Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technical potential assessments”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Satellite Power Systems (SPS): Concept development and evaluation program: Preliminary assessment

A preliminary assessment of a potential Satellite Power System (SPS) is provided. The assessment includes discussion of technical and economic feasibility; the effects of microwave power transmission beams on biological, ecological, and electromagnetic systems; the impact of SPS construction, deployment, and operations on the biosphere and on society; and the merits of SPS compared to other future energy alternatives.

Source record↗

Near-Earth Asteroid Retrieval Mission (ARM) Study

The Asteroid Redirect Mission (ARM) concept brings together the capabilities of the science, technology, and the human exploration communities on a grand challenge combining robotic and human space exploration beyond low Earth orbit. This paper addresses the key aspects of this concept and the options studied to assess its technical feasibility. Included are evaluations of the expected number of potential targets, their expected discovery rate, the necessity to adequately characterize candidate mission targets, the process to capture a non-cooperative asteroid in deep space, and the power and propulsion technology required for transportation back to the Earth-Moon system. Viable options for spacecraft and mission designs are developed. Orbits for storing the retrieved asteroid that are stable for more than a hundred years, yet allow for human exploration and commercial utilization of a redirected asteroid, are identified. The study concludes that the key aspects of finding, capturing and redirecting an entire small, near-Earth asteroid to the Earth-Moon system by the first half of the next decade are technically feasible. The study was conducted from January 2013 through March 2013 by the Jet Propulsion Laboratory (JPL) in collaboration with Glenn Research Center (GRC), Johnson Space Center (JSC), Langley Research Center (LaRC), and Marshall Space Flight Center (MSFC).

Solar Electric Propulsion (SEP)↗

Hot Springs and Geysers: Exploring Historical and Modern Impacts of Geothermal Energy Production on Associated Natural Surface Systems and Standardizing Management Practices

Surface thermal features, most notably hot springs and geysers are increasingly being recognized for their importance to ecosystems, indigenous cultures, and in some cases agriculture, recreation, and tourism. Geothermal project development poses a potential risk to these natural features but current regulatory requirements for assessing and managing these risks during exploration, permitting and monitoring are somewhat inconsistent and unpredictable across different geothermal fields. This has resulted in uncertainty and increases in exploration risk for geothermal energy developers that have led to costly project delays, cancellations, or hesitation to commit. Varying regulatory requirements may also influence public perception, fostering confusion, distrust and ultimately opposition to geothermal projects, further contributing to project delays or cancellations. At a time when there is an increasing urgency for reliable baseload clean energy, geothermal is a net-zero, renewable solution that additionally provides access to more equitable and environmentally just clean power. Continued integration of geothermal energy into the national energy roadmap can be facilitated through consistent and predictable permitting, providing regulators the framework they need, developers a clear path forward, and transparency that the public deserves. This project, currently in its beginning phases, seeks to address this important issue by providing a technical basis from which to build a preliminary protocol for assessing and managing potential impacts from new or existing geothermal energy projects to surface thermal features and their associated ecosystems. Development of this preliminary protocol will be informed by (1) a literature review of well-documented case studies in the western U.S. and New Zealand to understand the range of conditions that exemplify geothermal-surface thermal systems; (2) development of generic illustrative conceptual-numerical models to quantify, understand, and predict the first-order controls (e.g., pressure and permeability) on surface flows; and (3) additional independent and scientifically rigorous evaluations of geothermal-surface thermal system case studies from the Basin and Range Province that incorporate publicly available data as well as data provided by industry through data-sharing agreements. Learning from the successes of the process used to develop the Induced Seismicity Management Protocol (ISMP), we ultimately aim to use these initial efforts as a springboard for establishing a surface thermal feature management working group that will work collaboratively to finalize the protocol as well as co-create recommended best practices for implementation. We envision that the working group will primarily be composed of representatives from regulatory entities, government agencies, Tribes, academia, national laboratories, and industry, and will include early and regular engagement with community organizations and environmental groups. This will help ensure broad acceptance and implementation of the protocol, which will facilitate a more consistent, predictable, and standardized regulatory process, and help to ensure that geothermal energy continues to provide a reliable source of clean energy, and a pathway to achieving greater energy equity in the U.S.

