DOE OSTI2020
A modeling system to simulate fate and transport of contaminant plumes in groundwater beneath the Central Plateau to support the Cumulative Impact Evaluation (CIE) and Composite Analysis (CA) is being developed. The CIE will evaluate the cumulative effect of multiple Central Plateau radiological and chemical sources on groundwater quality (DOE/RL-2018-69, Cumulative Impact Evaluation Technical Approach Document ). This will enable cleanup decisions to be evaluated in the context of all Central Plateau waste sites and existing groundwater conditions. The CA evaluates the cumulative effect of all sources of radioactive materials on radiological dose to future members of the public (DOE/RL-2018-60, Annual Status Report (FY 2018): Composite Analysis of Low Level Waste Disposal in the Central Plateau of the Hanford Site ). Fate and transport modeling will be used to forecast future groundwater concentrations for both the CIE and CA. The CIE/CA subsurface modeling system is divided into source (inventory), vadose zone, and saturated zone facets. Source inventory is a necessary input to the vadose zone facet, and releases from the vadose zone to groundwater are inputs to the saturated zone facet. The vadose zone facet simulates historical and future releases from the vadose zone to groundwater for both liquid waste and solid waste disposal sites. Effluent release volumes and radionuclide inventory estimates for liquid waste sites are contained in ECFHANFORD- 17-0079, Hanford Soil Inventory Model (SIM-v2) Calculated Radionuclide Inventory of Direct Liquid Discharges to Soil in the Hanford Site’s 200 Areas , herein referred to as SIM-v2. The liquid waste sites in SIM-v2 include the 216-B-3 Pond near 200 East Area and the 216-U-10 Pond in 200 West Area. The 216-B-3 Pond system consisted of a main pond and 3 expansion lobes that were operational during overlapping time periods. It also included influent ditches, but these are not listed as liquid waste sources in SIM-v2 and are not included in the CIE/CA modeling. The total effluent volume released to the pond system was measured, but the partitioning of this volume to the various expansion lobes was not determined and is not accounted for in SIM-v2. Regarding the 216-U-10 Pond, it received water from several influent ditches. The pond and the influent ditches are listed as liquid waste sites in SIM-v2 and are included as sources in the CIE/CA modeling. Because water in the ditches flowed into the pond, only a portion of the effluent volumes and contaminant inventories assigned to the ditches in SIM-v2 infiltrated from the ditches. Thus, partitioning of infiltration and contaminant inventories between the ditches and the pond is not fully accounted for in SIM-v2. Further, some of the water in the 216-U-10 Pond entered overflow ditches and the amount of this overflow was not recorded and is not accounted for in SIM-v2. Thus, the purpose of this Environmental Calculation File (ECF) is to partition the infiltration of wastewater and contaminant inventory between the main pond and each expansion lobe of the 216-B-3 Pond system, and to partition the infiltration of wastewater and contaminant inventory between the ditches and pond of the 216-U-10 Pond system.
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