Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “system description”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Ocean Wave Energy Harvester with Oak Ridge Converter

Oceans can provide great potential for the American energy dominance. There is significant potential to utilize marine energy resources. In the United States, the total amount of marine energy available is equivalent to about 57% of the country's total power generation in 2019. Even if a fraction of this technical potential is harnessed, marine energy technologies could play a crucial role in fulfilling the nation's energy requirements. Marine energy resources are spread out geographically, and because more than 50% of the United States' population resides within 50 miles of the coastline, they are well-positioned to power local communities. These resources are also very dependable, making them a viable option for contributing to a consistent, trustworthy energy grid. Due to their predictable daily and seasonal patterns, marine energy resources can be integrated into our energy generation portfolio. On the other hand, ocean environment presents many challenges for cost-effective renewable energy conversion, including optimal control of ocean wave energy. This report presents a novel cost-effective energy conversion technique for ocean wave energy harvesters. The proposed system is simulated by using the Oak Ridge Converter to directly interface ocean wave energy source with the utility grid. The system description and simulation results are presented in detail. The results show that the proposed system is a cost effective and promising technology to reduce the infrastructure cost for ocean wave energy harvesters.

Sutton, Elizabeth [ORNL] (ORCID:0009000078885935)↗

SLUDGE PARTICLE SEPAPATION EFFICIENCIES DURING SETTLER TANK RETRIEVAL INTO SCS-CON-230

The purpose of this document is to release, into the Hanford Document Control System, FA1/0991, Sludge Particle Separation Efficiencies for the Rectangular SCS-CON-230 Container, by M. Epstein and M. G. Plys, Fauske & Associates, LLC, June 2009. The Sludge Treatment Project (STP) will retrieve sludge from the 105-K West Integrated Water Treatment System (IWTS) Settler Tanks and transfer it to container SCS-CON-230 using the Settler Tank Retrieval System (STRS). The sludge will enter the container through two distributors. The container will have a filtration system that is designed to minimize the overflow of sludge fines from the container to the basin. FAI/09-91 was performed to quantify the effect of the STRS on sludge distribution inside of and overflow out of SCS-CON-230. Selected results of the analysis and a system description are discussed. The principal result of the analysis is that the STRS filtration system reduces the overflow of sludge from SCS-CON-230 to the basin by roughly a factor of 10. Some turbidity can be expected in the center bay where the container is located. The exact amount of overflow and subsequent turbidity is dependent on the density of the sludge (which will vary with location in the Settler Tanks) and the thermal gradient between the SCS-CON-230 and the basin. Attachment A presents the full analytical results. These results are applicable specifically to SCS-CON-230 and the STRS filtration system's expected operating duty cycles.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cryogenic system for the Energy Recovery Linac and vertical test facility at BNL

A small cryogenic system and warm helium vacuum pumping system provides cooling to either the Energy Recovery Linac's (ERL) cryomodules that consist of a 5-cell cavity and an SRF gun or a large Vertical Test Dewar (VTD) at any given time. The cryogenic system consists of a model 1660S PSI piston plant, a 3800 liter storage dewar, subcooler, a wet expander, a 50 g/s main helium compressor, and a 170 m{sup 3} storage tank. A system description and operating plan of the cryogenic plant and cryomodules is given. The cryogenic system for ERL and the Vertical Test Dewar has a plant that can produce the equivalent of 300W at 4.5K with the addition of a wet expander 350 W at 4.5K. Along with this system, a sub-atmospheric, warm compression system provides pumping to produce 2K at the ERL cryomodules or the Vertical Test Dewar. The cryogenic system for ERL and the Vertical Test Dewar makes use of existing equipment for putting a system together. It can supply either the ERL side or the Vertical Test Dewar side, but not both at the same time. Double valve isolation on the liquid helium supply line allows one side to be warmed to room temperature and worked on while the other side is being held at operating temperature. The cryogenic system maintain the end loads from 4.4K to 2K or colder depending on capacity. Liquid helium storage dewar capacity allows ERL or the VTD to operate above the plant's capacity when required and ERL cryomodules ballast reservoirs and VTD reservoir allows the end loads to operate on full vacuum pump capacity when required.