Best Practices↗

Application of guided acoustic waves to delamination detection

Guided plate waves are able to interact with structural flaws such as delaminations and cracks due to their propagation properties highly sensitive to the thickness change in materials. A technique which employs an acoustic damper to probe the results of this interaction and then to locate flaws in a relatively short period of time is developed. With its technical advantages, this technique shows its potential application to large area structural integrity assessment.

Sun, Keun J.↗

Communications Technology Assessment for the Unmanned Aircraft System (UAS) Control and Non-Payload Communications (CNPC) Link

The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) is performing communications systems research for the Unmanned Aircraft System (UAS) in the National Airspace System (NAS) Project. One of the goals of the communications element is to select and test a communications technology for the UAS Control and Non-Payload Communications (CNPC) link. The GRC UAS Modeling and Simulation (M/S) Sub Team will evaluate the performance of several potential technologies for the CNPC link through detailed software simulations. In parallel, an industry partner will implement a technology in hardware to be used for flight testing. The task necessitated a technical assessment of existing Radio Frequency (RF) communications technologies to identify the best candidate systems for use as the UAS CNPC link. The assessment provides a basis for selecting the technologies for the M/S effort and the hardware radio design. The process developed for the technical assessments for the Future Communications Study1 (FCS) was used as an initial starting point for this assessment. The FCS is a joint Federal Aviation Administration (FAA) and Eurocontrol study on technologies for use as a future aeronautical communications link. The FCS technology assessment process methodology can be applied to the UAS CNPC link; however the findings of the FCS are not directly applicable because of different requirements between a CNPC link and a general aeronautical data link. Additional technologies were added to the potential technologies list from the State of the Art Unmanned Aircraft System Communication Assessment developed by NASA GRC2. This document investigates the state of the art of communications as related to UAS. A portion of the document examines potential communications systems for a UAS communication architecture. Like the FCS, the state of the art assessment surveyed existing communications technologies. It did not, however, perform a detailed assessment of the technology necessary to recommend a technology for the UAS CNPC link. The technical assessment process, as shown in Figure 1, consists of the following steps. First, candidate RF communications technologies are identified. An initial review of each of these technologies is then performed to determine if the technology appears to be a good candidate and requires further review. Any technology that can be shown to be inadequate at that point is removed from consideration to allow for more detailed analysis of the remaining technologies. Criteria for the detailed assessments are defined and a scoring methodology is devised. This is followed by the detailed review and scoring of each technology. The least favorable technologies are removed during the process until only the few best candidates remain.

Aircraft Command and Control↗

Unseen Winds: Harnessing High-Altitude Winds in the Southeast USA

This project aims to identify potential sites in the United States for further testing and development of airborne wind energy systems (AWES). Through industry questionnaires and interviews with AWES companies, the study assesses existing test sites' capabilities and gaps, leading to a three-tiered test site strategy: short-duration prototype demonstrations, long-duration technical assessments and power validations, and airspace interaction and deconfliction studies. Notably, the southeastern United States presents significant potential for AWES due to its lack of traditional wind turbines, which is attributed to low wind speeds at lower altitudes. However, wind conditions improve significantly at higher altitudes, making this region a promising candidate for AWES deployment. The project considers factors such as wind resources, infrastructure proximity, social acceptance, and environmental impacts to recommend sites that can support the unique needs of AWES manufacturers and facilitate their commercialization. Early findings suggest rural communities with low grid resiliency could benefit economically and technologically from hosting AWES test sites, especially with operator training centers and potential for long-term skilled employment in future disaster relief and other applications.

