Cyber-Attack Detection and Accommodation for the Energy Delivery System

The goals of this project were to create a software system with a suite of key algorithms for cyber-attack detection and accommodation providing domain layer protection for critical power generation assets. Example assets included gas and steam turbines, heat recovery steam generators, and electrical generators. The aggressive algorithm goals were aimed at reducing the false positive rates in threat detection to <1% using learnings from many evolving disciplines (power turbine and generator physics, power system modeling, modern control theory, system identification, machine learning, deep learning, mathematics and data science). Additional goals for the algorithms involved localizing threats on-the-fly to know in which monitoring node the effects of attacks are present, and then providing accommodation to keep the system running uninterrupted much of the time in the presence of the attack. Accommodation had a performance goal of providing resiliency when up to 50% of monitoring nodes are in an attack state.

cybersecurity, cyber-physical↗

Component level modeling of materials degradation for insights into operational flexibility of Existing Coal Power Plants

Increasingly, coal-fired power plants are required to balance power grids by compensating for the variable electricity supply from renewable energy sources. Fossil-fueled power plants, originally designed to be base loaded, will increasingly need to operate on a load following or cyclic basis. This demanding requirement for operational flexibility needs insights into accelerated material degradation arising due to the harsh operating conditions (e.g., fatigue, early oxide exfoliation due to stresses) along with current damage mechanisms (fireside corrosion, creep and erosion) observed in service. Our research objective is to develop component level modeling toolkit for materials-based degradation for two key mechanisms that can accelerate with cyclic operations. In more detail, this includes the fireside corrosion/steam oxidation/erosion/creep/fatigue of superheaters/reheaters and steam pipework and also the water droplet erosion/ fatigue of last stage steam turbine blades degradation mechanisms, that demand routine and sometimes unplanned maintenance and repair. The innovation is in developing a computational fluid dynamics/finite element (CFD/FE) modeling toolkit for the component level models of the boilers and low-pressure steam turbines in coal power plants that can tackle multidisciplinary failure mechanisms occurring concurrently for extreme environment materials. Lifetime assessment in such environments also needs to account for the unit-specific analyses, operational history and fuel feedstock; this can only be obtained by destructive analysis of components. This, in turn, enables validation of the model toolkits utilizing service feedback data, improving the probability of time/temperature dependent life prediction.

20 FOSSIL-FUELED POWER PLANTS↗

Flexible Operation of Natural Gas Power Plants in Texas: Startup and Shutdown Durations and Nitrogen Dioxide Emissions

This dataset provides insights into historical flexible operation of natural gas power plants in Texas, with a focus on startup and shutdown events. The dataset includes tables summarizing startup and shutdown durations as well as nitrogen oxide (NOx) emission factors during these events, and compares these emission factors with those observed during all other operating phases (referred to here as “steady-state operation”). The dataset is derived using the U.S. Environmental Protection Agency (EPA)’s Clean Air Markets Program Data (CAMPD). Historical hourly data from 2015–2024, including electricity generation, heat input, and NOx emission factors, are used for natural gas combined cycle units, combustion turbine units, and steam turbine units in Texas. This work was authored by the National Laboratory of the Rockies, operated by the Alliance for Energy Innovation, LLC, for the U.S Department of Energy (DOE) under contract no. DE-AC36-08GO28308. Funding was provided by the U.S. Department of Energy as part of its Grid Modernization Laboratory Consortium, a strategic partnership between DOE and the national laboratories to bring together leading experts, technologies, and resources to collaborate on the goal of modernizing the nation’s grid. The views expressed in the dataset do not necessarily represent the views of the DOE or the U.S. Government.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Creep-Fatigue Interaction Testing

Fatigue fives in metals are nominally time independent below 0.5 T(sub Melt). At higher temperatures, fatigue lives are altered due to time-dependent, thermally activated creep. Conversely, creep rates are altered by super. imposed fatigue loading. Creep and fatigue generally interact synergistically to reduce material lifetime. Their interaction, therefore, is of importance to structural durability of high-temperature structures such as nuclear reactors, reusable rocket engines, gas turbine engines, terrestrial steam turbines, pressure vessel and piping components, casting dies, molds for plastics, and pollution control devices. Safety and lifecycle costs force designers to quantify these interactions. Analytical and experimental approaches to creep-fatigue began in the era following World War II. In this article experimental and life prediction approaches are reviewed for assessing creep-fatigue interactions of metallic materials. Mechanistic models are also discussed briefly.

