Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “time service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

LunaNet: A Flexible and Extensible Lunar Exploration Communications and Navigation Infrastructure and the Inclusion of SmallSat Platforms

As NASA establishes a sustained presence on the Moon and ventures further into the solar system, the need for a robust interplanetary communications and navigation architecture increases. LunaNet, an extensible and scalable lunar communications and navigation architecture, is being developed to answer this growing need. The LunaNet architecture will provide users with three services: networking services, positioning, navigation and timing services, and science utilization services. With LunaNet in place, users will experience an operational environment similar to that experienced by users on Earth. The agency’s plan for solar system exploration necessitates both government and commercial participation, and the LunaNet architecture supports this goal as well, encouraging global participation from commercial and international partners, other government agencies, academia, and federally funded research development centers. This paper provides a high-level description of the LunaNet architecture, discusses how SmallSat platforms and technologies may provide critical capabilities, and defines the role that SmallSats can play within the architecture.

Communications↗

Mission Operations and Information Management Area Spacecraft Monitoring and Control Working Group

Working group goals for this year are: Goal 1. Due to many review comments the green books will be updated and available for re-review by CCSDS. Submission of green books to CCSDS for approval. Goal 2.Initial set of 4 new drafts of the red books as following: SM&C protocol: update with received comments. SM&C common services: update with received comments and expand the service specification. SM&C core services: update with received comments and expand the service the information model. SM&C time services: (target objective): produce initial draft following template of core services.

Lokerson, Donald C.↗

Energy Sector Position, Navigation, and Time Cybersecurity Profile

The Pacific Northwest National Laboratory has developed this positioning, navigation, and timing (PNT) profile for the Energy Sector at the request of the U.S. Department of Energy. The Department of Energy is the sector-specific agency for the Energy Sector and is responsible for providing guidance in the form of this PNT Profile, per Executive Order 13905, Strengthening National Resilience Through Responsible Use of Positioning, Navigation, and Timing Services (Executive Office of the President 2020) issued February 18, 2020. Executive Order 13905 directed the National Institute of Standards & Technology to develop a PNT Profile that is broadly applicable to all sectors and to serve as a foundation for sector-neutral guidance, NISTIR 8323 Foundational PNT Profile: Applying the Cybersecurity Framework for the Responsible Use of Positioning, Navigation, and Timing (PNT) Services. This document builds on NISTIR 8323 to identify and serve as the required Energy Sector specific guidance. For purposes of this PNT Profile, Energy Sector precise time is 0.5 µs (microseconds) to 1 µs accuracy. Currently, the electricity subsector has systems that use this level of precision time, but the oil and natural gas subsector currently does not. While the electricity subsector uses precision timing, it does not use positioning and/or navigation at this level of accuracy. For this reason, this PNT Profile will focus on only precise time for the electricity subsector.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NASA’s Approach to Lunar Communication and Navigation: Artemis and Beyond

NASA’s Space Communications and Navigation (SCaN) program is developing a support structure of networks, partners, and technologies to provide communication, position, navigation, and timing services at the Moon. In this paper, we describe the progress and status of these diverse efforts and the ways in which they will be used during NASA’s crewed lunar exploration program, Artemis. We provide an update on developments at NASA which are targeted to cislunar space, including the Orion Artemis II Optical Communications System (O2O) demonstration mission, planned Lunar Exploration Ground Sites (LEGS) that will offer a dedicated Direct to Earth (DTE) capability servicing the cislunar region, and a recently released RFP for commercial Lunar Communications Relay and Navigation Services as well as Direct to Earth communications capabilities. We also describe the current status and key role of the LunaNet Interoperability Specification (LNIS), a collaborative standards framework developed by NASA, international partner agencies, and commercial stakeholders. A common thread, weaving these efforts together, is the support of commercial enterprises that can meet the Artemis challenge. Together, these projects and activities will enable safe, robust, and reliable communications and position, navigation, and timing (PNT) services for both crewed and uncrewed missions across cislunar space. SCaN and NASA, with our partners, are helping to build the foundation for a long term, sustainable human presence at the Moon –one that will set the stage for similar efforts at Mars.