17 WIND ENERGY↗

MARSNET surface and atmosphere investigations

Following an ESA preliminary study on the possible areas of European participation in the future international exploration of Mars and a recent ESA in-depth scientific and technical assessment study, MARSNET was selected for further phase-A studies as a potential European contribution to such exploration. The MARSNET mission consists of a network of small stations to be landed on the surface of Mars. All surface stations will have identical design and payload, and will be located several thousand km apart from each other. The required operational lifetime on the surface of Mars for all landers is one Martian year (687 days) to carry out long-term meteorological and seismological measurements. The availability of a data relay orbiter at low altitude is assumed. The instruments are mounted on a platform under the semi-hard lander solar array. The main scientific goals of the mission during the atmospheric descent and on the surface are outlined.

Chicarro, A. F.↗

Evaluation of a wind turbine electric power generator

A technical assessment of the aerodynamic performance of the wind wheel turbine (WWT) is reported. The potential of the WWT in utilizing wind as an alternate power source was evaluated. Scaling parameters were developed to predict the aerodynamic performance of WWT prototype sized to produce 3, 9, 30, and 100 kw outputs in a 6.7 m/sec wind.

Swim, W. B.↗

Myco-Architecture off Planet: Growing Surface Structures at Destination

Our work focused on filling major select key technical knowledge gaps, and technical aspects to be addressed in a Phase II proposal were identified such as the secretion of glues or plastics by the fungi or bacteria to form biocomposites. Specifically, we raised the technical TRL by assessing the growth of in-house mycelial-producing strains on potential food substrates and analyzed the advantages and disadvantages to their use off planet. Growth of the mycelia on sawdust and powdered nutrients including dried, powdered algae, was used as a baseline. We measured growth as a function of temperature, tested the relevant material properties of the mycelia products produced, and measured the mass of input and output volume for production per volume of material. Mycotecture was produced in a bag simulating the proposed mission implementation. Post-production such as heat treatment (as is done with terrestrial mycotecture)was assessed.The material properties of the dried, frozen and baked mycelial outputs included density, strength,thermal insulation and flame retardation. Tensile/compression testing on biocomposite material specimens was performed to obtain three-dimensional elastic constants, as well as to examine deformation and fracture behavior. These mechanical tests were performed on both dormant and activated samples to understand the evolution of the structural material. In addition, experimental data obtained from the mechanical testing was used to build a failure prediction model that accounts for material anisotropy. This aided in future structural design through a quantitative understanding of the mechanical limits of the material. To examine the texture, defects, fracture surfaces of the material, high-resolution microstructural imaging was utilized before and after the mechanical tests. This microstructural analysis informed us about the macro-structural behavior and influenced structural design. Thermal decomposition analysis was also performed tounderstand the thermal limits.

Biocomposites↗

Digitalization mapping and assessment process supporting ION strategic transformation activities

