Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “traffic volume”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Simulation-based analysis of different curb space type allocations on curb performance

Curbspace is a limited resource in urban areas. Delivery, ridehailing and passenger vehicles must compete for spaces at the curb. Cities are increasingly adjusting curb rules and allocating curb spaces for uses other than short-term paid parking, yet they lack the tools or data needed to make informed decisions. In this research, we analyze and quantify the impacts of different curb use allocations on curb performance through simulation, covering various mixes of curbspace uses (bus stops, paid parking, passenger pick-up/drop-off zones, and commercial vehicle loading zones), parking rules, and driver rule compliance. Three metrics (including two new ones) are developed to evaluate the performance of the curb, covering productivity and accessibility of passengers and goods, and CO 2 emissions. The metrics are calculated for each scenario across a wide range of input parameters (traffic volume, parking demand rate, vehicle dwell time, and street design speed) and compared to each other and to a baseline scenario. This work can inform policy decisions by providing municipalities a tool to analyze various curb management strategies and choose the ones that produce results more in line with their policy goals.

99 GENERAL AND MISCELLANEOUS↗

A Stochastic Framework for Estimating Load Profiles at EV Fast Charging Stations

This paper formulates a methodology for estimating the average daily load profiles of EV fast charging stations over a planning horizon of five to ten years. The developed methodology uses historic vehicle registration data, state-level EV adoption targets, seasonal driving patterns, local demographics, competition, and traffic volume information to predict average station usage. Through Monte Carlo simulations, an average daily load profile is obtained for each month in the planning horizon, and prediction uncertainty is quantified. The proposed framework will facilitate the accurate estimation of energy and demand costs incurred by the charging station over the planning period, thereby informing return-on-investment calculations.

Biswas, Shuchismita↗

Fast Charging Infrastructure for Electrifying Road Trips to and from National Parks in the Western United States

National parks in the Western United States draw over 80 million visitors every year, and most visitors rely on personal cars for their road trips (or long-distance travels). Travel to national parks represents distinct travel demand, as they are typically located in remote areas necessitating long-distance trips. This study investigates the quantity and locations of on-route fast charging infrastructure needed by 2030 to enable seamless travel to/from national parks using electric vehicles in seven target states in the region, employing unprecedented high-resolution spatial and temporal analysis. We find that the required number of fast charging ports for on-route charging infrastructure ranges from 1,200 to 22,000, depending on different assumptions of key input parameters - vehicle electrification rate, charging behavior, average gap between charging stations, port utilization rate, and towing trailers. Our analysis also indicates that electrical load for on-route fast charging infrastructure would peak in the afternoon, in the range of 70-400 MW, varying with the key input parameters. This study illustrates how different input parameters result in different degrees of impact on various aspects of charging infrastructure. We also examine the characteristics of projected charging infrastructure in terms of land use type, relationship with traffic volume, size of stations, and other variables.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Effect of advanced aircraft noise reduction technology on the 1990 projected noise environment around Patrick Henry Airport

A study has been conducted of the future noise environment of Patric Henry Airport and its neighboring communities projected for the year 1990. An assessment was made of the impact of advanced noise reduction technologies which are currently being considered. These advanced technologies include a two-segment landing approach procedure and aircraft hardware modifications or retrofits which would add sound absorbent material in the nacelles of the engines or which would replace the present two- and three-stage fans with a single-stage fan of larger diameter. Noise Exposure Forecast (NEF) contours were computed for the baseline (nonretrofitted) aircraft for the projected traffic volume and fleet mix for the year 1990. These NEF contours are presented along with contours for a variety of retrofit options. Comparisons of the baseline with the noise reduction options are given in terms of total land area exposed to 30 and 40 NEF levels. Results are also presented of the effects on noise exposure area of the total number of daily operations.

Cawthorn, J. M.↗

Evaluation of routing and scheduling considerations for possible future commercial hypersonic transport aircraft

Travel markets which would be served by high speed commercial transport aircraft and the ability of the airlines to schedule and route the aircraft in a way that would achieve good daily utilization and productivity are examined. The following areas are considered: (1) identification of the major long-haul city pairs that would most likely demand nonstop service; (2) selection of flight tracks observing alternative sonic boom restrictions; (3) estimation of flight times for all city pairs for the various sonic boom constraints; (4) impact of airport curfews on possible departure and arrival schedules; (5) projection of passenger traffic volumes on the selected city pairs; and (6) potential daily utilization and aircraft productivity.

