Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “retirement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

The Successful Implementation of NASA Orbital Debris Requirements for the Retirement of TDRS-1

TDRS-1 was decommissioned on October 28th 2009 following more than 26 years of operation. The Grand Old Dame of the TDRSS constellation wa s launched aboard the maiden voyage of the Space Shuttle Challenger ( STS-6) in April 1983. TDRS-1 survived a malfunction of the Inertial Upper Stage eventually utilizing its own propulsion system to success fully reach its assigned station in geosynchronous orbit. The anomalo us beginning of the TDRS-1 mission was not without lasting consequenc es as the primary reaction control system (A-side) was completely di sabled with an apparent propellant leak and the secondary system (B-s ide) suffered damage to its negative roll thruster rendering the thru ster inoperable. Following decommissioning the challenge to completin g a successful TDRS-1 end-of-mission (EOM) was the implementation of the stringent orbital debris requirements of NPR 8715.6 with a parti ally functioning spacecraft not originally designed to meet those req uirements. The TDRS-1 EOM had three key goals: 1) removal of the spac ecraft from geosynchronous orbit; 2) depletion of the remaining prope llant; and 3) passivation of all other sources of energy storage or generation. The TDRS-1 EOM approach was one of minimizing risks while accomplishing the goals above. The orbit raising portion of EOM was accomplished using deltavelocity operations already proven during pre vious stationchanging maneuvers. The propellant depletion approach wa s necessarily more aggressive as over 20 hours of burn time was requ ired to deplete the remaining fuel. A novel approach utilizing a spin ning, thrusting, passively controlled spacecraft configuration was ut ilized to achieve reasonable burn durations that met schedule constra ints. This nonstandard configuration required careful analysis of ele ctrical, thermal, and communication subsystems. The configuration wa s thoroughly simulated prior to the start of operations and carefully characterized during the initial spin period and first burn. Passiva tion was by definition a unique operation not previously performed wi thin the TDRS 1-7 constellation. Use was made of a TDRS spacecraft si mulator to verify the operational procedure to mitigate risks and pro vide crew training. TDRS-1 orbit raising maneuvers commenced on June 5th 2010 and completed on June 14th with an apogee 370 km and a peri gee 352 km above geosynchronous altitude. 127 kg of propellant were e stimated to be remaining in the tanks at the completion of orbit rais ing. TDRS-1 was placed in its spinning orientation on June 16th and the first fuel depletion burn was performed the following day. A seri es of 10 depletion burns were performed ending on June 26th when both propellant tank pressures experienced dramatic drops. Final passivat ion was performed on June 27 th deactivating electronics, removing t he batteries from the bus and solar arrays, and disabling the space-t o-ground communications equipment. The Second TDRS Ground Terminal (S TGT) continued to open loop track TDRS-1 for several days attempting command reacquisition several times a day. All attempts were unsucce ssful confirming passivation was achieved. The TDRS-1 orbit at passiv ation was an orbital debris compliant 36,319 x 36,128 km in height. W hile differing spacecraft designs may preclude mimicking the exact TD RS-1 EOM approach, the TDRS-1 campaign serves to demonstrate that pr e-NPR 8715.6 designs can be made to meet the requirements resulting i n a reduced orbit debris environment for future missions

Mirczak, Walter↗

Innovative Approach Enabled the Retirement of TDRS-1 Compliant with NASA Orbital Debris Requirements

The first Tracking and Data Relay Satellite (TDRS-1) was deactivated on June 27th 2010 following more than 26 years of operation. The end-of-mission (EOM) operations were developed to address the stringent requirements of NPR 8715.6: NASA Procedural Requirements for Limiting Orbital Debris, which consists of three key items: 1) removal from the geosynchronous arc; 2) depletion of the remaining propellant; and 3) passivation of all sources of energy storage or generation [1]. The EOM approach minimized risks while accomplishing these goals. Raising TDRS-1 over 350 km above geosynchronous was accomplished via proven station change operations. Depleting propellant was the most challenging task, requiring over 20 hours of thruster on-time accumulated within schedule, orbit, and spacecraft subsystem constraints. The attitude configuration and operational procedures, including the unique final passivation method, were thoroughly analyzed and simulated prior to the start of operations. The complete EOM campaign lasted 21 days. The TDRS-1 EOM campaign demonstrated that pre-NPR 8715.6 satellite designs can be made to comply and that lessons learned could be applied to other satellite designs. The significant TDRS-1 effort demonstrates a commitment by NASA to responsible orbital debris management in compliance with international standards.