The existing fleet of commercial nuclear power plants (NPPs) are an important asset in the nation’s portfolio of electrical generating resources. Their continued safe and reliable operation are critical to providing a large source of carbon-free electricity to power the nation’s economy. The United States Department of Energy’s (DOE) Light Water Reactor Sustainability (LWRS) Program develops the scientific bases, methods, and tools, for the continued safe and economical operation of the nation's commercial NPPs. The Plant Modernization Pathway within LWRS Program focuses on providing guidance to industry on the full-scale implementation of modernization solutions for NPPs that significantly reduce the technical and financial risks associated with modernization. This research is focused on helping the nuclear industry understand how to digitize and digitalize their NPPs so that they can design their modernization solutions to be scalable, sustainable, and integrated both laterally and horizontally within their organization. That is, this research creates a digital transformation in NPPs by reshaping cultural mindsets and by identifying business efficiencies. In partnership with industry, and using four previously established guiding principles for digitalization, this research supported NPP modernization through assessing readiness for digitalization as a means to achieve integrated operations for nuclear. Specifically, this research created an assessment to review an entire organization’s work processes to gather information about the digitalization health of the plant. The assessment tools were administered to plant employees, and the results were used to develop a digitalization plan. The survey assessment identified the optimal candidate processes that would most benefit from a digitalization initiative which were revealed through analytical frameworks. One analysis calculated mean digitalization health indicator scores for all endorsed activities which allowed the researchers to rank and color code the results for easy identification. Individual health indicator scores are also provided, should our industry partner wish to understand these findings according to their own organizational priorities, business considerations and desired end-state. The results were also analyzed from the perspective that organizations are comprised of different types of innovators (e.g., generators, optimizers, conceptualizers, and implementers), which differentially affects the organization’s ability to comprehend and adapt to change (i.e., opportunities to innovate). Understanding the relative composition of innovator types at an NPP allows them to gather insights into the strengths and weaknesses they have in innovating how work is performed. For the utility that partnered with this research team, the results showed that implementers make up the largest portion of respondents and conceptualizers the smallest portion. Knowing the proportion of innovator types gave this organization insights on how they can effectively implement their innovation solutions. Additionally, the results were analyzed from a technical, economic, and risk perspective to identify and quantify work reduction opportunities (WROs). Recognizing that not all cost-saving opportunities are the same, a Technical, Economic and Risk Assessment (TERA) was performed to evaluate WROs to identify areas of greatest potential and lowest risk. The key results from TERA included a digitalization opportunity score for each activity, and a calculation of potential cost savings. These two outputs formed the bases for calculating a priority index and rank for the activities/processes assessed. From the prioritization calculations, TERA can then help the utility 1) decide what digitalization priorities to invest money in implementing and then 2) calculates how much should be invested in the digitalization initiatives selected to achieve cost savings and/or an acceptable return on investment. Last, onsite interviews revealed several inefficiencies in the standard work processes that occur cross-departmentally that are due to the absence of digitized and digitalized processes. Examples of these include time spent scanning paper documents and then uploading the documents electronically, obtaining signatures, and searching for desired information. This represents a digital but not digitalized process. Over 15 opportunities to improve work processes were identified through this multi-method digitalization assessment. The various analytical assessments used (e.g., TERA, digitalization health indicator scores), as well as discussions with the utility partner, corroborated that all the opportunities identified had a strong potential to make work processes more efficient and to improve overall performance of the NPP.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NAWI Research Spotlight: Technoeconomic Assessment of Brine Valorization from Brackish Groundwater

This NAWI Research Spotlight Webinar was presented to the NAWI Alliance on June 27, 2024. The presentation describes project progress to date on a technoeconomic assessment of brine valorization from brackish groundwater. Desalination at inland brackish groundwater treatment plants is currently limited by high costs of concentrate management and disposal. With current methods, 5-25% of the feed is disposed of as concentrate, with 98% of disposal using conventional methods (i.e. no byproduct recovery). This project aims to assess the technical and economic feasibility of industrial ecosystems to desalinate brackish groundwater and supply existing and potential markets for clean concentrate or other bulk constituents from the brine.

Fritz, Alison↗

Knowledge-based decision support for Space Station assembly sequence planning

A complete Personal Analysis Assistant (PAA) for Space Station Freedom (SSF) assembly sequence planning consists of three software components: the system infrastructure, intra-flight value added, and inter-flight value added. The system infrastructure is the substrate on which software elements providing inter-flight and intra-flight value-added functionality are built. It provides the capability for building representations of assembly sequence plans and specification of constraints and analysis options. Intra-flight value-added provides functionality that will, given the manifest for each flight, define cargo elements, place them in the National Space Transportation System (NSTS) cargo bay, compute performance measure values, and identify violated constraints. Inter-flight value-added provides functionality that will, given major milestone dates and capability requirements, determine the number and dates of required flights and develop a manifest for each flight. The current project is Phase 1 of a projected two phase program and delivers the system infrastructure. Intra- and inter-flight value-added were to be developed in Phase 2, which has not been funded. Based on experience derived from hundreds of projects conducted over the past seven years, ISX developed an Intelligent Systems Engineering (ISE) methodology that combines the methods of systems engineering and knowledge engineering to meet the special systems development requirements posed by intelligent systems, systems that blend artificial intelligence and other advanced technologies with more conventional computing technologies. The ISE methodology defines a phased program process that begins with an application assessment designed to provide a preliminary determination of the relative technical risks and payoffs associated with a potential application, and then moves through requirements analysis, system design, and development.

