning of the damaged reactors. Finally, recovery plans by the Japanese government to decontaminate surrounding regions have been started in order to get residents back to their homes as early as possible. Looking at the world's nuclear power industry, there are currently approximately 440 reactors in operation and 60 under construction. Despite the dramatic consequences of the Fukushima Daiichi catastrophe it is expected that the importance of nuclear power generation will not change in the years to come. Newly accumulated knowledge and capabilities must be passed on to the next generation. This is the duty put upon us and which is one that we must embrace.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LANDO: Developing Autonomous Payload Offloading Capabilities for Lunar Surface Operations

Introduction: The Lightweight Surface Manipulation System (LSMS) AutoNomy capabilities Development for surface Operations and construction (LANDO) project is an Early Career Initiative selected for funding by NASA Space Technology Mission Directorate. LANDO is developing a general-purpose autonomy framework applicable to serial and tension-actuated manipulation agents, that will be validated using an existing prototype of the LSMS-L35 (35-kg wrist lift capacity on the lunar surface [Fig. 1], sized for a Commercial Lunar Pay-load Services (CLPS) mission). The autonomous LSMS-L35 will be used to demonstrate autonomous payload handling capabilities for Lunar and other planetary surfaces, directly addressing STMD capability gaps in autonomous excavation and construction operations, advanced robotics and spacecraft autonomy technologies, and technologies supporting emerging space industries including the In-Space Servicing, Assembly and Manufacturing national strategy. LSMS: The LSMS is a tension actuated robotic agent that is scalable (reach and lifting capacity in different gravity environments), versatile (types of surface operations), and reusable. Compared to serial arms, the LSMS provides significantly higher structural efficiency and mechanical advantage, enabling a greater payload lift capacity at a lower system mass. The LSMS is envisioned to be a crucial part of the excavation and construction portfolio, capable of supporting a variety of activities on the lunar surface. Autonomous payload handling is one of the first activities the LSMS can support that develops capabilities that are extensible to other surface operations. Payload handling is required to: remove payloads from a lander; place payloads on mobile agents for transport from a lander to construction site/assembly point; emplace payloads in their operational configuration, and aggregate components to create an asset. As an example of this critical gap, manifested CLPS missions do not currently have a ubiquitous payload offloading capability; payloads (excluding rovers) are designed to remain on the lander. Why Autonomy? Autonomous robotic systems capable of carrying out excavation and construction operations are a fundamental and critical capability required for realizing the NASA Artemis program vision to “emplace and build the infrastructure, systems, and robotic missions that can enable a sustained lunar surface presence.” While teleoperation is still feasible for lunar surface operations, increased latency at Mars will require validated supervised autonomous technologies capable of operating with minimal human involvement (human-on-the-loop) unless an unexpected event occurs requiring human intervention. Autonomy reduces operator burden, allows operations to continue during uncrewed periods, in-creases the safety of operations by automatically detecting and handling faults, and allows operating in high latency environments. Development Activities: LANDO is extending critical autonomous operations to the manipulation domain and creating an integrated system, based on reusable software modules, that is capable of planning and executing payload handling and autonomous surface operations without requiring hu-man intervention beyond a supervisory role. The priority features under development are 1) autonomously offload payloads from a tilted lander deck without buckling the LSMS; 2) sensing whether a payload is safe to lift and handle; and 3) integrate with Astrobotic’s CLPS lander. The poster presentation will highlight current development activities over the past year on LSMS-L35 prototype hard-ware design, and autonomy software.

in-space assembly↗

Integrating renewable energy into mining operations: Opportunities, challenges, and enabling approaches

