Steam turbine materials and corrosion

Ultra-supercritical (USC) power plants offer the promise of higher efficiencies and lower emissions. Current goals of the U.S. Department of Energy’s Advanced Power Systems Initiatives include power generation from coal at 60% efficiency, which would require steam temperatures of up to 760°C. This project examines the steamside oxidation of candidate alloys for use in USC systems, with emphasis placed on applications in high- and intermediate-pressure turbines. As part of this research a concern has arisen about the possibility of high chromia evaporation rates of protective scales in the turbine. A model to calculate chromia evaporation rates is presented.

36 MATERIALS SCIENCE↗

Steam Turbine Materials and Corrosion

Ultra-supercritical (USC) power plants offer the promise of higher efficiencies and lower emissions. Current goals of the U.S. Department of Energy’s Advanced Power Systems Initiatives include coal generation at 60% efficiency, which would require steam temperatures of up to 760 °C. In prior years this project examined the steamside oxidation of alloys for use in high- and intermediate-pressure USC turbines. This steamside oxidation research is continuing and progress is presented, with emphasis on chromia evaporation.

20 FOSSIL-FUELED POWER PLANTS↗

Update on Evaluation of Steam Cycle Upgrades to Improve the Competitiveness of U.S. Coal Power Plants

Under an award issued by the U.S. Department of Energy (DE-FE0031535), the Electric Power Research Institute (EPRI) is leading project to examine the technical and economic feasibility of a series of steam cycle upgrades to the two most prevalent types of U.S. coal power plants (including both subcritical and supercritical cycle configurations). The retrofit upgrade options are focused on evaluating increasing main steam and reheat steam temperatures from 1000°F (538°C) to hotter temperatures, ranging from ultra-supercritical (USC) (i.e., 1100°F or 593°C) to advanced USC (AUSC) conditions (≥1300° or 704°C) while maintaining steam pressures at their original values. By maintaining the original operating steam pressures as well as the original boiler and furnace enclosure envelopes, we aim to minimize the modifications required to the existing power plant, while still providing a significant improvement in heat rate. A unique aspect of this study is that the economic value of the heat rate improvement of each technically feasible option will be determined by detailed modeling of unit dispatch, over the remaining future plant life, in several regional power markets, using EPRI’s US-REGEN model. The capital cost estimates will be compared to the increased revenue estimated by the dispatch modeling to determine the overall economic attractiveness of each upgrade option. The results of this study have the potential to be applicable at up to 80% of the existing U.S. coal-fired power generation fleet. The project team, led by the Electric Power Research Institute, has completed the technical feasibility evaluation, and is currently executing the unit dispatch and capital cost evaluation portions of the work scope. This will describe the motivation for the project, explain the project’s structure and schedule, and provide details on the work scope and preliminary results of the technical feasibility evaluation.

01 COAL, LIGNITE, AND PEAT↗

Advanced Ultra-Supercritical Component Test (ComTest) Project for 760*C Steam Conditions

ComTest is a $27M Department of Energy-funded project. Phase I, which began in November 2015, served to identify the technology gaps, as well as the scope and cost of required testing. Phase II, which was awarded in December 2018, includes an advanced manufacturing effort to complete U.S. based supply chain development for full commercial scale (800-850 MWe) AUSC components made of nickel-based alloys, components operating at up to 760°C. Completion of Phase II scheduled for September 30, 2021. Strategic Objectives of U.S. AUSC Project include: Power Plant Efficiency Improvements –Develop cost-effective, reliable technologies to improve the efficiency of new and existing high-temperature advanced generation power plants. Close gaps to achieve readiness for commercial scale demonstration of Advanced Ultra-Supercritical (AUSC) technology. Fabricate full-scale versions of key nickel-based alloy components. Validate capabilities of US supply chain for cost certainty. Support cross-cutting high-temperature generation technologies. Obtain ASME Code approval for new materials, components and processes. Increase power plant steam temperatures for higher cycle efficiency (Note: Average efficiency of US coal-fired fleet = 33% HHV; A-USC plant efficiency over 47% HHV at 1,400°F (760°C) steam temperature).

fireside corrosion↗

Designing an ultrasupercritical steam turbine

Carbon emissions produced by the combustion of coal may be collected and stored in the future, but a better approach is to reduce the carbon produced through efficient combustion technologies. Increasing the efficiency of new plants using ultrasupercritical (USC) technology will net less carbon released per megawatt-hour using the world's abundant coal reserves while producing electricity at the lowest possible cost. The article shows how increasing the steam turbine operating conditions for a new USC project in the USA and quantify the potential CO{sub 2} reduction this advanced design makes possible. 7 figs., 3 tabs.