Halford, Gary R.↗

Energy and cost saving results for advanced technology systems from the Cogeneration Technology Alternatives Study (CTAS)

An overview of the organization and methodology of the Cogeneration Technology Alternatives Study is presented. The objectives of the study were to identify the most attractive advanced energy conversion systems for industrial cogeneration applications in the future and to assess the advantages of advanced technology systems compared to those systems commercially available today. Advanced systems studied include steam turbines, open and closed cycle gas turbines, combined cycles, diesel engines, Stirling engines, phosphoric acid and molten carbonate fuel cells and thermionics. Steam turbines, open cycle gas turbines, combined cycles, and diesel engines were also analyzed in versions typical of today's commercially available technology to provide a base against which to measure the advanced systems. Cogeneration applications in the major energy consuming manufacturing industries were considered. Results of the study in terms of plant level energy savings, annual energy cost savings and economic attractiveness are presented for the various energy conversion systems considered.

Sagerman, G. D.↗

Chapter 2: Global Value Chain and Manufacturing Analysis on Geothermal Power Plant Turbines

The global geothermal power market has shown significant growth since the last decade and is expected to reach a total installed capacity of 18.4 gigawatts electric (GWe) by the end of 2021 (GEA, 2016). The global geothermal power plant turbine market is dominated by a small number of manufacturers. Between 2005 and 2015, 82% of the geothermal steam turbines were manufactured in Japan, and 74% of the geothermal binary cycle turboexpanders were manufactured in Israel. During this period, the United States played an important role in the global trade flow of fully assembled turbine units and turbine parts, with a high volume of imports and exports. Another significant growth area was in Italian turbine/turboexpander manufacturers, who have increased their market share in the last couple of years. One other important change in the manufacturing market was in Turkey, where the bonus on feed-in-tariff (FIT) for domestic hardware components boosted the national manufacturing sector between 2010 and 2020. When planning geothermal power projects, developers customize their power plant size to fit the available geothermal resource capacity. The turbine is designed and sized to optimize the efficiency and utilization of resource and revenue production. The rest of the power plant components such as heat exchangers (HX), water-cooled cooling towers (WCCT), or air-cooled condensers (ACC) are then chosen to complement the turbine size and design. These one-off manufacturing custom design turbines have relatively higher manufacturing set-up costs, longer lead times, and higher capital costs than the standard design turbines manufactured in larger volumes. However, turbines produced in standard increments and in larger manufacturing volumes could result in lower costs per turbine, but potentially lower efficiency. Based on pipeline projects and resource assessments, there is significant potential value in creating standard turbine sizes that could offer an economic advantage, as is done for modular microturbines.

40 EE - Geothermal Technologies Office (EE-4G)↗

Integration of a Concentrating Solar Steam Topping Turbine to an Existing Geothermal Binary Power Plant (CRADA CRD-17-700 Final Report)