Source record↗

Tool Use Within NASA Software Quality Assurance

As space mission software systems become larger and more complex, it is increasingly important for the software assurance effort to have the ability to effectively assess both the artifacts produced during software system development and the development process itself. Conceptually, assurance is a straightforward idea - it is the result of activities carried out by an organization independent of the software developers to better inform project management of potential technical and programmatic risks, and thus increase management's confidence in the decisions they ultimately make. In practice, effective assurance for large, complex systems often entails assessing large, complex software artifacts (e.g., requirements specifications, architectural descriptions) as well as substantial amounts of unstructured information (e.g., anomaly reports resulting from testing activities during development). In such an environment, assurance engineers can benefit greatly from appropriate tool support. In order to do so, an assurance organization will need accurate and timely information on the tool support available for various types of assurance activities. In this paper, we investigate the current use of tool support for assurance organizations within NASA, and describe on-going work at JPL for providing assurance organizations with the information about tools they need to use them effectively.

software assurance↗

Technology Readiness Assessment for Stirling Power Convertor

Stirling-based power conversion system could represent a critical enabling technology for future NASA missions, offering significantly enhanced power efficiency over traditional thermoelectric systems. To ensure the successful infusion of this technology into deep space and planetary surface missions, a rigorous evaluation of its maturity and associated risks is essential. The objective of this Technology Readiness Assessment (TRA) is to determine the current technology readiness level (TRL) of the Stirling power convertor and identify key technical risks and challenges associated with its maturation and potential infusion into a targeted flight system. The evaluation process will rigorously follow the NASA TRA procedure: (1) determining the requirements that underpin the design, function, and performance; (2) finding and listing all new technology elements (NTEs) and critical technology elements (CTEs); (3) identifying the level of integration assumed for the assessment; and (4) assessing the TRL for each NTE and CTE. The overall subassembly TRL will then be determined via a roll-up using the “weakest link” criterion, culminating in a final (5) assessment of risks to further progression of maturity. This paper will present the results of a comprehensive technology readiness assessment (TRA) conducted on the Stirling-based dynamic power conversion subassembly, excluding the radioisotope heat source. The paper will also describe a detailed breakdown of the TRL roll-up and a matrix of identified risks and recommended mitigation paths, along with identified key technical risks and challenges to achieve the required long-duration performance. Key Words: Radioisotope Power Conversion, Technology Readiness Assessment

Radioisotope Power Conversion↗

Electric Vehicle Supply Equipment (EVSE) Site Assessment Report for the U.S. Army Corps of Engineers Chena Site Near Fairbanks, Alaska

This report presents an analysis of the requirements for charging station installation and electric vehicle operation at the US Army Corps of Engineers - Chena Site, located in a cold weather climate in the Fairbanks North Star Borough, AK. The report includes findings from a site visit, and a detailed electric vehicle (EV) charging site plan with cost estimates. Cost for three 50-ampere pedestal chargers located on the edge of the existing parking lot is estimated at $\$$53,100, and the cost of three 80-ampere chargers is estimated at $\$$89,400. The authors did not assess the cost of a heated garage. The USACE Chena site reaches extreme cold temperatures of -40 Degrees Celsius (-40 Degrees Fahrenheit) and below in a typical winter, often for days on end. Considerations of operating EVs as well as electrical vehicle supply equipment (EVSE) at this site can be applicable to other cold or extremely cold locations. Interviews with EV users in cold climates and a literature review indicated that EVs operate well but have significantly decreased range compared to 21 Degrees Celsius (70 Degrees Fahrenheit) operations. Some strategies such as prewarming the vehicle while it is plugged in and using heated seats and steering wheel instead of cabin heat, can improve cold weather performance. Storing the EV in a garage would mean the battery and cabin are automatically preheated, the battery would not age as rapidly as when the vehicle is stored outside, and problems with charging the vehicle are less likely. Lowest temperate-rated Electric Vehicle Supply Equipment (EVSE), as electric vehicle chargers are known as, are rated to -40 Degrees Celsius (-40 Degrees Fahrenheit), and sometimes malfunction. No EVSE is rated to the temperatures that USACE Chena site experienced for more than a week in winter 2023-4, of -50 Degrees Celsius (-45 Degrees Fahrenheit) and which are typical for the area. If reliability is a must, entities may want to consider a heated garage to minimize potential problems with charging equipment. There is a companion technical report to this titled "Electric Vehicle and Charging Infrastructure Assessment in Cold-Weather Climates: A Case Study of Fairbanks, Alaska" that examines the data on EV and EVSE cold-weather functionality in more detail. (Esparza, Truffer Moudra, and Hodge 2024).