01 COAL, LIGNITE, AND PEAT↗

Modeling Creep-Fatigue-Environment Interactions in Steam Turbine Rotor Materials for Advanced Ultra-supercritical Coal Power Plants

The goal of this project is to model creep-fatigue-environment interactions in steam turbine rotor materials for advanced ultra-supercritical (A-USC) coal power Alloy 282 plants, to develop and demonstrate computational algorithms for alloy property predictions, and to determine and model key mechanisms that contribute to the damages caused by creep-fatigue-environment interactions.

36 MATERIALS SCIENCE↗

Steam Oxidation and Chromia Evaporation in Ultra-Supercritical Steam Boilers and Turbines

U.S. Department of Energy’s goals include power generation from coal at 60% efficiency, which requires steam conditions of up to 760 °C and 340 atm, so-called ultra-supercritical (USC) conditions. Evaporation of protective chromia scales is expected to be a primary corrosion mechanism. A methodology to calculate Cr evaporation rates from chromia scales was developed and combined with Cr diffusion calculations within the alloy (with a constant flux of Cr leaving the alloy from evaporation) to predict Cr concentration profiles and to predict the time until breakaway oxidation. At the highest temperatures and pressures, the time until breakaway oxidation was predicted to be quite short for the turbine blade, and of concern within the steam pipe and the higher temperature portions of the superheater tube. Alloy additions such as Ti may allow for a reduction in evaporation rate with time, mitigating the deleterious effects of chromia evaporation.

01 COAL, LIGNITE, AND PEAT↗

Solid State Joining of High Temperature Alloy Tubes for USC and Heat-Exchanger Systems

The principal objective of this project was to develop materials enabling joining technologies for use in forward looking heat-exchanger fabrication in Brayton cycle HIPPS, IGCC, FutureGen concepts capable of operating at temperatures in excess of 1000°C as well as conventional technology upgrades via Ultra Super-Critical (USC) Rankine-cycle boilers capable of operating at 760°C (1400F)/38.5MPa (5500psi) steam, while still using coal as the principal fossil fuel. The underlying mission in Rankine, Brayton or Brayton-Rankine, or IGCC combined cycle heat engine is a steady quest to improving operating efficiency while mitigating global environmental concerns.

36 MATERIALS SCIENCE↗

Materials for Advanced Ultra-Supercritical (AUSC) Steam Turbines – AUSC Component Demonstration

