Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “seams study”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

50 records · Page 3

Computer image processing: Geologic applications

Computer image processing of digital data was performed to support several geological studies. The specific goals were to: (1) relate the mineral content to the spectral reflectance of certain geologic materials, (2) determine the influence of environmental factors, such as atmosphere and vegetation, and (3) improve image processing techniques. For detection of spectral differences related to mineralogy, the technique of band ratioing was found to be the most useful. The influence of atmospheric scattering and methods to correct for the scattering were also studied. Two techniques were used to correct for atmospheric effects: (1) dark object subtraction, (2) normalization of use of ground spectral measurements. Of the two, the first technique proved to be the most successful for removing the effects of atmospheric scattering. A digital mosaic was produced from two side-lapping LANDSAT frames. The advantages were that the same enhancement algorithm can be applied to both frames, and there is no seam where the two images are joined.

Abrams, M. J.↗

Towards Erecting Straighter Lightweight Towers on the Moon Using Deployable Guy Wires

This paper reports our static stability test findings for a simple guy wire system to correct the natural lateral deflections of an 8.5m tall, compact deployable composite tower intended to support exploration of lunar permanently shadowed regions by nearby robotic assets. Deployable composite booms with microgravity flight heritage are currently being investigated at NASA Langley Research Center (LaRC) and Massachusetts Institute of Technology(MIT)’s Space Resources Workshop for their potential to be vertically deployed in the lunar gravity field, in support of NASA’s Artemis campaign. These applications include vertical solar arrays and the provision of elevated lines-of-sight to science or engineering payloads on landers and rovers, in support of nearby or distant crewed or robotic assets exploring scientifically interesting and hard to reach areas. Useful elevated payloads include radio repeaters, remote sensing and imaging, navigation and power beaming systems. However, while these lightweight booms have an excellent height to mass ratio, they typically exhibit slight axial curvature upon deployment resulting in appreciable lateral dead-load deflection of the tip mass relative to the tower base. This static deflection increases with tower height and tip mass, not only constraining the value delivered by the tower but also endangering its integrity. To develop a competitive, lightweight deployable composite boom tower, a capability to correct static deflections during and after deployment may be required. This paper presents a pathfinder deployable guy wire stability system for the MIT / LaRC self-erecting composite boom lunar tower that provides real time measurements, maintains tension passively, and can serve as a reconfigurable platform to test new guy wire components, configurations and control algorithms. Using a validated, calibrated photogrammetry system, the natural lateral deflection of the boom tip relative to the boom base at different deployed heights in Earth’s gravity field was recorded. With real-time tension measurements it was found that guy wires can significantly reduce the tip deflection of a deployable composite boom under dead load. Specifically, we found that (1) control capability is greatest where it is needed most, i.e. for the lever arm closest to being opposite the direction of deflection, and (2) for a tower height of at least 8.5 m and arm length of at least 60 cm, a solution of differential tension in all three arms exists and, in principle, provides sufficient control capability to correct or significantly reduce boom deflections. We also found that natural deflections occur almost entirely out-of-plane of the seams of the boom cross-section, which was expected, and that the natural boom tip lateral deflection under dead load upon deployment was ~5% of boom deployed length, unexpectedly exceeding the manufacturing acceptance specification of 1%.Ongoing and future collaborative work between LaRC and MIT includes the further investigation of the unexpected lateral deflection, testing of alternative guy wire system designs at higher tensions and higher deployed heights, as well as trade studies of costs and benefits of an optimized integrated guywire system compared to other types of static stability solutions.

lunar towers↗

Experimental and analytic studies of the triggered lightning environment of the F106B

The triggered lightning environment of the F106B aircraft is investigated. Scale modeling of the F106B with a metallized model was done to measure electric field enhancement factors on the aircraft and on canonically shaped conducting objects. These are then compared to numerically determined quantities. Detailed numerical modeling is done of the development of the triggered lightning channel. This is done using nonlinear air chemistry models to model a variety of physical phenomena which occur in a triggered lightning event. The effect of a triggered lightning strike on internal wires in the F106B is investigated using finite difference models and transmission line models to calculate the electromagnetic coupling of lightning currents through seams and joints of the aircraft to internal cables. Time domain waveforms are computed and compared to measured waveforms. The effect of thunderstorm particles on the initial triggering of a lightning strike is investigated. The electric field levels needed to cause air breakdown in the presence and absence of thunderstorm particles are calculated. This is done as a function of the size, shape, and density of the particles.