Mining is one of the most energy-intensive industries worldwide. It also provides a critical source of raw materials for the manufacturing, transportation, construction, and energy sectors. Demand for raw materials is projected to increase as the world population grows and many low-income economies become middle-income countries. This growth in mineral demand, coupled with falling mineral ore grade, will likely increase the mining industry’s energy demand, used for activities across exploration, extraction, beneficiation and processing, and refining. At the time of this writing, mine operations are – due to their remoteness – dependent on fossil fuels such as diesel, heavy oils, and coal. In principle, mining could use energy recovery, renewable energy, and carbon capture to supplement, replace, or mitigate the impacts of fossil fuel use. However, a combination of renewable-energy technologies would be required. We explore challenges, opportunities, and enabling approaches to integrate renewable energy technologies into mining operations by examining the literature, including academic work, technical reports, and data produced by international agencies. Here, we find that despite numerous opportunities, technical issues still need to be considered, but solutions can tailor renewables to the mining industry. Further research should focus on identifying specific opportunities, technologies, and implementation strategies across the value chain of a variety of minerals with similar operational procedures.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Commerical-Scale CO2 Capture and Sequestration for the Cement Industry

On June 8, 2009, DOE issued Funding Opportunity Announcement (FOA) Number DE-FOA-000015 seeking proposals to capture and sequester carbon dioxide from industrial sources. This FOA called for what was essentially a two-tier selection process. A number of projects would receive awards to conduct front-end engineering and design (FEED) studies as Phase I. Those project sponsors selected would be required to apply for Phase II, which would be the full design, construction, and operation of their proposed technology. Over forty proposals were received, and ten were awarded Phase I Cooperative Agreements. One of those proposers was CEMEX. CEMEX proposed to capture and sequester carbon dioxide (CO2) from one of their existing cement plants and either sequester the CO2 in a geologic formation or use it for enhanced oil recovery. The project consisted of evaluating their plants to identify the plant best suited for the demonstration, identify the best available capture technology, and prepare a design basis. The project also included evaluation of the storage or sequestration options in the vicinity of the selected plant.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Environmental licensing in Brazilian's crushed stone industries

Highlights: • Failures in environmental reporting compromise the effectiveness of the environmental license process • The infrastructure of environmental agencies must be improved • The participation of society is essential for monitoring industries - Abstract: The crushed stone industries' activities are characterized by the extraction and processing of stones for use as aggregates in construction. The sector causes environmental impacts that can be mitigated by the implementation of control instruments, namely, environmental licensing, whose purpose is to carry out monitoring of potentially polluting activities. In this paper, it was analyzed the environmental studies of three industries located in Monsenhor Gil, Piauí, Brazil, elaborated as requisites for obtaining the environmental and mineral licenses. There were made visits to the State Department of Environment and Water Resources (SEMAR) and to the National Department of Mineral Production (DNPM) to verify the environmental reports and the environmental and mineral licensing processes. There were also made visits to the analyzed industries, with the aim of comparing the information contained in the studies, with the reality and verifying the implementation of the mitigating measures proposed in them, through the observation of the industries operation, and interviews with the responsible managers. Furthermore, it was made a research in the scientific literature, to know the licensing process in other countries, to compare with the Brazilian reality. From the research, in Brazilian industries, it was observed that, although all the legal steps to obtain the licenses have been fulfilled, the environmental reports have elaboration failures, such as the lack of a multidisciplinary team and the fact that some data diverge from the reality, decreasing the reliability of the evaluation of the environmental impacts caused by the projects. Also, the environmental replacement cost is not accounted in the final value of the product, and any of the industries have started the implementation of the proposed mitigation measures since they do not have mineral depletion areas. SEMAR was delayed in issuing licenses within the period established by law, and there are no periodic inspections by both the environmental agency and DNPM. It should also be pointed out that the community did not claim public hearings and there is no participation in environmental education projects, factors that compromise the effectiveness of the environmental licensing process. Regarding the process in other parts of the world, in some countries, such as Uruguay and Paraguay, the agency responsible for licensing and inspection is federal. In Argentina, as in Brazil and USA, states have autonomy to legislate on environmental issues. There is also divergence in the period of execution of the licenses, being 12 months in Brazil, while in Thailand it can be up to 56 days. In Peru, the society participation is much more representative than in Brazil, and there is differentiation in the collection form of environmental compensation fees, among countries. The failures pointed out in the Brazilian process, as well as the system of other countries, can serve as parameters for the improvement of the process' effectiveness, both in Brazil and in other parts of the world, aiming at the conservation of the environment.