The work by the United States Department of Energy (U.S. DOE)/Ohio Coal Development Office (OCDO) Advanced Ultra-Supercritical (AUSC) Steam Boiler and Turbine Materials Consortia from 2001 through September 2015 was primarily focused on lab scale and pilot scale materials testing. The field testing included air-cooled probes and steam-cooled “loops” that were installed into existing utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion due to the constituents in the coal ash. Successful research and development resulted in identification of metallic alloy materials and fabrication processes suited for power generation applications with metal temperatures up to approximately 1472°F (800°C). These materials or alloys have shown, in extensive laboratory tests and shop fabrication studies, to have excellent applicability for high-efficiency low CO2 transformational power generation technologies. However, as valuable as these material field tests have been for obtaining information, their scale is significantly below that required to minimize the risk associated with a power company building a multi-billion-dollar AUSC power plant. To decrease the identified risk barriers to full-scale implementation of these advanced materials, the U.S. DOE/OCDO AUSC Steam Boiler and Turbine Materials Consortia identified the key areas of the technology that need to be tested at a larger scale. Based upon the recommendations and outcome of a Consortia-sponsored workshop with the U.S.’s leading utilities, a Component Test (ComTest) Program for AUSC was proposed. The AUSC ComTest program would define materials performance requirements, plan for overall advanced system integration, design critical component tests, fabricate components for testing from advanced materials, and carry out the tests. A Pre-FEED evaluation of the test facility including the evaluation of three potential sites has been completed and previously reported. This report describes the Front-End Engineering Design (FEED), Detailed Engineering and the Environmental Assessment of the ComTest project. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as INCONEL 740H or HAYNES 282 alloys. Pathways to supply these components for ComTest have been identified as well as any further development that would be required. Every project of this nature has challenges and this project was no exception. The greatest challenge has been the project cost. Largely due to the infrastructure and balance of plant equipment upgrades required for Youngstown Thermal, the estimated project cost for the “base case” project was greater than originally budgeted. The project team spent a significant amount of time exploring opportunities for reducing the project cost. These options included: • Youngstown Thermal was exploring building a Combined Heat and Power (CHP) unit at their facility. The Youngstown Thermal staff, supported by Thermal Engineering Group, worked with the project team to determine whether it was economically desirable to supply ComTest with steam and other utilities, which would be supplied by the CHP project. • The project team also evaluated opportunities to optimize the project scope to reduce cost, such as reducing project scope by eliminating the Superheater Outlet Header test. • Southern Company had offered two sites as possible host locations for ComTest. Both sites had infrastructure in place such as steam from an existing unit, natural gas, cooling water and ample electrical power that would be required to be added at the Youngstown Thermal site. Utilizing this existing infrastructure could reduce the project cost. An additional project challenge was the departure of Babcock and Wilcox from the project in September 2016. This project setback was overcome by GE Power’s willingness to assume the design of the ComTest superheater. Since the project could not proceed without the superheater, this was a very positive project development. The merger of the GE Power and Alstom Power steam turbine divisions created synergies leading to the conclusion that instead of building a small-scale turbine, a more practical and useful endeavor would be to validate the manufacturing technology and supplier readiness for fabricating and machining full scale steam turbine components. Consequently, in March 2017, GE Power decided that a steam turbine test would not be necessary as part of the ComTest demonstration. Removing the operational testing of the steam turbine from ComTest further reduced the total project cost. Additionally, there was an opportunity to move ComTest from Youngstown Thermal to one of the Southern Company sites and operate ComTest at supercritical steam conditions and test the steam turbine main stop/control valve at a temperature and pressure that would be representative of the conditions of a high pressure steam turbine inlet valve. The steam could also possibly be returned to the host boiler so there would be no economic penalty of using this steam for ComTest. Relocating the project could further reduce the project cost due to the infrastructure already in place, including high pressure natural gas and cooling water, and the potential for heat integration, allowing a reduction of operating costs. Due to these potential cost reductions, it was decided to move the project away from Youngstown Thermal in March 2017. As integrating ComTest at the Southern Company site was explored, an issue was raised regarding the integration of the ComTest cycle with the plant steam cycle. Steam would be supplied to ComTest at nominally ~3865 psia and 775°F. The steam would be heated with natural gas to 1400°F for the valve test and then cooled to 1000°F so that the steam would be returned to the host boiler at the same conditions as their high pressure steam turbine inlet. However, there were concerns raised that the addition of the energy (natural gas) to the steam could trigger a New Source Review on the unit. Southern Company did not want ComTest to cause this review, so condensing all of the steam exiting ComTest and returning it to the host steam cycle as condensate was explored to insure there would be no implication that ComTest was adding energy to the host plant’s steam cycle. Ultimately, Southern Company decided that they wanted to “decouple” ComTest from the operating unit, making ComTest self-supporting, similar to the Youngstown Thermal “base case.” Without the steam turbine, the project team reached a consensus that operating the ComTest Superheater and steam turbine valves at the typical pressure of a package boiler (~1000 psig) would not generate enough useful technical information to justify the cost of the test. Therefore, it was decided in the December 2017 project quarterly meeting to cancel the operational phase of ComTest. Throughout the engineering phase of ComTest, manufacturing and supply chain challenges were identified. When GE Power recommended dropping the steam turbine test from ComTest, they identified many important manufacturing issues that should be evaluated and demonstrated. Other challenges had been raised by the GE Power group designing the superheater as well as those engineering components such as pressure relief and steam turbine bypass valves. In the December 2017 meeting, the project team decided that it was more beneficial to the AUSC technology to pursue these manufacturing and supply chain issues as Phase 2 of the ComTest project. This report is organized in the following manner: • Section 2 discusses the ComTest project background and organization. • Section 3 discussed project management. • Section 4 discusses the design of the ComTest AUSC components – the Superheater, steam turbine and Superheater Outlet Header. • Section 5 discusses the implementation of ComTest at Youngstown Thermal and the Southern Company site. • Section 6 discusses the development of the AUSC Supply Chain • Section 7 discusses the recommended plan for Phase 2 of ComTest

