Community Center and Administration Solar PV Project

The Tribe installed two (2) roof mounted solar PV systems with a total production of approximately 146 kW on the Paskenta Band of Nomlaki Indians’ Community Center in Corning, CA. One of the two solar PV arrays provided 90% of the Community Center’s energy, while the second array provided nearly 100% of the adjacent administration building’s energy.

14 SOLAR ENERGY↗

Building Resiliency into Grand Canyon West Micro-Grid

The objective of the project was to improve the resilience of the non-regional-grid-connected electrical generation system at Grand Canyon West (GCW) to withstand short-term disruptions and rising energy costs by installing an 885-kW solar photovoltaic (PV) array and 750-kilowatts (kW)/2,145-kilowatt hour (kWh) battery energy storage system (BESS). The system is designed to provide 50% of the annual energy needed for the essential facilities at GCW, supplementing the existing diesel generators, saving approximately $\$$463,339 per year and an estimated $\$$11,583,475 over the 25-year life of the system. The project aligns with the Tribe’s conservation ethic and self-determination in the area of energy development.

14 SOLAR ENERGY↗

Community-Scale Solar Photovoltaic for the Forest County Potawatomi Community

Forest County Potawatomi Community will install and operate 1,228 kW of solar photovoltaic (PV) energy systems at approximately nine (9) tribal facilities in Milwaukee, WI and on the Tribe's Forest County reservation lands. The individual installations will range in size from 8 kW to 280 kW, and will displace between 4.2 and 99.9% of total current energy usage from those buildings and save $105,996 annually.

14 SOLAR ENERGY↗

Shaktoolik Battery System Construction Project

Alaska Village Electric Cooperative, Inc. (AVEC) and Shaktoolik IRA Tribal Council (Tribe) have created a Tribal Energy Development Organization (TEDO), known as AVEC/Shaktoolik Renewable Energy Joint Venture TEDO (ASRA), for building a community-scale energy storage “grid bridging system” (GBS) for the existing power plant and wind turbines on Tribal Lands in Shaktoolik, Alaska.

25 ENERGY STORAGE↗

Strategic Pathways for Indigenous Resilient and Innovative Transportation

This presentation details the results of the project, titled Strategic Pathways for Indigenous Resilient and Innovative Transportation. The project culminated in a guidebook for Tribes interested in pursuing public EV charging infrastructure. The guidebook is designed to serve Tribal planners, Tribal departments of transportation, environmental offices, Tribal enterprises, Tribal utility authorities, Tribal leadership, and any other interested parties. The conference presentation will provide details on the engagement conducted during the project to inform the project publications. The presentation will also discuss Tribal sovereignty-related considerations for EV charging infrastructure topics including O&M and working with the electric utility.

33 ADVANCED PROPULSION SYSTEMS↗

The Future of Vehicle Grid Integration: Harnessing the Flexibility of EV Charging

This document lays out a shared vision for a beneficial, EV-integrated future where EVs are safely and securely connected, reliably served, and harmonized with the electric grid. It was developed as part of the U.S. Department of Energy’s (DOE) EVGrid Assist initiative. Stakeholder input was gathered through individual and collective conversations, including eight listening sessions with more than 100 participants representing utilities of different sizes and operating structures, manufacturers of vehicles and chargers, national associations, standards organizations, Tribes, fleet managers, consumer advocates, charging network operators, community-based organizations, utility regulators, consultants, vendors, labor, and environmental justice organizations. This document focuses on the future of electric on-road U.S. transportation, specifically the integration of light-duty vehicles (LDV) and medium- and heavy-duty vehicles (MHDV) and their charging infrastructure with the electric grid. However, many of the insights here may apply to electrifying other transportation modes, as well as other distributed energy resources (DER).

EVGrid Assist initiative, EV-integrated future, el↗

The Future of Vehicle Grid Integration: Harnessing the Flexibility of EV Charging

This document lays out a shared vision for a beneficial, EV-integrated future where EVs are safely and securely connected, reliably served, and harmonized with the electric grid. It was developed as part of the U.S. Department of Energy’s (DOE) EVGrid Assist initiative. Stakeholder input was gathered through individual and collective conversations, including eight listening sessions with more than 100 participants representing utilities of different sizes and operating structures, manufacturers of vehicles and chargers, national associations, standards organizations, Tribes, fleet managers, consumer advocates, charging network operators, community-based organizations, utility regulators, consultants, vendors, labor, and environmental justice organizations. This document focuses on the future of electric on-road U.S. transportation, specifically the integration of light-duty vehicles (LDV) and medium- and heavy-duty vehicles (MHDV) and their charging infrastructure with the electric grid. However, many of the insights here may apply to electrifying other transportation modes, as well as other distributed energy resources (DER).

