Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “system reliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

PV Systems Reliability and Outreach

The project purpose was to collaborate with the Electric Power Research Institute (EPRI) to reach out to the photovoltaic (PV) industry to cooperate, collaborate and facilitate establishment and access to PV plant data for use in the Photovoltaic Reliability Operations and Maintenance (PVROM) database. Sandia National Laboratories (SNL) and EPRI conducted this outreach to expand and accelerate the implementation of PVROM by gathering more data for analyzing trends, with a goal of accelerating the adoption of PV systems as a primary power generation source in the United States. SNL and EPRI analyzed the data from the PVROM database to assess industry trends in operations and maintenance (O&M) and develop guidelines for the industry. More specifically, this project was intended to leverage SNL’s expertise in PV plant reliability data collection and analysis, with data sharing partners that own or operate PV systems who wanted to learn about rigorous reliabilitybased data collection to track issues over time and improve O&M activities. The partnership also worked to host multiple workshops as part of the SNL/EPRI PV Systems Symposium to gather industry feedback on O&M process improvement and data standards, and share insights learned from the collaboration between SNL and EPRI in the area of PV system reliability. Additional outreach included multiple ‘expert elicitation’ interviews led by EPRI to gather best practices and paths forward for improving/standardizing PV plant O&M and asset management practices. Technical accomplishments included further development of the PVROM database process, sharing best practices for reliability data collection and improving industry understanding of existing O&M practices, important knowledge, and new and novel techniques for benefitting EPRI utility partners and the broader PV industry. Improved reliability at a PV power plant leads to a lower levelized cost of energy (LCOE), which is reflected most directly in its operating expenses. Electric utilities that utilize PV as a larger share of plants they own and operate are interested in having a high degree of availability or ‘uptime’, similar to other power generation sources in their service area. Having low cost, reliable PV generation can lead to fewer costs that need to be recovered by the utility over the lifetime of the power plant, and less regulatory uncertainty when considering bulk transmission and distribution system reliability. The public and taxpayers benefit by the electric utility passing through lower electricity costs.

14 SOLAR ENERGY↗

Operating Experience Data Analysis for Digital Instrumentation and Control System Reliability and Risk Assessment in Nuclear Power Plants

The implementation of advanced digital instrumentation and control (DI&C) systems in U.S. nuclear power plants (NPPs) can bring significant advancements in reliability, monitoring, and control capabilities. However, these systems also introduce new challenges, particularly in assessing risks such as common-cause failures (CCFs) and establishing robust reliability estimates for DI&C components. Addressing these challenges is critical for ensuring the safe and efficient operation of NPPs. Recently, Idaho National Laboratory was tasked by the U.S. Nuclear Regulatory Commission (NRC) to conduct a DI&C reliability study using operating experience data from the nuclear industry. The two operating experience data sources for the study are the Institute of Nuclear Power Operations’ Industry Reporting and Information System (IRIS) and the NRC’s Licensee Event Report database which is hosted at Idaho National Laboratory at https://lersearch.inl.gov/LERSearchCriteria.aspx. This report provides a comprehensive examination of DI&C systems, including their architecture, operational advantages, and associated challenges. It reviews existing industry DI&C studies and failure mode taxonomies, along with reliability data from various industries. Through a detailed analysis of these databases, the study provides insights into DI&C system performance. Considerations should be given to incorporate DI&C failure data into the NRC's Integrated Data Collection and Coding System and updating the Reliability and Availability Data System to support ongoing DI&C reliability studies. Recommendations are also provided for modeling DI&C reliability and CCF in probabilistic risk assessment, thereby supporting risk-informed decision-making and enhancing the reliability and safety of NPPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Using Synchrophasors to Improve Bulk Power System Reliability in North America

Maintaining reliable operation of the bulk power system is a fundamental aspect of grid operation, and focuses on ensuring the system can withstand sudden disturbances or unanticipated failures of system elements such that instability, uncontrolled separation, or cascading failures will not occur. Phasor measurement units (PMUs) provide the capability for enhanced real-time monitoring and control room solutions as well as improved power system analysis in the planning horizon. With over 1,700 PMUs deployed in the North American grid, numerous PMU-based applications have been developed. This paper summarizes synchrophasor-based applications and presents utility synchrophasor experience.

