Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technical management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Science Office for Mission Assessments Overview

The Science Office for Mission Assessments (SOMA) at NASA Langley Research Center (LaRC) supports the Science Mission Directorate (SMD) at NASA Headquarters in the acquisition of competed, Principal Investigator-led, Earth and space science missions and instruments. SOMA Acquisition Managers work with SMD Program Scientists to develop Announcement of Opportunity (AO) solicitations, and to lead the Technical, Management, and Cost (TMC) evaluations of proposals received in response to the AO solicitations and Phase A concept studies. The SOMA proposal evaluation process is described, along with examples of space science missions that SOMA personnel have worked on.

SOMA↗

DOE/NASA Lewis large wind turbine program

An overview of the large wind turbine activities managed by NASA is given. These activities include resuls from the first and second generation field machines (Mod-0A, -1, and -2), the status of the Department of Interior WTS-4 machine for which NASA is responsible for technical management, and the design phase of the third generation wind turbines (Mod-5).

Thomas, R. L.↗

DOE large horizontal axis wind turbine development at NASA Lewis Research Center

Large wind turbine activities managed by NASA Lewis are reviewed. These activities include results from the first and second generation field machines (Mod-OA, -1, and -2), the status of the Department of Interior WTS-4 machine for which NASA is responsible for technical management, and the design phase of the third generation wind turbines (Mod-5).

Linscott, B. S.↗

Distributed Sensing and Reasoning for Advanced Air Mobility Health Management and Mission Assurance

As envisioned, Advanced Air Mobility (AAM) and Urban Air Mobility (UAM) will introduce new vehicles and operations within the national airspace, moving people and cargo safely and efficiently at a much larger scale than today. Driven by transformative technology and revolutionary aircraft, this movement must still manage technical, regulatory, operational, and policy challenges. NASA’s work in support of AAM and UAM includes, but is not limited to tools, technologies, and architectures for distributed sensing of aircraft, data & reasoning services exchange, Human-Autonomy Teaming (HAT), contingency management, and vehicle health management. This paper builds upon these concepts and evaluates the use of distributed sensing and infrastructure assistance towards health management and mission assurance of UAM vehicles in specific operational scenarios. Through analysis of these example missions, aided by the data produced by the conceptual distributed sensing and reasoning infrastructure, we define opportunities for state estimation, diagnosis, and key decision points affecting the health state of the vehicle and the airspace volume. As a result, we define a number of measurable health state parameters providing relevant information to drive decision-making in contingency situations or feed automation tools in support of operators and managers.

Safety↗

WTS-4 system verification unit for wind/hydroelectric integration study

The Bureau of Reclamation (Reclamation) initiated a study to investigate the concept of integrating 100 MW of wind energy from megawatt-size wind turbines with the Federal hydroelectric system. As a part of the study, one large wind turbine was purchased through the competitive bid process and is now being installed to serve as a system verification unit (SVU). Reclamation negotiated an agreement with NASA to provide technical management of the project for the design, fabrication, installation, testing, and initial operation. Hamilton Standard was awarded a contract to furnish and install its WTS-4 wind turbine rated at 4 MW at a site near Medicine Bow, Wyoming. The purposes for installing the SVU are to fully evaluate the wind/hydro integration concept, make technical evaluation of the hardware design, train personnel in the technology, evaluate operation and maintenance aspects, and evaluate associated environmental impacts. The SVU will be operational in June 1982. Data from the WTS-4 and from a second SVU, Boeing's MOD-2, will be used to prepare a final design for a 100-MW farm if Congress authorizes the project.

Watts, A. W.↗

Project resources planning and control

This report contains instructional guidelines for the resources planning and control of research and development (R&D) projects managed by NASA's Langley Research Center (LaRC). Although written to serve primarily as a practical guide and reference for those LaRC personnel who perform resources planning, analysis, control, and reporting functions, it should also be meaningful to other NASA personnel who are directly or indirectly involved in or affected by these functions, especially project technical managers whose responsibilities include resources management. Certain sections should help Contractor personnel to better understand what resources information must usually be submitted on LaRC projects and what use is made of such information. The Project Manager of a large R&D project typicaly receives support from an Analyst in the area of resources management. The Analyst provides assistance in four functional areas: Planning, Analysis/Control, Administration, and Reporting. Each of these functions are discussed in detail. Examples of techniques used effectively on LaRC projects have been included where applicable. A considerable amount of information has been included on the use of Performance Measurement (Earned Value) Systems for contract cost control and reporting as little information is currently available on this subject in NASA publications.