U.S. Geothermal Inc. is a publicly traded leading renewable energy company focused on the development, production, and sale of electricity from geothermal energy with operating generation facilities at Raft River, Idaho; San Emidio, Nevada; and Neal Hot Springs, Oregon. (U.S. Geothermal was acquired by Ormat Technologies, Inc. since the execution of this project). This project will evaluate the integration of a concentrating solar steam topping cycle with a geothermal bottoming binary cycle. This hybrid plant configuration will enable high efficiency conversion of the solar heat to electrical power, while simultaneously increasing the power output of the bottoming cycle. Such a design has the potential to reduce the cost of electrical power from concentrating solar power (CSP) and geothermal plants, and a viable design could be deployed at existing geothermal plants that have experienced resource productivity decline as well as in greenfield projects. This analysis will examine US Geothermal’s Raft River power plant for implementation of this concept. INL and NREL have previously collaborated in the analysis of geo-solar hybrid power plants. These two labs will again work together to model the solar field, steam-topping, and geothermal bottoming cycles in order to investigate the performance of the proposed cycle. This analysis will provide US Geothermal with technical information including equipment specifications and estimated power generation necessary to advance the concept toward implementation. A successful project outcome has two parts: One would be for US Geothermal to have a process flow diagram (heat and mass balance), and performance parameters for the major pieces of equipment. US Geothermal could then use this information evaluate the techno-economic feasibility of the hybrid power cycle, and serve as the basis for subsequent detailed equipment design, purchase, and installation of the cycle. The second would be for the developed solution to be published by DOE for use by other geothermal developers both to retrofit underperforming plants and to lower the LCOE of new developments.

15 GEOTHERMAL ENERGY↗

Optimization of energy requirements for CO 2 post-combustion capture process through advanced thermal integration

The energy optimization modeling work described here was performed to determine efficiency improvements that could be achieved for existing coal-fired power plants to retrofit a partial CO 2 capture from the post-combustion flue gas for carbon sequestration through thermal integration. The work presented includes optimization of the mono-ethanol amine (MEA)-based post-combustion CO 2 capture to reduce energy requirements that could be achieved at existing power plants by thermal integration of the steam turbine cycle, boiler, CO 2 compression train and post-combustion CO 2 capture process to offset efficiency and capacity losses that would be incurred by retrofit or implementation of post-combustion CO 2 capture. Furthermore, partial CO 2 capture, involving treatment of less than 100% of the flue gas leaving the plant and modular design of the CO 2 scrubbing system, was also investigated. Thermal integration of the steam turbine cycle with boiler and CO 2 compression train improved cycle and plant performance and offset, in part, the negative effects of post-combustion CO 2 capture. The best-analyzed integration options improved gross power output by 5% and net unit efficiency by 1.57%, relative to the conventional MEA process. Operating with 40% CO 2 capture increased gross power output by 11.6–14% (depending on the MEA thermal integration option), relative to the conventional MEA integration and 90% CO 2 capture. The improvement in net unit performance is larger compared to the improvement in turbine cycle performance because of the CO 2 compression work, which is also reduced by partial CO 2 capture.

42 ENGINEERING↗

Development of Corrosion- and Erosion-Resistant Coatings for Advanced Ultra-Supercritical Materials