Zaleski, Ronald↗

Retired Satellites: A chance to shed light

Satellite data are vital to decisions about both environmental and human health. As satellites are replaced and decommissioned, they could be repurposed to spark new scientific insights.

Eleanor C Stokes↗

Retiring environmental risks of marine renewable energy devices: The “habitat change” case

The installation, presence, operation, and decommissioning of marine renewable energy (MRE) devices inevitably alters the surrounding ocean habitats. These changes may include direct effects on the benthos from the installation or removal of foundations and anchors, changes in community composition on and near devices, artificial reef effects, and indirect effects such as alteration of the food web or facilitation of non-native, invasive species dispersal. Although there is no expectation that MRE devices affect marine environments differently than other anthropogenic ocean uses, regulators and stakeholders continue to have questions about potential negative impacts to species and habitats from development. Research studies and survey reports that inform our understanding of habitat changes related to MRE devices and associated equipment were compiled into an evidence base, sorted into categories of effects, and evaluated by a group of international experts to assess potential risk to habitats and biota from small numbers of MRE devices, as well as to identify knowledge gaps. These gaps were organized by category and divided up by relevance to consenting, research, or project development and monitoring responsibilities. Identifying these “known unknowns” allows for study design and collaboration from various perspectives to fill the knowledge gaps. Distribution of the evidence base and remaining uncertainties and knowledge gaps to the MRE community, coupled with new research, will help advance the MRE industry while resolving concerns about the potential risks of habitat change for small numbers of devices.

Hemery, Lenaig G.↗

U.S. Federal Policy Considerations for the Management of Retired Large-Format Batteries

The global demand for large-format batteries used in electric vehicles (EV) and battery energy storage is expected to continue as governments call for zero emission policies. Total installed large-scale stationary battery energy storage is expected to increase almost 20-fold in the coming years - from 17 GW installed globally in 2020 to 358 GW projected in 2030. Similarly, light duty EVs sales globally are expected to increase more than 8-fold from 2020 to 2030 - from 3 million units to 25 million units. The expected demand for large-format batteries brings supply chain concerns, and economic opportunities. Domestic reuse and recycling is one potential circular economy solution for large-format batteries. This presentation discusses current U.S. law and regulatory landscape for the reuse and recycling of large-format batteries, and how certain policy frameworks impact reuse and end-of-life management decisions for large-format battery materials.

