Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “software cost estimation practices”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

45 records · Page 3

Prioritization Risk Integration Simulation Model (PRISM) For Environmental Remediation and Waste Management - 12097

The PRISM (Prioritization Risk Integration Simulation Model), a computer model was developed to support the Department of Energy's Office of Environmental Management (DOE-EM) in its mission to clean up the environmental legacy from the Nation's nuclear weapons materials production complex. PRISM provides a comprehensive, fully integrated planning tool that can tie together DOE-EM's projects. It is designed to help DOE managers develop sound, risk-informed business practices and defend program decisions. It provides a better ability to understand and manage programmatic risks. The underlying concept for PRISM is that DOE-EM 'owns' a portfolio of environmental legacy obligations (ELOs), and that its mission is to transform the ELOs from their current conditions to acceptable conditions, in the most effective way possible. There are many types of ELOs - - contaminated soils and groundwater plumes, disused facilities awaiting D and D, and various types of wastes waiting for processing or disposal. For a given suite of planned activities, PRISM simulates the outcomes as they play out over time, allowing for all key identified uncertainties and risk factors. Each contaminated building, land area and waste stream is tracked from cradle to grave, and all of the linkages affecting different waste streams are captured. The progression of the activities is fully dynamic, reflecting DOE-EM's prioritization approaches, precedence requirements, available funding, and the consequences of risks and uncertainties. The top level of PRISM is the end-user interface that allows rapid evaluation of alternative scenarios and viewing the results in a variety of useful ways. PRISM is a fully probabilistic model, allowing the user to specify uncertainties in input data (such as the magnitude of an existing groundwater plume, or the total cost to complete a planned activity) as well as specific risk events that might occur. PRISM is based on the GoldSim software that is widely used for risk and performance assessment calculations. PRISM can be run in a deterministic mode, which quickly provides an estimate of the most likely results of a given plan. Alternatively, the model can be run probabilistically in a Monte Carlo mode, exploring the risks and uncertainties in the system and producing probability distributions for the different performance measures. The PRISM model demonstrates how EM can evaluate a portfolio of ELOs, and transform the ELOs from their current conditions to acceptable conditions, utilizing different strategic approaches. There are many types of ELOs - contaminated soils and groundwater plumes, disused facilities awaiting D and D, and various types of wastes waiting for processing or disposal. This scope of work for the PRISM process and the development of a dynamic simulation model are a logical extension of the GoldSim simulation software used by the OCRWM to assess the long-term performance for the Yucca Mountain Project and by NNSA to assess project risk at its sites. Systems integration modeling will promote better understanding of all project risks, technical and nontechnical, and more defensible decision-making for complex projects with significant uncertainties. It can provide effective visual communication and rapid adaptation during interactions with stakeholders (Administration, Congress, State, Local, and NGO). It will also allow rapid assessment of alternative management approaches. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Audit Report on "The Department of Energy's Opportunity for Energy Savings Through the Use of Setbacks in its Facilities"