PMU, oscillation monitoring, Power Plant Model Val↗

Probabilistic Approach to Quantifying the Contribution of Variable Generation and Transmission to System Reliability: Preprint

The increasing electrical load served by variable generation (VG), such as wind and solar energy, in the United States and many other countries has stimulated an interesting line of research to better quantify the capacity value of these resources. Methods applied traditionally to thermal units based on their average outage rates do not apply to VG because of their uncertain and non-dispatchablenature. The North American Electric Reliability Corporation's Integration of Variable Generation Task Force recently released a report that highlighted the need to develop and benchmark underlying loss-of-load expectation and related metrics that reasonably and fairly calculate the contribution to planning reserves, or capacity value, of solar and wind power. As the fraction of generation comingfrom VG becomes more significant, their estimated capacity value will have a larger impact on system planning. In this paper, we provide a method to include VG in traditional probabilistic-based adequacy methods. This method has been implemented in the Renewable Energy Probabilistic Resource Assessment tool developed at the National Renewable Energy Laboratory. Through an example based on the U.S. Western Interconnection, this method is applied to assess the effect that transmission can have on resource adequacy. We also analyze the interactions between available transmission and capacity value for VG.

14 SOLAR ENERGY↗

Production Facility System Reliability Analysis Report

This document describes the reliability, maintainability, and availability (RMA) modeling of the Los Alamos National Laboratory (LANL) design for the Closed Loop Helium Cooling System (CLHCS) planned for the NorthStar accelerator-based 99 Mo production facility. The current analysis incorporates a conceptual helium recovery system, beam diagnostics, and prototype control system into the reliability analysis. The results from the 1000 hr blower test are addressed.

Accelerator Design, Technology, and Operations↗

Evaluating Proposed Investments in Power System Reliability and Resilience: Preliminary Results from Interviews with Public Utility Commission Staff

Policymakers and regulatory agencies are expressing renewed interest in the reliability and resilience of the U.S. electric power system in large part due to growing recognition of the challenges posed by climate change, extreme weather events, and other emerging threats. Unfortunately, there has been little or no consolidated information in the public domain describing how public utility/service commission (PUC) staff evaluate the economics of proposed investments in the resilience of the power system. Having more consolidated information would give policymakers a better understanding of how different state regulatory entities across the U.S. make economic decisions pertaining to reliability/resiliency. To help address this, Lawrence Berkeley National Laboratory (LBNL) was tasked by the U.S. Department of Energy Office of Energy Policy and Systems Analysis (EPSA) to conduct an initial set of interviews with PUC staff to learn more about how proposed utility investments in reliability/resilience are being evaluated from an economics perspective. LBNL conducted structured interviews in late May-early June 2016 with staff from the following PUCs: Washington D.C. (DCPSC), Florida (FPSC), and California (CPUC).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Field Verification of Grid-Forming Inverter-Based Power Plant Performance for Transmission System Reliability

This report describes some examples of the operation of two grid-forming (GFM) inverter-based photovoltaic-battery hybrid power plants connected to the electric system of the island of Kauai in Hawaii. Both plants are photovoltaic power plants with battery energy storage and are connected to the networked transmission system operated by Kauai Island Utility Cooperative (KIUC), along with several other power plants including an oil-fired plant, diesel generators, small hydroelectric plants, a biofuel plant, and several other photovoltaic plants.

14 SOLAR ENERGY↗

Estimating the Value of Worker Training: A System Reliability & LCOE Perspective

This workshop presentation briefly describes the labor standards required for large photovoltaic (PV) systems (>1MWac) to receive the full investment tax credit from the Inflation Reduction Act. The potential for labor standards to affect aspects other than upfront installation costs (such as energy generation or maintenance expenses) is analyzed using levelized cost of energy (LCOE) calculations. This considers benefits which may come from better training for workers, more productive workers, or improved installation quality, using NREL's simplified PV-specific LCOE calculator at pvlcoe.nrel.gov.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

System Reliability for LED-Based Products

Results from accelerated life tests (ALT) on mass-produced commercially available 6” downlights are reported along with results from commercial LEDs. The luminaires capture many of the design features found in modern luminaires. In general, a systems perspective is required to understand the reliability of these devices since LED failure is rare. In contrast, components such as drivers, lenses, and reflector are more likely to impact luminaire reliability than LEDs.

