Satellite services system analysis study. Volume 2A: Satellite and services user model, appendix
A satellite user model and update are presented. Satellite service needs are assessed. Manned, remote, and automatic involvement are also assessed.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
A satellite user model and update are presented. Satellite service needs are assessed. Manned, remote, and automatic involvement are also assessed.
Payload deployment equipment is discussed, including payload separation, retention structures, the remote manipulator system, tilt tables, the payload installation and deployment aid, the handling and positioning aid, and spin tables. Close proximity retrieval, and on-orbit servicing equipment is discussed. Backup and contingency equipment is also discussed. Delivery and retrieval of high-energy payloads are considered. Earth return equipment, the aft flight deck, optional, and advanced equipment are also discussed.
The ICAO Aeronautical Mobile Communications Panel (AMCP) completed the drafting of the Aeronautical Mobile Satellite Service (AMSS) Standards and Recommended Practices (SARP's) and the associated Guidance Material and submitted these documents to ICAO Air Navigation Commission (ANC) for ratification in May 1994. This effort, encompassed an extensive, multi-national SARP's validation. As part of this activity, the US Federal Aviation Administration (FAA) sponsored an effort to validate the SARP's via computer simulation. This paper provides a description of this effort. Specifically, it describes: (1) the approach selected for the creation of a high-fidelity AMSS computer model; (2) the test traffic generation scenarios; and (3) the resultant AMSS performance assessment. More recently, the AMSS computer model was also used to provide AMSS performance statistics in support of the RTCA standardization activities. This paper describes this effort as well.
This summer 22 kindergarten through 8th grade teachers attended a 3-week Teacher Enhancement Institute (TEI) at NASA Langley Research Center. TEI is funded by NASA Education Division and is a collaborative effort between NASA Langley's Office of Education and Christopher Newport University. Selected teacher teams were drawn from Langley's 5-state precollege service region, which includes Kentucky, North Carolina, South Carolina, Virginia, and West Virginia. The goal of TEI was for teachers to learn aeronautics and the broad application of science and technology through a problem-based learning (PBL) strategy. PBL is an instructional method using a real world problem, also known as an ill-structured problem, as the context for an in-depth investigation. Most real life problems are ill-structured, as are all the really important social, political and scientific problems. The teachers were immediately immersed in an ill-structured problem to design a communication strategy for the White House Commission on Aviation Safety and Security to educate and disseminate aviation information to the general public. Specifically, the communication strategy was to focus on aeronautics principles, technology and design associated with US general aviation revitalization and aviation safety programs. The presented problem addressed NASA's strategic outcome to widely communicate the content, relevancy and excitement of its missions and discoveries to the general population. Further, the PBL scenario addressed the technological challenges being taken up by NASA to revolutionize air travel and the way in which aircraft are designed, built, and operated. It also addressed getting people and freight safely and efficiently to any location in the world at a reasonable cost. With a "real" need-to-know problem facing them, the teachers set out to gather information and to better understand the problem using inquiry-based and scientific methods. The learning in this aeronautics scenario was driven by the direction taken by participants. With the support of the TEI faculty, the teachers quickly identified NASA Langley researchers that served as consultants to help solve the problem. To achieve their goal, the teacher teams developed lesson plans for elementary and middle school students, wrote a newspaper, published a brochure to educate the general public, constructed games for children of all ages, and produced a video. As a second problem, the TEI participants will design their own aeronautic lesson plan and immerse their 1997-98 school year students in the problem. The problem is for the students "to create a traveling hands-on, minds-on aeronautics museum exhibit created for children by children." As a culminating activity, the Virginia Air and Space Center in Hampton, VA, will set up a special display of the exhibits in the Summer 1998. The TEI faculty will visit each TEI teacher's classroom during the academic school year to observe the implementation of the unit. In addition to the classroom observations, electronic follow-up sessions will be conducted during the school year to support the teachers' efforts in developing their PBL units to integrate technology in math and science instruction. These sessions eill be conducted using the Internet. Teachers will be connected through a chat-line to share ideas, ask questions, and generate solutions.
NASA collaborated with industry partners to develop and test the small Unmanned Aircraft System (sUAS) Traffic Management (UTM) research platform, a software prototype used for developing airspace integration requirements for sUAS operations. The lessons learned from these activities will help inform the Federal Aviation Administration (FAA) on what is needed to safely manage sUAS operations. A core component of the UTM platform is the UAS Service Supplier (USS), which acts as a communications bridge to meet the regulatory and operational requirements. As the UTM partners began USS flight tests, NASA found that it was difficult to get all USSs functioning at comparable quality levels to ensure successful flight tests. Also, NASA anticipated that the FAA would encounter similar challenges when they begin to register USSs for operational use. These realizations led to the development of USS Checkout, a set of processes and tools designed to increase flight test efficiency. We learned that a good USS Checkout process is balanced for simplicity versus test coverage, and is amenable to automation. We also learned that when USS Checkout is a USS prerequisite for flight tests, flight tests were more efficient and effective.