Rudolph, Terence↗

Durability Characterization of Mechanical Interfaces in Solar Sail Membrane Structures

The construction of a solar sail from commercially available metallized film presents several challenges. The solar sail membrane is made by seaming together strips of metallized polymer film. This requires seaming together a preselected width and thickness of a base material into the required geometry, and folding the assembled sail membranes into a small stowage volume prior to launch. The sail membranes must have additional features for connecting to rigid structural elements (e.g., sail booms) and must be electrically grounded to the spacecraft bus to prevent charge build up. Space durability of the material and mechanical interfaces of the sail membrane assemblies will be critical for the success of any solar sail mission. In this study, interfaces of polymer/metal joints in a representative solar sail membrane assembly were tested to ensure that the adhesive interfaces and the fastening grommets could withstand the temperature range and expected loads required for mission success. Various adhesion methods, such as surface treatment, commercial adhesives, and fastening systems, were experimentally evaluated and will be discussed.

Interface↗

Sample Return Containerization and Planetary Protection Using Brazing for Breaking the Chain of Contact to Mars

Planetary protection of Mars samples returned to Earth in a future NASA mission is a critical part of preventing uncontrolled biological materials being released from the samples. The planetary protection process requires addressing the potential risks and would involve “breaking the chain of contact (BTC)”, where any returned material reaching Earth for further analysis would have to be sealed inside a container with extremely high confidence. The sterilization process would require destroying any potential biological materials that may contaminate the external surface of the container. A novel process for containing the returned samples has been conceived and developed at JPL. The process consists of using induction heated brazing to synchronously sterilize, separate, seam and seal the container. In this case. the braze material is heated to the level of melting at temperatures higher than 500°C to assure sterilizing exposed areas since carbon bonds are broken above this temperature. The container that encloses the samples consists of double walls with interstitial space that is Earth-clean. The process consists of two-steps, where one was intended to be prepared on Earth and the second potentially executed on orbit around Mars. The latest results of this study that established the needed capability are described and discussed in this manuscript.

Shirajian, Nareg↗

Status of the 3-MDCP, the 3-D Woven TPS enabling MSR Earth Entry System Development

While the HEEET project established the dual-layer, 3-D Woven TPS at TRL 6 for extreme entry environment missions such as Saturn and Ice-Giant Probe missions, subsequent to the completion of HEEET project in 2018, further development was undertaken to assess the viability of a variant of the 3-D Woven, a single, insulating layer alone as a viable TPS for Mars Sample Return mission. MSR Earth Entry System (EES) baselined it and named the TPS as 3D, mid-density, carbon-phenolic (3MDCP). MSR program invested in building a new loom and the weaver T.E.A.M. Inc is currently weaving 80” wide 1.2” thick insulating layer. Unlike HEEET, where a set of tiles and seams are integrated to form the heat-shield, 3MDCP is a seamless heatshield by wrapping and shaping a flat panel into the heatshield shape and then rigidizing the preform through resin infusion. MSR EES is investing in technology maturation of 3MDCP for the current mission launch in 2027. This lighting talk will provide key developments and time line for 3MDCP technology maturation to show that 3MDCP will be ready to support future UOP or Saturn Probe mission. In addition, the limitations of the capability will be presented so that Saturn mission proposers as well as UOP flagship mission study can be fully informed as to the 3MDCP capability.