33 ADVANCED PROPULSION SYSTEMS↗

Stratospheric Observatory for Infrared Astronomy (SOFIA) Acoustical Resonance Technical Assessment Report

A request was submitted on September 2, 2004 concerning the uncertainties regarding the acoustic environment within the Stratospheric Observatory for Infrared Astronomy (SOFIA) cavity, and the potential for structural damage from acoustical resonance or tones, especially if they occur at or near a structural mode. The requestor asked for an independent expert opinion on the approach taken by the SOFIA project to determine if the project's analysis, structural design and proposed approach to flight test were sound and conservative. The findings from this assessment are recorded in this document.

Gilbert, Michael G.↗

Utility-Scale Operational Consequences for Solar Grid Services

This report delves into the critical aspects of grid services provided by solar inverter-based resources (IBRs), with an emphasis on the evolving landscape of microgrids, virtual power plants (VPPs), aggregators, and distributed energy resource management systems (DERMS). As the energy sector undergoes a transformative shift towards more decentralized and resilient grid architectures, understanding the multifaceted risks associated with these technologies becomes paramount. The report categorizes these risks into organizational, technical, and procedural domains, providing a thorough risk assessment framework that stakeholders can utilize to anticipate and mitigate potential issues. In addressing the increasing complexity of grid interconnections, the report highlights the importance of Cyber-Informed Engineering (CIE). By embedding engineering controls and cybersecurity measures into the early stages of system design, this approach aims to fortify grid infrastructure against emerging cyber threats. The analysis includes an exploration of best practices and strategies for integrating CIE principles to enhance grid security and resilience. To provide practical insights, the report conducts a detailed consequence analysis of various grid services and cyber mitigations that can be applied through the interconnection process. This analysis evaluates the potential impacts of different failure modes and vulnerabilities, offering a clear understanding of the consequences that could arise from disruptions within the energy grid. The findings are further enriched by a series of case studies that illustrate real-world scenarios and lessons learned from past incidents. Through this comprehensive examination of grid services and their criticality, the report aims to prepare industry professionals with the knowledge and tools necessary to navigate the complexities of modern energy systems. By providing a comprehensive approach that includes risk assessment, cybersecurity, and consequence analysis, solar stakeholders can more effectively guarantee the reliability, efficiency, and security of the energy grid.

14 SOLAR ENERGY↗

Project Cassini - A potential collaborative ESA/NASA Saturn Orbiter and Titan Probe mission

Project Cassini is concerned with a potential collaborative mission to Saturn and Titan. The project has been the subject of a joint ESA/NASA Technical Assessment Study from April 1984 to July 1985. The spacecraft consists of a Saturn Orbiter and a Titan entry Probe. Science objectives with respect to Titan include a determination of the abundances of atmospheric constituents and isotope ratios, a study of the distribution of trace gases, cloud physics, and a determination of the state of the surface. Other science objectives are related to Saturn, the rings, icy satellites, the magnetosphere of Saturn, and asteroids. Attention is given to mission design, the spacecraft, and future prospects.

Beckman, J.↗