Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technical issues”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Enhancing U.S. competitiveness through federal scientific and technical information - Issues and opportunities

The possibility of using federally funded scientific and technical information (STI) to increase U.S. industrial innovation and productivity is discussed. The history of federally funded research and development in the fields of agriculture and aviation is reviewed as an example of successful government-sponsored research. Issues related to the production and utilization of information are considered and federal STI policy is outlined. Issues related to the transfer of knowledge between government agencies and industry are examined and a model depicting the transfer of STI in aerospace research and development is presented. Also, consideration is given to the problem of open communication versus restricted access to STI.

Pinelli, Thomas E.↗

Peer Review of a Formal Verification/Design Proof Methodology

The role of formal verification techniques in system validation was examined. The value and the state of the art of performance proving for fault-tolerant compuers were assessed. The investigation, development, and evaluation of performance proving tools were reviewed. The technical issues related to proof methodologies are examined. The technical issues discussed are summarized.

Source record↗

Progress Updates for the Hanford Waste Treatment and Immobilization Plant Project - 18327

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to cleanup radioactive waste at the Hanford Site, located in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 56 million gallons of radioactive waste stored in Hanford's 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever, built for radioactive waste processing. DOE is proceeding with its approach to complete the WTP Project in phases, which includes the following principal actions: - Completing construction of the Low-Activity Waste (LAW) Facility, Balance of Facilities (BOF), and Analytical Laboratory (LAB) (collectively referred to as LBL); - Implementing a direct-feed low-activity waste (DFLAW) process to treat low-activity waste independent of the Pretreatment (PT) Facility; - Resolving the technical issues associated with primarily the PT Facility; - Completing the design and construction of the High-Level Waste (HLW) and PT facilities to enable integrated WTP operations. In March 2016, a federal judge amended the 2010 Consent Decree 1 completion milestones for the Hanford WTP, which generally aligns with DOE's plans for completing the WTP facilities in sequence: - Complete LAW Facility hot commissioning: December 31, 2023; - Complete HLW Facility hot commissioning: December 31, 2033; - Complete PT Facility hot commissioning: December 31, 2033; - Achieve initial plant operations for the WTP: December 31, 2036. Having established milestones for completing the WTP facilities has enabled DOE to formally implement its plans for completing the WTP facilities in sequence, starting with the LAW Facility. In December 2016, DOE executed a contract modification and approved a change to the project's performance baseline to complete the LBL facilities and incorporate modifications needed to allow direct feed of low-activity waste to the LAW Facility. Significant progress has been made toward completing the design, construction, and planning for commissioning of the facilities needed to enable the DFLAW operations to commence as early as January 2022. In 2012, DOE partially suspended production work on the WTP's PT Facility and to a lesser degree the HLW Facility because of unresolved technical issues associated with those facilities. In September 2017, DOE acknowledged the WTP contractor had met all the criteria for full resumption of engineering, procurement, and construction (EPC) activities for the HLW Facility. By December 2017, DOE had completed the actions needed to resolve the six of the eight primary technical issues associated with the PT Facility, with the remaining two issues expected to be resolved in the first quarter of 2018. Although significant progress has been made to prepare for resuming production activities for the HLW and PT facilities, DOE has made the decision to constrain EPC work on those facilities in the near term based on DOE's higher priority of completing the WTP facilities needed to begin DFLAW operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ATK Launch Systems Engineering NASA Programs Engineering Examples

This presentation provides an overview of the work done at ATK Launch Systems with and indication of how engineering knowledge can be applied to several real world problems. All material in the presentation has been screened to meet ITAR restrictions. The information provided is a compilation of general engineering knowledge and material available in the public domain. The presentation provides an overview of ATK Launch Systems and NASA programs. Some discussion is provided about the types of engineering conducted at the Promontory plant with added detail about RSRM nozzle engineering. Some brief examples of examples of nozzle technical issues with regard to adhesives and phenolics are shared. These technical issue discussions are based on material available in the public domain.