01 COAL, LIGNITE, AND PEAT↗

Advanced Ultrasupercritical (AUSC) Materials Thick-Walled Cycling Header Development for ComTest-AUSC (Final Report)

Alstom Power Inc., a wholly owned subsidiary of the General Electric Company (GE) recently completed “Advanced Ultrasupercritical (AUSC) Materials Thick-Walled Cycling Header Development for ComTest-AUSC” under Award No. DE-FE0026183 for the U.S. Department of Energy National Energy Technology Laboratory (DOE NETL). This project developed a design for testing of a high temperature nickel-based superalloy thick-walled header to simulate cycling and flexible plant operation in new and existing plants. The objective was to simulate the expected thermal stresses of a new AUSC plant or a retrofit header in an existing plant to improve flexible dynamic operation while maintaining component integrity and overall power plant reliability. The high performance superalloy materials that enable higher operating temperatures and pressures can support future transformational power technologies including new AUSC plants at 4250-5000 psi, 730°C/760°C or will serve as a replacement component in a repowered or retrofit USC coal powered cycling plant at 3600 psi, 600°C. These alloys can also enable supercritical CO2 cycles, nuclear power, solar power and more efficient natural gas combined cycle units as targeted by the U.S. DOE/NETL Cross-Cutting Research Technology Program Plan. Recently developed advanced nickel alloys such as Inconel 740H (740H) and Haynes 282 (H282) have been successfully tested on a pilot scale for fireside corrosion using steam loop tubing at AUSC temperatures of 760°C in actual operating coal fired boiler. These high strength materials have been demonstrated their adequacy for use in other high temperature boiler components such as superheater tubes. Thick-walled superheater outlet headers which operate at high temperatures and pressure under severe cycling condition are considered as one of the most critical component in the AUSC coal fired boiler. Over the design life of a plant, these headers are exposed to the most severe fatigue and creep damage accumulation and need to be properly designed for the expected cycling in an AUSC plant with flexible operation. These materials need to demonstrate adequate design life of 20 to 30 years for creep and fatigue conditions. The following tasks were performed: 1. A conceptual design was developed of a thick-walled component representative of typical headers with several tube connections and proper flow rates (~100,000 lbs/hr) suitable for Phase II test at 760°C operation. This was based on a process analysis of expected full scale new and component retrofit designs for AUSC; 2. A multi-physics flow and heat transfer computational fluid dynamics (CFD) analysis of the component for proper layout of the header configuration, number and geometry (size) of tubes required for bypass flow, flow rates through the tubing, and sectional pressure drops was performed. Steam to header metal heat transfer film coefficients in the header section and the tubes during the two stages (half load and full load) of the cycling operation were evaluated and used in the stress analysis; 3. Detailed analytical evaluation of the thick-walled pipe and tube connections for mechanical integrity under cycling conditions was performed. This included transient thermal stress analysis and fatigue usage estimation including the tube-to-pipe weld geometries and weld materials; 4. A layout and design of the thick-walled test component was developed and instrumentation required for a test was identified; 5. Continuum Damage Mechanics (CDM) creep prediction models were extended to 740H and H282 and validated with public data on 740H and H282 for use in creep analysis. In addition, detailed creep analyses were performed separately for the design life of the conceptual AUSC superheater outlet header using these General Electric (GE) creep constitutive models. GE was the prime contractor for the project, which was directed by Principal Investigator Robert Schrecengost and Lead Scientist Dr. B. Reddy Ganta. Other collaborative participants in this project included GE Global Research, GE Boiler Engineering, and a Technical Consultant from EPRI.