Our testing at Office of Science and National Nuclear Security Administration facilities revealed that the Department either did not use or failed to properly maintain setback systems and equipment in a number of instances. At just the four sites we visited, the Department had not ensured that setback conservation methods were used for 35 of the 55 (approximately 64 percent) owned or leased buildings included in our review. The buildings that did not use setbacks capabilities to control energy consumption comprised over one million square feet of space. Specifically: Although in place or capable of being deployed, officials did not utilize setbacks in 20 separate buildings; and, Equipment in 15 other buildings had either never been enabled or had deteriorated and was no longer functional, thus making setbacks impossible. Typical of the problems we noted, the Y-12 National Security Complex recently leased two buildings that were constructed with setback capability. The property manager for these buildings told us that the setback equipment was not used because the owner of the properties had not purchased the software necessary to enable the capability. In another case, we learned that Los Alamos National Laboratory was not using the setback capability in two buildings because facility operators and tenants had not been trained on operating the setback control system. Finally, the Oak Ridge National Laboratory lost the ability to operate the setback equipment in two buildings when the electronic control system failed in 2008. Laboratory officials told us that they elected not to replace it because they planned to implement campus-wide energy conservation measures in the future. In spite of its energy conservation leadership role, we found that the Department and its facility contractors did not place adequate emphasis on reducing energy consumption through the application of setbacks. Of particular significance, we found that the Department had not always required the operation of setback capabilities in building lease agreements. This was especially troubling given the expanded use of leased space to house Departmental operations. Despite discussions with several Federal and contractor officials, we could not obtain what we considered to be a satisfactory explanation as to why the Department failed to take advantage of this conservation practice, one that is generally low cost and has limited, if any, adverse impact on operations or building occupants. Consistent with the lack of emphasis in this area, we noted that the Department had not required the four contractors included in our review to develop training requirements or energy policies and procedures governing the use of setback capabilities. Energy consumption reduction goals related to setbacks had also not been established to help incentivize contractor performance in this important area. With nearly $300 million in annual utility costs, the Department could realize significant savings by using setbacks in its buildings. We estimate that the Department could save over $11.5 million in annual utility costs. We developed the estimate based on the observation that approximately 64 percent of the facilities included in our review had not used setbacks. We then conservatively applied a 15 percent energy consumption savings estimate observed by Sandia National Laboratory and savings estimates contained in a study conducted by Pacific Northwest National Laboratory to the 40 percent of utility costs generally recognized as resulting from HVAC operation. Such savings could be used to fund high priority programs and install additional energy saving features. The consumption savings would be, at today's average residential electricity cost, sufficient to power over 9,800 homes each year. We recognize that while setbacks can be used in many situations, they are not appropriate for facilities that are continuously operated or those that house delicate equipment that depend on constant temperatures. However, during the course of our audit officials at four of the sites included in our review told us that they recognized the utility of using setbacks for most facilities. At two sites, implementation efforts began almost immediately after we briefed officials on our findings. We also noted that Department Headquarters facilities used setbacks in offices and many common areas. With over 9,000 buildings in its inventory, the consistent use of setbacks can help the Department significantly reduce its energy consumption and, as noted above, achieve substantial cost savings. Actions related to setbacks that officials began after we initiated our audit are noteworthy and should, if fully implemented, help further reduce energy consumption. However, additional action at sites across the complex is necessary to maximize energy efficient operations and to establish the Department as the leader in this effort in all of the Federal sector.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Implementation of ANL’s Mechanics Based Evolutionary Fatigue Modeling Through ABAQUS-WARP3D Based High-Performance Computing Framework

This report presents an update on the environmental fatigue research that is being conducted at Argonne National Laboratory in support of the Department of Energy’s Light Water Reactor Sustainability (LWRS) program. Argonne is developing a fully mechanistic fatigue evaluation approach without using empirical fatigue (S~N) curves. This approach is based on the fundamental concept of the time evolution of progressive fatigue damage rather than on the conventional S~N curve approaches using end-of-life data. In FY 2017, we performed extensive validation of this approach with respect to fatigue test data for 316 stainless steel [1]. This validation was performed for different loading cases, including constant, variable, and random amplitude. In the present FY 2018 semi-annual report, we present the further advances of Argonne’s environmental fatigue research work in the context for more practical applications. In this report, we discuss a methodology for fully mechanistic (i.e., not using S~N curves) fatigue life evaluation of reactor components subjected to realistic loading cycles, namely, design-basis loading cycles. The loading cycles include plant heat-up, full-power, and cool-down operations. As a test case, we considered a typical pressurized water reactor surge line, which is made of 316 SS. To perform the fatigue simulation for thousands of fatigue cycles in a computationally cost effective way, we modified our previous desktop-based finite element (FE) modeling approach to work in a high-performance computing (HPC) framework. For the HPC implementation, we developed a hybrid framework based on commercial FE software (ABAQUS), open-source FE software (WARP3D), and Argonne-developed evolutionary cyclic-plasticity modeling methods. We validated this HPC-based cycle-by-cycle damage model for the entire fatigue life of a Pressurized Water Reactor (PWR) surge line (SL) pipe with respect to assumed loading cycles. The simulated fatigue life was found to be 5855 cycles, which is 85% accurate as compared to the corresponding small-specimen-based experimental fatigue life (6914 cycles). Also, the simulated stress history captures the cyclic hardening and softening behavior of the material for entire fatigue cycles. The FE simulation of the PWR SL pipe was conducted in a reasonable time of 12.5 days. These results show the promise that a fully mechanistic (not using S~N curves) fatigue life evaluation of a safety-critical nuclear reactor component (or even other safety critical components like those in aircraft, aero-engines, etc.) is possible. We anticipate that this type of methodology will drastically reduce the uncertainly associated with conventional fatigue life estimates based on empirical S~N curves. We also proposed an FE model that is based on a hybrid full-component and single-element approach and that can readily be used by industry if HPC resources are not available. In this approach, a single-cycle FE simulation has to be performed first for the required loading cycle. Then, the resulting strain/stress profile at the hotspot (highest strain/stress location) is used as input strain/stress loading to the single-element FE model. The single-element FE model is run under multiple fatigue cycles as long as the failure criteria are achieved. The cycle number at failure gives the fatigue life of the component in question. This cost-effective framework does not require expensive HPC hardware and can be performed in a reasonable time by using a desktop computer. We demonstrated this approach with respect to PWR SL fatigue evaluation under two realistic design-basis loading cycles (simple and detailed). The associated results were validated with respect to test data obtained through fatigue testing of uniaxial specimens under the in-air condition at 300 °C. The approach is in the development stage and requires further improvement and validation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Mars Sample Return Landed with Red Dragon