LunaNet↗

Bayes Analysis and Reliability Implications of Stress-Rupture Testing a Kevlar/Epoxy COPV using Temperature and Pressure Acceleration

Composite Overwrapped Pressure Vessel (COPVs) that have survived a long service time under pressure generally must be recertified before service is extended. Sometimes lifetime testing is performed on an actual COPV in service in an effort to validate the reliability model that is the basis for certifying the continued flight worthiness of its sisters. Currently, testing of such a Kevlar49(registered TradeMark)/epoxy COPV is nearing completion. The present paper focuses on a Bayesian statistical approach to analyze the possible failure time results of this test and to assess the implications in choosing between possible model parameter values that in the past have had significant uncertainty. The key uncertain parameters in this case are the actual fiber stress ratio at operating pressure, and the Weibull shape parameter for lifetime; the former has been uncertain due to ambiguities in interpreting the original and a duplicate burst test. The latter has been uncertain due to major differences between COPVs in the data base and the actual COPVs in service. Any information obtained that clarifies and eliminates uncertainty in these parameters will have a major effect on the predicted reliability of the service COPVs going forward. The key result is that the longer the vessel survives, the more likely the more optimistic stress ratio is correct. At the time of writing, the resulting effect on predicted future reliability is dramatic, increasing it by about one nine , that is, reducing the probability of failure by an order of magnitude. However, testing one vessel does not change the uncertainty on the Weibull shape parameter for lifetime since testing several would be necessary.

Phoenix, S. Leigh↗

Bayes Analysis and Reliability Implications of Stress-Rupture Testing a Kevlar/Epoxy COPV Using Temperature and Pressure Acceleration

Composite Overwrapped Pressure Vessels (COPVs) that have survived a long service time under pressure generally must be recertified before service is extended. Flight certification is dependent on the reliability analysis to quantify the risk of stress rupture failure in existing flight vessels. Full certification of this reliability model would require a statistically significant number of lifetime tests to be performed and is impractical given the cost and limited flight hardware for certification testing purposes. One approach to confirm the reliability model is to perform a stress rupture test on a flight COPV. Currently, testing of such a Kevlar49 (Dupont)/epoxy COPV is nearing completion. The present paper focuses on a Bayesian statistical approach to analyze the possible failure time results of this test and to assess the implications in choosing between possible model parameter values that in the past have had significant uncertainty. The key uncertain parameters in this case are the actual fiber stress ratio at operating pressure, and the Weibull shape parameter for lifetime; the former has been uncertain due to ambiguities in interpreting the original and a duplicate burst test. The latter has been uncertain due to major differences between COPVs in the database and the actual COPVs in service. Any information obtained that clarifies and eliminates uncertainty in these parameters will have a major effect on the predicted reliability of the service COPVs going forward. The key result is that the longer the vessel survives, the more likely the more optimistic stress ratio model is correct. At the time of writing, the resulting effect on predicted future reliability is dramatic, increasing it by about one "nine," that is, reducing the predicted probability of failure by an order of magnitude. However, testing one vessel does not change the uncertainty on the Weibull shape parameter for lifetime since testing several vessels would be necessary.

Phoenix, S. Leigh↗

TDRS MA phased-array antenna simulations

The NASA's Space Network (SN) nominal user services are prescheduled to allocate service type and required equipment to a user of the network. The availability of a resource for a given user is then communicated back to the user prior to requested service time. A proposed Demand Assignment Multiple Access (DAMA) system for NASA's SN to make it easier to allow a real time changes to add new user to the service schedule, is presented. The goals of the project are to improve the current operational modes by (1) reducing the support overhead required to maintain the overall scheduling requirements in this area; (2) allowing for more users to access the system especially those who traditionally have not considered SN access available to them; and (3) providing additional scheduling flexibility.