Feir, J. B.↗

Telecommunication service markets through the year 2000 in relation to millimeter wave satellite systems

NASA is currently conducting a series of millimeter wave satellite system market studies to develop 30/20 GHz satellite system concepts that have commercial potential. Four contractual efforts were undertaken: two parallel and independent system studies and two parallel and independent market studies. The marketing efforts are focused on forecasting the total domestic demand for long haul telecommunications services for the 1980-2000 period. Work completed to date and reported in this paper include projections of: geographical distribution of traffic; traffic volume as a function of urban area size; and user identification and forecasted demand.

Stevenson, S. M.↗

Relationships Between the Performance of Time/Frequency Standards and Navigation/Communication Systems

The relationship between system performance and clock or oscillator performance is discussed. Tradeoffs discussed include: short term stability versus bandwidth requirements; frequency accuracy versus signal acquisition time; flicker of frequency and drift versus resynchronization time; frequency precision versus communications traffic volume; spectral purity versus bit error rate, and frequency standard stability versus frequency selection and adjustability. The benefits and tradeoffs of using precise frequency and time signals are various levels of precision and accuracy are emphasized.

Hellwig, H.↗

U.S. launch systems evolution

Shuttle improvements and Shuttle-derived vehicles which could answer projected launch system demands for the 1990s are explored. Traffic volume is suggested to be at levels exceeding the STS ability to deliver, thereby necessitating use of unmanned launch vehicles. Some payload delivery increase is possible using an Aft Cargo Carrier attached to the bottom of the external tank. This configuration would handle cargo with a diameter larger than the 15 ft allowable in the Orbiter bay. Various configurations of solid rocket booster cargo rockets are described, together with use of a module containing the Shuttle main engines and avionics as a recoverable part of a system able to place cargo 30 ft in diam and 90-100 ft tall in orbit. Using liquid reusable boosters would permit an increase of cargo capacity by the Shuttle of 50%, while a side-mount cargo vehicle (unmanned) offers a payload capacity of 165-200 klb. It is predicted that launch vehicles in the beginning of the 21st century will be of a fully reusable design.

Marshall, W. R.↗

Future satellite systems - Market demand assessment

During 1979-80, a market study was performed regarding the future total demand for communications services, and satellite transmission service at the 4/6 GHz, 12/14 GHz, and 20/30 GHz frequencies. Included in the study were a variety of communications traffic characteristics as well as projections of the cost of C and Ku band satellite systems through the year 2000. In connection with the considered study, a total of 15 major study tasks and subtasks were undertaken and were all interrelated in various ways. The telecommunications service forecasts were concerned with a total of 21 data services, 5 voice services, and 5 video services. The traffic volumes within the U.S. for the three basic services were projected for three time periods. It is found that the fixed frequency allocation for domestic satellites combined with potential interference from adjacent satellites means a near term lack of orbital positions above the U.S.

Reiner, P. S.↗

An integrated voice and data multiple-access scheme for a land-mobile satellite system

An analytical study is performed of the satellite requirements for a land mobile satellite system (LMSS). The spacecraft (MSAT-X) would be in GEO and would be compatible with multiple access by mobile radios and antennas and fixed stations. The FCC has received a petition from NASA to reserve the 821-825 and 866-870 MHz frequencies for the LMSS, while communications with fixed earth stations would be in the Ku band. MSAT-X transponders would alter the frequencies of signal and do no processing in the original configuration considered. Channel use would be governed by an integrated demand-assigned, multiple access protocol, which would divide channels into reservation and information channels, governed by a network management center. Further analyses will cover tradeoffs between data and voice users, probability of blocking, and the performance impacts of on-board switching and variable bandwidth assignment. Initial calculations indicate that a large traffic volume can be handled with acceptable delays and voice blocking probabilities.