43 PARTICLE ACCELERATORS↗

World Record Earned Value Management System Certification for Cleanup of the East Tennessee Technology Park, Oak Ridge, Tennessee, USA - 13181

On projects that require Earned Value Management (EVMS) Certification, it is critical to quickly prepare for and then successfully obtain certification. This is especially true for government contracts. Projects that do poorly during the review are subject to financial penalties to their company and they lose creditability with their customer creating problems with the project at the outset. At East Tennessee Technology Park (ETTP), we began preparing for Department of Energy (DOE) certification early during proposal development. Once the contract was awarded, while still in transition phase from the previous contractor to our new company, we immediately began reviewing the project controls systems that were in place on the project and determined if any replacements needed to be made immediately. The ETTP contract required the scheduling software to be upgraded to Primavera P6 and we determined that no other software changes would be done prior to certification. Next, preparation of the Project Controls System Description (PCSD) and associated procedures began using corporate standards as related to the project controls systems. During the transition phase, development was started on the Performance Measurement Baseline which is the resource loaded schedule used to measure our performance on the project and which is critical to good Earned Value Management of the project. Early on, and throughout the baseline review, there was positive feedback from the Department of Energy that the quality of the new baseline was good. Having this superior baseline also contributed to our success in EVMS certification. The combined companies of URS and CH2M Hill had recent experience with certifications at other Department of Energy sites and we were able to capitalize on that knowledge and experience. Generic PCSD and procedures consistent with our co-operations approach to Earned Value Management were available to us and were easily tailorable to the specifics of our contract and site. We also had corporate EVMS experts available to us so as to draw upon their recent certification experiences with lessons learned. This knowledge was especially helpful for training of personnel that were involved in the certification which included Project Controls, Project Management and Control Account Managers. We were also able to bring in these corporate experts to assist with our training efforts. To assure our readiness for the review, we conducted a 'White Hat' review. The 'White Hat' team consisted of corporate experts in EVMS along with an industry expert in EVMS from Humphrey and Associates. This review identified early any weaknesses that we had so corrections could be enacted prior to the EVMS Certification Readiness Review. It also helped give the evaluators confidence that we had done proper due diligence prior to their arrival. Also critical to our success, was early communication with our evaluators. It is important to start the communications early to ensure you understand the expectations of the certification team and the process that will be used during the certification. Communication through the entire process is critical to understand expectations and issues along the way. Very important to the overall process was management commitment, support and reinforcement. Management made sure that all personnel involved knew the importance and made preparations a priority. This was noted as a key strength by the evaluators during the out-brief. As a result of our preparation, our review yielded one Corrective Action Report (CAR) and two Continuous Improvement Opportunities (CIOs). The Certification team in their out-brief explained that this was the lowest number of CARs and CIOs in the history of EVMS certifications in the DOE Complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