54 ENVIRONMENTAL SCIENCES↗

Retrieval of High Level Waste for the Cigeo Project - A Practical Retrieval Test Story - 16085

Since the passing of the June 28, 2006 Act, Andra has incorporated in its step-wise design development of the French high level waste (HLW) and intermediate level long lived waste (IL-LLW) deep geological repository (DGR, aka Cigeo) various requirements linked to 'reversibility' at different stages of the repository life cycle (from its construction phase to its final closure). Reversibility is based on a number of practical dispositions including the progressivity of the development and deployment of the facility, the flexibility of the nature of operations being carried out, the adaptability of the facility to future modifications and the possible retrieval of waste. The capacity to retrieve waste from Cigeo, also called 'retrievability', bears specific requirements. On a shorter term, one must demonstrate that the waste container retrieval operations are technically safe and feasible over at least 100 years. The current paper starts with two acceptations: retrievability and reversibility. It details how those two notions are defined and inter-linked. The 'Retrievability Scale' as proposed by OECD/NEA (and adopted by Andra) is also reminded. The needs for demonstration of retrieval operations are also exposed for the two categories of waste containers disposed of in Cigeo (IL-LLW and HLW) within the context of their respective emplacement configurations (in disposal horizontal vaults and micro-tunnels) at different stages of the repository life cycle. The technical part of the paper is then focused on a practical case story: a technological test campaign (still running) of HLW container retrieval out of a steel cased disposal micro-tunnel. On a test bench built on surface to simulate (create) the environmental conditions that may prevail inside a HLW micro-tunnel at time of retrieval, it was possible to check whether the mechanical means developed for the purpose were adequate and sufficient. The test case story is exposed, c/w the problems and challenges encountered (high temperature impairing the retrieval robot's proper functioning, presence of corrosion products...). The trouble-shooting solutions implemented and the results are commented. This article concludes with a critical analysis of the methods and equipment used, the results obtained and provides some perspectives of improvement. The positive outcomes of this technical test campaign pave the way for planning the in situ retrieval tests to be programmed in the 'industrial pilot phase' of Cigeo (to be implemented over the ten first years of operations, including the active and inactive test period and the first years of disposal activities): the industrial pilot phase is presently scheduled around 2026-2036 (provided the Cigeo construction is authorized in 2021, following the licensing request filing scheduled in 2018). The issues of IL-LLW containers retrieval (for which specific solutions are also studied and technical demonstrations engaged or planned) are also briefly presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Outcomes of the full scale seal experiment: a seal industrial prototype for the Cigeo project - 15207

The Full Scale Seal (FSS) Experiment is one of various experiments implemented by Andra, within the frame of the French HLW and IL-LLW Deep Geological Repository Project (aka Cigeo) development, to demonstrate the technical feasibility and check the performance of the seals which will be constructed in the shafts, ramps, drifts and disposal vaults, at time of Cigeo underground facilities progressive closure. The FSS experimental objectives, principles and rationale were presented at WM'2013 (Paper 1306): FSS is a technological demonstrator built on surface, inside a concrete made horizontal drift model (also called the 'test box'). FSS is part of the European DOPAS (Demonstration of Plugs and Seals) [2] project, under the umbrella of the Implementing Geological Disposal - Technology Platform (IGD-TP) [3] project. FSS construction activities started in July 2012 and were completed in September 2014. The construction compliance assessment work activities are now ongoing (and will be continued until mid-2015). This paper presents the construction and monitoring story of the FSS components, starting with the construction of a first containment wall based on a low pH self-compacting concrete (SCC), followed by the swelling clay core backfilling sequence and finishing with the erection of a second containment wall based on a low pH shotcrete. The FSS experiment also enabled to qualify the commissioning methods applicable to an industrial sealing work at time of underground operations in the Repository. These commissioning methods are described and the results discussed. The equipment and methods used for the purpose of seal component construction and monitoring are presented. The physical characteristics obtained for each component of the seal are detailed and the compliance of measured values with the initial requirements is commented. The post-mortem work planned (e.g. coring and wire sawing of low pH concrete containment walls, use of penetrometer for the swelling clay core...) is also explained. FSS is a first of a kind experiment, by its size, by the technical choices made. The first technical outcomes were presented to the French Nuclear Authority and to its Technical Support Organization. The successful implementation of the work carried out in the FSS drift model was positively assessed by the evaluators and deemed representative of the real underground conditions (industrial feasibility is proven). This article concludes with a critical analysis of the methods and equipment used, of the results obtained and provides some perspectives of improvement for the construction of the first Cigeo industrial prototype seals scheduled around 2030 in ramps and horizontal drifts (provided the Cigeo construction is authorized in late 2020, and following the licensing request filing scheduled in late 2017). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modernizing the Nuclear Industry and New Ways of Working

