Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Networked HIL Simulation System for Modeling Large-scale Power Systems

This paper presents a network hardware-in-the-loop (HIL) simulation system for modeling large-scale power systems. Researchers have developed many HIL test systems for power systems in recent years. Those test systems can model both microsecond-level dynamic responses of power electronic systems and millisecond-level transients of transmission and distribution grids. By integrating individual HIL test systems into a network of HIL test systems, we can create large-scale power grid digital twins with flexible structures at required modeling resolution that fits for a wide range of system operating conditions. This will not only significantly reduce the need for field tests when developing new technologies but also greatly shorten the model development cycle. In this paper, we present a networked OPAL-RT based HIL test system for developing transmission-distribution coordinative Volt-VAR regulation technologies as an example to illustrate system setups, communication requirements among different HIL test systems, and connection mechanisms. Impacts of communication delays, information exchange cycles, and computing delays are illustrated. Simulation results show that the performance of a networked HIL test system is satisfactory.

digital twin, distribution system, co-simulation, ↗

System and method for testing missile components

A testing system for testing a missile component having a sense axis includes a centrifuge, a support arm, an orientation assembly, and a controller. The centrifuge rotates the orientation assembly about a vertical axis in a substantially horizontal plane. The orientation assembly includes a first motor, a first gimbal, and a gimballed support. The first motor has a first rotatable shaft defining a first gimbal axis. The first gimbal is coupled with the first rotatable shaft to rotate about the first gimbal axis while the centrifuge rotates the orientation assembly about the vertical axis such that missile component is simultaneously rotated about both the vertical axis and the first gimbal axis to simulate a missile launch of the missile component. The gimballed support is coupled with the first gimbal for supporting the missile component such that the sense axis of the missile component is not parallel to the substantially horizontal plane. The orientation assembly may also include a second gimbal that is rotated about a second gimbals axis by a second motor.

Prewitt, Steven Forrest↗

System and method for testing missile components

A testing system for testing a missile component having a sense axis includes a centrifuge, a support arm, an orientation assembly, and a controller. The centrifuge rotates the orientation assembly about a vertical axis in a substantially horizontal plane. The orientation assembly includes a first motor, a first gimbal, and a gimballed support. The first motor has a first rotatable shaft defining a first gimbal axis. The first gimbal is coupled with the first rotatable shaft to rotate about the first gimbal axis while the centrifuge rotates the orientation assembly about the vertical axis such that missile component is simultaneously rotated about both the vertical axis and the first gimbal axis to simulate a missile launch of the missile component. The gimballed support is coupled with the first gimbal for supporting the missile component such that the sense axis of the missile component is not parallel to the substantially horizontal plane. The orientation assembly may also include a second gimbal that is rotated about a second gimbals axis by a second motor.

Prewitt, Steven Forrest↗

Molten salt environment creep testing extensometry system

Disclosed herein are systems, devices and methods for creep testing selected materials within a high-temperature molten salt environment. Exemplary creep testing systems include a load train for holding a test specimen under a load within a heated inert gas vessel. An extensometry system can be included to measure elongation of the test specimen while under load. The extensometry system can include fixed members and axially translating member that move along with the elongation of the test specimen, and the system can include a sensor to measure the relative axial motion between such components to measure elongation of the test specimen over time. The test specimen can include a cylindrical gage portion having an internal void filled with a molten salt during creep testing to simulate the corrosive effect of the molten salt on the specimen material during testing.

Ren, Wenlin↗

Two-terminator RF adapter for background/environment noise measurement

A two-terminator RF adapter for background noise measurement in a test environment comprises a system test port comprising a system test port termination and a system test port connector to connect to a system under test; and a data acquisition port, comprising a data acquisition port termination and a data acquisition port connector to connect to a data acquisition system.

Kolski, Jeffrey↗

BioID/LID System Cartridge Testing Report

LLNL produced two lots of lyophilized LAMP assay containing cartridges, LNL022818 and LNL071818, for testing on Gen3 BioID systems. Thirty-nine cartridges were tested for lot LNL022818. All thirty-nine cartridges performed as expected regarding correct positive control (IPC) and negative control (NTC) reactions. Five different templates were tested on these 39 cartridges. The BioID system detected 79.1% true positives and 9.3% false positives along with 98.9% true negatives and 2.9% false negatives for cartridge lot LNL022818. Thirty cartridges were tested for lot LNL071818. It was noted early that due to a manufacturing issue with the cartridges related to incomplete sonic welding of the cartridge, a large fraction of lot LNL071818 cartridges leaked. Insufficient funds were available to replace this lot of cartridges. Twenty three of 30 cartridges performed as expected regarding correct positive control (IPC) and negative control (NTC) reactions. Four different templates were tested on these 30 cartridges. The BioID system detected 77% true positives and 23% false positives along with 96.9% true negatives and 3.1% false negatives for cartridge lot LNL071818. For all tested cartridges using DNA template, DNA was added at a final concentration of 25 pg/ul. All reactions contained positive control DNA at 2.5 pg/ul.