Sibbers, C. W.↗

The systems engineering upgrade intiative at NASA's Jet Propulsion Laboratory

JPL is implementing an initiative to significantly upgrade our systems engineering capabilities. This Systems Engineering Upgrade Initiative [SUI] has been authorized by the highest level technical management body of JPL and is sponsored with internal funds. The SUI objective is to upgrade system engineering at JPL to a level that is world class, professional and efficient compared to the FY04/05 baseline. JPL system engineering, along with the other engineering disciplines, is intended to support optimum designs; controlled and efficient implementations; and high quality, reliable, cost effective products. SUI technical activities are categorized into those dealing with people, process and tools. The purpose of this paper is to describe the rationale, objectives/plans and current status of the JPL SUI.

Systems Engineering Upgrade Initiative (SUI)↗

Environmental Projects. Volume 8: Modifications of wastewater evaporation ponds

The Goldstone Deep Space Communications Complex (GDSCC), located in the Mojave Desert about 45 miles north of Barstow, California, and about 160 miles northeast of Pasadena, is part of NASA's Deep Space Network, one of the world's largest and most sensitive scientific telecommunications and radio navigation networks. The Goldstone Complex is managed, technically directed, and operated for NASA by the Jet Propulsion Laboratory (JPL) of the California Institute of Technology in Pasadena, California. Activities at the GDSCC are carried out in support of seven parabolic dish antennas. These activities may give rise to environmental hazards: use of hazardous chemicals, asbestos, and underground storage tanks as well as the generation of hazardous wastes and the disposal of wastewater. Federal, state, and local laws governing the management of hazardous substances, asbestos, underground storage tanks and wastewater disposal have become so complex there is a need to devise specific programs to comply with the many regulations that implement these laws. In support of the national goal of the preservation of the environment and the protection of human health and safety, NASA, JPL, and the GDSCC have adopted a position that their operating installations shall maintain a high level of compliance with these laws. One of the environmental problems at the GDSCC involved four active, operational, wastewater evaporation ponds designed to receive and evaporate sewage effluent from upstream septic tank systems. One pair of active wastewater evaporation ponds is located at Echo Site, while another operational pair is at Mars Site.

Source record↗

Multi-Center Implementation of NPR 7123.1A: A Collaborative Effort

Collaboration efforts between MSFC and GRC Engineering Directorates to implement the NASA Systems Engineering (SE) Engine have expanded over the past year to include other NASA Centers. Sharing information on designing, developing, and deploying SE processes has sparked further interest based on the realization that there is relative consistency in implementing SE processes at the institutional level. This presentation will provide a status on the ongoing multi-center collaboration and provide insight into how these NPR 7123.1A SE-aligned directives are being implemented and managed to better support the needs of NASA programs and projects. NPR 7123.1A, NASA Systems Engineering Processes and Requirements, was released on March 26, 2007 to clearly articulate and establish the requirements on the implementing organization for performing, supporting, and evaluating SE activities. In early 2009, MSFC and GRC Engineering Directorates undertook a collaborative opportunity to share their research and work associated with developing, updating and revising their SE process policy to comply and align with NPR 7123.1A. The goal is to develop instructions, checklists, templates, and procedures for each of the 17 SE process requirements so that systems engineers will be a position to define work that is process-driven. Greater efficiency and more effective technical management will be achieved due to consistency and repeatability of SE process implementation across and throughout each of the NASA centers. An added benefit will be to encourage NASA centers to pursue and collaborate on joint projects as a result of using common or similar processes, methods, tools, and techniques.

Hall, Phillip B.↗

Countermeasure Evaluation and Validation Project (CEVP) Database Requirement Documentation

The initial focus of the project by the JSC laboratories will be to develop, test and implement a standardized complement of integrated physiological test (Integrated Testing Regimen, ITR) that will examine both system and intersystem function, and will be used to validate and certify candidate countermeasures. The ITR will consist of medical requirements (MRs) and non-MR core ITR tests, and countermeasure-specific testing. Non-MR and countermeasure-specific test data will be archived in a database specific to the CEVP. Development of a CEVP Database will be critical to documenting the progress of candidate countermeasures. The goal of this work is a fully functional software system that will integrate computer-based data collection and storage with secure, efficient, and practical distribution of that data over the Internet. This system will provide the foundation of a new level of interagency and international cooperation for scientific experimentation and research, providing intramural, international, and extramural collaboration through management and distribution of the CEVP data. The research performed this summer includes the first phase of the project. The first phase of the project is a requirements analysis. This analysis will identify the expected behavior of the system under normal conditions and abnormal conditions; that could affect the system's ability to produce this behavior; and the internal features in the system needed to reduce the risk of unexpected or unwanted behaviors. The second phase of this project have also performed in this summer. The second phase of project is the design of data entry screen and data retrieval screen for a working model of the Ground Data Database. The final report provided the requirements for the CEVP system in a variety of ways, so that both the development team and JSC technical management have a thorough understanding of how the system is expected to behave.