Davis, J Lynn↗

A random onset model for degradation of high-reliability systems

Both the U. S. Department of Defense (DoD) and Department of Energy (DOE) maintain weapons stockpiles: items like bullets, missiles and bombs that have already been produced and are being stored until needed. Ideally, these stockpiles maintain high reliability over time. To assess reliability, a surveillance program is implemented, where units are periodically removed from the stockpile and tested. The most definitive tests typically destroy the weapons so a given unit is tested only once. Surveillance managers need to decide how many units should be tested, how often they should be tested, what tests should be done, and how the resulting data are used to estimate the stockpile's current and future reliability. These issues are particularly critical from a planning perspective: given what has already been observed and our understanding of the mechanisms of stockpile aging, what is an appropriate and cost-effective surveillance program? Surveillance programs are costly, broad, and deep, especially in the DOE, where the US nuclear weapons surveillance program must 'ensure, through various tests, that the reliability of nuclear weapons is maintained' in the absence of full-system testing (General Accounting Office, 1996). The DOE program consists primarily of three types of tests: nonnuclear flight tests, that involve the actual dropping or launching of a weapon from which the nuclear components have been removed; and nonnuclear and nuclear systems laboratory tests, which detect defects due to aging, manufacturing, and design of the nonnuclear and nuclear portions of the weapons. Fully integrated analysis of the suite of nuclear weapons surveillance data is an ongoing area of research (Wilson et al., 2007). This paper introduces a simple model that captures high-level features of stockpile reliability over time and can be used to answer broad policy questions about surveillance programs. Our intention is to provide a framework that generates tractable answers that integrate expert knowledge and high-level summaries of surveillance data to allow decision-making about appropriate trade-offs between the cost of data and the precision of stockpile reliability estimates.

97 MATHEMATICS AND COMPUTING↗

PV Module and System Reliability Research

While photovoltaic (PV) technologies have experienced widespread success and adoption, continued growth of these technologies - especially new PV technologies - requires ongoing improvements to their reliability and the testing procedures, data, and standards that underpin them. To better understand and address failure mechanisms of PV modules and systems, NREL conducts testing, models failures, analyzes performance data, helps to develop standards, and convenes expert stakeholders. This work is focused both on improving the performance of industry-dominant PV technologies and rapidly de-risking new PV technologies so they can be proven reliable without decades of field testing.

14 SOLAR ENERGY↗

Applying Diagnostics to Enhance Cable System Reliability (Cable Diagnostic Focused Initiative, Phase II)

The Cable Diagnostic Focused Initiative (CDFI) played a significant and powerful role in clarifying the concerns and understanding the benefits of performing diagnostic tests on underground power cable systems. This project focused on the medium and high voltage cable systems used in utility transmission and distribution (T&D) systems. While many of the analysis techniques and interpretations are applicable to diagnostics and cable systems outside of T&D, areas such as generating stations (nuclear, coal, wind, etc.) and other industrial environments were not the focus. Many large utilities in North America now deploy diagnostics or have changed their diagnostic testing approach as a result of this project. Previous to the CDFI, different diagnostic technology providers individually promoted their approach as the “the best” or “the only” means of detecting cable system defects.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Time-Varying, Multi-Scale Adaptive System Reliability Analysis of Lifeline Infrastructure Networks

The majority of current societal and economic needs world-wide are met by the existing networked, civil infrastructure. Because the cost of managing such infrastructure is high and increases with time, risk-informed decision making is essential for those with management responsibilities for these systems. To address such concerns, a methodology that accounts for new information, deterioration, component models, component importance, group importance, network reliability, hierarchical structure organization, and efficiency concerns has been developed. This methodology analyzes the use of new information through the lens of adaptive Importance Sampling for structural reliability problems. Deterioration, multi-scale bridge models, and time-variant component importance are investigated for a specific network. Furthermore, both bridge and pipeline networks are studied for group and component importance, as well as for hierarchical structures in the context of specific networks. Efficiency is the primary driver throughout this study. With this risk-informed approach, those responsible for management can address deteriorating infrastructure networks in an organized manner.

97 MATHEMATICS AND COMPUTING↗