42 ENGINEERING↗

Tests of a High Temperature Sample Conditioner for the Waste Treatment Plant LV-S2, LV S3, HV S3A and HV-S3B Exhaust Systems

Tests were performed to evaluate a sample conditioning unit for stack monitoring at Hanford Tank Waste Treatment and Immobilization Plant (WTP) exhaust stacks with elevated air temperatures. The LV-S2, LV-S3, HV-S3A and HV-S3B exhaust stacks are expected to have elevated air temperature and dew point. At these emission points, exhaust temperatures are too high to deliver the air sample directly to the required stack monitoring equipment. As a result, a sample conditioning system is considered to cool and dry the air prior to its delivery to the stack monitoring system. The method proposed for the sample conditioning is a dilution system that will introduce cooler, dry air to the air sample stream. This method of sample conditioning is meant to reduce the sample temperature while avoiding condensation of moisture in the sample stream. An additional constraint is that the ANSI/HPS N13.1-1999 standard states that at least 50% of the 10 µm aerodynamic diameter (AD) particles present in the stack free stream must be delivered to the sample collector. In other words, depositional loss of particles should be limited to 50% in the sampling, transport, and conditioning systems. Based on estimates of particle penetration through the LV-S3 sampling system, the diluter should perform with about 80% penetration or better to ensure that the total sampling system passes the 50% or greater penetration criterion.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimal Power Dispatch of DGs in Radial and Mesh AC Grids: A Hybrid Solution Methodology between the Salps Swarm Algorithm and Successive Approximation Power Flow Method

In this paper, we address the problem of the optimal power dispatch of Distributed Generators (DGs) in Alternating Current (AC) networks, better known as the Optimal Power Flow (OPF) problem. We used, as the objective function, the minimization of power losses (P loss ) associated with energy transport, which are subject to the set of constraints that compose AC networks in an environment of distributed generation. To validate the effectiveness of the proposed methodology in solving the OPF problem in any network topology, we employed one 10-node mesh test system and three radial text systems: 10, 33, and 69 nodes. In each test system, DGs were allowed to inject 20%, 40%, and 60% of the power supplied by the slack generator in the base case. To solve the OPF problem, we used a master–slave methodology that integrates the optimization method Salps Swarm Algorithm (SSA) and the load flow technique based on the Successive Approximation (SA) method. Moreover, for comparison purposes, we employed some of the algorithms reported in the specialized literature to solve the OPF problem (the continuous genetic algorithm, the particle swarm optimization algorithm, the black hole algorithm, the antlion optimization algorithm, and the Multi-Verse Optimizer algorithm), which were selected because of their excellent results in solving such problems. The results obtained by the proposed solution methodology demonstrate its superiority and convergence capacity in terms of minimization of P loss in both radial and mesh systems. It provided the best reduction in minimum P loss in short processing times and showed excellent repeatability in each test system and scenario under analysis.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Handbook for Performing Hydrocarbon Fuel Fires in XTF For Fast-Heat System Level Tests

This document serves to provide information on all aspects of a system level thermal qualification test including a description of the setup and conduct of a full system fuel fire test in the Thermal Test Complex (TTC) Crosswind Test Facility (XTF). This might be referred to as a “handbook” for future tests. This information is intended to assist technologists and test directors in performing these types of tests in the future.

42 ENGINEERING↗

NREL's Advanced Distribution Management System (ADMS) Test Bed

Transform utility electric distribution management systems to enable the integration and management of all assets and functions across the utility enterprise regardless of vendor or technology. Four program areas: Platform: Develop an open-source platform; evaluate advanced applications. Test bed: Build a vendor-neutral test bed to evaluate existing and future advanced distribution management system (ADMS) functionalities in a realistic setting. Applications: Develop an initial suite of ADMS applications. Advanced control: Develop new integrated optimization and control solutions.