A Mars Sample Return (MSR) mission is the highest priority science mission for the next decade as recommended by the recent Decadal Survey of Planetary Science. However, an affordable program to carry this out has not been defined. This paper describes a study that examined use of emerging commercial capabilities to land the sample return elements, with the goal of reducing mission cost. A team at NASA Ames examined the feasibility of the following scenario for MSR: A Falcon Heavy launcher injects a SpaceX Dragon crew capsule and trunk onto a Trans Mars Injection trajectory. The capsule is modified to carry all the hardware needed to return samples collected on Mars including a Mars Ascent Vehicle (MAV), an Earth Return Vehicle (ERV) and Sample Collection and Storage hardware. The Dragon descends to land on the surface of Mars using SuperSonic Retro Propulsion (SSRP) as described by Braun and Manning [IEEEAC paper 0076, 2005]. Samples are acquired and deliverd to the MAV by a prelanded asset, possibly the proposed 2020 rover. After samples are obtained and stored in the ERV, the MAV launches the sample-containing ERV from the surface of Mars. We examined cases where the ERV is delivered to either low Mars orbit (LMO), C3 = 0 (Mars escape), or an intermediate energy state. The ERV then provides the rest of the energy (delta V) required to perform trans-Earth injection (TEI), cruise, and insertion into a Moon-trailing Earth Orbit (MTEO). A later mission, possibly a crewed Dragon launched by a Falcon Heavy (not part of the current study) retrieves the sample container, packages the sample, and performs a controlled Earth re-entry to prevent Mars materials from accidentally contaminating Earth. The key analysis methods used in the study employed a set of parametric mass estimating relationships (MERs) and standard aerospace analysis software codes modified for the MAV class of launch vehicle to determine the range of performance parameters that produced converged spacecraft designs capable of meeting mission requirements. Subsystems modeled in this study included structures, power system, propulsion system, nose fairing, thermal insulation, actuation devices, and GN&C. Best practice application of loads and design margins for all resources were used. Both storable and cryogenic propellant systems were examined. The landed mass and lander capsule size provide boundary conditions for the MAV design and packaging. We estimated the maximum mass the Dragon capsule is capable of landing. This and the volume capability to store the MAV was deduced from publically available data from SpaceX as well as our own engineering and aerodynamic estimates. Minimum gross-liftoff mass (GLOM) for the MAV were obtained for configurations that used pump-fed storable bi-propellant rocket engines for both the MAV and the ERV stage. The GLOM required fits within our internal estimate of the mass that Dragon can land at low elevation/optimal seasons on Mars. Based on the analysis, we show that a single Mars launch sample return mission is feasible using current commercial capabilities to deliver the return spacecraft assets.

Mars Ascent Vehicle (MAV)↗

Recovery Act: A Measurement -- Management Technology for Improving Energy Efficiency in Data Centers and Telecommunication Facilities (Final Technical Report)