Nuclear energy is recognized as the most feasible energy source towards achieving nation-wide net-zero goals (COP 208, MIT). Additionally, the demand for reliable, consistent energy supply is soaring with the construction of energy hungry data centers and AI tools. This means the construction of new nuclear and the continuation of current nuclear are a high national priority. However, this leaves the nuclear industry with a workforce challenge. The rising demand for nuclear power is threatened by an underpopulated workforce. There exist a few contributors to the decreased workforce such as skewed workforce demographics resulting in large-scale workforce retirement. Also, some plants have observed difficulty hiring and retaining skill sets that typically comprise the nuclear power workforce – specifically skilled craftsman. Those who are graduating with desirable skills are seeking employment in sectors that are more modern and culturally more aligned with younger generational values. Lastly, within the nuclear sector, skilled employees will be a competitive commodity as advanced plants come online offering work environments that incorporate modern technologies, skill sets, and opportunities for career advancement. These factors emphasize the need for legacy plants to modernize with a focus on the workplace environment and culture that meets younger generations’ skills, cultural expectations, and desire for advancement opportunities. Nuclear plants are actively engaged in deploying advancements that improve the management of systems, structures, and components as well as process improvements and technologies that can reduce the costs of operation and maintenance. However, the advancements must also be analyzed, reviewed and deployed in a manner that considers the impact on how people within the organization collaborate, communicate, make decisions, and solve problems. Neglecting to consider the cultural impact of modernization risks poor adoption, unrealized opportunities, or insignificant change toward helping attract new employees. The traditional way of working is not necessarily the way new generations want to engage with their employer. For instance, in a survey performed by North American Young Generation in Nuclear the top three reasons for younger nuclear employees to seek other job opportunities was seeking better work-life balance, a lack of advancement opportunities, and work culture and leadership style differences (Smyth et al. 2022). Integrated Operations for Nuclear (ION) is an approach for the nuclear industry to create long-term strategic modernization plans and analyze each advancement for the impact on people and processes and measure how those impacts flow up to support high-level, long-term plant goals and requirements. One principle of ION is to replace the current labor-centric operation style in legacy nuclear plants with data-centric collaborative operation styles. This paper will explain how transitioning operations to leverage centralized skills and responsibility, multi-skilled teams, and collaborative decision making can flatten the hierarchical structure in plants, enable greater individual efficacy while also offering more experiences and advancement opportunities to staff. Adopting the ION way of working shifts the industry mind-set towards more networked, collaborative, and modern way of working that will attract skilled, next-generation workers to operate the legacy nuclear fleet.

99 - GENERAL AND MISCELLANEOUS↗

Achieving Unprecedented CO 2 Utilization InCO 2 Concrete™: System Design, Product Development and Process Demonstration