Caballero, Ruben↗

Flexible Data and Frame Synchronization Structure for the LunaNet PNT Signal

A LunaNet Lunar Augmented Navigation Service (LANS) is being developed to enable a position, navigation, and timing service for future Lunar operations. The signal includes two components. An in-phase data channel signal is spread by a 1.023 MCPS ranging code that provides a high-rate data message at 250 bps and is encoded by a strong Low Density Parity Check (LDPC) code. A pilot channel with a 5.115 MCPS spreading code is also provided. The pilot code is configured with a secondary (overlay) code that does not currently provide absolute time or frame Synchronization as is the case for L1C. This work shows the advantage of implementing an overlay structure that provides absolute time for the LunaNet LANS signal structure known as the Augmented Forward Signal (AFS). The LunaNet AFS structure was developed to service two classes of user receivers. The first class is a low-complexity user receiver that only receives the 1.023 MCPS signal and does not use the 5.115 MCPS pilot channel. For this class of user, a data frame Sync word is needed. The second class of receiver is a high-end receiver that can processes both data and pilot channels to take advantage of the higher chip rate pilot channel for enhanced robustness and improved accuracy. In the current draft LunaNet LANS AFS design, these users must employ the frame Sync word in the data channel and obtain absolute time after decoding the AFS navigation message. The signal structure would greatly benefit from the addition of a pilot overlay structure that provides absolute time and robust frame Sync for high-end users as done for L1C. To provide a more robust and interoperable AFS structure, this work summarizes a study and recommends alternatives for a new overlay code on the pilot channel that provides absolute time and a Sync word approach on the data channel. The overlay code and Sync word are designed to allow for flexible and robust data synchronization for both low- complexity and high-end user receivers. The new overlay code structure permits frame synchronization performance that is as good as or better than the L1 C signal, while enabling a determination of absolute time upon frame Sync to aid high-end assisted LANS AFS user receivers at low signal to noise levels. We also present the design of rate-matched 5G new radio (5GNR) LDPC codes that fit within the current 6000-symbol frame size along with a time of interval (TOI) word, frame ID (FID) word, and the remaining LunaNet AFS data message blocks. The paper describes and demonstrates robust frame Synchronization performance of the overlay code and Synch word approaches. The results are described in terms of probability of missed detection and probability of false alarm for a correct frame Synchronization at low Eb/No levels expected for decoding the TOI word and LDPC encoded data. Advantages of the proposed data Synchronization structure will be described along with use cases for low-end and high-end receivers. Practical implementation considerations will also be described.

LunaNet↗

Flexible Data and Frame Synchronization Structure for the LunaNet PNT Signal

A LunaNet Lunar Augmented Navigation Service (LANS) is being developed to enable a position, navigation, and timing service for future Lunar operations [1]. The signal includes two components. An in-phase data channel signal is spread by a 1.023 MCPS ranging code that provides a high-rate data message at 250 bps and is encoded by a strong Low Density Parity Check (LDPC) code. A pilot channel with a 5.115 MCPS spreading code is also provided. The pilot code is configured with a secondary (overlay) code that does not currently provide absolute time or frame Synchronization as is the case for L1C [2] [3]. This work shows the advantage of implementing an overlay structure that provides absolute time for the LunaNet LANS signal structure known as the Augmented Forward Signal (AFS). The LunaNet AFS structure was developed to service two classes of user receivers. The first class is a low-complexity user receiver that only receives the 1.023 MCPS signal and does not use the 5.115 MCPS pilot channel. For this class of user, a data frame Sync word is needed. The second class of receiver is a high-end receiver that can processes both data and pilot channels to take advantage of the higher chip rate pilot channel for enhanced robustness and improved accuracy. In the current draft LunaNet LANS AFS design, these users must employ the frame Sync word in the data channel and obtain absolute time after decoding the AFS navigation message [2]. The signal structure would greatly benefit from the addition of a pilot overlay structure that provides absolute time and robust frame Sync for high-end users as done for L1C [3]. To provide a more robust and interoperable AFS structure, this work summarizes a study and recommends alternatives for a new overlay code on the pilot channel that provides absolute time and a Sync word approach on the data channel. The overlay code and Sync word are designed to allow for flexible and robust data synchronization for both low- complexity and high-end user receivers. The new overlay code structure permits frame synchronization performance that is as good as or better than the L1 C signal, while enabling a determination of absolute time upon frame Sync to aid high-end assisted LANS AFS user receivers at low signal to noise levels. We also present the design of rate-matched 5G new radio (5GNR) LDPC codes that fit within the current 6000-symbol frame size along with a time of interval (TOI) word, frame ID (FID) word, and the remaining LunaNet AFS data message blocks. The paper describes and demonstrates robust frame Synchronization performance of the overlay code and Synch word approaches. The results are described in terms of probability of missed detection and probability of false alarm for a correct frame Synchronization at low Eb/No levels expected for decoding the TOI word and LDPC encoded data. Advantages of the proposed data Synchronization structure will be described along with use cases for low-end and high-end receivers. Practical implementation considerations will also be described.