Data center (DC) electricity use is increasing at an annual rate of over 20% and presents a concern for the Information Technology (IT) industry, governments, and the society. A large fraction of the energy use is consumed by the compressor cooling to maintain the recommended operating conditions for IT equipment. The most common way to improve the DC efficiency is achieved by optimally provisioning the cooling power to match the global heat dissipation in the DC. However, at a more granular level, the large range of heat densities of today's IT equipment makes the task of provisioning cooling power optimized to the level of individual computer room air conditioning (CRAC) units much more challenging. Distributed sensing within a DC enables the development of new strategies to improve energy efficiency, such as hot spot elimination through targeted cooling, matching power consumption at rack level with workload schedule, and minimizing power losses. The scope of Measurement and Management Technologies (MMT) is to develop a software tool and the underlying sensing technology to provide critical decision support and control for DC and telecommunication facilities (TF) operations. A key aspect of MMT technology is integration of modeling tools to understand how changes in one operational parameter affect the overall DC response. It is demonstrated that reduced ordered models for DC can generate, in less than 2 seconds computational time, a three dimensional thermal model in a 50 kft 2 DC. This rapid modeling enables real time visualization of the DC conditions and enables "0what if" scenarios simulations to characterize response to "disturbances". One such example is thermal zone modeling that matches the cooling power to the heat generated at a local level by identifying DC zones cooled by a specific CRAC. Turning off a CRAC unit can be simulated to understand how the other CRAC utilization changes and how server temperature responds. Several new sensing technologies were added to the existing MMT platform: (1) air contamination (corrosion) sensors, (2) power monitoring, and (3) a wireless environmental sensing network. All three technologies are built on cost effective sensing solutions that increase the density of sensing points and enable high resolution mapping of DCs. The wireless sensing solution enables Air Conditioning Unit (ACU) control while the corrosion sensor enables air side economization and can quantify the risk of IT equipment failure due to air contamination. Validation data for six test sites demonstrate that leveraging MMT energy efficiency solutions combined with industry best practices results in an average of 20% reduction in cooling energy, without major infrastructure upgrades. As an illustration of the unique MMT capabilities, a data center infrastructure efficiency (DCIE) of 87% (industry best operation) was achieved. The technology is commercialized through IBM System and Technology Lab Services that offers MMT as a solution to improve DC energy efficiency. Estimation indicates that deploying MMT in existing DCs can results in an 8 billion kWh savings and projection indicates that constant adoption of MMT can results in obtainable savings of 44 billion kWh in 2035. Negotiations are under way with business partners to commercialize/license the ACU control technology and the new sensor solutions (corrosion and power sensing) to enable third party vendors and developers to leverage the energy efficiency solutions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

FUSRAP Case Study - Benefits and Lessons Learned from Implementation of a Modern Data Solution at Maywood - 18399

This paper focuses on data production and management practices dating back to 1999 that continue to evolve to support the project today. In 2000, the FUSRAP Maywood Project began using a software environmental data management system and laboratory information management system, developed by a single database administrator (DA) and authored in Microsoft Access{sup TM} (MS Access). The original databases included basic functionality including sample number assignment and label generation, tracking of LIMS gamma spec QC and assignment of basic qualifiers and basic database queries. The DA continued over the next fifteen years to refine the EDMS/LIMS by integrating project-specific data evaluation guidance document processes and Quality Assurance/Quality Control (QA/QC) charting and excursion warning tools. With the retirement of the original DA, the U.S. Army Corps of Engineers (USACE)-Cabrera Team procured and implemented a commercial-leaning solution using modern database tools and an established EDMS vendor. For the database transition process, the project team established and configured the new EDMS/LIMS with basic architecture and accessibility; evaluated existing workflows; established/revised LIMS and EDMS-related documentation (manuals and procedures); and conducted dry runs and validation testing. The overall team coordinated closely to facilitate a seamless transition from initial assessment and authoring, to data migration, and finally to resumption of normal ongoing operations. Key features of the new EDMS Subcontractor's software included lookup tables, an import wizard, data checking options and unique indexes. Since the database systems became operational, the technical staff gathered useful feedback from end users (e.g., lab staff, field engineers, task managers, and the third-party data validator) to refine the EDMS/LIMS operation. This feedback triggered improvements in the performance of onsite laboratory qualification forms, promoted consistency in sample ID numbers between the database sample planning screens and field chain-of-custodies, corrected bugs in the LIMS Duplicate Evaluation Report, eliminated data import issues such as blank, inconsistent or missing data from key fields. One of the advantages of the commercial database solution was that it allowed the project to cut cost over time due to the lower cost of database maintenance provided by the commercial database vendor versus the cost of an on-staff DA. Cost savings are estimated at $40,000 per year. There were also indirect cost savings resulting from implementation of the new database since it allowed better integration of the LIMS and EDMS. While there will always be challenges associated with long term records/data management for any old remediation site, the Maywood Team's approach to an upgraded EDMS/LIMS implementation serves as one element of the overall effort to enhance the integrity and reproducibility of critical data that supports the remediation program while at the same time, more effectively using available resources. These lessons-learned will enhance implementation of cost-effective solutions for similar environmental remediation sites. (authors)

97 MATHEMATICS AND COMPUTING↗

A Portable Quantitative High-Resolution Gamma System for In-Situ Waste, D and D, and Emergency Measurements - 18573