Anthropogenic sources of carbon dioxide are generated from a number of sources, but the key among these are ordinary Portland cement (OPC) production and combustion of fossil fuels. Cement production is the largest global CO 2 source from the mineral decomposition of carbonates. This is due to the clinkering process whereby limestone (mainly consisting of CaCO 3 ) is decomposed into CaO and CO 2 , and combined with silica rich clays at high temperatures to form clinkers (i.e. the four key minerals that comprise cement). The high temperature range of 1400 – 1550°C required for this process accounts for up to 60% of the generated CO 2 from cement production. Combination of the limestone decomposition and thermal requirements of the clinkering process causes cement production to contribute 8-9% of annual global CO 2 emissions. Combustion of fossil fuels (coal, oil and gas) was shown to contribute a much larger portion of global CO 2 emissions. As of 2018, combustion of fossil fuels accounted for 65% of global CO 2 , where 41% was derived from stationary sources for electricity and heat generation and the other 24% was related to transport. To reduce these contributions, key steps forward in CO 2 utilization technologies are required. Therefore, a CO 2 mineralization technology (CO 2 mineralization concrete) to reduce the OPC content in concrete, while utilizing flue gas emissions from fossil fuel combustion has been developed to address both areas simultaneously. This Reversa™ technology utilizes low-carbon cementation agents produced by in situ CO 2 mineralization (“mineral carbonation reactions”) to offer a promising alternative to OPC. CO 2 mineralization relies upon the reaction of dissolved CO 2 with inorganic alkaline reactants to precipitate mineral carbonates (e.g., CaCO 3 ), which bind proximate particles and achieve cementation. Herein, a concrete green body, which is composed of a mixture of binder, water, and mineral aggregates, is exposed to CO 2 borne in industrial flue gas streams. This manner of CO 2 mineralization allows the production of construction components that feature equivalent engineering attributes as their OPC-based counterparts while featuring a much smaller embodied carbon intensity (eCI). The purpose of this project is to demonstrate the feasibility of the Reversa process evolving from a TRL-3 technology at the bench-scale up to TRL-6 technology at the pilot-scale. The reliability of the Reversa technology was tested to prove the effective production of three standard industrial concrete products selected during the course of the project. The results detailed herein will demonstrate the evolution of this technology to the industrial scale. The culmination of this work resulted in 9 production runs completed at the National Carbon Capture Center (NCCC), Wilsonville, AL, using natural gas (NG) flue gas as the CO 2 source. Over the course of the production runs at NCCC, the CO 2 utilization as a function of time, 24-h CO 2 uptake, electricity usage, and 28-d net area compressive strength recorded for each run. Collection of this data will be used to determine the success of the demonstration goals: (1) achieving in excess of 0.2gCO 2 /g reactant , (2) achieving greater than 50% reduction in global warming potential compared to standard produced units, and (3) ensuring compliance of carbonated concrete with industry standard specifications.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Satellite power system concept development and evaluation program. Volume 1: Technical assessment summary report

Candidate satellite power system (SPS) concepts were identified and evaluated in terms of technical and cost factors. A number of alternative technically feasible approaches and system concepts were investigated. A reference system was defined to facilitate economic, environmental, and societal assessments by the Department of Energy. All elements of the reference system were defined including the satellite and all its subsystems, the orbital construction and maintenance bases, all elements of the space transportation system, the ground receiving station, and the associated industrial facilities for manufacturing the required hardware. The reference conclusions and remaining issues are stated for the following topical areas: system definition; energy conversion and power management; power transmission and reception; structures, controls, and materials; construction and operations; and space transportation.

Source record↗

MRP: Qualification of Powder Metallurgy Hot Isostatic Pressed (PM HIP) Materials for Elevated-Temperature Nuclear Construction

PM HIP is a mature technology that offers many advantages that are attractive to the microreactor industry. The elevated-temperature creep-fatigue properties of the PM HIP 316H SS bar that has been characterized are reduced compared to the wrought material. Work will be carried out in fiscal year 2022 to identify the mechanisms responsible for the reduced creep-fatigue properties. Confirmatory testing of optimized material will be conducted to demonstrate long-term PM HIP properties comparable to the wrought-product form. The lessons learned for PM HIP 316H SS will be applied to the procurement and confirmatory testing of PM HIP Alloy 800H.

316H stainless steel↗

Moon to Mars Planetary Autonomous Construction Technology (MMPACT) Lunar Surface Construction Activity at NASA Marshall Space Flight Center

