Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Audit”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Putting Data to Work: Using Building Energy Performance Data to Expand the Market for Energy Efficiency in Buildings

An increasing number of state and local jurisdictions are implementing building performance reporting laws, which generate large quantities of useful data on the characteristics and resource consumption of the building stock. Yet, to realize the potential of these policies, the data must not only be disclosed, but put to work to drive energy savings. Under a three-year pilot, Washington DC (DC), New York City (NYC) and their partners are pioneering the use of data from building performance reporting in energy efficiency programs. To minimize the administrative burden of managing, combining, and sharing these data sets, the cities are utilizing the U.S. Department of Energy’s (DOE) open-source Standard Energy Efficiency Data (SEED) Platform. The Putting Data to Work project team is working with efficiency program administrators to develop and implement new and innovative ways in which the data collected through benchmarking, energy audits, and related policies can be used to improve energy policies and planning, unlock data directly for market use, scale-up the market for energy efficiency services, drive competition, better target utility incentive programs, and inform measurement and verification. This paper details achievements and key findings in DC and NYC to date, including the importance of high compliance, data quality, and data cleansing in using the information collected; methods that the cities are using to apply data to drive maximum energy efficiency; and the importance of inter- and intra-agency collaboration in program success. We also outline the path forward and detail expected outcomes and scalability of project activities.

Beddingfield, Erin↗

“It is amazing what you can accomplish if you do not care who gets the credit”: Creating Alignment between Cities and Utility Energy Efficiency Programs

Cities are significantly acting as market catalysts to encourage and require building owners to improve energy performance. Yet, cities implementing building performance policies that require actions like audits or re-tuning may experience conflicts with their regulated utilities’ efficiency programs, which depend on energy savings being additional—not attributable to market adoption or preexisting laws. These utility programs preclude free ridership, meaning that the energy savings should be achieved by someone who otherwise would not have acted in the absence of the incentive or rebate. Utilities may decline to offer incentives where cities require particular actions, in turn dissuading cities from enacting ordinances that would lead to further efficiency improvements. This regulatory challenge impedes what could otherwise be a shared goal of improving energy efficiency. Finding solutions that allow city ordinances and utility programs to coexist is vital as cities are taking climate and energy matters into their own hands. Cities and utilities have so far navigated this problem informally. One potential approach is to apply established models from the world of energy codes, where some state regulators have permitted utilities to earn energy savings credit from supporting adoption of energy codes, or from improving code compliance. We consider how this approach and other frameworks could be applied to building performance policies. More specifically, this paper lays out a theory for how utilities can collaborate with local partners to drive deeper energy savings, with oversight from regulators, and examines the question of attributing the savings between the city and utility.

Crandall, Kelly↗

Acceptable Knowledge Summary Report for REMOTE-HANDLED DEPLETED URANIUM INGOTS FROM MATERIALS AND FUELS COMPLEX

This Acceptable Knowledge (AK) Summary Report has been prepared for the Central Characterization Program (CCP) for remote-handled (RH) transuranic (TRU) waste generated and managed by the Materials and Fuels Complex (MFC), formerly Argonne National Laboratory-West (ANL-W) and part of the Idaho National Laboratory (INL). The waste described in this report, depleted uranium ingots (waste stream ID-MFC-DU-INGOT), was historically generated in Building 765, the Fuel Conditioning Facility (FCF), formerly, Hot Fuel Examination Facility (HFEF)-South. This AK Summary Report, along with the referenced supporting documents, provides a defensible and auditable record of AK for the designated waste stream, depleted uranium ingots, produced from the FCF electrorefining process. The references and AK source documents used to prepare this report are listed in Sections 8.0 and 9.0 respectively. The source documents cited throughout this report are identified by alphanumeric designations corresponding to a unique Source Document Tracking Number (e.g., AKA01, C001, CCE01, DR001, M001, P001, and U001).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deploying Software-Defined Networking in Operational Technology Environments

Software Defined Networking for Operational Technologies, referred to as OT-SDN, is a leading technology to secure critical infrastructure and command and control (C2) systems. As the name implies, OT-SDN networks are programmable, which allows system owners to utilize the characteristics of their physical process to inform the security of their network. There are best practices for deploying OT-SDN into an environment, whether it is all at once or over time (hybrid) that the network is converted to SDN technologies. Through the development of data mining tools and standardized process control, OT-SDN can be deployed reliably. These tools will minimize or eliminate any communication failures during the transition and provide the network owner with complete documentation of their environment. This documentation could enable or facilitate the network owner to pass any audits or policy checks (Authority to Operate) before being allowed to utilize the OT-SDN infrastructure.