National Ignition Facility. Facility and Infrastructure Systems Maintenance Plan

Ensuring the reliability of the NIF, including its support systems, laser systems, target diagnostic systems, and utilities, is essential to the availability of the NIF in its support of NNSA missions. NIF is a key capability in the DOE Stockpile Stewardship Program and supports high energy physics experiments for nuclear weapons, energy, and astrophysics applications. High system reliability provides opportunities for shots and scientific discoveries with opportunities to enhance and upgrade capabilities. This Maintenance Plan (MP) identifies the policies and procedures used to perform and support asset management of the NIF Facility and Infrastructure Systems (FInS), NIF Lasers & Alignment (LASE), NIF Target Experimental Operations (TOPS), NIF Target Area Science and Engineering (TASE), and NIF&PS Control Systems (NCS). The FInS systems include the facility, HVAC, contamination control, beampath, and Line Replaceable Units (LRUs) as well as utilities which create the beampath environments, such as vacuum, argon, or clean dry air. The LASE systems are Programmatic systems which include laser diagnostics, alignment, power conditioning, pulsed power, and input laser systems. The TOPS and TASE systems are also Programmatic systems which include target and diagnostic delivery systems and positioners, many different insertable and fixed target diagnostics, and cryogenic and target gas fill systems. Finally, the NCS systems include both software and hardware for industrial and shot operation control systems. Policies governing administrative and operational practices related to maintenance of FInS, LASE, TOPS, TASE, and NCS systems are described in this plan. In addition, the plan provides processes and procedures for managing, tracking, and documenting the work. This document, the NIF Operations Management Plan, NIF-5020544 (Ref. 1), and NIF Shot Operations Plan, NIF-5018506 (Ref. 2), together satisfy the requirements of the Conduct of Operations. Duties, responsibilities, and reporting requirements of the various positions associated with FInS, LASE, and TOPS maintenance are detailed in this plan. The FInS systems include both Real Property systems with asset management requirements specified in DOE Order 430.1C (Ref. 3) and Programmatic systems. In addition, for FInS, there is a list of the System Level Maintenance Plans (SLMPs) in NIF-1007419198 (Ref. 4) which provide the system descriptions and maintenance plan and schedule. In addition, the list includes the Reliability Centered Maintenance (RCM) and Experience Centered Maintenance (ECM) evaluations that have been performed for applicable FInS systems as well as reliability criticality per Section 3.5. The -AM version of the NIF Maintenance Plan focuses on the reliability program for FInS, LASE, TOPS, TASE, and NCS within the context of the overall NIF Reliability, Availability, and Maintainability (RAM) program and incorporates changes since the -AL version from August 2011 and has been updated to be fully consistent with the updates to Ref. 1. It also includes asset management considerations, updates to the Work Order (WO) process within the NIF Computerized Maintenance Management System (CMMS) which is EAM infor® System Maintenance and Reliability Tracking (SMaRT) (Ref. 5), and updates to metrics and key performance indicators (KPIs).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Ice at the Interface: Atmosphere-Ice-Ocean Boundary Layer Processes and Their Role in Polar Change (Workshop Report)

The atmosphere-ocean boundary layer in which sea ice resides includes many complex processes that require a more realistic treatment in GCMs, particularly as models move toward full earth system descriptions. The primary purpose of the workshop was to define and discuss such coupled processes from observational and modeling points of view, including insight from both the Arctic and Antarctic systems. The workshop met each of its overarching goals, including fostering collaboration among experimentalists, theorists and modelers, proposing modeling strategies, and ascertaining data availability and needs. Several scientific themes emerged from the workshop, such as the importance of episodic or extreme events, precipitation, stratification above and below the ice, and the marginal ice zone, whose seasonal Arctic migrations now traverse more territory than in the past.

54 ENVIRONMENTAL SCIENCES↗

Reduction of Systematic Errors in Diagnostic Receivers Through the Use of Balanced Dicke-Switching and Y-Factor Noise Calibrations

Receivers designed for diagnostic applications range from those having moderate sensitivity to those possessing large dynamic range. Digital receivers have a dynamic range which are a function of the number of bits represented by the ADC and subsequent processing. If some of this range is sacrificed for extreme sensitivity, noise power can then be used to perform two-point load calibrations. Since load temperatures can be precisely determined, the receiver can be quickly and accurately characterized; minute changes in system gain can then be detected, and systematic errors corrected. In addition, using receiver pairs in a balanced approach to measuring X+, X-, Y+, Y-, reduces systematic offset errors from non-identical system gains, and changes in system performance. This paper describes and demonstrates a balanced BPM-style diagnostic receiver, employing Dicke-switching to establish and maintain real-time system calibration. Benefits of such a receiver include wide bandwidth, solid absolute accuracy, improved position accuracy, and phase-sensitive measurements. System description, static and dynamic modelling, and measurement data are presented.

99 GENERAL AND MISCELLANEOUS↗

AFECS. Multi-Agent Framework for Experiment Control Systems

AFECS is a pure Java based software framework for designing and implementing distributed control systems. AFECS creates a control system environment as a collection of software agents behaving as finite state machines. These agents can represent real entities, such as hardware devices, software tasks, or control subsystems. A special control oriented ontology language (COOL), based on RDFS (Resource Definition Framework Schema) is provided for control system description as well as for agent communication. AFECS agents can be distributed over a variety of platforms. Agents communicate with their associated physical components using range of communication protocols, including tcl-DP, cMsg (publish-subscribe communication system developed at Jefferson Lab), SNMP (simple network management protocol), EPICS channel access protocol and JDBC.