EVGrid Assist initiative, EV-integrated future, el↗

Hydropower Flexibility and Environmental Tradeoffs Analysis

The importance of hydropower increases as the power grid evolves with the higher variable renewable contribution. As conventional thermal power plants are retired, the importance of hydropower contribution increases to balance the variability of solar and wind generation. However, reservoir water resources are constrained by multiple constraints, and variability of water inflow to the reservoirs creates limitations to dam water releases for power grid needs. Coordinating multiple tools, including water resources, ecological, and technical and economic power grid modeling, informs dam water releases. The case study, the Columbia River Basin multipurpose reservoir project, is operated for hydropower production and many other purposes considering the aquatic habitat of the river basin. Specifically, the river basin fish population is a vital element for the tribal community of the river basin. We integrated a production cost model, a water resource model, and decades of tribal knowledge to analyze the fish-friendly way of operating Columbia hydropower scheduling and grid impacts. We measure power grid impacts for various water resources planning scenarios in terms of total system operating cost, system reliability indicators, changes in wind and solar generation and curtailments, local marginal prices, and revenue for hydropower producers. The study results inform reservoir operating rules decisions from hydropower power producers, system operators, other water users, tribes, environmentalists, and other stakeholders.

Columbia River↗

Lessons Learned from the Clean Energy to Communities (C2C) Peer-Learning Cohort Enhancing Resilience at Critical Facilities through Solar, Storage, and Microgrids

The National Renewable Energy Laboratory (NREL), with support from World Resources Institute (WRI), designed and led a six-month peer-learning cohort from January through July 2024 on "Enhancing Resilience at Critical Facilities through Solar, Storage, and Microgrids" as part of the U.S Department of Energy's Clean Energy to Communities (nrel.gov/c2c) (C2C) program. Representatives from 15 municipalities, municipal utilities, colleges, and Tribes from across the United States participated in monthly workshops covering best practices for planning and deploying local resilience projects. This document shares key takeaways, lessons learned, and resources from the cohort including considerations for planning, proposing, designing, procuring, and funding microgrid projects for resilience.

C2C↗

Lessons Learned from the Clean Energy to Communities (C2C) Peer-Learning Cohort Evaluating and Prioritizing Municipal Buildings for Energy Efficiency and Decarbonization Investment

The National Renewable Energy Laboratory (NREL), with support from World Resources Institute (WRI), designed and led a six-month peer-learning cohort from January through July 2024 on "Enhancing Resilience at Critical Facilities through Solar, Storage, and Microgrids" as part of the U.S Department of Energy's Clean Energy to Communities (nrel.gov/c2c) (C2C) program. Representatives from 15 municipalities, municipal utilities, colleges, and Tribes from across the United States participated in monthly workshops covering best practices for planning and deploying local resilience projects. This document shares key takeaways, lessons learned, and resources from the cohort.

buildings↗

Lessons Learned from the Clean Energy to Communities (C2C) Peer-Learning Cohort Incorporating Community Priorities into Electric Vehicle Plans and Projects

The National Renewable Energy Laboratory (NREL), with support from World Resources Institute (WRI), designed and led a six-month peer-learning cohort from January through July 2024 on "Enhancing Resilience at Critical Facilities through Solar, Storage, and Microgrids" as part of the U.S Department of Energy's Clean Energy to Communities (nrel.gov/c2c) (C2C) program. Representatives from 15 municipalities, municipal utilities, colleges, and Tribes from across the United States participated in monthly workshops covering best practices for planning and deploying local resilience projects. This document shares key takeaways, lessons learned, and resources from the cohort including key steps that can be taken to help entities design effective community engagement processes around clean mobility.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Hot Springs and Geysers: Exploring Historical and Modern Impacts of Geothermal Energy Production on Associated Natural Surface Systems and Standardizing Management Practices

Surface thermal features, most notably hot springs and geysers are increasingly being recognized for their importance to ecosystems, indigenous cultures, and in some cases agriculture, recreation, and tourism. Geothermal project development poses a potential risk to these natural features but current regulatory requirements for assessing and managing these risks during exploration, permitting and monitoring are somewhat inconsistent and unpredictable across different geothermal fields. This has resulted in uncertainty and increases in exploration risk for geothermal energy developers that have led to costly project delays, cancellations, or hesitation to commit. Varying regulatory requirements may also influence public perception, fostering confusion, distrust and ultimately opposition to geothermal projects, further contributing to project delays or cancellations. At a time when there is an increasing urgency for reliable baseload clean energy, geothermal is a net-zero, renewable solution that additionally provides access to more equitable and environmentally just clean power. Continued integration of geothermal energy into the national energy roadmap can be facilitated through consistent and predictable permitting, providing regulators the framework they need, developers a clear path forward, and transparency that the public deserves. This project, currently in its beginning phases, seeks to address this important issue by providing a technical basis from which to build a preliminary protocol for assessing and managing potential impacts from new or existing geothermal energy projects to surface thermal features and their associated ecosystems. Development of this preliminary protocol will be informed by (1) a literature review of well-documented case studies in the western U.S. and New Zealand to understand the range of conditions that exemplify geothermal-surface thermal systems; (2) development of generic illustrative conceptual-numerical models to quantify, understand, and predict the first-order controls (e.g., pressure and permeability) on surface flows; and (3) additional independent and scientifically rigorous evaluations of geothermal-surface thermal system case studies from the Basin and Range Province that incorporate publicly available data as well as data provided by industry through data-sharing agreements. Learning from the successes of the process used to develop the Induced Seismicity Management Protocol (ISMP), we ultimately aim to use these initial efforts as a springboard for establishing a surface thermal feature management working group that will work collaboratively to finalize the protocol as well as co-create recommended best practices for implementation. We envision that the working group will primarily be composed of representatives from regulatory entities, government agencies, Tribes, academia, national laboratories, and industry, and will include early and regular engagement with community organizations and environmental groups. This will help ensure broad acceptance and implementation of the protocol, which will facilitate a more consistent, predictable, and standardized regulatory process, and help to ensure that geothermal energy continues to provide a reliable source of clean energy, and a pathway to achieving greater energy equity in the U.S.