Software Defined Networking, Operational Technolog↗

State Insights On The Water-Energy Nexus And Policy Ideas To Achieve Greater Savings

Governors, state policymakers, utilities and other stakeholders across the country are increasingly aware of the connection between energy and water production and use, and the need to conserve both resources to meet economic and environmental goals. It requires substantial amounts of water to produce energy and considerable amounts of energy to treat and deliver water. The critical interdependence between energy and water was clearly illustrated during the recent winter storm in Texas and other parts of the South in February 2021. Initial power outages contributed to a longer-term water crisis. Power outages led to water pump failures while water demand increased from frozen water pipes that burst. This caused low water pressure that can lead to harmful bacteria growth in the water. The power outages also prevented water treatment plants from properly treating the water for several days, thereby leaving many residents without clean drinking water and worsening the storm’s impacts. The National Governors Association has been working with states on this connection between water and energy and strategies for conserving those resources for several years. NGA held a Water-Energy Nexus Learning Lab in September 2020. This event invited two leading states in the water-energy nexus space, Arizona and Wisconsin, to showcase some of their model policies and programs to other states, Maryland, Nevada, North Carolina, North Dakota, and Washington, looking for greater savings opportunities. This paper provides an overview of challenges that states are facing in developing integrated water and energy conservation policies; provides background on Arizona and Wisconsin’s innovative water-energy policies and programs; and summarizes action items the participating state teams identified for their respective states. The main categories of policy solutions identified by states at NGA’s Water-Energy Nexus Learning Lab were: Funding & Financing – providing financial incentives for water efficiency modeled after established energy efficiency programs, and an emphasis on financial support for small water and energy utilities. Education & Technical Assistance – providing more education and training opportunities about ways to achieve cost-effective energy and water savings, and the needs of resource-constrained small and medium utilities for training and other assistance. Structural Changes to Encourage Conservation – developing ways to incentivize agricultural conservation such as through water allocation strategies; adopting water reuse or water loss standards; and requiring electric utilities to consider water impacts as part of their integrated resource planning process. Communications & Data – conducting energy audits, reviewing water data provided to state agencies, and developing data benchmarking tools to measure and better manage energy and water use. Climate Strategy – establishing a multi-agency working group or other collaborative approach to determine ways to integrate energy and water savings in state policies and help meet the state climate objectives.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ACCELERATED CREEP TEST (ACT) QUALIFICATION OF CREEP RESISTANCE USING THE WCS CONSTITUTIVE MODEL AND STEPPED ISOSTRESS METHOD (SSM)

In this study, a qualification of accelerated creep-resistance of Inconel 718 is assessed using the novel Wilshire-Cano-Stewart (WCS) model and the stepped isostress method (SSM) and predictions are made to conventional creep data. Conventional creep testing (CCT) is a long-term continuous process, in fact, the ASME B&PV III requires that 10,000+ hours of experiments must be conducted to each heat for materials employed in boilers and/or pressure vessel components. This process is costly and not feasible for rapid development of new materials. As an alternative, accelerated creep testing techniques have been developed to reduce the time needed to characterize the creep resistance of materials. Most techniques are based upon the time-temperature-stress superposition principle (TTSSP) that predicts minimum-creep-strain-rate (MCSR) and stress-rupture behaviors but lack the ability to predict creep deformation and consider deformation mechanisms that occur for experiments of longer duration. The stepped isostress method (SSM) has been developed which enables the prediction of creep deformation response as well as reduce the time needed for qualification of materials. The SSM approach has been successful for polymer, polymeric composites, and recently has been introduced for metals. In this study, the WCS constitutive model, calibrated to SSM test data, qualifies the creep resistance of Inconel 718 at 750°C and predictions are compared to CCT data. The WCS model has proven to make long-term predictions for stress-rupture, minimum-creep-strain-rate (MCSR), creep deformation, and damage in metallic materials. The SSM varies stress levels after time interval adding damage to the material, which can be tracked by the WCS model. The SSM data is calibrated into the model and the WCS model generates realistic predictions of stress-rupture, MSCR, damage, and creep deformation. The calibrated material constants are used to generate predictions of stress-rupture and are post-audit validated using the National Institute of Material Science (NIMS) database. Similarly, the MCSR predictions are compared from previous studies. Finally the creep deformation predictions are compared with real data and is determined that the results are well in between the expected boundaries. Material characterization and mechanical properties can be determined at a faster rate and with a more cost-effective method. This is beneficial for multiple applications such as in additive manufacturing, composites, spacecraft, and Industrial Gas Turbines (IGT).