HEEET↗

Development of LaRC (TM): IA thermoplastic polyimide coated aerospace wiring

NASA Langley has invented LaRC(exp TM) IA and IAX which are thermoplastic polyimides with good melting, thermal and chemical resistance properties. It was the objective of this contract to prepare and extrude LaRC (exp TM) polyimide onto aircraft wire and evaluate the polymers performance in this critical application. Based on rheology and chemical resistance studies at Imitec, LaRC (exp TM) IAX melts readily in an extruder, facilitating the manufacture of thin wall coatings. The polyimide does not corode the extruder, develop gel particles nor advance in viscosity. The insulated wire was tested according to MiL-W-22759E test specifications. The resulting wire coated with LaRC (exp TM) IAX displayed exceptional properties: surface resistance, non blocking, non burning, hot fluid resistance, impulse dielectric, insulation resistance, low temperature flexibility, thermal aging, wire weight, dimensions, negligible high temperature shrinkage and stripability. The light weight and other properties merit its application in satellites, missiles and aircraft applications. The extruded IAX results in a polyimide aircraft insulation without seams, outstanding moisture resistance, continuous lengths and abrasion resistance.

Keating, Jack↗

Mechanisms of Oxide Formation in the Self-Reacting Friction Stir Weld Process

The initial objective of this study was to evaluate the effect of an extended delay time between preweld cleaning and the completion of a self-reacting friction stir welding (SRFSW) process on the resulting quality of various thickness panels of AA2219-T87. The current NASA standard specifies no more than a 48 hour delay between preweld cleaning and actual welding. The concern is whether increasing the cleaning delay time results in development of the residual oxide defect (ROD) in SRFSW. This concern emanates from the possibility of increased time correlating with increased oxide layer thickness on the faying surfaces. Oxide content on the faying surfaces has been reported to correlate with the occurrence of the ROD which reduces mechanical properties. When the SRFSW process was first adopted by the NASA Marshall Space Flight Center (MSFC), unexpected low tensile values that resulted were attributed to oxides within the weld that appeared to follow the former faying surface contours. Mitigation of the ROD was achieved through a combination of modifications to the processing parameters, tool designs, and incorporation of a weld seam offset. Two operations are involved in preweld cleaning: the first is removal of oil and grease, and the second is removal of surface oxides. In arc welding, improper cleaning of the faying surfaces of aluminum welded joints can increase the sensitivity toward development of defects. As the aluminum is locally melted, these contaminants contribute toward the development of porosity, inclusions, entrapped oxides, and other discontinuities which can degrade the strength of the weld joint. For weldment of large structures, the weld joint is typically cleaned, fit-up, and tack welded prior to the final full penetration welding pass. Because of the stringent joint fit-up requirements for mismatch and peaking for launch vehicle structures, the joint fit-up can sometimes contribute to lengthy delays between cleaning and tack welding, especially for circumferential weld joints on large diameter components. When the conventional friction stir welding (CFSW) process was introduced at the NASA MSFC, there was no procedure for cleaning prior to the solid-state joining process. As the process expanded to include SRFSW, preparation of the faying, crown, and root surfaces were implemented to overcome the ROD. Although the solid-state process is not expected to reach temperatures high enough for dissociation of the native oxide layer, concern remained regarding the redeposition of the native oxide layer within the stir zone. NASA has previously established the allowable time at 48 hours between preweld cleaning and a SRFSW process. The effect of potential 2 contamination resulting from an extended delay to 188 hours was subsequently evaluated for SRFSWs using tensile testing and metallographic imaging. Tensile specimens were tested at room temperature (RT), and at cryogenic conditions of liquid nitrogen (LN2) and liquid hydrogen. No detrimental effect on weld quality, as determined by weld strength, was reported for cleaning delays of 48, 120, 168, 240 or 288 hours. While no trends were established in this study, which extended the delay from 48 to 188 hours, there were a few outliers in terms of ultimate tensile strength (UTS). According to M. Fisher's 2014 Boeing Company Memo no. EYBF-MAF-14-029, all outliers were above the minimum acceptance criteria, but out of family with respect to the average values. As the robustness and reliability of any process ultimately depends on the average values as well as the outliers, an understanding of the cause of these outliers will ultimately improve the process. This report examines those outliers and their possible causes.