Best Practices↗

Work In Progress: Using Internships as Means for Indirect Assessment of ABET Criteria 3 "1-7" Student Outcomes

PSU operates the Power Engineering Internship program with funding from two U.S. Department of Energy grants. The program is operated in partnership with the lead organizations of these grants, an investor-owned utility, Portland General Electric (PGE), and the Confederated Tribes of the Warm Springs (CTWS). One of the programmatic goals of the PEI is to create and sustain a clean energy engineering workforce pipeline on behalf of these lead organizations. Both grants support internships at PGE, which is also a partner on the CTWS grant. The PEI provides engineering students with year-long internships, spanning both the academic year and the summer. The interns work at PGE facilities located throughout the Portland metropolitan area. Interns are employed full-time during summers and part-time during the academic year. Proximity of the worksites to the PSU campus enables the interns to participate in the program while attending school full-time. During the academic year, students average fifteen hours per week, adjusting their work schedule according to their academic workload. The interns are allocated 930 hours per year, 480 in the summer and 450 during the academic year, which they can plan as they see fit. The internships provide meaningful financial support for the students, who can earn up to $21k if they use all of their allocated hours. Such funding is particularly important for the typical student who attends a minority serving institutions,

99 GENERAL AND MISCELLANEOUS↗

State-Tribal Collaboration: Utility Programs

This is one of 6 fact sheets for the State/Tribal Collaboration project for Office of Policy. This fact sheets discusses low-income utility programs that can benefit Tribes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Operations and Maintenance for Electric Vehicle Charging Infrastructure in Indian Country

This fact sheet provides an overview of operations and maintenance (O&M) costs, responsibilities, and contracts to help ensure EV charging infrastructure remains functional and reliable in Indian Country. O&M planning is important for Tribes to consider at the beginning of EV charging infrastructure projects to help ensure charger uptime and longevity.

33 ADVANCED PROPULSION SYSTEMS↗

Lessons Learned from the Energy to Communities (E2C) Peer-Learning Cohort on Engaging with Electric Utilities for Successful Local Partnerships

NLR designed and led a six-month peer-learning cohort from July through December 2025 on “Engaging With Electric Utilities for Successful Local Partnerships” as part of the U.S. Department of Energy’s Energy to Communities (E2C) program. Representatives from 15 local and regional governments from across the United States participated in monthly workshops covering best practices for engaging with their utilities to advance their own energy goals. This document shares key takeaways, lessons learned, and resources from the cohort that may be useful to local governments, regional governments, or Tribes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Bull Trout and Westslope Cutthroat Trout movement in a dam tailrace

Populations of Bull Trout Salvelinus confluentus and Westslope Cutthroat Trout Oncorhynchus clarkii lewisi in the Pend Oreille Basin have declined, partly due to fragmentation caused by hydropower dams. This study aimed to analyze the movements and behavior of these species downstream of Albeni Falls Dam over two years to inform fishway design. Radiotracking investigations were conducted to monitor 10 adult Bull Trout and 17 adult Westslope Cutthroat Trout from September 2008 to July 2010. Macro and micro detection zones were delineated to study fine- and large-scale movements in the tailrace. Macro zones included the spillway and powerhouse tailrace areas. Micro zones were nested within macro zones to identify regions close to the dam where fishway structures could be built. Both Bull Trout and Westslope Cutthroat Trout exhibited high mobility in the dam tailrace, transitioning between macro detection zones. Seasonal variations influenced their distribution patterns. During the spring freshet migration season, both species were primarily detected at the left powerhouse micro zone. In sedentary periods (fall/winter and summer), fish actively swam throughout the tailrace, displaying search behavior. These behavior observations suggest that potential fishway entrances located near dam concrete would be effective: the area near the left powerhouse was identified as the optimal construction location. This study highlights the feasibility of designing fish passage structures to mitigate population fragmentation and support species recovery.

13 HYDRO ENERGY↗