Richardson, David↗

ACE: A distributed system to manage large data archives

Competitive pressures in the oil and gas industry are requiring a much tighter integration of technical data into E and P business processes. The development of new systems to accommodate this business need must comprehend the significant numbers of large, complex data objects which the industry generates. The life cycle of the data objects is a four phase progression from data acquisition, to data processing, through data interpretation, and ending finally with data archival. In order to implement a cost effect system which provides an efficient conversion from data to information and allows effective use of this information, an organization must consider the technical data management requirements in all four phases. A set of technical issues which may differ in each phase must be addressed to insure an overall successful development strategy. The technical issues include standardized data formats and media for data acquisition, data management during processing, plus networks, applications software, and GUI's for interpretation of the processed data. Mass storage hardware and software is required to provide cost effective storage and retrieval during the latter three stages as well as long term archival. Mobil Oil Corporation's Exploration and Producing Technical Center (MEPTEC) has addressed the technical and cost issues of designing, building, and implementing an Advanced Computing Environment (ACE) to support the petroleum E and P function, which is critical to the corporation's continued success. Mobile views ACE as a cost effective solution which can give Mobile a competitive edge as well as a viable technical solution.

Daily, Mike I.↗

Processing and Device Oriented Approach to CIGS Module Reliability; SunShot Initiative, U.S. Department of Energy (DOE)

Abstract: A device level understanding of thin film module reliability has been lacking. We propose that device performance and stability issues are strongly coupled and simultaneous attention to both is necessary. Commonly discussed technical issues such as light soaking, metastability, reverse bias breakdown and junction breakdown can be understood by comparing the behaviors of cells made inAbstract: A device level understanding of thin film module reliability has been lacking. We propose that device performance and stability issues are strongly coupled and simultaneous attention to both is necessary. Commonly discussed technical issues such as light soaking, metastability, reverse bias breakdown and junction breakdown can be understood by comparing the behaviors of cells made in the laboratory and industry. It will then be possible to attribute the observed effects in terms of processing and cell design. Process connection to stability studies can help identify root causes and a path for mitigating the degradation.

14 SOLAR ENERGY↗

High-Temperature Aquifer Thermal Energy Storage (HT-ATES) Projects in Germany and the Netherlands—Review and Lessons Learned

Aquifer thermal energy storage (ATES) is a concept that can help to address heating and cooling needs through the use of the subsurface as a seasonal thermal energy storage (STES) system. Over 2800 ATES systems have been deployed with storage temperatures typically below 25 °C and only a few with higher temperatures (>40 °C), which would increase the energy density and utility of the stored thermal fluids. Until now, only a few high-temperature aquifer thermal energy storage (HT-ATES) projects have been initiated and are still in operation. These HT-ATES projects have encountered a range of technical and non-technical challenges. This study reviews ten such projects: four in Germany and six in the Netherlands. The non-technical issues include public acceptance, a lack of regulatory framework for these systems, managing overlapping uses of the subsurface, managing changes with the providers and off-takers of thermal energy, and obtaining financing to implement these projects. Common technical issues include geological factors such as incomplete characterization of the subsurface and reservoir heterogeneity; geochemical issues such as mineral scaling, corrosion, and biofouling; lower than expected thermal recovery; and issues with system design and reliability. This review highlights benefits and challenges faced by HT-ATES projects with the goal to use the lessons learned to improve the siting, design, development, and operation of such systems. Recommendations include improved initial subsurface site characterization, use of coupled process models to optimize system design and predict system performance, cascaded uses of stored thermal energy to better utilize the stored heat, monitoring networks to provide feedback on system performance, and expanded system scale to allow for continued operation even when maintenance of some system components is required. Techno-economic modeling and risk analysis could be used to optimize such HT-ATES project design and identify key factors that will affect sustained economic viability. In addition, design flexibility is important for these systems to allow for changing conditions regarding the supply and demand of thermal energy. Adopting these findings should improve the performance and reduce the risks for future HT-ATES projects worldwide.