Schneider, J. A.↗

NASA's Integrated Instrument Simulator Suite for Atmospheric Remote Sensing from Spaceborne Platforms (ISSARS) and Its Role for the ACE and GPM Missions

Forward simulation is an indispensable tool for evaluation of precipitation retrieval algorithms as well as for studying snow/ice microphysics and their radiative properties. The main challenge of the implementation arises due to the size of the problem domain. To overcome this hurdle, assumptions need to be made to simplify compiles cloud microphysics. It is important that these assumptions are applied consistently throughout the simulation process. ISSARS addresses this issue by providing a computationally efficient and modular framework that can integrate currently existing models and is also capable of expanding for future development. ISSARS is designed to accommodate the simulation needs of the Aerosol/Clouds/Ecosystems (ACE) mission and the Global Precipitation Measurement (GPM) mission: radars, microwave radiometers, and optical instruments such as lidars and polarimeter. ISSARS's computation is performed in three stages: input reconditioning (IRM), electromagnetic properties (scattering/emission/absorption) calculation (SEAM), and instrument simulation (ISM). The computation is implemented as a web service while its configuration can be accessed through a web-based interface.

real-aperture instruments↗

The Evolution of Friction Stir Welding Theory at Marshall Space Flight Center

From 1995 to the present the friction stir welding (FSW) process has been under study at Marshall Space Flight Center (MSFC). This is an account of the progressive emergence of a set of conceptual tools beginning with the discovery of the shear surface, wiping metal transfer, and the invention of a kinematic model and making possible a treatment of both metallurgical structure formation and process dynamics in friction stir welding from a unified point of view. It is generally observed that the bulk of the deformation of weld metal around the FSW pin takes place in a very narrow, almost discontinuous zone with high deformation rates characteristic of metal cutting. By 1999 it was realized that this zone could be treated as a shear surface like that in simple metal cutting models. At the shear surface the seam is drawn out and compressed and pressure and flow conditions determine whether or not a sound weld is produced. The discovery of the shear surface was followed by the synthesis of a simple 3- flow kinematic model of the FSW process. Relative to the tool the flow components are: (1) an approaching translational flow at weld speed V, (2) a rotating cylindrical plug flow with the angular velocity of the tool , and (3) a relatively slow ring vortex flow (like a smoke ring) encircling the tool and driven by shoulder scrolls and pin threads. The rotating plug flow picks up an element of weld metal, rotates it around with the tool, and deposits it behind the tool ( wiping metal transfer ); it forms plan section loops in tracers cut through by the tool. Radially inward flow from the ring vortex component retains metal longer in the rotating plug and outward flow expels metal earlier; this interaction forms the looping weld seam trace and the tongue and groove bimetallic weld contour. The radial components of the translational and ring vortex flows introduce parent metal intrusions into the small grained nugget material close to the tool shoulder; if this feature is pronounced, nugget collapse may result. Certain weld features, in particular internal banding seen in transverse section as onion rings and associated surface ridges called tool marks , have long implied an oscillation flow component, but have only recently been attributed in the literature to tool eccentricity. Rotating plug shape, typically a hollow cylinder flared at the end where it sticks to the shoulder, varies as pressure distribution on the tool determines where sticking occurs. Simplified power input estimates balanced against heat loss estimates give reasonable temperature estimates, explain why the power requirement changes hardly at all over a wide range of RPM s, and yield isotherms that seem to fall along boundaries of parameter windows of operation.