battery↗

IM3 Data Center Driven Grid Stress Dataset for the U.S. Western Interconnection

This dataset provides projected grid stress and reliability results (including all model inputs and outputs from an open-source grid operations modeling framework - GO), for the Integrated Multisector, Multiscale Modeling (IM3) project, under varying levels of data center demand growth between 2025 and 2035 in the U.S. Western Interconnection. The scenarios and sensitivity experiments are combinations of different data center demand growth rates and energy, weather, population and economic pathways. Data center demand growth projections were sourced from the Electric Power Research Institute (EPRI). The data center demand growth projection names are: Low (3.71% annual data center demand growth) Moderate (5% annual data center demand growth) High (10% annual data center demand growth) Higher (15% annual data center demand growth) Energy, weather, population and economic pathways are informed by two Shared Socioeconomic Pathways (SSP3 and SSP5) and two Representative Concentration Pathways (RCP4.5 and RCP8.5) following the hotter general circulation model (GCM) forcing group from a set of perturbed thermodynamics simulations. The resulting pathway names are: rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 The main scenarios and sensitivity experiments are detailed below. Reference scenario: The projected grid stress and reliability results for the U.S. Western Interconnection from a previous study. This scenario does not consider data center demand growth explicitly. Data center scenario: Building on the reference scenario, this scenario considers various data center growth rates and how they impact the U.S. Western Interconnection. Data center loads are modeled as flat 8760-hr profiles. This scenario does not consider new generation and transmission capacities specifically designed to meet the new data center demands. The related folder is named "flat". Delayed generator retirements sensitivity experiment: Building on the data center scenario, this experiment explores the impact of different levels of natural gas and nuclear generator retirement delays. The resulting scenario names are: (1) postponing 100% nuclear retirements; (2) postponing 100% nuclear and 25% natural gas retirements; (3) postponing only 50% natural gas retirements; (4) postponing 100% nuclear and 50% natural gas retirements; (5) postponing 100% nuclear and 75% natural gas retirements; and (6) postponing 100% nuclear and 100% natural gas retirements. The related folder names are: no_gen_retire_0_gas, no_gen_retire_25_gas, no_gen_retire_50_gas, no_gen_retire_50_gas_only, no_gen_retire_75_gas, and no_gen_retire_100_gas. Demand response through curtailment sensitivity experiment: Building on the data center scenario, this experiment explores the impact of different participation and compensation levels of data center demand response. The resulting scenario names are: (1) 5% demand available for curtailment with 750 $/MWh compensation; (2) 5% demand available for curtailment with 500 $/MWh compensation; (3) 5% demand available for curtailment with 250 $/MWh compensation; (4) 15% demand available for curtailment with 750 $/MWh compensation; (5) 15% demand available for curtailment with 500 $/MWh compensation; and (6) 15% demand available for curtailment with 250 $/MWh compensation. The related folder names are: dr_cost_250_drup_0_drdown_5, dr_cost_250_drup_0_drdown_15, dr_cost_500_drup_0_drdown_5, dr_cost_500_drup_0_drdown_15, dr_cost_750_drup_0_drdown_5, and dr_cost_750_drup_0_drdown_15. Combination of delayed generator retirements and demand response through curtailment sensitivity experiment: The impact of combining postponing 100% nuclear and 25% natural gas retirements with 5% demand available for curtailment with 750 $/MWh compensation is simulated. The related folder is named "dr_cost_750_drup_0_drdown_5_nuc_100_gas_25". Please refer to the README file for a detailed description of the dataset including individual files and references.

Artificial Intelligence↗

Repurposing Fossil-Fueled Assets For Energy Storage

The annual retirement of U.S. coal-fired electricity generation units (CF-EGU) is at an all-time high and is expected to continue. This loss of reliable baseload generation, combined with predicted growth of variable renewable energy (VRE) generation, is expected to stress grid reliability as the number of load-following resources drops below the experienced load variability. Many regions are already experiencing challenges, and fossil retirement-related warnings by the North American Electric Reliability Corp. are becoming more dire. All CF-EGU retirements pose significant challenges to asset owners, local workforces, and their communities. Repurposing a retiring CF-EGU as a long-duration energy storage plant can address these challenges and offer a suite of additional benefits to asset owners, the grid, and society. This project performed a techno-economic evaluation and assessment of repurposing a Duke Energy fossil-fueled asset (in particular, a coal plant) into an energy storage system by integrating the retiring asset with a Malta long duration Pumped Heat Energy Storage (PHES) system. The project validated the technoeconomic benefits of repurposing retiring coal plants into long-duration energy storage using Malta’s PHES. Key findings for this project are summarized below: (1) Technical: (a) Retiring coal plants (and other steam turbine fossil generation) can be repurposed to enable the clean energy transition using Malta’s technology. (b) For older retiring coal plants, repurposing the site and electrical interconnection for a standalone PHES plant is the most economically favorable option. (c) For newer coal plants where there is also a local peaking capacity need, repowering the steam cycle into a hybrid integration with PHES is attractive. (d) A process was developed to assist fossil generation owners in choosing the best path for each plant’s circumstances. (2) Economic (a) Communities facing economic challenges caused by the retirement of fossil generation would benefit from repurposing the plant as long-duration energy storage using Malta’s PHES. (b) On a $/MW basis, repowering retiring coal units into Malta PHES plants can maintain the same number and types of jobs and economic activity. (c) For a 70% carbon reduction scenario, a 10-hour Malta PHES plant is more economic for the asset owner than similar-power 4-hour batteries. This project showed that repurposing a retiring coal unit into thermal energy storage, by integrating it with a Malta PHES system, makes techno-economic sense. At least two integration options are available, with the optimal solution depending on the coal plant and its location. Repurposing retiring coal plant into energy storage results in economic benefits for the plant owner and local communities.