15 - GEOTHERMAL ENERGY↗

An Integrated Framework for Risk Assessment of Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology Refinement and Exploration

This report documents activities performed by Idaho National Laboratory (INL) during Fiscal Year (FY) 2023 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a technical basis to support effective, and secure DI&C technologies for digital upgrades/designs. A risk assessment-informed framework was proposed for this strategy, which aims to (1) provide a best-estimate, risk informed capability to quantitatively estimate the safety margin obtained from plant modernization, especially for safety-related DI&C systems, (2) support and supplement existing risk informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems, (4) assure the long-term safety and reliability of safety-related DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals, the LWRS-developed framework provides a means to address relevant technical issues by: (1) defining a risk informed analysis process for DI&C upgrade that integrates hazard analysis, reliability analysis, and consequence analysis, (2) applying risk informed tools to address common cause failures (CCFs) and quantify corresponding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the component level, system level, and plant level, and (4) providing insights and suggestions on designs to manage the risks, thus to support the development and deployment of advanced DI&C technologies in nuclear power plants (NPPs). Adding diversity within a system or components is the primary means to eliminate and mitigate CCFs, but diversity also increases system complexity and may not address all sources of systematic failures. Optimization of diversity and redundancy applications for the safety-critical DI&C systems remains a challenge. To deal with the technical issues in addressing potential software CCFs in safety-related DI&C systems of NPPs and supporting relevant design optimization, the proposed framework provides: (a) A best-estimate, risk informed capability to address new technical digital issues quantitatively, focusing on software CCFs in safety-related DI&C systems of NPPs; (b) A common and a modularized platform for DI&C designers, software developers, cybersecurity analysts, and plant engineers to predict and prevent risk in the early design stage of DI&C systems; (c) Technical bases and risk informed insights to assist users address the risk informed alternatives for evaluation of CCFs in safety-related DI&C systems of NPPs; and (d) A risk informed tool that offers a capability of design architecture evaluation of various DI&C systems to support system design decisions in diversity and redundancy applications. The research and development efforts of this project in FY 2023 are focused on refining current methods on software CCF modeling and estimation and exploring additional innovative approaches to risk assessment of DI&C systems to enable a more comprehensive and complete assessment of various safety-related DI&C design architectures. The primary audience of this report are DI&C designers, engineers, and probabilistic risk assessment (PRA) practitioners. This includes stakeholders, such as the nuclear utilities and regulators who consider the deployment and upgrade of DI&C systems, DI&C software developers and reviewers, and cybersecurity specialists. It should be noted that all the analyses are performed for the demonstration of the methodology, not for the evaluation of an actual digital control system. Results are obtained based on limited design information and testing data.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Laser Atmospheric Wind Sounder (LAWS) phase 1. Volume 2

This report summarizes and documents the results of the 12-month phase 1 work effort. The objective of phase 1 was to establish the conceptional definition of the laser atmospheric wind sounder (LAWS) sensor system, including accommodations analyses to ensure compatibility with the Space Station Freedom (SSF) and the Earth Observing System (EOS) Polar Orbiting Platform (POP). Various concepts were investigated with trade studies performed to select the configuration to be carried forward to the phase 2 Preliminary Design Definition. A summary of the LAWS system and subsystem trade studies that were performed leading to the baseline design configuration is presented in the appendix. The overall objective of the LAWS Project is to define, design, and implement an operational space based facility, LAWS, for accurate measurement of Earth wind profiles. Phase 1 addressed three major areas: (1) requirements definition; (2) instrument concepts and configurations; and (3) performance analysis. For the LAWS instrument concepts and configurations, the issues which press the technological state of the art are reliable detector lifetime and laser performance and lifetime. Lag angle compensation, pointing accuracy, satellite navigation, and telescope design are significant technical issues, but they are considered to be currently state of the art. The primary issues for performance analysis concern interaction with the atmosphere in terms of backscatter and attenuation, wind variance, and cloud blockage. The phase 1 tasks were formulated to address these significant technical issues and demonstrate the technical feasibility of the LAWS concept. Primary emphasis was placed on analysis/trade and identification of candidate concepts. Promising configurations were evaluated for performance, sensitivities, risks, and budgetary costs. Lockheed's baseline LAWS configuration is presented.