This final report summarized the research efforts and major findings of the Phase I Project “Development of Corrosion- and Erosion-Resistant Coatings for Advanced Ultra-Supercritical Materials”, for the period of October 1, 2019 – Sept. 30, 2021. This project is a collaborative endeavor between Tennessee Tech University, Purdue University, Oak Ridge National Laboratory, Siemens Corporation, and Eastern Plating, LLC, aiming at improving the durability and lifetime of high-pressure (HP) steam turbine blades in advanced ultra-supercritical (A-USC) coal-fired power plants through the development of corrosion/erosion-resistant coatings manufactured via a low-cost electrolytic codeposition process. While Tribaloy alloy T-400C was identified by the U.S. A-USC Materials Consortium as a promising coating composition, further composition optimization is needed to enhance its corrosion and erosion resistance for protecting the A-USC Ni-base turbine components. An integrated computational and experimental approach was employed to optimize coating composition/microstructure and processing parameters. In order to identify candidate coating compositions that could offer balanced properties, thermodynamic calculations were performed to explore the γ+Laves composition space in the Co-Ni-Cr-Mo-Si system with different alloying additions at 600-800 °C. Guided by the calculation results, experimental assessment of selected alloys led to the development of a new generation of Tribaloy compositions with the optimal levels of Cr, Mo and Si, reactive element (e.g., 0.4-0.6 wt.% Y) and other alloying additions. The low-cost and non-line-of-sight electro-codeposition process was employed to deposit a Ni(Co)-CrMoSiY composite coating on commercial Haynes 282 (H282) Ni-base alloy. A diffusion treatment was subsequently applied to convert the composite to the Tribaloy-type coating. Both the codeposition parameters and heat treatment conditions were varied to achieve the desired coating composition, microstructure and phase constituents. In addition, since additive manufacturing (AM) may be an alternative cost-saving option for potential A-USC turbine repair, laser direct deposition was explored to fabricate the H282 alloy with minimal defects. The electro-codeposited Tribaloy coating was also applied to the AM H282 substrate to demonstrate the viability of the coating process in improving the surface finish of AM alloys. Both high-temperature oxidation performance and solid particle erosion (SPE) resistance of model alloys and electro-codeposited coatings were evaluated. About 25 model alloys with various Cr/Mo ratios and reactive element levels, as well as partial substitution of Mo with Nb were evaluated with regard to their oxidation resistance in both air and pure steam at 760-800°C. Compositions based on Ni(Co)-20Cr-18Mo-2.6Si-0.6Y (wt.%) showed significantly improved oxidation resistance over the baseline T400-C. Based on the alloy development results, three generations of new Tribaloy coatings (Gen-1, Gen-2, and Gen-3) with various Mo/Cr contents and Y levels were prepared via electro-codeposition and their microstructure/performance were evaluated. Outstanding air and steam oxidation resistance was achieved for the Gen-2 and Gen-3 coatings. Furthermore, while the SPE resistance of the coatings depended on many factors such as temperature, environment, erodent, velocity and impact angle, the coated samples exhibited similar or better SPE resistance compared to the H282 substrate when magnetite was used as erodent (which is a realistic erodent in A-USC steam turbines). The new Tribaloy coatings also had good long-term compatibility with the H282 alloy substrate. The two large-sized rotating barrels were designed, constructed, and employed to coat dummy HP blades. Uniform coating thickness and microstructure were achieved at various blade locations. Also, a preliminary techno-economic analysis of the proposed coating process was conducted to quantify the cost-effectiveness and to assess the commercial viability of the corrosion- and erosion-resistant coatings. It is estimated that a cost reduction of ~30% could be achieved with the electro-codeposition coating process over the state-of-the-art high velocity oxygen fuel (HVOF) thermal spray. Compared to the leading Tribaloy coating technologies such as HVOF and plasma transfer alloying, electro-codeposition based process has advantages such as low-cost process equipment, uniform deposition even for complex shapes, low levels of contaminants/porosities, reduction of powder waste, and potentially better surface finish and longer turbine service life. The Phase 1 study has demonstrated that it is feasible to develop an electro-codeposited Tribaloy coating with balanced corrosion and erosion properties, even though additional research efforts such as further coating process scale-up and longer-term performance evaluation under realistic A-USC conditions are clearly needed.

20 FOSSIL-FUELED POWER PLANTS↗

Development of Novel Ferritic-Martensitic Steels with Superior Creep Properties for Power Plant Applications