Philip Dafesh↗

STADAN and data relay satellite simulation (emphasis on the scheduler)

A set of computer programs was developed which can be used to simulate the operation of NASA's Satellite Tracking and Data Acquisition Network (STADAN). The simulation consists of two major modules, a computerized algorithmic satellite scheduler (CASS) and a generalized evaluation model simulator (GEMS). CASS generates in-view time intervals of satellites over ground stations, and using these candidate passes, produces a schedule of service times for specific satellites to be serviced by specific ground stations in an attempt to fulfill certain inputted service requirements. GEMS than examines how well STADAN fulfills this schedule in terms of the availability and dependability of different (inputted) complements of equipment at the ground stations. The simulation was modified to allow for the introduction of one or more tracking and data relay satellites, which can serve as orbital receiving and command stations.

Kerne, B.↗

The BBC network radio time and frequency standard and its role in the provision of the Greenwich time signal

The British Broadcasting Corporation (BBC) has broadcast the Greenwich Time Signal (GTS) on its networks since 1924. Up to February 1990 this signal was generated by the Royal Greenwich Observatory (RGO) in England. The BBC was informed that the RGO was moving its location to Cambridge and might not be able to continue to provide the Greenwich Time Service. The BBC in its role of a public service broadcaster believed that a long tradition of providing a time signal to its listeners should be upheld, and as such decided to seek alternative methods of provision. In parallel with this activity, an in-house requirement arose to re-engineer time switch equipment and provide new facilities for digital audio projects. As both requirements have a common engineering core, a decision was taken to design and procure a Time and Frequency Standard that could generate the Greenwich Time Signal to the same specification adhered to by the RGO, and provide additional time and frequency facilities. The concept of time and time/frequency dissemination as used in a broadcast network is discussed, as well as the details of an engineering solution to the requirements of BBC Network Radio.

Mcilroy, Jim J.↗

The Effect of Prior Exposures on the Notched Fatigue Behavior of Disk Superalloy ME3

Environmental attack has the potential to limit turbine disk durability, particularly in next generation engines which will run hotter; there is a need to understand better oxidation at potential service conditions and develop models that link microstructure to fatigue response. More efficient gas turbine engine designs will require higher operating temperatures. Turbine disks are regarded as critical flight safety components; a failure is a serious hazard. Low cycle fatigue is an important design criteria for turbine disks. Powder metallurgy alloys, like ME3, have led to major improvements in temperature performance through refractory additions (e.g. Mo,W) at the expense of environmental resistance (Al, Cr). Service conditions for aerospace disks can produce major cycle periods extending from minutes to hours and days with total service times exceeding 1,000 hours in aerospace applications. Some of the effects of service can be captured by extended exposures at elevated temperature prior to LCF testing. Some details of the work presented here have been published.