Introduction: The goal of the Moon to Mars Planetary Autonomous Construction Technology (MMPACT) Project at NASA Marshall Space Flight Center (MSFC) is to develop, deliver, and demonstrate on-demand capabilities to protect astronauts and create infrastructure elements on the lunar surface via construction of landing pads, habitats, shelters, roadways, berms, and blast shields using lunar regolith-based materials. MSFC has strong collaborations with industry, academia, and other NASA Centers to accomplish this goal. The MMPACT project consists of three elements. The first focuses on the development of an autonomous construction system. The second focuses on construction feedstock materials development. The third element focuses on the development of a microwave sintering construction capability. The team plans to demonstrate construction on a small Commercial Lunar Payload Services (CLPS) lander in the 2025 timeframe, with a future goal of constructing a subscale landing pad in 2028-2029.The MMPACT project is funded through the Lunar Surface Innovation Initiative, which is part of the Space Technology Mission Directorate. Technology Development: The MMPACT team will evaluate multiple autonomous construction and microwave construction technologies, materials, and construction element forms. Selected technologies will be matured; processes and operations will be defined for the two flight missions. Evaluations of materials, as well as the technology itself, will be demonstrated in simulated lunar environments as part of the technology maturation process. The team is keenly aware of the properties of the lunar environment. Its temperature swings, negligible exosphere, and unprepared site foundations factor into the materials for both construction and hardware, the concept of operations, and the technology’s interdependencies. Materials: The team is looking at materials that can be produced from in-situ resources in an effort to make lunar construction cost-effective. The particular focus of the materials team is cementitious materials, metals, and sintered and melted regolith. These materials will be studied for tensile, compressive, and flexural strength. They will also be tested for their ability to handle thermal swings and vacuum. They will be fully characterized using various microscopy techniques to examine micro-structures, chemistry, and crystal formation. Interdependencies: There are many interdependencies that MMPACT has already identified. These include: •Excavation interface •Regolith feedstock beneficiation •Regolith feedstock storage and provision •Requirements for structures •Site-to-site mobility systems •Availability of lunar simulant •Lander off-loading capabilities •Navigation systems •Power •Regolith composition and mineralogy •Lander specifications •Communication protocols Technology developments in these additional areas would be beneficial to MMPACT.

Moon to Mars Planetary Autonomous Construction Tec↗

FCC-ee: The Lepton Collider

Particle physics has arrived at an important moment of its history. The discovery of the Higgs boson, with a mass of 125 GeV, completes the matrix of particles and interactions that has constituted the “Standard Model” for several decades. This model is a consistent and predictive theory, which has so far proven successful at describing all phenomena accessible to collider experiments. On the other hand, several experimental facts do require the extension of the Standard Model and explanations are needed for observations such as the domination of matter over antimatter, the evidence for dark matter and the non-zero neutrino masses. Theoretical issues that need to be addressed include the hierarchy problem, the neutrality of the Universe, the stability of the Higgs boson mass upon quantum corrections and the strong CP problem. This report contains the description of a novel research infrastructure based on a highest-luminosity energy frontier electron-positron collider (FCC-ee) to address the open questions of modern physics. It will be a general precision instrument for the continued in-depth exploration of nature at the smallest scales, optimised to measure precisely the properties of the Higgs boson at the per-cent level, the Z and W bosons, the top quark and the Higgs coupling to the Z at the per-mil level. FCC-ee will provide unprecedented sensitivity to signs of new physics appearing either in the form of small deviations from the Standard Model or as rare decay processes. This collider will be implemented in stages, successively spanning the entire energy range from the Z pole over the WW threshold and H production peak to the t"t" ̅ threshold. Most of the infrastructure (e.g. underground structures, surface sites, electrical distribution, cooling & ventilation, RF systems) can be directly re-used for a subsequent highest-energy hadron collider (described in the FCC conceptual design report volume 3), serving the world-wide particle-physics community in a highly synergetic and cost-effective manner throughout the 21st century. The European Strategy for Particle Physics (ESPP) update 2013 stated “To stay at the forefront of particle physics, Europe needs to be in a position to propose an ambitious post-LHC accelerator project at CERN by the time of the next Strategy update”. The FCC study has implemented the ESPP recommendation by developing a long-term vision for an “accelerator project in a global context”. This document describes the detailed design and preparation of a construction project for a post-LHC circular lepton collider “in collaboration with national institutes, laboratories and universities worldwide”, and enhanced by a strong participation of industrial partners. Now, a coordinated preparation effort can be based on a core of an ever-growing consortium of already more than 135 institutes worldwide. The technology for constructing a high-energy, highest-luminosity circular lepton collider exists today. The FCC-ee concept comprises a power-saving twin-aperture magnet system, a continuous top-up injection scheme for stable operation and maximum integrated luminosity. Combined with an energy staging scheme, the FCC-ee represents the most efficient and most sustainable route for executing the research required to discover signs of new physics beyond the Standard Model. The step-wise energy increase of the FCC-ee does not require any additional civil engineering activities. Strategic R&D for FCC-ee aims at minimising construction cost and energy consumption, while maximising the socio-economic impact. It will mitigate residual technology-related risks and ensure that industry can benefit from an acceptable economic utility. Concerning the implementation, a preparatory phase of about eight years is both necessary and adequate to establish the project governance and organisation structures, building the international machine and experiment consortia, developing a territorial implementation plan in agreement with the host-states’ requirements, optimising the disposal of land and underground volumes and preparing the civil engineering project. Such a large-scale, international fundamental research infrastructure, tightly involving industrial partners and providing training at all education levels, will be a strong motor of economic and societal development in all participating nations. The FCC study has implemented a set of actions towards a coherent vision for the world-wide high-energy and particle physics community, providing a collaborative framework for topically complementary and geographically well-balanced contributions. This conceptual design report lays the foundation for a subsequent infrastructure preparatory and technical design phase.