A creep resistant martensitic steel, CPJ-7, was developed with an operating temperature approaching 650°C. Subsequently, another creep resistant martensitic steel, JMP, was designed with the potential to operate at, or slightly above, 650°C. This report describes the development of these alloys from early iterations of CPJ steels to the final CPJ-7 formulation as well as the more heat resistant JMP steel formulation. The design originated from computational modeling for phase stability and precipitate strengthening using fifteen constituent elements. Approximately forty heats of CPJ and ten of JMP, each weighing ~7 kg, were vacuum induction melted. A computationally optimized heat treatment schedule was developed to homogenize the ingots prior to hot forging and rolling prior to final normalization and tempering. Overall, wrought and cast versions of CPJ-7 present superior creep properties when compared to wrought and cast versions of COST alloys for steam turbine and wrought and cast versions of P91/92 for boiler applications. For instance, the Larson Miller Parameter curve for CPJ-7 at 650°C almost coincides with that of COST E at 620°C. The prolonged creep life was attributed to slowing down the process of the destabilization of the MX and M 23 C 6 precipitates at 650°C. On the other hand, the cast version of CPJ-7 also revealed superior mechanical performance, well above commercially available cast 9% Cr martensitic steel or derivatives, especially for creep life at 650°C. The casting process employed slow cooling to simulate the conditions of a thick wall full-size steam turbine casing but utilized a separate homogenization step prior to final normalization and tempering. To advance the development of CPJ-7 for commercial applications, a process was used to scale up the production of the alloy using vacuum induction melting (VIM) and electroslag remelting (ESR), which underlined the importance of melt processing control of intentionally designed minor and trace elements in these advanced alloys. Following the work on CPJ-7, the JMP steels were designed with higher Co for increased solid solution strengthening, Si for oxidation resistance and increased W (with low Mo content) for matrix strength and stability as well as solid solution strengthening. The JMP steels showed increases in creep life compared to CPJ-7 between 118 to 150% at 650°C for testing at various stresses between 138 MPa and 207 MPa. On a Larson-Miller plot, the performance of the JMP steels surpasses that of state-of-the-art MARBN and other MARBN-type steels. The influence of various elements within the composition of the alloys on the microstructure and mechanical properties are discussed. This report presents approximately 420,000 h of in-house creep testing, the equivalent of almost 50 years of cumulative creep tests.

36 MATERIALS SCIENCE↗

Optimal Design and Techno-Economic Analysis of 3D-Printed, Intensified Packings for Absorbers and Strippers in Solvent-Based CO 2 Capture

A potential technology for the CO 2 absorption process is utilizing intensified structured packing with embedded cooling/heating channels for continuous heat exchange, which can overcome limitations of discrete methods, such as discrete intercooling and centralized reboilers, to aid in reducing energy consumption and decreasing costs. This work investigates the modeling of intensified packing (IP) for the stripper tower, extending on previous work for the absorber, which distributes heat internally within the column, improving the thermodynamics for the solvent regeneration process. The model includes submodels for steam turbine extraction to produce steam at various qualities as well as a surrogate model for calculating steam enthalpy. A cost model for a plant-scale absorption capture process was developed, allowing for the design of the plant to be optimized, subject to minimizing capture cost using two different power plant flue gas sources. In this optimization, the placement of IP in both towers is optimized to balance the trade-off between enhanced heat transfer and reduced mass transfer volume. For natural gas combined cycle flue gas, the standard process configuration had a minimum cost of $\$$65.40/tonne CO 2 , and considering IP, the minimum capture cost is reduced to $\$$62.73/tonne, with utilization in the stripper column, which reduces yearly costs by up to $\$$2.67 MM/yr. Cooling the absorber through IP, or intercoolers, was only found to be beneficial at higher capture rates, with IP in both towers having a cost of capture of $\$$68.08/tonne at 99.9% capture, a reduction of $\$$12.64/tonne when using only intercoolers at the same capture rate. When capturing from pulverized-coal power plants, the minimum cost of capture when using IP in both towers is $\$$44.18/tonne (at 97% capture), while the standard configuration with and without intercoolers was $\$$45.69 and $\$$47.22 per tonne, respectively. This results in a reduction in yearly costs of $\$$16.98 MM/yr from the base-case configuration. At this higher CO 2 concentration, cooling in the absorber from the IP becomes extremely beneficial, reducing energy consumption by up to 6%.