Nunes, Arthur C.↗

Sustaining Thermal Protection Systems Needed for Uranus Probes

Summary: Achieving Uranus in-situ science objectives through deploying probes in the atmosphere requires thermal protection systems capable of withstanding extreme entry environments. NASA’s 3-D Woven based thermal protection systems (TPS), developed specifically to meet this challenge, are mature, efficient, and capable of withstanding such entry. These science-enabling capabilities need to be sustained, otherwise mission implementation risk may increase to the point that the mission is untenable. The heatshield technology has been developed in concert with industry, and manufacturing processes have been technology transferred. Current technology readiness does not guarantee future availability. Sustainment requires maintaining expertise within NASA as well as ensuring that proven industrial expertise and capabilities will be readily available in the future. A constant awareness and risk assessment followed by risk mitigation are required. The scientific community needs to be aware of these challenges. It needs to engage NASA to ensure these capabilities will be available when needed. As was the case with the atrophy of heritage carbon phenolic that led to developing the 3-D Woven capabilities, our vigilance is again needed to sustain these enabling TPS capabilities for Uranus and for other missions. Background: NASA invested in and developed Heatshield for Extreme Entry Environment Technology (HEEET) TPS that was matured to TRL 6 in 2019 as a tiled system with seams and gap-fillers. Manufacturing readiness included development of specialized looms, molding, and infusion processes using commercial partners. In support of the Mars Sample Return mission, a single-layer, seamless, single-piece variant referred to as 3MDCP (3-D woven Mid-Density Carbon-Phenolic) was developed and is limited to a 1.3m maximum diameter scale due to weaving width limitations of 80”. Molding techniques developed to transform a flat, 2”-thick 3-D woven preform into a sphere-cone shape prior to phenolic resin infusion has been demonstrated. A team at NASA Ames is currently working with industry to demonstrate infusion at full-scale. By 2026, 3MDCP will be at a high level of maturity in technical, manufacturing, and integration readiness as well as material characterization. HEEET and 3MDCP for Uranus Entry: Several system studies have evaluated and baselined 3-D Woven TPS for Uranus entry, both HEEET as well as 3MDCP. If the aeroshell carrying the descent probe is 1.3m or less, then 3MDCP is a very capable and the most mass-efficient choice. If the aeroshell is bigger than 1.3m diameter, then HEEET can meet the mission need as it allows for an aeroshell of any diameter. HEEET and 3MDCP are capable of Saturn in-situ science missions prioritized in the New Frontiers-5 draft Announcement of Opportunity (AO) and if Saturn is the mission of choice, there is a pathway for sustaining the capability. Capability Sustainment: Given NASA’s current budgetary constraints, the postponement of the next New Frontiers AO to no earlier than 2026 and the unknown delay in starting the UOP flagship effort point to potential gap years for the HEEET and 3MDCP capabilities. The first step in capability sustainment is to understand the risks as they emerge, assess those risks, and develop plans to mitigate them. Keeping the science community, who are interested in UOP as well as the larger Giant Planet missions, informed of the emerging challenges requires continuous risk assessment/mitigation. Without these steps, atrophy is more likely within the industrial partners with which NASA has partnered. This presentation will provide more details as well as steps NASA can take to minimize the impact to the UOP mission.

Ethiraj Venkatapathy↗

Large Scale Testing of a Foam/Multilayer Insulation Thermal Control System (TCS) for Cryogenic Upper Stages

The development of high energy cryogenic upper stages is essential for the efficient delivery of large payloads to various destinations envisioned in future programs. A key element in such upper stages is cryogenic fluid management (CFM) advanced development/technology. Due to the cost of and limited opportunities for orbital experiments, ground testing must be employed to the fullest extent possible. Therefore, a system level test bed termed the Multipurpose Hydrogen Test Bed (MHTB), which is representative in size and shape (3 meter diameter by 3 meter long with a volume of 18 cubic meters) of a fully integrated space transportation vehicle liquid hydrogen propellant tank has been established. To date, upper stage studies have often baselined the foam/multilayer insulation (FMLI) combination concept; however, hardware experience with the concept is minimal and was therefore selected for the MHTB. The foam element (isofoam SS-1 171 with an average thickness of 3.5 centimeters) is designed to protect against ground hold/ascent flight environments, and allows for the use of a dry nitrogen purge as opposed to the more complex/heavy helium purge subsystem normally required with MLI in cryogenic applications. The MLI (45 layers of Double Aluminized Mylar with Dacron spacers) provides protection in the vacuum environment of space and is designed for an on-orbit storage period of 45 days. Several unique features were incorporated in the MLI concept and included: variable density MLI (reduces weight and radiation losses by changing the layer density), larger but fewer DAM perforations for venting during ascent to orbit (reduces radiation losses), and roll wrap installation of the MLI with a commercially established process to lower assembly man-hours and reduce seam heat leak. Thermal performance testing of the MHTB TCS was conducted during three test series conducted between September 1995 and May 1996. Results for the ground hold portion of the tests were as expected producing an average heat leak of 63 WattS/M2 at an average foam surface temperature of 170 K. The results of the simulated orbit hold test interval produced heat leaks ranging from 0.085 to 0.22 Watts/squareM at warm boundary temperatures of 164K and 305K, respectively. When compared to the performance for a traditional MLI system, a 60% reduction in orbital heat leak or boiloff was measured. Overall, the MHTB TCS demonstrated satisfactory performance for all mission phases required of a cryogenic upper stage.