Li, V. O. K.↗

Traffic model for the satellite component of UMTS

An algorithm for traffic volume estimation for satellite mobile communications systems has been developed. This algorithm makes use of worldwide databases for demographic and economic data. In order to provide for such an estimation, the effects of competing services have been considered so that likely market demand can be forecasted. Different user groups of the predicted market have been identified according to expectations in the quality of services and mobility requirement. The number of users for different user groups are calculated taking into account the gross potential market, the penetration rate of the identified services and the profitability to provide such services via satellite.

Hu, Y. F.↗

Determination and Applications of Environmental Costs at Different Sized Airports: Aircraft Noise and Engine Emissions

With the increasing trend of charging for externalities and the aim of encouraging the sustainable development of the air transport industry, there is a need to evaluate the social costs of these undesirable side effects, mainly aircraft noise and engine emissions, for different airports. The aircraft noise and engine emissions social costs are calculated in monetary terms for five different airports, ranging from hub airports to small regional airports. The number of residences within different levels of airport noise contours and the aircraft noise classifications are the main determinants for accessing aircraft noise social costs. Whist, based on the damages of different engine pollutants on the human health, vegetation, materials, aquatic ecosystem and climate, the aircraft engine emissions social costs vary from engine types to aircraft categories. The results indicate that the relationship appears to be curvilinear between environmental costs and the traffic volume of an airport. The results and methodology of environmental cost calculation could input for to the proposed European wide harmonized noise charges as well as the social cost benefit analysis of airports.

Lu, Cherie↗

Validating the Airspace Concept Evaluation System for Different Weather Days

This paper extends the process for validating the Airspace Concept Evaluation System using real-world historical flight operational data. System inputs such as flight plans and airport en-route capacities, are generated and processed to create a realistic reproduction of a single day's operations within the National Airspace System. System outputs such as airport throughput, delays, and en-route sector loads are then compared to real world operational metrics and delay statistics for the reproduced day. The process is repeated for 4 historical days with high and low traffic volume and delay attributed to weather. These 4 days are simulated using default en-route capacities and variable en-route capacities used to emulate weather. The validation results show that default enroute capacity simulations are closer to real-world data for low weather days than high weather days. The use of reduced variable enroute capacities adds a large delay bias to ACES but delay trends between weather days are better represented.

Zelinski, Shannon↗

Integrated Analysis of Airport Capacity and Environmental Constraints

LMI conducted an integrated analysis of airport capacity and environmental constraints. identifying and ranking the key factors limiting achievement of NextGen capacity goals. The primary metric used was projected throughput, which was estimated for the years 2015 and 2025 based on the unconstrained demand forecast from the Federal Aviation Administration, and planned improvements including those proposed in the NextGen plan. A set of 310 critical airports was identified.. collectively accounting for more than 99 percent of domestic air traffic volume; a one-off analytical approach was used to isolate the constraint being assessed. The study considered three capacity constraints (runway.. taxiway, and gate) and three environmental constraints (fuel, NO(x) emissions, and noise). For the ten busiest airports, runway and noise are the primary and secondary constraints in both 2015 and 2025. For the OEP 35 airports and overall for the remaining airports, the most binding constraint is noise. Six of the 10 busiest airports, will face runway constraints in 2025, and 95 will face gate constraints. Nearly every airport will be subject to constraints due to emissions and NOx. Runway and taxi constraints are more concentrated in the large airports: environmental constraints are present at almost every airport regardless of size.

Hasan, Shahab↗

Factors Influencing the Decisions and Actions of Pilots and Air Traffic Controllers in Three Plausible NextGen Environments

In the current air traffic management (ATM) system, pilots and air traffic controllers have well-established roles and responsibilities: pilots fly aircraft and are concerned with energy management, fuel efficiency, and passenger comfort; controllers separate aircraft and are concerned with safety and management of traffic flows. Despite having different goals and obligations, both groups must be able to effectively communicate and interact with each other for the ATM system to work. This interaction will become even more challenging as traffic volume increases dramatically in the near future. To accommodate this increase, by 2025 the national air transportation system in the U.S. will go through a transformation that will modernize the ATM system and make it safer, more effective, and more efficient. This new system, NextGen, will change how pilots and controllers perform their tasks by incorporating advanced technologies and employing new procedures. It will also distribute responsibility between pilots, controllers and automation over such tasks as maintaining aircraft separation. The present chapter describes three plausible concepts of operations that allocate different ATM responsibilities to these groups. We describe how each concept changes the role of each operator and the types of decisions and actions performed by them.