36 MATERIALS SCIENCE↗

ESPC ESA Webinar Series: ESPC ENABLE Contract Vehicle Overview

This webinar provides instructions and resources for financing distributed energy projects (e.g. on-site renewable energy, storage, and combined heat and power) using an energy savings performance contract (ESPC) energy sales agreement (ESA) through the U.S. Department of Energy's (DOE) ESPC ENABLE contract vehicle. The ESPC ENABLE contract vehicle is a streamlined procurement process that uses a standard investment grade audit tool and standard contract templates. Topics covered in the webinar include: An overview of the ESPC ENABLE contract vehicle; ESA-specific considerations for ENABLE contracts; and Case studies. This webinar also provides an overview of the resources available on the Federal Energy Management Program website, such as ESPC ENABLE templates. This webinar is the fourth of a series that provides information, best practices, and resources for implementing an ESPC ESA project. ESPC ESAs are a great option for federal sites that are motivated to reduce site costs, have no capital investment funding, and cannot use the U.S. Department of Defense 10 USC 2922a authority for long-term contracting.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Smart Semi-Supervised Accumulation of Large Repositories for Industrial Control Systems Device Information

Industrial Control Systems device manufacturers frequently add new features to improve their product performance. Oftentimes, these changes are mainly vendor-driven initiatives, and customers may not be aware of the full impact of these new capabilities on their cybersecurity posture. In the energy sector, this can lead to considerable dissonance between vendor-provided cybersecurity claims and a customer’s responsibility for Operation Technology cybersecurity compliance. Thus, the resulting dynamic verification burden is shifted towards the customer and may pose a significant cybersecurity risk to the energy sector landscape. We found that there is very limited research into cybersecurity auditing for Operational Technology. However, a solution is needed for vetting the vendor-supplied feature claims and their adherence to cybersecurity requirements and standards. We are presently engaged in an effort to develop such a system. This paper demonstrates one vital aspect of this effort in proposing an end-to-end framework to accumulate a large repository of ICS device information for this vetting system, curate the dataset, and conduct extensive processing. This framework is designed to use web scraping, data analytics and Natural Language Processing (NLP) techniques to identify vendor websites, automate the collection of website-accessible documents and automatically derive metadata from them for identification of product documents relevant to the repository. We have found that this automated approach to vendor identification, document extraction into a product repository, and NLP pre-processing is unique and has not been previously presented in the literature. The preliminary work shows that this is feasible and can produce reliable results with minimum supervision. Future work will be built upon this foundation in order to achieve semi-supervised vetting of device technical information – a vital capability for ensuring that vendor-claimed device cybersecurity capabilities match industry requirements.

Ameri, Kimia↗

A Commercial Building Plug Load Management System that Uses Internet of Things Technology to Automatically Identify Plugged-In Devices and Their Locations

Plug and process loads (PPLs) account for a large portion of U.S. commercial building energy use. There is a huge potential to reduce whole building consumption by targeting PPLs for energy savings measures or implementing some form of plug load management (PLM). Despite this potential, there has yet to be a widely adopted commercial PLM technology. This paper describes the Automatic Type and Location Identification System (ATLIS), a PLM system framework with automatic and dynamic load detection (ADLD). ADLD gives PLM systems the ability to automatically identify devices as they are plugged into the outlets of a building. The ATLIS framework takes advantage of smart, connected devices to identify device locations in a building, meter and control their power, and communicate this information to a central database. ATLIS includes five primary capabilities: location identification, communication, control, energy metering, and data storage. A laboratory proof of concept (PoC) demonstrated all but the energy metering capability, and these capabilities were validated using a series of system tests. The PoC was able to identify when a device was plugged into an outlet and the location of the device in the building. When a device was moved, the PoC's dashboard and database were automatically updated with the new location. The PoC implemented controls to devices from the system dashboard so that devices maintained correct schedules regardless of where they were plugged in within the building. ATLIS's primary technology application is improved PLM, but other applications include asset management, energy audits, and interoperability for grid-interactive efficient buildings. An ATLIS-based system could also be used to direct power to critical devices, such as ventilators, during a brownout or blackout. Such a framework is an opportunity to make PLM more widespread and reduce the amount of energy consumed by PPLs in current and future commercial buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