Sudbrack, Chantal K.↗

Inter-satellite time transfer: Techniques and applications

A brief review is presented of the well known time transfer techniques that have been studied and tested throughout the years. The applicability of time transfer techniques to a timing service as provided through a TDRS/DRS System, the problems related to the choice of the timing signal within the constraints imposed by the existing systems, and the possible practical implementations, including a description of the time synchronization support via TDRSS to the Gamma Ray Observatory (GRO) are discussed.

Detoma, Edoardo↗

The national- and international-wide prospects of future improvements of position location and time synchronization systems and aids

The concept being designed by the Leningrad Scientific Research Radio Technical Institute (LSRRI) of united positioning and timing service on the basis of the utilization of long-range and global radionavigation and common time systems and aids for different users is described. The estimate of its utilization on the national as well as on international scale is given.

Gouzhva, Yuri G.↗

The Keck Task Library (KTL)

KTL is a set of routines which eases the job of writing applications which must interact with a variety of underlying sub-systems (known as services). A typical application is an X Window user interface coordinating telescope and instruments. In order to connect to a service, application code specifies a service name--typically an instrument name--and a style, which defines the way in which the application will interact with the service. Two styles are currently supported: keyword, where the application reads and writes named keywords and the resulting inter-task message traffic is hidden; and message, where the application deals directly with messages. The keyword style is intended mainly for user interfaces, and the message style is intended mainly for lower-level applications. KTL applications are event driven: a typical application first connects to all its desired services, then expresses interest in specified events. The application then enters an event dispatch loop in which it waits for events and calls the appropriate service's event-handling routine. Each event is associated with a call-back routine which is invoked when the event occurs. Call-back routines may (and typically do) interact with other sub-systems and KTL provides the means of doing so without blocking the application (vital for X Window user interfaces). This approach is a marriage of ideas culled from the X window, ADAM, Keck instrument, and Keck telescope control systems. A novel feature of KTL is that it knows nothing about any services or styles. Instead it defines a generic set of routines which must be implemented by all services and styles (essentially open(), ioctl(), read(), write(), event(), and close()) and activates sharable libraries at run-time. Services have been implemented (in both keyword and message styles) for HIRES (the Keck high resolution echelle spectrograph built by Lick Observatory), LWS (the Keck long wavelength spectrometer built by UC San Diego), and the Keck telescope. Each of these implementations uses different underlying message systems: the Lick MUSIC system, RPC's, and direct sockets (respectively). Services for the remaining three front-line Keck instruments will be implemented over the next few months.

Lupton, W. F.↗

High accuracy time transfer synchronization

In July 1994, the U.S. Naval Observatory (USNO) Time Service System Engineering Division conducted a field test to establish a baseline accuracy for two-way satellite time transfer synchronization. Three Hewlett-Packard model 5071 high performance cesium frequency standards were transported from the USNO in Washington, DC to Los Angeles, California in the USNO's mobile earth station. Two-Way Satellite Time Transfer links between the mobile earth station and the USNO were conducted each day of the trip, using the Naval Research Laboratory(NRL) designed spread spectrum modem, built by Allen Osborne Associates(AOA). A Motorola six channel GPS receiver was used to track the location and altitude of the mobile earth station and to provide coordinates for calculating Sagnac corrections for the two-way measurements, and relativistic corrections for the cesium clocks. This paper will discuss the trip, the measurement systems used and the results from the data collected. We will show the accuracy of using two-way satellite time transfer for synchronization and the performance of the three HP 5071 cesium clocks in an operational environment.

Wheeler, Paul J.↗

Remote clocks linked by a fully calibrated two-way timing link

Fully calibrated two-way time transfers between the U.S. Naval Observatory (USNO) and the U.S. Naval Observatory Time Service Substation (NOTSS) have become operational. The calibration method employed was the co-located Earth station method. Results concerning timing, stability, comparison of two-way and Global Positioning System (GPS) timing links, and remote clock contribution to local time scale computation will be presented.

Deyoung, James A.↗