Explore the source record for details and available documents.
The following topics were discussed: (1) data availability and distribution, (2) complete processing systems, (3) subsystems, (4) applications, (5) research for future technology, and (6) education, training opportunities, and materials. Evidence was given that remote sensing technology is being increasingly utilized. Therefore, it was concluded that a second stage of remote sensing technology should be developed.
This report presents detailed descriptions, statistics, and graphs on European and American air transport. The European countries listed are Belgium, Czecho-Slovakia, Denmark, France, Germany, Great Britain, Holland, and Italy.
The technologies associated with distance learning are evolving rapidly, giving to educators a potential tool for enhancing the educational experiences of large numbers of students simultaneously. This enhancement, in order to be effective, must take into account the various agendas of teachers, administrators, state systems, and of course students. It must also make use of the latest research on effective pedagogy. This combination, effective pedagogy and robust information technology, is a powerful vehicle for communicating, to a large audience of school children the excitement of mathematics and science--an excitement that for the most part is now well-hidden. This project,"Technology Development, Implementation and Assessment," proposed to bring to bear on the education of learners in grades 3 - 8 in science and mathematics both advances in information technology and in effective pedagogy. Specifically, the project developed components NASA CONNECT video series--problem-based learning modules that focus on the scientific method and that incorporate problem-based learning scenarios tied to national mathematics and science standards. These videos serve two purposes; they engage students in the excitement of hands-on learning and they model for the teachers of these students the problem-based learning practices that are proving to be excellent ways to teach science and mathematics to school students. Another component of NASA CONNECT is the accompanying web-site.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
No abstract provided
In an effort to adapt existing space flight operations services to new emerging Grid technologies we are developing a Grid-based prototype space flight operations Grid. This prototype is based on the operational services being provided to the International Space Station's Payload operations located at the Marshall Space Flight Center, Alabama. The prototype services will be Grid or Web enabled and provided to four user communities through portal technology. Users will have the opportunity to assess the value and feasibility of Grid technologies to their specific areas or disciplines. In this presentation descriptions of the prototype development, User-based services, Grid-based services and status of the project will be presented. Expected benefits, findings and observations (if any) to date will also be discussed. The focus of the presentation will be on the project in general, status to date and future plans. The End-use services to be included in the prototype are voice, video, telemetry, commanding, collaboration tools and visualization among others. Security is addressed throughout the project and is being designed into the Grid technologies and standards development. The project is divided into three phases. Phase One establishes the baseline User-based services required for space flight operations listed above. Phase Two involves applying Gridlweb technologies to the User-based services and development of portals for access by users. Phase Three will allow NASA and end users to evaluate the services and determine the future of the technology as applied to space flight operational services. Although, Phase One, which includes the development of the quasi-operational User-based services of the prototype, development will be completed by March 2004, the application of Grid technologies to these services will have just begun. We will provide status of the Grid technologies to the individual User-based services. This effort will result in an extensible environment that incorporates existing and new spaceflight services into a standards-based framework providing current and future NASA programs with cost savings and new and evolvable methods to conduct science. This project will demonstrate how the use of new programming paradigms such as web and grid services can provide three significant benefits to the cost-effective delivery of spaceflight services. They will enable applications to operate more efficiently by being able to utilize pooled resources. They will also permit the reuse of common services to rapidly construct new and more powerful applications. Finally they will permit easy and secure access to services via a combination of grid and portal technology by a distributed user community consisting of NASA operations centers, scientists, the educational community and even the general population as outreach. The approach will be to deploy existing mission support applications such as the Telescience Resource Kit (TReK) and new applications under development, such as the Grid Video Distribution System (GViDS), together with existing grid applications and services such as high-performance computing and visualization services provided by NASA s Information Power Grid (IPG) in the MSFC s Payload Operations Integration Center (POIC) HOSC Annex. Once the initial applications have been moved to the grid, a process will begin to apply the new programming paradigms to integrate them where possible. For example, with GViDS, instead of viewing the Distribution service as an application that must run on a single node, the new approach is to build it such that it can be dispatched across a pool of resources in response to dynamic loads. To make this a reality, reusable services will be critical, such as a brokering service to locate appropriate resource within the pool. This brokering service can then be used by other applications such as the TReK. To expand further, if the GViDS application is constructed using a services-based mel, then other applications such as the Video Auditorium can then use GViDS as a service to easily incorporate these video streams into a collaborative conference. Finally, as these applications are re-factored into this new services-based paradigm, the construction of portals to integrate them will be a simple process. As a result, portals can be tailored to meet the requirements of specific user communities.