99 GENERAL AND MISCELLANEOUS↗

An Analysis of Testing Requirements for Fluoride Salt Cooled High Temperature Reactor Components

This report provides guidance on the component testing necessary during the next phase of fluoride salt-cooled high temperature reactor (FHR) development. In particular, the report identifies and describes the reactor component performance and reliability requirements, provides an overview of what information is necessary to provide assurance that components will adequately achieve the requirements, and then provides guidance on how the required performance information can efficiently be obtained. The report includes a system description of a representative test scale FHR reactor. The reactor parameters presented in this report should only be considered as placeholder values until an FHR test scale reactor design is completed. The report focus is bounded at the interface between and the reactor primary coolant salt and the fuel and the gas supply and return to the Brayton cycle power conversion system. The analysis is limited to component level testing and does not address system level testing issues. Further, the report is oriented as a bottom-up testing requirements analysis as opposed to a having a top-down facility description focus.

flouride salt high-temperature reactor component↗

System Modeling Frameworks for Wind Turbines and Plants: Review and Requirements Specifications

System modeling frameworks for wind turbines and plants are used by research groups and industry to design wind energy systems that take into account key trade-offs across performance, cost, and reliability at both the turbine and plant level. The frameworks are exercised using a variety of multi-disciplinary design, analysis and optimization (MDAO) methods. To improve inter-operability and foster collaboration, this report proposes a classification system for the frameworks along dimensions of model fidelity and scope. The classification system is first motivated with reviews the state-of-the-art in the development of software frameworks for integrated wind turbine and plant simulation. Within each major wind turbine and power plant subsystem, a matrix is developed for the disciplines used and the fidelity levels with which each discipline can be modeled. The existing frameworks are then classified according to the matrix. Next, an ontology is proposed that will allow for standardizing how data is transferred between the most common discipline-fidelity combinations used in the frameworks. A common representation of data creates the ability to 1) share system descriptions and analysis results, supporting more transparent benchmarks and comparison, and 2) integrate models together into workflows within and across organizations for improving the efficiency and performance of wind turbine and power plant design processes. Ultimately, this integration leads to better overall wind energy system designs with high performance and low costs.

17 WIND ENERGY↗

Development of a Severe Accident Analysis Engine Using Approximate Reasoning

In hypothetical severe accident scenarios, nuclear power plant safety is challenged by core degradation and release of fission products. To aid the plant operator and technical support center staff, research has been performed to develop understanding of severe accident phenomenology, assessing their risk and devise measures to mitigate accident consequences (Sehgal, 2011). Nuclear power plant accidents involve highly complex physical and chemical interactions, a large number of safety related systems, and emergency operating procedures (EOP) and severe accident management guidelines (SAMG). Large number of factors with uncertainty and stress can overwhelm the operators. The overall objective of the present research is to develop a methodology and tools that an operator can use to predict severe accident progression and make effective decisions to arrest and manage the accident under large uncertainties. Towards this goal, this study examines a novel approach that brings to bear a combined use of techniques in artificial intelligence (Russel and Norvig, 2010), including Bayesian Network (BN), Answer Set Programming (ASP) and Fuzzy Inference (FI) to achieve faster-than-real-time, yet sufficiently accurate analysis of severe accident progression. Bayesian network (BN) is a type of probabilistic graphical models that can be used to represent knowledge and conditional dependencies about an uncertain realm. It is useful for capturing the causal relationships in a complex system. It also allows prediction via Bayesian inference (Kelly and Smith, 2012). It is composed of nodes and edges, which express random variables and probabilistic relationships between the nodes, respectively. This relationship, given by conditional probability is calculated using stochastic methods. The BN is used in several systems for analysis and management of accident risk; e.g. (Knochenhauer and Frid, 2010). In those systems, the nodes or so-called 'effective factors' are presumably known within the network by system descriptions in SAMGs. There are two steps to configure the BN, namely (i) identifying compositions within the network and (ii) defining conditional dependency between nodes. The first step is performed following the spirit of ASP (Baral, 2003) using Prolog (Wielemaker, 2005). Knowledge representation is used to build databases required for processing by ASP. Knowledge representation is defined as the expression of knowledge in a way that is understandable to both human and computers. Originally knowledge indicates data, information and facts. To focus, knowledge should be formed to achieve a goal. In a severe accident, key physics and safety related components status are defined according to a failure mode. The conditional dependencies between nodes are generated by approximate reasoning using Fuzzy inference (Zadeh, 1995). Fuzzy logic is a multiple-valued logic to treat ambiguous features such as linguistic description. It indicates possibility, which is distinguished from probability. Fuzzy set consists of linguistic variables according to the fixed rule. In other words, even uncertain states could be expressed as not binary logic, but as many-value logic by rule-based technology. Fuzzy control system is comprised of Fuzzy inference engine that is performed based on the 'If-Then Rule'. The 'If-Then Rule' is of the following form. If Y1 is B11 and Y2 is B12 then Z is C1. If Y1 is B21 and Y2 is B22 then Z is C2. Y1 and Y2 are inputs, which indicate conditional variables. Z indicates decision-making and both B and C are linguistic variables. With this rule-based technique, the approximate reasoning can be realized by Fuzzy inference. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