System and method associated with expedient detection and reconstruction of cyber events in a compact scenario representation using provenance tags and customizable policy

A system associated with detecting a cyber-attack and reconstructing events associated with a cyber-attack campaign, is disclosed. The system performs various operations that include receiving an audit data stream associated with cyber events. The system identifies trustworthiness values in a portion of data associated with the cyber events and assigns provenance tags to the portion of the data based on the identified trustworthiness values. An initial visual representation is generated based on the assigned provenance tags to the portion of the data. The initial visual representation is condensed based on a backward traversal of the initial visual representation in identifying a shortest path from a suspect node to an entry point node. A scenario visual representation is generated that specifies nodes most relevant to the cyber events associated with the cyber-attack based on the identified shortest path.A corresponding method and computer-readable medium are also disclosed.

Source record↗

Application of the Continuum Damage Mechanics Wilshire-Cano-Stewart (WCS) Model

In this study, the applications of the continuum damage mechanics-based Wilshire-Cano-Stewart (WCS) model are explored to predict rupture time, minimum-creep-strain-rate (MCSR), damage, damage evolution, and creep deformation. Increase knowledge in manufacturing methods has pushed the limit of material science and the development of new materials. Conventional testing is required to qualify materials against creep which according to the ASME B&PV III code, 10,000+ hours of experiments are necessary for each heat before materials are put into service. This process is costly and not feasible for new materials. As an alternative, models have been employed to predict creep behaviors and reduce the amount of time necessary for material qualification. Many models have been developed to predict distinct creep behaviors and the question of which model is best remains. Amongst current models, the WCS model has emerge with the ability to predict multiple behaviors using an explicit analytical approach with the ability to predict long-term creep. In this study the novel continuum damage mechanics WCS is employed in multiple applications. The goals of the study are (a) to discuss and determine the framework of the WCS model and validated it mathematically and using parametric simulations, (b) applied the model to accelerated creep data to show the capabilities of the model with non-conventional data, and (c) applied a novel numerical method, the datum temperature method (DTM) to show the model extrapolations and interpolations capabilities with limited and reduce data sets. To accomplish these goals, data is gathered for alloy P91 and Inconel 718 to develop and post-audit validate the model. The benefits of using the WCS model is that it provides an explicit stress and temperature dependency ideal for extrapolations, the coupled equations are suitable for finite element analysis (FEA) implementation, and it follows an explicit calibration approach. The model also proves that it can be applied to accelerated testing data and using the DTM.

Cano, Jaime A↗

It's All About the Envelope: Prioritizing Envelope Upgrades for Electrification of Cold Climate Homes

Building decarbonization via electrification on a clean grid is the most promising climate solution proposed to date for the building sector. In cold climate zones, building electrification will be driven in large part by moving from natural gas space heating to cold climate heat pumps (CCHPs). CCHPs are commercially available today, including economical cold climate air source heat pumps (ccASHPs). But there's one big problem - wide-scale adoption of ccASHPs will dramatically increase winter peak electricity demand, even with the highest efficiency ccASHP products. Furthermore, cold climate space heating loads will drive unprecedented electric system peaks during the lowest periods of renewable generation and are likely to overwhelm existing distribution systems. This scenario is avoidable by coupling electrification with building envelope upgrades to reduce peak heating loads. This paper presents a model, built from home energy audit and research data sets, that quantifies the above challenges. Results demonstrate how weatherization efforts coupled with additional high-performance envelope upgrade measures can prepare the building stock for electrification and show the benefit these measures can bring to future utility operations. Much of this envelope upgrade work is cost-effective, according to conservative cost-benefit testing and program successes to date, and is coupled with substantial non-energy benefits. However, persistent market barriers have made scaling of envelope retrofit work challenging for decades, suggesting additional policy support is required. Lessons learned from previous policy experience, combined with new technology and administrative support, create exciting potential for this decarbonization climate solution.

air sealing↗

Uncertainty evaluation for the realistic safety analysis methodology of RIA by utilizing experimental results