20 FOSSIL-FUELED POWER PLANTS↗

Crack nucleation at forging flaws studied by non-local peridynamics simulations

We present a computational study and framework that allows us to study and understand the crack nucleation process from forging flaws. Forging flaws may be present in large steel rotor components commonly used for rotating power generation equipment including gas turbines, electrical generators, and steam turbines. The service life of these components is often limited by crack nucleation and subsequent growth from such forging flaws, which frequently exhibit themselves as non-metallic oxide inclusions. The fatigue crack growth process can be described by established engineering fracture mechanics methods. However, the initial crack nucleation process from a forging flaw is challenging for traditional engineering methods to quantify as it depends on the details of the flaw, including flaw morphology. We adopt the peridynamics method to describe and study this crack nucleation process. For a specific industrial gas turbine rotor steel, we present how we integrate and fit commonly known base material property data such as elastic properties, yield strength, and S-N curves, as well as fatigue crack growth data into a peridynamic model. The obtained model is then utilized in a series of high-performance two-dimensional peridynamic simulations to study the crack nucleation process from forging flaws for ambient and elevated temperatures in a rectangular simulation cell specimen. The simulations reveal an initial local nucleation at multiple small oxide inclusions followed by micro-crack propagation, arrest, coalescence, and eventual emergence of a dominant micro-crack that governs the crack nucleation process. The dependence on temperature and density of oxide inclusions of both the details of the microscopic processes and cycles to crack nucleation is also observed. The results are compared with fatigue experiments performed with specimens containing forging flaws of the same rotor steel.

97 MATHEMATICS AND COMPUTING↗

Cost and Performance Estimates for State-of-the-Art and Advanced 1×1 H-Class Natural Gas-Fired Power Plants

As an extension of NETL's Fossil Energy Baseline for Electricity Generating Units Volume 1: Coal and Natural Gas to Electricity (FEB Rev 4a, this study develops cost and performance estimates for analogous NGCC cases using a state-of-the-art 2023 vintage H-Class CT in a 1×1 configuration, where a single combustion turbine and heat recovery steam generator are coupled to a single steam turbine on a common shaft. These 1×1 H-Class cases are used to develop cost and performance estimates of X-Class 1×1 NGCC cases with advanced performance characteristics, analogous to NETL’s cost and performance projections report.

20 FOSSIL-FUELED POWER PLANTS↗

FEED Study of Carbon Capture Inc. DAC and CarbonCure Utilization Using United States Steel's Gary Works Waste Plant

Direct Air Capture (DAC) has been proposed as a means of reducing atmospheric concentrations of CO2. While DAC has been evaluated through lab-scale, bench-scale, and small-scale pilot units, large-scale deployment has not been achieved. Feasibility studies are one tool to understand the potential design, operation, performance, and impact of commercial-scale DAC. This paper presents the results of a feasibility study for a passive DAC system deployed at >100,000 tpy scale in three different regions across the U.S. and awarded to Carbon Collect by the U.S. Department of Energy National Energy Technology Laboratory (DOE NETL). The MechanicalTree™technology has been designed and engineered by Carbon Collect based on the concept initially developed at Arizona State University Center for Negative Carbon Emissions. It uses a tower of stacked, sorbentcontaining disks supported by a lifting mechanism, exposed to the air to capture CO2 during the adsorption phase. The disks are then lowered into a regeneration chamber for vacuum and steam regeneration to produce CO2 product during the desorption step. The modular tree design allows large installations with repeatable, mass-manufactured units connected to common utilities such as steam supply, vacuum, and CO2 processing for compression and geologic storage. The passive DAC system eliminates the equipment and energy of forced air fans by using natural air circulation to contact the sorbent with the CO2 in the air. Because of this, the performance is dependent on the wind speed in addition to the temperature and relative humidity. Performance and flow rate fluctuations were incorporated into equipment and facility design with considerations for turndown to 10% of maximum rated flow to allow operation in all seasons. The feasibility study was undertaken to evaluate the technology in different regions and climates. Three locations were selected for this study representing different climates: Alabama (hot and humid), California (hot and arid), and Wyoming (continental). For each region, the adsorption/desorption cycle was optimized including tuning the heat integration and cycle timings. The performance of individual trees was then scaled to the full facility with the same design of more than 20,000 trees common between all regions. The installations had expected average CO2 capture rates of between 330,000 and 485,000 tonnes of CO2 per year depending on the climate. The initial engineering design for the facility at each location was performed with cost and performance estimates for the trees, carbon purification and compression, and the balance of plant. To supply thermal and electrical energy for the facility, carbon-free or low-carbon power must be considered. Options for low-carbon, continuous thermal and electrical energy were considered. The best-performing option from those considered was identified to be an electrically-heated molten salt energy storage system, powered by an on-site photovoltaic field. During molten salt thermal discharge, steam is produced from heat exchange with the molten salt and used to generate power in a steam turbine as well as steam for regenerating the DAC carbon trees. The thermal and electrical supply and analysis is presented in the context of low-carbon power for carbon removal. Modelling and economics of transportation and geologic storage of the CO2 is considered and presented for each location. The results of the feasibility study are incorporated into the presented techno-economic and life-cycle assessments. This work is intended to provide an understanding of the performance, cost, and impact of capturing CO2 at the commercial scale and the impact of climate and regional siting on the considered passive DAC system.