14 Steps to Creating Value in Cost and Schedule Resources for Nuclear Waste Management - 20188

While Waste Management budgets are shrinking, DOE required cost and schedule controls are becoming increasingly stringent. At the same time, there is a scarcity of adept, qualified, and competent projects controls staff who both understand nuclear waste management and are capable of addressing today's cost and schedule challenges. In response, we have developed a systematic approach to training and mentoring project controls staff. The approach is based on the observations and lessons learned on projects, both successful and unsuccessful, over the past 20 years. During that time, we evaluated staff development and used that experience to design a program that progresses the maturity, knowledge and experience of the individual. The program is based on the unique needs of cost and schedule specialists while incorporating the best leadership and managerial applications. The system is not limited to developing individual software skills, which is a primary focus of many project controls training programs. Instead, our system develops an individual's soft and hard skill sets. The system develops the user's skill, talent, attitude, and drive to do the best job possible. It focuses on all aspects of becoming a more productive technical team while accepting responsibility for individual growth. It also enhances the project controls team by setting up checks and balances that everyone is aware of and participates in. The system is based on 14 steps of increasing complexity in knowledge and application. The system clarifies roles, responsibilities and expectations. It helps eliminate uncertainty and reduces stress on staff and managers. It contains everyday routine actions and is simple to implement. It allows the development of a consistent rhythm to staff growth and development. Mastering the steps will allow the user to achieve excellence in cost and schedule control. The 14 steps are: 1 - Key Performance Objectives, 2 - Check Lists, 3 - Desktop Guides, 4 - System Description, 5 - Procedures, 6 - Software and On the Job Training (OTJ), 7 - Traceability Checks, 8 - Surveillances, 9 - 32 Criteria, 10 - The Contract, 11 - Customer/Government Guidance, 12 - Training and Mentoring Others, 13 - Master your weekly and daily schedules, 14 - Improving your interpersonal skills. Application and mastery of this system will produce better cost and schedule control results. Your project controls staff will write better reports, analyze data better, make better use of their time, and be more valuable to decision makers. If followed rigorously, our system will produce a great project controls team, which is invaluable to the success of each project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Source size measurement options for low-emittance light sources

Radiation-based techniques for measuring electron source sizes are widely used as emittance diagnostics at existing synchrotron sources. Three of these techniques, namely, pinhole imaging, double-slit interferometry, and a K-edge filter-based beam position and size monitor system (ps-BPM), are evaluated for measuring source sizes at low-emittance storage rings. Each technique is reviewed with a detailed system description, design optimization, and practical considerations targeted for small source sizes. Pinhole imaging has the simplest setup and gives the beam profile in both transverse dimensions but with limited resolution. Double-slit interferometry has the highest resolution but with a limited detectable size range. The ps-BPM system shows reasonable resolution for monitoring small source sizes and divergence and can give real-time information of the source position and angle. New facilities may consider an integrated system that combines some or all of these techniques.