An audit calculation methodology for the safety analysis of reactivity-initiated accident (RIA) in a PWR based on the realistic approach is under developing in Korean Institute of Nuclear Safety. In this paper important uncertainty parameters to the rod performance were described, and the validity of those parameters was assessed by utilizing the CABRI and NSRR experimental results. Sensitivity study has been carried out to identify the parameters by changing fuel burnup, injected energy and full-width half maximum (FWHM) of given RIA power pulses. FRAPCON-3.5 and FRAPTRAN-1.5 fuel performance code were utilized. Non-parametric order statistics was used for the uncertainty quantification, and 124 inputs on each experimental case were produced by simple random sampling technique. Analysis results showed that the assessed fuel performance uncertainties such as the fuel enthalpy, fission gas release and clad plastic hoop strain could not bound some experimental results. This means that the currently considered uncertainty range, particularly for the peak power, is not enough to cover the fuel performance uncertainty within a sufficient probability and confidence level. (author)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Assessment of defense-related uranium mines in the United States and other US DOE office of legacy management domestic and international uranium initiatives - 15335

US DOE's Office of Legacy Management (LM) has taken several initiatives to improve domestic uranium mining and milling operations in the United States and to contribute to the management of legacy uranium mining and milling sites around the world. Initiatives include completing the 2014 Report to Congress on Defense-Related Uranium Mines, managing the Title X Uranium and Thorium Program with the Office of Environmental Management, and assisting IAEA with uranium issues in member state countries. The 2014 Report to Congress identified abandoned uranium mines (AUMs) in the United States that provided uranium ore to the US Atomic Energy Commission (AEC) between 1947 and 1970. The report identified AUM locations, reclamation/remediation status, radiological risks and other hazards, costs for reclamation and remediation, and potential prioritization schemes for mine cleanup. To develop reclamation and remediation cleanup cost estimates and assess risks, AUMs were grouped into six categories by tons of uranium ore produced, ranging from Small (less than 91 metric tons [100 tons]) to Very Large (greater than 453,900 metric tons [500,000 tons]). Radiological risk was calculated using the RESRAD computer code for five exposure scenarios: offsite resident, onsite resident, occasional visitor, recreational visitor, and mine reclamation worker. Results indicate that 69 percent of the AUMs are in Colorado and Utah and 23 percent are in Arizona, Wyoming, and New Mexico; and that the majority of the AUMs (68 percent) were considered Small or Small/Medium production mines, producing less than 908 metric tons (1,000 tons) of uranium ore. Although New Mexico has fewer AUMs (247) than the other states in the Colorado Plateau region, AUMs in that state (primarily those in the Grants Mineral Belt) produced 45 percent of the 79.5 million tons of AEC-purchased uranium ore. About 50 percent of the AUMs are on public land managed by the US Bureau of Land Management; 435 AUMs are on the Navajo Nation. Risk estimates for the onsite resident scenario (plausible on tribal and non-federal land) could result in an incremental cancer risk greater than 10{sup -4}. Radon inhalation was the dominant contributor to radiological risk for the five exposure scenarios evaluated. Different state and federal agencies are conducting cleanup of some AUMs under various remedial and legal authorities. Activities constituting mine 'reclamation' may reduce radiological risks to humans to acceptable levels for many mines on federal public lands if the occasional visitor and recreational visitor exposure scenarios are assumed. Addressing physical hazards (e.g., open shafts) at mines where conditions could cause serious injuries is typically a priority of public land management agencies. At locations where mine-related groundwater contamination occurs, it is a significant contributor to cleanup costs. However, most Small and Small/Medium AUMs were likely developed above the water table, and some wet mines are located in areas where groundwater has high, naturally occurring levels of the same constituents (including radioactive elements) that are typically associated with uranium mines. LM is also administering, with the US DOE Office of Environmental Management, the Title X program, which was developed by Congress to reimburse private companies (i.e., those that held active operating licenses prior to 1978) for a portion of their reclamation costs for mill sites that processed ore sold to AEC. LM recently updated the program guidance document and established internal protocols for annually auditing companies. LM is assisting IAEA on two different initiatives: assisting developing countries with training on the basic steps to take to perform reclamation of uranium mines, and developing technical guidance and case studies related to safety and environmental assessments and post-closure management of uranium legacy sites as part of the IAEA Regulatory Supervision of Legacy Sites initiative. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning costs - some international perspectives and initiatives. Presentation for Panel discussion. Session No. 024: 'Getting a Handle on Decommissioning Costs - a Global Perspective'