Source record↗

Human Factors Considerations for Automating Microreactors

The U.S. Nuclear Regulatory Commission (NRC) has interacted with vendors pursuing the commercialization of microreactors ( <10 MW th ). It is envisioned that microreactors could be assembled and fueled in a factory and shipped to a site. Many of the sites are expected to be remote locations requiring off-grid power or in some cases military bases. However, before this new class of nuclear reactor can be fully developed and implemented by designers, an effort must be made to explore the technical issues and provide reasonable assurance to the public regarding health and safety impacts centered on various technical issues. Prior works have examined many of these issues. One issue not yet fully explored is the possible change in role of the operations and support personnel. Due to the passive safety features of microreactors and their low level of nuclear material, the microreactor facilities may automate more functions and rely on inherent safety features more than its predecessor nuclear power plants. In some instances, human operators may not be located onsite and may instead be operating or monitoring the facility from a remote location. Some designs also call for operators to supervise and control multiple microreactors from the control room. This report explores the issues around reduced staffing of microreactors, highlights the historical safety functions associated with human operators, assesses current licensing requirements for appropriateness to varying levels of personnel support, and describes a recommended regulatory approach for reviewing the impact of reduced staff to the operation of microreactors. The report evaluates these issues through an extensive literature survey and Subject Matter Expert interviews. The literature covers research topics related to Human Factors Engineering as well as regulatory guidance given by the Nuclear Regulatory Commission.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

NASA Universal Waste Management System and Toilet Integration Hardware Operations on ISS – Issues, Modifications and Accomplishments

The Universal Waste Management System (UWMS), which has the ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020with final installation completed in 2021. Although technical issues were encountered that delayed installation and operations, progress was made towards the objectives of the project. Technical issue work arounds resulted in operation of the Toilet with use by male and female crew members in a controlled extended checkout and a longer nominal use. This paper will summarize operations of the Toilet and Toilet Integration Hardware in both of those configurations, problems encountered during installation and checkout, the modifications made to allow further usage on ISS, and the future modifications planned for nominal use. It will also describe the portions of the technology demonstration that were completed and the benefits from that work and how that knowledge informs the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

life support↗

NASA Universal Waste Management System and Toilet Integration Hardware Operations on ISS – Issues, Modifications and Accomplishments

The Universal Waste Management System (UWMS), which has the ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020 with final installation completed in 2021. Although technical issues were encountered that delayed installation and operations, progress was made towards the objectives of the project. Technical issue work-arounds resulted in operation of the Toilet with use by male and female crew members in a controlled extended checkout. This paper will summarize operations of the Toilet and Toilet Integration Hardware in this limited configuration, problems encountered during installation and checkout, the modifications made to allow further usage on ISS, and the future modifications planned for nominal use. It will also describe the portions of the technology demonstration that were completed and the benefits from that work and how that knowledge informs the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

Toilet↗

The WISE Satellite Development: Managing the Risks and the Opportunities

NASA's Wide-field Infrared Survey Explorer (WISE) MIDEX mission is surveying the entire sky in four infrared bands from 3.4 to 22 micrometers. The WISE instrument consists of a 40 cm telescope, a solid hydrogen cryostat, a scan mirror mechanism, and four 1K x1K infrared detectors. The WISE spacecraft bus provides communication, data handling, and avionics including instrument pointing. A Delta 7920 successfully launched WISE into a Sun-synchronous polar orbit on December 14, 2009. WISE was competitively selected by NASA as a Medium cost Explorer mission (MIDEX) in 2002. MIDEX missions are led by the Principal Investigator who delegates day-to-day management to the Project Manager. Given the tight cost cap and relatively short development schedule, NASA chose to extend the development period one year with an option to cancel the mission if certain criteria were not met. To meet this and other challenges, the WISE management team had to learn to work seamlessly across institutional lines and to recognize risks and opportunities in order to develop the flight hardware within the project resources. In spite of significant technical issues, the WISE satellite was delivered on budget and on schedule. This paper describes our management approach and risk posture, technical issues, and critical decisions made.