43 PARTICLE ACCELERATORS↗

Design and requirements of a hydrogen component reliability database (HyCReD)

Hydrogen technologies are expected to play a key role in the decarbonization of several sectors including energy storage and transportation. Rigorous investigation and quantification of the risk and reliability issues associated with hydrogen technologies will be critical to ensuring both their wider adoption and safe, economical operations. Quantitative risk assessment (QRA) is an important tool that has been used to enable the safe deployment of many engineering systems, including hydrogen fueling stations and hydrogen storage systems. However, QRA studies require reliability data which is currently lacking for expanding applications of hydrogen systems. Here, to address this gap, we present a new structure for a hydrogen component reliability database (HyCReD) that can be used to generate reliability data to be used in QRA, reliability, safety studies, maintenance planning, and more. Building on our previous work examining four major hydrogen safety data collection tools (West et al., 2022) [1], our approach in this work was to consult scientific literature on reliability data collection as well as a number of existing reliability engineering databases in the oil & gas, chemical processing, and nuclear power plant sectors. The evaluation of these databases led to identifying best practices to be implemented in a data collection framework for a hydrogen component reliability database. Based on these best practices, a set of 24 requirements for the proposed database are presented, covering its characteristics and the types of data to be collected. We define the structure of the HyCReD database and 25 data elements to be collected, spanning system description, failure, shutdown, or near-miss events, and maintenance events. The data elements are then defined according to international standards used in the safety and reliability practice and potential choice lists are provided for each field. Since this database is being piloted for hydrogen fueling stations, a generic station component hierarchy developed by West (2021) [2] is used to standardize system data. Finally, we demonstrate populating the database with information extracted from five narrative reports on hydrogen fueling station incidents.

08 HYDROGEN↗

System Design and the Safety Basis

The objective of this paper is to present the Bechtel Jacobs Company, LLC (BJC) Lessons Learned for system design as it relates to safety basis documentation. BJC has had to reconcile incomplete or outdated system description information with current facility safety basis for a number of situations in recent months. This paper has relevance in multiple topical areas including documented safety analysis, decontamination & decommissioning (D&D), safety basis (SB) implementation, safety and design integration, potential inadequacy of the safety analysis (PISA), technical safety requirements (TSR), and unreviewed safety questions. BJC learned that nuclear safety compliance relies on adequate and well documented system design information. A number of PISAs and TSR violations occurred due to inadequate or erroneous system design information. As a corrective action, BJC assessed the occurrences caused by systems design-safety basis interface problems. Safety systems reviewed included the Molten Salt Reactor Experiment (MSRE) Fluorination System, K-1065 fire alarm system, and the K-25 Radiation Criticality Accident Alarm System. The conclusion was that an inadequate knowledge of system design could result in continuous non-compliance issues relating to nuclear safety. This was especially true with older facilities that lacked current as-built drawings coupled with the loss of "historical knowledge" as personnel retired or moved on in their careers. Walkdown of systems and the updating of drawings are imperative for nuclear safety compliance. System design integration with safety basis has relevance in the Department of Energy (DOE) complex. This paper presents the BJC Lessons Learned in this area. It will be of benefit to DOE contractors that manage and operate an aging population of nuclear facilities.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

NDMAS System and Process Description

This report provides an overview of the system and its components, defines roles and responsibilities, describes the internal processes that the NDMAS team uses to carry out the mission, and describes hardware and software used by the team.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Long-range force and moment calculations in multiresolution simulations of molecular systems

Multiresolution simulations of molecular systems such as DNAs, RNAs, and proteins are implemented using models with different resolutions ranging from a fully atomistic model to coarse-grained molecules, or even to continuum level system descriptions. For such simulations, pairwise force calculation is a serious bottleneck which can impose a prohibitive amount of computational load on the simulation if not performed wisely. Herein, we approximate the resultant force due to long-range particle-body and body-body interactions applicable to multiresolution simulations. Since the resultant force does not necessarily act through the center of mass of the body, it creates a moment about the mass center. Although this potentially important torque is neglected in many coarse-grained models which only use particle dynamics to formulate the dynamics of the system, it should be calculated and used when coarse-grained simulations are performed in a multibody scheme. Herein, the approximation for this moment due to far-field particle-body and body-body interactions is also provided.

74 ATOMIC AND MOLECULAR PHYSICS↗