The Canberra ISOCS system has been a highly successful and technologically innovative product since its introduction about 22 years ago. The combination of field-portable HPGe detectors, flexible shield/collimator set, and accurate mathematical efficiency calibration software made in-situ gamma spectroscopy measurements very practical. Good quality in-situ measurements are economically beneficial for items that are either large or complex, in comparison to the cost, time and impracticality of extracting a sample for laboratory measurements or producing representative calibration standards. And where the item is not homogeneous [most of the time for in-situ measurement situations] an assay of a large part of the item has been shown to be more accurate than a few widely dispersed extracted samples [the normal case]. However the size, weight, cost and complexity of the full-size ISOCS system limit its usefulness in some situations. A companion device was recently introduced, and is the subject of this document. The gamma sensor is a 1 cm{sup 3} CZT detector. It is surrounded by an optional tungsten shield/collimator set with a tripod for support. The detector is powered solely by a USB connection from a laptop PC. The full power of the ISOCS efficiency calibration software can be used with this detector. This entire package is less than 15 kg, needs no cooling, and is quite rugged, in comparison to the 120 kg for ISOCS with sensitive HPGe detectors which need Liquid Nitrogen or electro-mechanical cooling. Furthermore this CZT package is about 1/3 the cost. This is a very complementary device for the many current ISOCS users, especially for quick initial evaluations or simple situations where the full energy resolution and sensitivity of the HPGe ISOCS are not needed. Operating nuclear power plants or those in the initial phases of decommissioning are prime examples. Their complex layout often precludes the deployment of the full-sized ISOCS system, whereas the CZT system can be hand-carried there and very quickly setup for a measurement. The small detector size, and therefore low efficiency, is not a disadvantage, and in many cases is an advantage due to the elevated radioactivity of the items. This can be used to assay items in tanks, spills on floors, activity on filters, waste or items in small containers, and waste in drums. In the event of an emergency, it can be quickly deployed to measure gas or liquid effluent streams, air particulate and iodine filters in the field, or even in-vivo thyroid activity. Examples of measurements at nuclear facilities are shown and discussed in further detail, along with estimated detection limits. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Serpentine: Finite Difference Methods for Wave Propagation in Second Order Formulation

Wave propagation phenomena are important in many DOE applications such as nuclear explosion monitoring, geophysical exploration, estimating ground motion hazards and damage due to earthquakes, non-destructive testing, underground facilities detection, and acoustic noise propagation. There are also future applications that would benefit from simulating wave propagation, such as geothermal energy applications and monitoring sites for carbon storage via seismic reflection techniques. In acoustics and seismology, it is of great interest to increase the frequency bandwidth in simulations. In seismic exploration, greater frequency resolution enables shorter wave lengths to be included in the simulations, allowing for better resolution in the seismic imaging. In nuclear explosion monitoring, higher frequency seismic waves are essential for accurate discrimination between explosions and earthquakes. When simulating earthquake induced motion of large structures, such as nuclear power plants or dams, increased frequency resolution is essential for realistic damage predictions. Another example is simulations of micro-seismic activity near geothermal energy plants. Here, hydro-fracturing induces many small earthquakes and the time scale of each event is proportional to the square root of the moment magnitude. As a result, the motion is dominated by higher frequencies for smaller seismic events. The above wave propagation problems are all governed by systems of hyperbolic partial differential equations in second order differential form, i.e., they contain second order partial derivatives of the dependent variables. Our general research theme in this project has been to develop numerical methods that directly discretize the wave equations in second order differential form. The obvious advantage of working with hyperbolic systems in second order differential form, as opposed to rewriting them as first order hyperbolic systems, is that the number of differential equations in the second order system is significantly smaller. Another issue with re-writing a second order system into first order form is that compatibility conditions often must be imposed on the first order form. These (Saint-Venant) conditions ensure that the solution of the first order system also satisfies the original second order system. However, such conditions can be difficult to enforce on the discretized equations, without introducing additional modeling errors. This project has previously developed robust and memory efficient algorithms for wave propagation including effects of curved boundaries, heterogeneous isotropic, and viscoelastic materials. Partially supported by internal funding from Lawrence Livermore National Laboratory, many of these methods have been implemented in the open source software WPP, which is geared towards 3-D seismic wave propagation applications. This code has shown excellent scaling on up to 32,768 processors and has enabled seismic wave calculations with up to 26 Billion grid points. The WPP calculations have resulted in several publications in the field of computational seismology, e.g.. All of our current methods are second order accurate in both space and time. The benefits of higher order accurate schemes for wave propagation have been known for a long time, but have mostly been developed for first order hyperbolic systems. For second order hyperbolic systems, it has not been known how to make finite difference schemes stable with free surface boundary conditions, heterogeneous material properties, and curvilinear coordinates. The importance of higher order accurate methods is not necessarily to make the numerical solution more accurate, but to reduce the computational cost for obtaining a solution within an acceptable error tolerance. This is because the accuracy in the solution can always be improved by reducing the grid size h. However, in practice, the available computational resources might not be large enough to solve the problem with a low order method.

15 GEOTHERMAL ENERGY↗