Risk Management↗

A Guide to Updating Interconnection Rules and Incorporating IEEE Standard 1547

The intent of this paper is to support local authorities in adopting the most current technical requirements for interconnecting distributed energy resources (DERs) to the electric distribution system as specified in the Institute of Electrical and Electronics Engineers Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces (IEEE Std 1547-2018). To create interconnection rules that successfully address policy goals, market trends, and technical requirements, state regulators need to be well informed of DER integration considerations. Interconnection processes and technical issues often overlap; the two are not easily segregated, and they are often considered and evaluated concurrently within the context of interconnection rulemaking. Accordingly, this paper addresses both the technical issues and related process considerations. A lack of uniform and transparent procedures for addressing interconnection rule changes can result in implementation issues or inefficiencies, such as unclear, lengthy, and complicated interconnection rules that can increase distributed generation "soft costs" (i.e., non-hardware costs). This can further delay the deployment of DERs and jeopardize time-constrained national and state policy goals, such as renewable energy targets, or limit participation in emerging techno-economic trends. Additionally, misconstructed interconnection rules are at risk of becoming mired in stakeholder conflicts. This guide addresses the concerns of electric service regulators from both the process and technical standpoints by presenting a structured, step-by-step approach to developing and updating existing interconnection rules. In this document, the process of developing and updating interconnection rules is subdivided into three steps: (1) determining the context (stakeholders and major drivers); (2) developing the rule, including updating technical requirements; and (3) maintaining and revising the rule over time.

14 SOLAR ENERGY↗

Mode Selection Techniques in Variable Mass Flexible Body Modeling

In developing a flexible body spacecraft simulation for the Launch Abort System of the Orion vehicle, when a rapid mass depletion takes place, the dynamics problem with time varying eigenmodes had to be addressed. Three different techniques were implemented, with different trade-offs made between performance and fidelity. A number of technical issues had to be solved in the process. This paper covers the background of the variable mass flexibility problem, the three approaches to simulating it, and the technical issues that were solved in formulating and implementing them.

Launch Abort System↗

Russian questions remain after space station review

Following the project's first major design review, some unresolved technical issues, mainly centered on details of how to integrate Russian hardware into the U.S./international space station, remain. No 'show stoppers' were found in the review. Specific open technical issues are discussed in this article.

Asker, James R.↗

Informative Background on the Interoperability Requirements in IEEE Std 1547-2018

The intent of this document is to support local authorities governing interconnection requirements in adopting the most current requirements for interconnecting distributed energy resources (DERs) to the electric distribution system, as specified in the Institute of Electrical and Electronics Engineers Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces (IEEE Std 1547-2018 ). To create interconnection rules that successfully address policy goals, market trends, and technical requirements, electric service regulators need to be well informed of DER integration considerations. Interconnection processes and technical issues often overlap; the two are not easily segregated, and they are often considered and evaluated concurrently within the context of interconnection rulemaking. Accordingly, this document addresses both the technical issues and related process considerations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Technical and Licensing Considerations for Micro-Reactors

The U.S. Nuclear Regulatory Commission (NRC) has interacted with vendors pursuing the commercialization of micro-reactors (i.e., reactors capable of producing about 1 MW(th) to 20 MW(th) of energy from nuclear fission). It is envisioned that micro-reactors could be assembled and fueled in a factory and shipped to a site. Many of the sites are expected to be remote locations requiring off-grid power or in some cases military bases. The objective of this effort is to explore the technical issues and the approach required to reach a finding of "reasonable assurance of public health and safety" for this new and different class of reactors. The analysis performed here leverages available micro-reactor design and testing data available from national laboratory experience as well as commercial design information to explore technical issues. Some factors considered include source term, accidents that would need to be analyzed, and the extent of the probabilistic risk assessment (PRA). The technical evaluation was performed within the framework of the Licensing Modernization Project (LMP) to identify licensing basis events, classification of structures, systems and components, and defense-in-depth needed to provide regulatory certainty. With this framework and technical evaluation in mind, the scope and content of a micro-reactor licensing application is discussed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