Financing for decommissioning: Are the cost estimates valid? Are the financing arrangements suitable? Are the fund management systems appropriate? Cost estimates are estimated, analysed and updated on a regular basis, but cost comparisons are not straight-forward. There is an incomplete understanding of variability between estimates. Multiple internal and external factors impact estimates: Institutional, legal and policy, purpose, Strategies and plans, overall context, Facility characteristics and history Contingencies and risk, Limited actual cost data. The financing arrangements: there exists a range of systems in place for the implementation of Funding Policy and Strategy, but there are Considerable variations in: Calculating funding requirements, contributions/provisions, Allocating risks and requirements for securities Managing funds and accounting, adjusting the system, Managing disbursements, Reporting and supervision. All cost estimates for future decommissioning activities include considerable uncertainties. These uncertainties will gradually diminish with growing experience from current and planned projects. Different costing methods have different data requirements. Their reliability depends on the extent to which various data are available and applicable to the specific case being considered. Independent of the assessment method, some uncertainty is inevitable in all estimates of future costs. Analysis of the costing method may be useful in order to locate the key uncertainties in each specific estimate. NEA's Decommissioning Cost Estimation Group (DCEG) was Created in 2008 to foster the exchange of information and experience. It Aims to enhance the credibility, reliability, and auditability of the cost estimation process. It Helps define international good practices in decommissioning cost estimation. However, some major challenges remain. Weaknesses in: Understanding relations between estimates and actual costs, Lack of relevant cost data, sharing data. How might be addressed: Improved sharing of cost data, Systematic analyses of estimates and actual costs, Developing benchmarking approaches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Dismantling and Packaging of the RPV and Thermal Shield at the Obrigheim NPP - 16073

The Obrigheim Nuclear Power Plant (KWO) is located in the Federal State of Baden- Wuerttemberg in Germany and was operated by the EnKK-KWO. The Nuclear Power Plant - a light water pressurized water reactor with 357 MW of electrical power - was operated from 1968 to 2005. In June 2009 the Energiewerke Nord GmbH (EWN) was charged with the dismantling planning and dismantling of the reactor. According to the German nuclear and radiation protection law, several licenses will be required for the realisation of this task. This also applies to the disposal of the waste produced by dismantling, which must finally be stored in the German final repository for low and medium-radioactive waste (underground repository 'Konrad'). In spring 2010 EWN completed all application documents for the dismantling of the reactor pressure vessel (RPV) and the RPV internals and EnKK-KWO delivered them to the responsible Environmental Ministry of Baden-Wuerttemberg. Since then it has been worked intensively on the design, construction and manufacturing of the facilities for dismantling. With a separate notification of amendment, it was applied for the license to install and commission the facilities for the dismantling of the RPV and the RPV internals at the Environmental Ministry of Baden-Wuerttemberg in October 2010. This notification of amendment was confirmed in summer 2012. In September 2011 the work process and test plan and the technical information about the campaign for the removal of the radioactive waste resulting from the RPV with internals, peripheral components and secondary waste with the aim of final disposal in the Federal Repository 'Konrad' was submitted to the Federal Office for Radiation Protection. The evaluation and assessment of the work process and test plan was concluded in August 2013, when it was audited by TUV Nord EnSys without any further measures and indications. On September 10 the work process and test plan was released by the Federal Office for radiation protection. The dismantling of the RPV internals upper core and lower core structure started in September 2013 in the wet cutting area in room 01.106/306 and were finished in October 2014. In the presentation 'Dismantling of the Obrigheim NPP Reactor and Waste Management' held on the WM Symposia in Phoenix, 2014, an overview about the remote cutting and packaging of the upper and lower core structure was given. In today's presentation the subsequent dismantling activities will be outlined and evaluated. The presentation will start with the short description of the basic frame conditions for the nuclear licensing procedure, important procedural principles, and necessary plant-specific conditions. After the remote cutting and packing of the reactor internals of the upper and lower core structure was completed, the wet cutting area 'reactor room 01.106/306' was cleaned and the reactor room rebuilt into a cutting area for peripheral components. After the peripheral components were dismantled, all preconditions were set to lift the RPV from its mounting position and to arrange it in the upper reactor room 01.306. After these activities were completed, the lifting of the RPV was prepared and the cutting area 'Dismantling of the RPV insulation in the reactor room 01.106/306' was set up. To carry out this task, a strand jack unit with connection block was installed on the bridge of the reactor building crane. The opening created by the dismantling of the pool plate was closed with a flap door. The manipulators used for the wet cutting of the RPV internals were also used for the remote dismantling of the RPV insulation and mounted in the cutting area. The remote facilities were handled from a control centre and/or control stand. The air-technical housing which has already been used for the remote dismantling of the RPV internals was designed for the dismantling of the RPV insulation and was extended for this dismantling scope with appropriate ventilation systems. A special feature is the fixation of the RPV insulation at the RPV corpus. The RPV insulation consists of insulation wool, wire mesh and metal-sheet insulation. This 'Sandwich Construction' is detached with a steel corset at the RPV corpus and partly tightened. The insulation of the RPV bottom dome is tightened at the supporting frame. Due to the activation of the material in the core area and the resulting high ambient dose rate the RPV insulation can only be dismantled remotely. Additionally, as asbestos fibers are expected to be found in the insulation the dismantling has to be performed according to the Technical Rules for hazardous substances. The demolition, restoration or maintenance works have to be performed remotely according to the Technical Rules for hazardous substances when the RPV is located in the cutting area. But in case of dismantling of a power reactor no such experience can be found. Beginning with the explanation of the technical, radiological and substantial boundary conditions this presentation will not only impart knowledge about the dismantling of the RPV insulation but also about the remote controlled packaging of the metal sheet insulation and the manual conditioning of the RPV insulation. Subsequently, reports on the remotely controlled cutting and packaging of the RDB are given. Here is particularly interesting that cutting methods have been used and how the activity determination of the segments was carried out. On the basis of the evaluation of the realisation the subsequent dismantling activities will be lined out. In parallel to the dismantling tasks, the waste package documentation for the final repository was issued, checked and confirmed for the containers loaded with parts of the RDB internals. The most important stages are exemplified in this presentation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radioactive Waste Disposal Strategies within the US Army Corps of Engineers FUSRAP - 18328

