Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “schedule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

An algorithm for a single machine scheduling problem with sequence dependent setup times and scheduling windows

An enumeration algorithm is presented for solving a scheduling problem similar to the single machine job shop problem with sequence dependent setup times. The scheduling problem differs from the job shop problem in two ways. First, its objective is to select an optimum subset of the available tasks to be performed during a fixed period of time. Secondly, each task scheduled is constrained to occur within its particular scheduling window. The algorithm is currently being used to develop typical observational timelines for a telescope that will be operated in earth orbit. Computational times associated with timeline development are presented.

Moore, J. E.↗

Crew Autonomy through Self-Scheduling: Guidelines for Crew Scheduling Performance Envelope and Mitigation Strategies

Future long duration exploration missions (LDEMs) bring new challenges to astronaut crews in deep space, one of which is increased communication latencies with ground stations. As a result, crews will have to behave more autonomously by self-scheduling their own operational timelines in an efficient and effective manner. To support crew autonomy, our team has spent the last few years developing Playbook, a mission planning and scheduling tool. Our research focuses on investigating scheduling performance using Playbook to inform the deployment of novel aids that streamline the timeline creation process and proposing relevant standards and guidelines for autonomous crews in LDEMs. Summarizing yearly progress of research analysis and experiment in HERA.

user experience↗

Crew Autonomy Through Self-Scheduling: Guidelines for Crew Scheduling Performance Envelope and Mitigation Strategies

NASA’s future long duration exploration missions (LDEMs) will encounter increasing communication transmission delays as they move farther from Earth-based ground stations. Because crews can no longer rely on real-time support from ground planners, they will have to self-schedule their own operational timelines effectively and efficiently. To enable this, our team develops Playbook, a mission planning and scheduling tool. Our research focuses on quantifying scheduling performance using Playbook to inform the design and development of future features aimed at streamlining timeline creation. We also aim to propose standards and guidelines for autonomous crews in LDEMs. This year, we discuss preliminary results from HERA Campaign 6.

self-scheduling↗

Tools And Methods to Analyze Plant Outage Schedule and Assist Schedulers in Improving Outage Resilience

Refueling outages of nuclear power plants (NPPs) are considered one of the most critical phases throughout the plant lifetime. In such instances, tens of thousands of activities (e.g., maintenance, surveillance) are performed in a short amount of time (typically 2-3 weeks unless major backfitting or modernization projects are carried out) by a large number of crews (e.g., electricians, mechanics) that are hired as contractors. As a consequence, a plant outage can be expensive not only in terms of costs (e.g., contractor labor, material), but also in terms of loss generation since the plant is taken off the grid during the full outage duration (an indicative metric is about 1.2M$/day of loss of revenue). Thus, there is a continuous need to decrease the economic impact of outages on plant finances. This can be done by: decreasing the frequency of plant outages (e.g., from 18 to 24 months), reducing the time to complete the outage, and reducing the risk of outage delays. The Optimization of Outage Activities project under the Risk Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program focuses on developing tools and methods to support NPPs with outage schedule optimization. The developed tools and methods are designed to analyze plant outage schedule with the goal of identify critical elements in the schedule that might pose a high risk of delays. These methods and tools can be considered resource-centric in the sense that they address outage challenges as a resource optimization problem. In this context, resources are either time and crews; outage delays occurs when either (or both) resources are insufficient to complete the set of tasks assigned at a specific time instant of the outage. This report provides details on how plant resources (time and crews) can be allocated in such a way that delays are minimized. In this respect, two classes of methods have been developed: the first one focuses on the time resource and how variability of the time to complete outage tasks may impact outage delays. The second one integrates available resources to assess when dailies activities should be performed such that the risk of outage delays are minimized.

97 MATHEMATICS AND COMPUTING↗

Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

Zoch, David R.↗

Requirements for the implementation of schedule repair technology in the Experiment Scheduling Program

The following list of requirements specifies the proposed revisions to the Experiment Scheduling Program (ESP2) which deal with schedule repair. These requirements are divided into those which are general in nature, those which relate to measurement and analysis functions of the software, those which relate specifically to conflict resolution, and those relating directly to the user interface. (This list is not a complete list of requirements for the user interface, but only a list of those schedule repair requirements which relate to the interface.) Some of the requirements relate only to uses of the software in real-time operations. Others are clearly for future versions of the software, beyond the upcoming revision. In either case, the fact will be clearly stated.

Bullington, Stanley F.↗

Utilizing Schedule Constraints to Improve Automated Scheduling in NASA's Deep Space Network

NASA’s Deep Space Network (DSN) is a mission critical facility that supports many different space missions,from LEO to deep space exploration. In recent years, as the network has suffered from increasing oversubscription, more restrictions have been added to reduce the amount of manual scheduling labor necessary to come to consensus. In this paper, we describe a new auto-mated scheduling tool which takes advantage of these restrictions to bring the scheduling problem closer to feasibility. In addition, we describe an algorithm to reduce problem inputs given a partially-solved problem,thereby bringing the problem even closer to feasibility

Johnston, Mark↗

Robust Scheduling of Microgrids Considering Unintentional Islanding Conditions

This paper proposes a robust scheduling model for microgrids considering the stochastic unintentional islanding conditions. The proposed model minimizes the total operating cost of the microgrid by efficiently coordinating the supply of power from local distributed energy resources and the main grid. To capture the prevailing uncertainties in renewable generation and demand as well as unintentional islanding conditions, a two-stage adaptive robust optimization model is formulated to minimize the total operating cost under the worst realization of the modeled uncertainties. The column and constraint generation (C&CG) method is used to solve the problem in an iterative manner. The solution of the proposed scheduling model ensures robust microgrid operation in consideration of all possible realization of renewable generation, demand and unintentional islanding condition. Numerical simulations on a microgrid consisting of a wind turbine, a PV panel, a fuel cell, two micro-turbines, a diesel generator and a battery demonstrate the effectiveness of the proposed approach.

Liu, Guodong↗

Decomposing the Train-Scheduling Problem into Integer-Optimal Polytopes

This paper presents conditions for which the linear relaxation for the train-scheduling problem is integer optimal. These conditions are then used to identify how to partition a general problem’s feasible region into integer-optimal polytopes. Such an approach yields an extended formulation that contains far fewer binary variables. Our computational experiments show that this approach results in significant computational savings. Moreover, this approach scales well when the train-scheduling problem is modeled using smaller time increments, allowing for higher fidelity models to be solved without significantly increasing the required computational time.

97 MATHEMATICS AND COMPUTING↗

Crew Autonomy through Self-Scheduling: Guidelines for Crew Scheduling Performance Envelope and Mitigation Strategies

As NASA considers long-duration exploration missions, it is envisioned that crews will behave more autonomously as compared to low-Earth orbit missions. When considering long duration exploration missions, Flight Operations Directorate (FOD) identified the following benefits and challenges presented on this slide. As missions operate further from Earth, the communication latency between the spacecraft and Mission Control Center will increase requiring the crew to take a more active role in reacting to daily planning. However, one of the key challenges for crew self-scheduling is that we do not want to overwhelm astronauts who are not expert mission planners. This leads to our primary research objective: to first, characterize the human performance envelope for the task of planning and scheduling in the context of human spaceflight operations, then, develop countermeasure aids to mitigate adverse performance effects due to plan complexity, and finally, inform performance standards and guidelines based on research results. Our next steps are to finish summarizing our findings from the experiment in conference papers and our upcoming yearly report. In the upcoming year, we will continue to collect data in analog missions and begin summarizing our recommended standards and guidelines.

user experience↗