Shin, Sung Y.↗

Flight Demonstration of Unmanned Aircraft System (UAS) Traffic Management (UTM) at Technical Capability Level 4

The NASA Unmanned Aircraft Systems (UAS) Traffic Management (UTM) Project executed the fourth and final UTM Technical Capability Level demonstration between May and August 2019. Two Federal Aviation Administration (FAA)-designated UAS test sites managed the range, partners, and operations to meet the requirements set forth by the UTM Project. All stakeholders supported the execution of the flight testing through close collaboration. Results of the demonstration indicate the viability of the UTM concept to manage large scale operations and contingencies in an urban environment. The demonstration also provided insight into key technological gaps that must be addressed before such operations are routine, safe, and efficient. Standardization efforts related to UTM and the industry participants of those efforts can leverage the results and experiences of this flight activity to accelerate and more firmly ground forthcoming standards. The FAA and other regulators will be able to leverage results to inform future rule-making and identify additional gaps that require further analysis.

Unmanned Aircraft System Traffic Management↗

The Apollo Experience Reports.

This paper presents some of the problems and procedures in producing the Apollo Experience Reports, a series of about 121 documents covering the major technical system and subsystem experience in the design concepts for the Apollo Project, NASA's manned lunar landing program. This series of documents replaced technical conferences to document Apollo experience, and met the need to document crew/hardware interface experience. The purpose of these reports is to provide guidance for future programs of the magnitude and complexity of the Apollo Project and to convey very specific information to a selective segment of the engineering and technical management sectors of the aerospace community.

Holman, D. N.↗

ATS-6 - Technical aspects of the Health/Education Telecommunications Experiment

An overview is given of the HET experiment on ATS-6. The paper is divided into nine parts, including a technical overview, a preliminary evaluation of the HET demonstration, a review of operations at the Denver uplink terminal, a discussion of remote ground terminals, a review of C-band comprehensive terminals and of S-band comprehensive terminals, and parts devoted to general network operations, technical management and effectiveness of the network, and the site equipment operator.

Boor, J. L.↗

Space Shuttle Solid Rocket booster nozzle flexible seal pivot point dynamics

The NASA Space Shuttle Solid Rocket Motor (SRM) uses an omniaxial flexible seal for vectoring the nozzle. This flexible seal, being built under the technical management of Marshall Space Flight Center in Huntsville, Alabama, is the first ever to be used on a manned spacecraft booster. Since no test history on the particular type of flexible seal being used was available and since flexible seal dynamics characteristics affect many vehicle hardware design and manufacture requirements, a rigorous test program to assess the integrity and operating characteristics of the seal was developed and executed. Vector requirements of the SRM flexible seal and results of subscale and full-scale prototype seal verification tests are included. The advantages of an improved method of calculating actuator stroke versus vector angle and pressure over the more classical method of calculating actuator strokes using pivot point envelopes are discussed. Results presented show that the SRM seal design will satisfy flight requirements.

Gaffin, R. D.↗

Status of the DOE /STOR/-sponsored national program on hydrogen production from water via thermochemical cycles

A pure thermochemical cycle is a system of linked regenerative chemical reactions which accepts only water and heat and produces hydrogen. Thermochemical cycles are potentially a more efficient and cheaper means of producing hydrogen from water than is the generation of electricity followed by electrolysis. The Energy Storage Systems Division of the Department of Energy is currently funding a national program on thermochemical hydrogen production. The National Aeronautics and Space Administration is responsible for the technical management of this program. The goal is to develop a cycle which can potentially operate with an efficiency greater than 40% using a heat source providing a maximum available temperature of 1150 K. A closed bench-scale demonstration of such a cycle would follow. This cycle would be labeled a 'reference cycle' and would serve as a baseline against which future cycles would be compared.

Baker, C. E.↗