The second DIP workshop’s topic is DIP for Service Providers. The workshop presentation covers topics such as DIP onboarding process, service authentication, catalog service capabilities, API requirements, NASA services and their access points, and data requirements for service providers. The Onboarding Process describes the required documentation that enables to collaborate with NASA as well as other industry partners through DIP. Also, step by step approach for the partner to take to register services or consme services through the DIP platform. The Catalog Service describes the different ways for the users to search for services that are of interest as well as registering services to the platform, so other users can search and discover. The API Requirements and Service Specifications describes the benefits of DIP's API management approach via API Gateway where services are managed centrally but ownership is decentralized and partners completely own the administration of their own services. NASA Services and Data Access Points topic describes the services, both data access service and machine learning prediction service, that NASA provides via the DIP platform in near time and post operations via REST API endpoints defined on the API Gateway. Also, NASA's approach for data storage process is explained. The Data Requirements for service providers describes the requirements for storing and exposing to support the performance of services that are provided by the service providers. Lastly, NASA's technology development plan with preliminary scheduler will be presented. There will be a Q&A session at the end of each segment of the presentation to solicit feedback from the participants.
Besides providing position, velocity, and timing (PVT) for terrestrial users, the Global Positioning System (GPS) is also being used to provide PVT information for earth orbiting satellites. In 2006, F. H. Bauer, et. al., defined the Space Service Volume in the paper GPS in the Space Service Volume , presented at ION s 19th international Technical Meeting of the Satellite Division, and looked at GPS coverage for orbiting satellites. With GLONASS already operational, and the first satellites of the Galileo and Beidou/COMPASS constellations already in orbit, it is time to look at the use of the new Global Navigation Satellite Systems (GNSS) coming into service to provide PVT information for earth orbiting satellites. This presentation extends GPS in the Space Service Volume by examining the coverage capability of combinations of the new constellations with GPS GPS was first explored as a system for refining the position, velocity, and timing of other spacecraft equipped with GPS receivers in the early eighties. Because of this, a new GPS utility developed beyond the original purpose of providing position, velocity, and timing services for land, maritime, and aerial applications. GPS signals are now received and processed by spacecraft both above and below the GPS constellation, including signals that spill over the limb of the earth. Support of GPS space applications is now part of the system plan for GPS, and support of the Space Service Volume by other GNSS providers has been proposed to the UN International Committee on GNSS (ICG). GPS has been demonstrated to provide decimeter level position accuracy in real-time for satellites in low Earth orbit (centimeter level in non-real-time applications). GPS has been proven useful for satellites in geosynchronous orbit, and also for satellites in highly elliptical orbits. Depending on how many satellites are in view, one can keep time locked to the GNSS standard, and through that to Universal Time as long as at least one satellite is in view (the longest duration with no satellites in view is important in determining the maximum clock drift from GNSS time). Instantaneous position requires four satellites in view, but because orbital motion is predictable, it is possible to build up knowledge of the orbital position gradually through time without a need for constant four satellite coverage. However, it is desirable to have four satellite coverage when performing satellite maneuvers, since there can be significant changes in velocity, leading to large changes in orbit parameter, causing substantial divergence in position over time. The Space Service Volume has been defined as the volume between three thousand km altitude and geosynchronous altitude, and can be divided into medium orbit services between three thousand km altitude and eight thousand km altitude, and high orbit services above eight thousand km. The Terrestrial Service Volume includes the Earth s surface, the atmosphere, and space below the altitude of three thousand km. The Terrestrial Service Volume is the volume within which the GNSS systems will have very similar performance to the Earth surface, and satellites need only use the signals specified to provide terrestrial performance. Above three thousand km the use of signals passing by the Earth s limb becomes important, so it is desirable to have additional information on signal strength, phase delay, and group delay covering wider beam angles than are needed for terrestrial service (and which can be obtained by monitoring GNSS signals from the Earth s surface). This presentation will look at each of the new GNSS constellations in combination with GPS (GLONASS with GPS, Galileo with GPS, Beidou/COMPASS with GPS), and also at the combination of all four GNSS systems. The presentation will largely follow the format of GPS in the Space Service Volume , presenting data on the availability of one, two, three, or four of the various combinations of GNSS constellation satelles at approximately two thousand grid points evenly spaced and fixed in longitude and latitude, the duration of the longest single-fold outages (intervals when no satellites are available), and the duration of the longest four-fold outages (intervals when fewer than four satellites are available) at several altitudes. Following the original paper, we will use the altitudes of three hundred km (typical LEO satellite, and within the Terrestrial Service Volume), at three thousand km (border between Terrestrial Service Volume and Space Service Volume), at eight thousand km (the border between medium and high orbit service within the Space Service Volume), at fifteen thousand km (just below the GNSS constellations), at twenty five thousand km (just above the GNSS constellations), at thirty six thousand, five hundred km (limit of Space Service Volume definition, geosynchronous altitude), and at seventy thousand km (to show the potential usefulness of GNSS beyond geosynchronous altitude).