01 COAL, LIGNITE, AND PEAT↗

Materials for Advanced Ultrasupercritical Steam Turbines Task 3: Materials for Non-Welded Rotors, Buckets, and BoltingMaterials for Advanced Ultrasupercritical Steam Turbines

The primary objective of the task was to characterize the materials suitable for mechanically coupled rotor, buckets and bolting operating with an inlet temperature of 760°C (1400°F). A previous study DOE-FC26-05NT42442, identified alloys such as Haynes®282®, Nimonic 105, Inconel 740, Waspaloy, Nimonic 263, and Inconel 617 as potential alloys that met the requirements for the necessary operating conditions. Of all the identified materials, Waspaloy has been widely utilized in the aviation industry in the form of disk and other smaller forgings, and sufficient material properties and vendor experience exist, for the design and manufacture of large components. The European program characterizing materials for A-USC conditions are evaluating Nimonic 263 and Inconel 617 for large components. Inconel 740 has been studied extensively as a part of the boiler consortium and is code approved. Therefore, the consortium focused efforts in the development of material properties for Haynes®282® and Nimonic 105 to avoid replicative efforts and provide material choices/trade off during the detailed design of large components. Commercially available Nimonic 105 and Haynes®282® were evaluated for microstructural stability by long term thermal exposure studies. Material properties requisite for design such as tensile, creep / rupture, low cycle fatigue, high cycle fatigue, fatigue crack growth rate, hold-time fatigue, fracture toughness, and stress relaxation are documented in this report. A key requisite for the success of the program was a need demonstrate the successful scale up of the down-selected alloys, to large components. All property evaluations in the past were performed on commercially available bar/billet forms. Components in power plant equipment such as rotors and castings are several orders in magnitude larger and there is a real need to resolve the scalability issue. Nimonic 105 contains high volume fraction y’ [>50%], and hence the alloy is best suited for smaller forging and valve internals, bolts, smaller blades. Larger Nimonic 105 forgings, would precipitate y’ during the surface cooling during forging, leading to surface cracks. The associate costs in forging Nimonic 105 to larger sizes [hotter dies, press requirements], were beyond the scope of this task and not investigated further. Haynes®282® has 20 - 25% volume fraction y’ was a choice for large components, albeit untested. A larger ingot diameter is pre-requisite for a larger diameter forging and achieves the “typically” accepted working ratio of 2.5-3:1. However, Haynes®282® is manufactured via a double melt process [VIM-ESR] limited by size [<18-16” diameter], which limited the maximum size of the final forging. The report documents the development of a 24” diameter triple melt ingot, surpassing the current available technology. A second triple melt ingot was manufactured and successfully forged into a 44” diameter disk. The successful developments in triple melting process and the large diameter forging of Haynes®282® resolved the scalability issues and involved the first of its kind attempt in the world for this alloy. The complete characterization of Haynes®282® forging was performed and documented in this report. The dataset from the commercially available Haynes®282® [grain size ASTM 3-4] and the finer grain size disk forging [ASTM 8-9] offer an additional design tradeoff to balance creep and fatigue during the future design process.

Saha, Deepak↗

Engineering and Economic Analysis of an Advanced Ultra-Supercritical Pulverized Coal Power Plant with and without Post-Combustion Carbon Capture Task 7. Design and Economic Studies

This report evaluates the economics and performance of two A-USC PC power plants; Case 1 is a conventionally configured A-USC PC power plant with superior emission controls, but without CO 2 removal; and Case 2 adds a post-combustion carbon capture (PCC) system to the plant from Case 1, using the design and heat integration strategies from EPRI’s 2015 report, “Best Integrated Coal Plant.” The capture design basis for this case is “partial,” to meet EPA’s proposed New Source Performance Standard, which was initially proposed as 500 kg-CO 2 /MWh (gross) or 1100 lb-CO 2 /MWh (gross), but modified in August 2015 to 635 kg-CO 2 /MWh (gross) or 1400 lb-CO 2 /MWh (gross). This report draws upon the collective experience of consortium members, with EPRI and General Electric leading the study. General Electric provided the steam cycle analysis as well as v the steam turbine design and cost estimating. EPRI performed integrated plant performance analysis using EPRI’s PC Cost model.

54 ENVIRONMENTAL SCIENCES↗