The U.S. Army Corps of Engineers' (USACE) highest priority is the protection of human health and the environment and public and worker safety during the cleanup, transportation, and disposal of Formerly Utilized Sites Remedial Action Program (FUSRAP) material. In addition to following all appropriate federal and state rules and regulations, the USACE has its own safety program that ensures that we are being protective. One aspect of the USACE FUSRAP is the radioactive waste disposal strategies that we must consider. The USACE will only dispose of FUSRAP material in a facility that is licenses/permitted to accept it. The estimated exposures to facility workers and members of the public from the permitted disposal of FUSRAP wastes is evaluated as part of this process. The USACE uses the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process to study and remediate FUSRAP sites. An evaluation is performed to decide whether it is best to manage the waste on-site or off-site and the requirements for disposal. The action selected must be protective of human health and the environment and must comply with regulations. When making the decision, there are several other factors taken into consideration including cost of the disposal and whether the public and state agencies support the action. Prior to determining disposal options, wastes must first be characterized. This involves an evaluation of both site history and analytical data. Determining the proper disposal requirements and subsequent disposal option involves: Characterizing the waste as stated above. This is important because there are several regulatory agencies which may oversee management of the waste. The US Nuclear Regulatory Commission, the US Environmental Protection Agency (US EPA), the US Department of Transportation, and state hazardous waste and/or radiation protection agencies may all have varying degrees of involvement. Identifying disposal requirements. Certain wastes must be disposed at licensed radioactive waste disposal facilities. Wastes containing US EPA regulated hazardous waste must be disposed at permitted hazardous waste disposal facilities. Certain wastes must be disposed at facilities licensed/permitted for both radioactive and hazardous waste. Some lower activity wastes may be accepted for disposal at other types of landfills. Considering acceptance criteria of the disposal facility. Radionuclides and/or hazardous constituents in the waste, as well as physical and chemical form of the waste, are evaluated to ensure they meet the acceptance criteria of the receiving facility's license and/or permit. If they don't, another disposal location must be used. Considering the accessibility and location of the disposal facility. Some facilities are able to accept shipments only by truck and others can accept material via railcar as well. The distance to a disposal facility impacts the risk of transportation accidents and efficient use of project resources such as the number of trucks required to perform the transportation. These factors are also important in evaluating whether material can be cost effectively shipped to a disposal facility. Evaluating the compliance status of the receiving facility. It is not assumed that just because a facility has a license or permit that it is acceptable for the USACE' waste. Prior to selecting a facility for disposal of FUSRAP waste, a site visit, audit and consultation with the US EPA is required to determine whether there are any known relevant violations at the facility. Facilities that have violations that negatively impact the USACE or US EPA approval of the facility are not used for disposal of FUSRAP waste. Once a facility is selected. The USACE procures contracts, or utilizes existing contracts, to facilitate the transportation and disposal action. Additionally, the USACE continues to consult with US EPA routinely to confirm the compliance status of the facility. Considering state acceptance of wastes to a facility. The USACE seeks to obtain written authorization from the facility state regulator indicating the action is compliant with existing licenses, permits, laws, and regulations. Each of these factors is considered by the USACE in selecting a FUSRAP disposal location. The goal is to provide safe, cost effective disposal which is protective of human health and the environment and which complies with all regulatory requirements. These steps all feed in to the disposal strategy consideration that USACE must go through for our FUSRAP waste streams. There are a number of challenges in the process to include In order to achieve the Congressional mandate of completing cleanup work under FUSRAP in a more cost effective, timely manner, while assuring protection of public health and safety. USACE must determine all disposal options that are available for the types of waste at each FUSRAP site. As a solution, completion of a disposal strategy document can help ensure this goal is met and will foster consistency across the FUSRAP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Energy Efficiency and Infrastructure Upgrades on Nuclear Clean-up Sites: The Hanford Experience - 18641