43 PARTICLE ACCELERATORS↗

Ultra-Stable and High-Cobalt-Loaded Cobalt@Ordered Mesoporous Carbon Catalysts: All-in-One Deoxygenation of Ketone into Alkylbenzene

Catalytic deoxygenation represents a straightforward and core methodology for fine-chemical production and biomass upgrading. Generally, the application of homogeneous metal complexes or heterogeneous noble-metal catalysts prevails in academia and the chemical industry. We introduce cobalt@ordered mesoporous carbon (Co@OMC) catalysts, which are constructed conveniently by a mechanochemical coordination self-assembly based on a renewable tannin precursor. Importantly, the Co@OMC catalysts with a high loading of in situ confined Co species promote the selective deoxygenation of various ketones, aldehydes, and alcohols efficiently into the corresponding alkanes under mild conditions. Therefore, a simple, inexpensive, and heterogeneous catalyst for selective deoxygenation can be expected, meanwhile the solid-state synthesis affords a green, rapid, and scalable pathway to Co@OMC catalysts.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Species- and element-specific patterns of metal flux from contaminated wetlands versus metals shed with exuviae in emerging dragonflies

Dragonfly adults and their aquatic immature stages are important parts of food webs and provide a link between aquatic and terrestrial components. During emergence, contaminants can be exported into terrestrial food webs as immature adults fly away or be shed with their exuviae and remain in the wetland. Our previous work established metals accumulating in dragonfly nymphs throughout a contaminated constructed wetland designed to regulate pH and sequester trace metals from an industrial effluent line. In this paper we evaluated the concentration and mass of metals leaving the wetland in flying emergents versus remaining in the wetland with the shed exuviae in 10 species of dragonflies belonging to 8 genera. Nine elements (Cu, Zn, Cd, Mn, V, Mg, Fe, Al, Pb) were evaluated that include essential and nonessential elements as well as trace and major metals. Metal concentrations in the emergent body and exuviae can differ by orders of magnitude. Aluminum, Fe, Mn, and Pb were largely shed in the exuviae. Vanadium and Cd were more variable among species but also tended to be shed with the exuviae. In contrast, Cu, Zn, and Mg showed a higher tendency to leave the wetland with an emerging dragonfly. Metals shed in dragonfly exuviae can moderate the transport of metals from contaminated wetlands. Taxonomic- and metal-specific variability in daily metal flux from the wetland depended upon concentration accumulated, individual body mass, and number of individuals emerging, with each factor's relative importance often differing among species. This illustrates the importance of evaluating the mass of metals in an individual and not only concentrations. Furthermore, differences in numbers of each species emerging will magnify differences in individual metal flux when calculating community metal flux. A better understanding of the variability of metal accumulation in nymphs/larvae and metal shedding during metamorphosis among both metals and species is needed.

54 ENVIRONMENTAL SCIENCES↗