Vu, Kim-Phuong L.↗

Fuel Efficiencies Through Airframe Improvements

The factors of continuing strong growth in air traffic volume, the vital role of the air transport system on the economy, and concerns about the environmental impact of aviation have added focus to the National Aeronautics Research Policy. To address these concerns in the context of the National Policy, NASA has set aggressive goals in noise reduction, emissions, and energy consumption. With respect to the goal of reducing energy consumption in the fleet, the development of promising airframe technologies is required to realize the significant improvements that are desired. Furthermore, the combination of advances in materials and structures with aerodynamic technologies may lead to a paradigm shift in terms of potential configurations for the future. Some of these promising airframe technologies targeted at improved efficiency are highlighted.

Bezos-O'Connor, Gaudy M.↗

Benefit Assessment of the Precision Departure Release Capability Concept

A Precision Departure Release Capability concept is being evaluated by both the National Aeronautics and Space Administration and the Federal Aviation Administration as part of a larger goal of improving throughput, efficiency and capacity in integrated departure, arrival and surface operations. The concept is believed to have the potential of increasing flight efficiency and throughput by avoiding missing assigned slots and minimizing speed increase or path stretch to recover the slot. The main thrust of the paper is determining the impact of early and late departures from the departure runway when an aircraft has a slot assigned either at a meter fix or at the arrival airport. Results reported in the paper are for two scenarios. The first scenario considers flights out of Dallas/Fort Worth destined for Hartsfield-Jackson International Airport in Atlanta flying through the Meridian meter-fix in the Memphis Center with miles-in-trail constraints. The second scenario considers flights destined to George Bush Intercontinental/Houston Airport with specified airport arrival rate constraint. Results show that delay reduction can be achieved by allowing reasonable speed changes in scheduling. It was determined that the traffic volume between Dallas/Fort Worth and Atlanta via the Meridian fix is low and the departures times are spread enough that large departure schedule uncertainty can be tolerated. Flights can depart early or late within 90 minutes without accruing much more delay due to miles-in-trail constraint at the Meridian fix. In the Houston scenario, 808 arrivals from 174 airports were considered. Results show that delay experienced by the 16 Dallas/Fort Worth departures is higher if initial schedules of the remaining 792 flights are kept unaltered while they are rescheduled. Analysis shows that the probability of getting the initially assigned slot back after perturbation and rescheduling decreases with increasing standard deviation of the departure delay distributions. Results show that most Houston arrivals can be expected to be on time based on the assumed zero-mean Normal departure delay distributions achievable by Precision Departure Release Capability. In the current system, airport-departure delay, which is the sum of gate-departure delay and taxi-out delay, is observed at the airports. This delay acts as a bias, which can be reduced by Precision Departure Release Capability.

Palopo, Kee↗

A Framework for Probabilistic Evaluation of Interval Management Tolerance in the Terminal Radar Control Area

Projections of future traffic in the national airspace show that most of the hub airports and their attendant airspace will need to undergo significant redevelopment and redesign in order to accommodate any significant increase in traffic volume. Even though closely spaced parallel approaches increase throughput into a given airport, controller workload in oversubscribed metroplexes is further taxed by these approaches that require stringent monitoring in a saturated environment. The interval management (IM) concept in the TRACON area is designed to shift some of the operational burden from the control tower to the flight deck, placing the flight crew in charge of implementing the required speed changes to maintain a relative spacing interval. The interval management tolerance is a measure of the allowable deviation from the desired spacing interval for the IM aircraft (and its target aircraft). For this complex task, Formal Methods can help to ensure better design and system implementation. In this paper, we propose a probabilistic framework to quantify the uncertainty and performance associated with the major components of the IM tolerance. The analytical basis for this framework may be used to formalize both correctness and probabilistic system safety claims in a modular fashion at the algorithmic level in a way compatible with several Formal Methods tools.

Hercencia-Zapana, Heber↗