The Hanford site, located in southeastern Washington, produced much of our nation's weapons-grade plutonium for the Defense nuclear weapons program. This production lasted the better part of four decades with production ending in 1987. Since 1987, the focus of the Hanford site has turned to clean-up activities. Mission Support Alliance (MSA) is the integrator of the multi-contractor effort to clean up the Hanford site. MSA collaborates with the U.S. Department of Energy (DOE) and all Hanford site contractors in finding and implementing new, cost-saving, safe and practical solutions to cleanup challenges with a continual focus on innovative processes and technologies that reduce costs, energy use and bring safety improvements to the site. Support Services include environmental integration and land management; fleet and road maintenance; water/electric and utilities; cyber security and information management as well as the preservation of the site's cultural artifacts. This paper describes the process, challenges, and focus on infrastructure upgrade and energy efficiency projects in the context of a multi-contractor nuclear clean-up site. Project development and new technology deployment at Hanford has long been plagued with economic challenges. For example, despite extensive auditing, analysis, and project development, most of the energy-related projects on the Hanford site have gone unfunded due to the low cost of electricity, the relatively high cost of labor, and costs associated with detailed safety and cultural reviews. - The Hanford site is a direct-service customer of the Bonneville Power Administration (BPA) and has a marginal electricity rate of $0.033/kWh. - Labor costs on the Hanford site track high because of the requirements associated with the safety and security necessary to operate a legacy nuclear weapons complex. - In partnership with three federally recognized and other affected Native American tribes (Yakama Nation, Confederated Tribes of the Umatilla Indian Reservation, the Nez Perce Tribe, and Wanapum People), most activities on the Hanford site are afforded in-depth cultural reviews. To work within these constraints, the MSA Energy Management team has embarked on a three-pronged approach to energy project development: Program Visibility: The MSA Energy Management team has promoted both project opportunities and requirements across the Hanford site. This information comes in the form of site-wide newsletters, group meetings, e-mails, success stories, and recognition of staff. Single-point Analysis: To by-pass the inevitable duplications of effort, learning curve issues, and to improve project consistency/delivery, the MSA Energy Management team serves as the single resource to the site for energy project analysis. This resource includes initial assessment, engineering analysis, efficiency calculation and project recommendations. Contractor/utility Interface: In addition to the infrastructure under its own purview, MSA provides all support services for the contractor/utility interface. These activities include formulation and submission of incentive-based efficiency projects, project tracking, and incentive awards. All incentive awards are forwarded to the relevant contractor and then highlighted in the visibility campaign. Successful energy efficiency projects at Hanford have included high efficiency heating, ventilation, air conditioning (HVAC) systems, interior and exterior lighting/lighting control systems, pump and motor systems, and the right-sizing of transformers and area-wide electrical distribution systems. Prior to the initiation of this program and structure (roughly 3 years ago) the average annual energy efficiency incentive applied for and received was under $10,000, with an annual energy savings of approximately 36,000 kilowatt hours (kWh). In fiscal year 2017, the annual incentive received was over $419,000, with identified energy savings of over 1.3 million kWh. Details and case studies of the major project accomplishments are included. The success of this program can be traced to an understanding of the constraints, the development of a program to address these constraints, and good communication/coordination across DOE and the multiple contractors serving the Hanford site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