ADMS test bed↗

Pavilion 2 Feature Additions [Slides]

Pavilion 2 is a critical component of system testing for LANL HPC systems. Pavilion 2 is system independent, which allows for the creation of a large suite of generalized tests than can be applied to multiple systems. These additions to Pavilion 2 improve our ability to test systems and diagnose issues. With such a large suite, running the proper tests when diagnosing and fixing a system can be difficult, as well as locating old tests for reference. Test configurations may contain several permutations of a test, not all of which may apply to a given system. The ability to run sets of test permutations lets the tester focus on specific parts of the test without having to edit the test configurations or run extraneous tests. The addition of the filter argument improves the ability to find test results based on test attributes, including past tests. Pavilion 2's system independence is largely based on various layers of configuration files. Configuration files for the host, test, and modes exist to allow generalized testing. The operating system configuration layer can provide helpful OS defaults to a test. Survey, a collection and reporting tool, can help us gauge the performance of a system as well as diagnose issues. The addition of a Survey mode in Pavilion 2 makes running tests with Survey very straightforward. The Survey results are combined with Pavilion 2's test results to make it easy to access.

97 MATHEMATICS AND COMPUTING↗

Pavilion 2 Feature Additions [Slides]

Pavilion 2 is a critical component of system testing for LANL HPC systems. Pavilion 2 is system independent, which allows for the creation of a large suite of generalized tests than can be applied to multiple systems. These additions to Pavilion 2 improve our ability to test systems and diagnose issues. With such a large suite, running the proper tests when diagnosing and fixing a system can be difficult, as well as locating old tests for reference. Test configurations may contain several permutations of a test, not all of which may apply to a given system. The ability to run sets of test permutations lets the tester focus on specific parts of the test without having to edit the test configurations or run extraneous tests. The addition of the filter argument improves the ability to find test results based on test attributes, including past tests. Pavilion 2's system independence is largely based on various layers of configuration files. Configuration files for the host, test, and modes exist to allow generalized testing. The operating system configuration layer can provide helpful OS defaults to a test. Survey, a collection and reporting tool, can help us gauge the performance of a system as well as diagnose issues. The addition of a Survey mode in Pavilion 2 makes running tests with Survey very straightforward. The Survey results are combined with Pavilion 2's test results to make it easy to access.

97 MATHEMATICS AND COMPUTING↗

Production and testing of the powerboard for ATLAS ITk Strip barrel modules

The upgrade of the ATLAS ITk strips detector for HL-LHC will employ a custom PCB (powerboard) for on-module DC-DC conversion, HV switching, and monitoring. Production of about 14100 of such PCBs with high reliability is a big challenge. In this paper we will present the production procedure and quality control (QC) testing system for the powerboards to be installed on ITk Strip barrel modules. During production, about 150 powerboards will be produced every week. Each powerboard will need to pass QC tests before they are assembled to module. The QC tests include thermal cycling between -35 °C and 40 °C, soak test (continuous running of DC-DC converter at high load at 20 °C), and basic functionality and characterization electrical tests of the low voltage (LV), high voltage (HV), and monitoring functions of the powerboard. A custom QC test system is described, which is based on a reusable PCB (active board) with all testing circuits, a one-time powerboard carrier card, and a Z-turn SoC board which hosts and runs the testing program. The production procedure and QC test system has been tested with 400 powerboards during pre-production, and the system has been proven ready for production with the desired testing program, speed, safety, and cost. Performance and typical failures of powerboards observed during the QC test of pre-production powerboards is also presented.

47 OTHER INSTRUMENTATION↗

NREL's Advanced Distribution Management System (ADMS) Test Bed

NREL's advanced distribution management system (ADMS) research helps utilities meet customer expectations of reliability, power quality, renewable energy use, data security, and resilience to natural disasters and other threats.

Advanced Research on Integrated Energy Systems↗

Impact of K-factor on Short Circuit Program Convergence for Inverter-Based Resources during Faults

Classical short-circuit programs that linearize the power network are no longer applicable for inverter based resources (IBRs), necessitating an iterative approach. Phasor domain programs can model the IBRs using an iterative approach considering nonlinear fault responses. In phasor domain models, the IBR can be modeled as a voltage controlled current source (VCCS) in tabular form with positive, negative, and zero sequence information for balanced and unbalance short-circuit faults. In the VCCS modeling of the IBR, positive and negative incremental reactive current, also known as the k-factor, plays an important role in short circuit program convergence. In this work, a few approaches: conventional VCCS modeling with a k-factor of 2, conventional VCCS modeling with a k-factor of 2 with modified pre-fault voltages, VCCS characteristics based on the power flow solution with a k-factor of 2, and VCCS characteristics based on the power flow solution with a k-factor of 1 are investigated for short circuit program convergence under higher IBR penetration. The IEEE 39 bus New England Test System is taken as the test system, and simulations are carried out in PSS®CAPE 15.0.26 simulation software. Simulation results demonstrate that IBR penetration is higher for the VCCS model, which corresponds to the power flow solution with k-factor 1, compared to other approaches.

42 ENGINEERING↗