Hastings, Leon↗

Synchronous Separation, Seaming, Sealing and Sterilization (S4) using Brazing for Sample Containerization and Planetary Protection

The potential return of samples back to Earth from other planetary bodies would be based on planetary protection requirements that vary depending on the type of body [1]. Potential Mars Sample Return would require the protection of our planet from backward contamination. To fulfill this requirement, it would be necessary to implement “break the chain of contact (BTC)” process, where any material reaching Earth would have to be inside a container that is sealed with an extremely high level of confidence. In order to accomplish this, it would be necessary to contain the acquired samples and destroy any potential biological materials that may have contaminated the external surface of the container, while protecting the samples for further analysis. Using brazing, a novel synchronous separation, seaming, sealing and sterilization (S4) process for sample containerization and planetary protection has been conceived and demonstrated. A prototype double-wall container with inner and outer shells and Earth clean interstitial space was used for this demonstration. For potential Mars sample return, the double wall container would be consist of two halves and prepared on Earth. The on-orbit execution would consist of inserting the sample into one of the halves and then mating to the other half and melt the braze material to perform the S4 process. The use of brazing material that melts at temperatures higher than 500OC would assure sterilization of the exposed areas due to pyrolysis since carbon bonds are broken at this temperature. The process consists of two-steps, Step-1: the double wall container halves are fabricated and brazed on Earth; and Step-2: Assembly and brazing the samples on orbit. To prevent potential jamming during the process of mating the two halves of the double-wall container and the extraction of the brazed inner container, a double cone-within-cone approach has been conceived. The results of this study are described and discussed in this manuscript.

Bar-Cohen, Yoseph↗

Improvements to Stitching Controls for Manufacturing Advanced Stitched Composites

Stitched composites have been extensively studied and have been shown to have benefits over unstitched composites for stiffened structures, including improved damage tolerance, reduced weight, and fewer fasteners. These benefits make stitched composites attractive from a performance perspective, however, the nature of stitching the preforms prior to infusion includes additional manufacturing steps and equipment compared to conventional resin infusion. Stitching of composite material structures at NASA Langley Research Center (LaRC) is performed at the Integrated Structural Assembly of Advanced Composites (ISAAC) facility using control algorithms developed by the lead author. Two deficiencies have been identified in the current control algorithms, and mitigations for these deficiencies were developed within the Hi-Rate Composite Aircraft Manufacturing (HiCAM) project and are presented herein. First, decoupling stitch translation and rotation takes more time for stitching since two robot operation control steps are executed for each stitch. Therefore, a method was developed to determine when to decouple the translation and rotation for stitching, which reduces stitch time by decoupling the operation control steps only when necessary to execute the stitch properly. Second, a correction to the sideslip stitching approach that eliminates a significant portion of the pre- and post-stitching activities was developed. The developed method adjusts the sideslip stitch angle based on the rotations of previous stitches to ensure that the width of the stitching seam remains constant along its length. Constant seam width eliminates observed overlap of the insertion and catcher thread portions for highly curved paths, which maintains the desired uniformity of through-the-thickness architecture along the seam and eliminates the local degradation of properties where the insertion needle is too close to, or crosses, the catcher needle portion of the seam.

stitching↗