42 ENGINEERING↗

Water separator for hydrogen steam injected turbine engine

A propulsion system for an aircraft includes a core engine that includes a core flow path where air is compressed in a compressor section, communicated to a combustor section, mixed with a hydrogen based fuel and ignited to generate a core gas flow that is expanded through a turbine section. The propulsion system includes a hydrogen fuel system that is configured to supply hydrogen fuel to the combustor through a fuel flow path, a condenser that is arranged along the core flow path and configured to condense water within the core gas flow, and a separator that includes an inlet, a primary water outlet and an exit that includes a plurality of exit guide vanes for straightening the core gas flow that proceeds through the exit. The exit guide vanes include a secondary water outlet for removing condensed water in the core gas flow that proceeds through the exit.

Terwilliger, Neil J.↗

Energy Conversion Alternatives Study (ECAS), Westinghouse phase 1. Volume 1: Introduction and summary and general assumptions

Nine advanced energy conversion concepts using coal or coal-derived fuels are summarized. They are; (1) open-cycle gas turbines, (2) combined gas-steam turbine cycles, (3) closed-cycle gas turbines, (4) metal vapor Rankine topping, (5) open-cycle MHD; (6) closed-cycle MHD; (7) liquid-metal MHD; (8) advanced steam; and (9) fuel cell systems. The economics, natural resource requirements, and performance criteria for the nine concepts are discussed.

Beecher, D. T.↗

Front-End Engineering Design Study for Retrofit Post-Combustion Carbon Capture on a Natural Gas Combined Cycle Power Plant

The objective of the project is to conduct a Front-End Engineering Design (FEED) study to determine the technical and economic feasibility of installing a retrofit, post-combustion, carbon capture facility on a commercially operating, natural gas-fired, combined cycle (NGCC) power plant. The Electric Power Research Institute (EPRI), California Resources Corporation (CRC), and Fluor Corporation used Fluor's Econamine FG Plus SM (EFG+) conducted the FEED study for capturing CO 2 produced by CRC's 550 MWe Elk Hills Power Plant (EHPP), located in the Elk Hills Oil Field near Tupman, Kern County, California. The EHPP was commissioned in 2003 and is powered by two General Electric 7FA gas turbines, with two heat recovery steam generators (HRSGs) providing steam to a General Electric D11 steam turbine. The target capture amount is 4,000 tonnes CO 2 /day for use in either enhanced oil recovery or dedicated geological saline storage located on CRC property at or nearby EHPP. This CO 2 is captured from a combination of the CO 2 emitted from the flue gas from EHPP and the flue gas generated from a natural gas-fired auxiliary boiler that supplies steam to the EFG+ process.

03 NATURAL GAS↗