20 FOSSIL-FUELED POWER PLANTS↗

Flooding and ecological restoration promote wetland microbial communities and soil functions on former cranberry farmland

Microbial communities are early responders to wetland degradation, and instrumental players in the reversal of this degradation. However, our understanding of soil microbial community structure and function throughout wetland development remains incomplete. We conducted a survey across cranberry farms, young retired farms, old retired farms, flooded former farms, ecologically restored former farms, and natural reference wetlands with no history of cranberry farming. We investigated the relationship between the microbial community and soil characteristics that restoration intends to maximize, such as soil organic matter, cation exchange capacity and denitrification potential. Among the five treatments considered, flooded and restored sites had the highest prokaryote and microeukaryote community similarity to natural wetlands. In contrast, young retired sites had similar communities to farms, and old retired sites failed to develop wetland microbial communities or functions. Canonical analysis of principal coordinates revealed that soil variables, in particular potassium base saturation, sodium, and denitrification potential, explained 45% of the variation in prokaryote communities and 44% of the variation in microeukaryote communities, segregating soil samples into two clouds in ordination space: farm, old retired and young retired sites on one side and restored, flooded, and natural sites on the other. Heat trees revealed possible prokaryotic ( Gemmatimonadetes ) and microeukaryotic ( Rhizaria ) indicators of wetland development, along with a drop in the dominance of Nucletmycea in restored sites, a class that includes suspected mycorrhizal symbionts of the cranberry crop. Flooded sites showed the strongest evidence of wetland development, with triple the soil organic matter accumulation, double the cation exchange capacity, and seventy times the denitrification potential compared to farms. However, given that flooding does not promote any of the watershed or habitat benefits as ecological restoration, we suggest that flooding can be used to stimulate beneficial microbial communities and soil functions during the restoration waiting period, or when restoration is not an option.

Rubin, Rachel L. (ORCID:0000000284326811)↗

The software analysis project for the Office of Human Resources

There were two major sections of the project for the Office of Human Resources (OHR). The first section was to conduct a planning study to analyze software use with the goal of recommending software purchases and determining whether the need exists for a file server. The second section was analysis and distribution planning for retirement planning computer program entitled VISION provided by NASA Headquarters. The software planning study was developed to help OHR analyze the current administrative desktop computing environment and make decisions regarding software acquisition and implementation. There were three major areas addressed by the study: current environment new software requirements, and strategies regarding the implementation of a server in the Office. To gather data on current environment, employees were surveyed and an inventory of computers were produced. The surveys were compiled and analyzed by the ASEE fellow with interpretation help by OHR staff. New software requirements represented a compilation and analysis of the surveyed requests of OHR personnel. Finally, the information on the use of a server represents research done by the ASEE fellow and analysis of survey data to determine software requirements for a server. This included selection of a methodology to estimate the number of copies of each software program required given current use and estimated growth. The report presents the results of the computing survey, a description of the current computing environment, recommenations for changes in the computing environment, current software needs, management advantages of using a server, and management considerations in the implementation of a server. In addition, detailed specifications were presented for the hardware and software recommendations to offer a complete picture to OHR management. The retirement planning computer program available to NASA employees will aid in long-range retirement planning. The intended audience is the NASA civil service employee with several years until retirement. The employee enters current salary and savings information as well as goals concerning salary at retirement, assumptions on inflation, and the return on investments. The program produces a picture of the employee's retirement income from all sources based on the assumptions entered. A session showing features of the program was conducted for key personnel at the Center. After analysis, it was decided to offer the program through the Learning Center starting in August 1994.

Tureman, Robert L., Jr.↗

Evaluating How Climate Adaptation Measures Affect the Interconnected Water‐Energy Resource Systems of the Western United States

Abstract The Western US faces increasing water stress from the impacts of climate change, making it difficult to meet water demands for the region's cities, agriculture, and hydropower generators. Existing literature suggests that climate adaptation measures such as water conservation, cropland retirement, wastewater recycling, and managed aquifer recharge can alleviate some of these challenges. Few analyses, however, compare the relative efficacy and system‐wide effects of these adaptations under different climate projections across the entire Western United States. Here we use a Western US‐wide water systems model to evaluate, by sector and sub‐region, how the widespread implementation of these adaptive measures impacts water demands, water deliveries, and electricity use related to the water system for three different climate projections. We find that wastewater recycling has greater potential to lower unmet indoor water demands than urban indoor water conservation measures. However, when implemented at scale, indoor water conservation reduces electricity use by an average of 683 Terawatt hours while wastewater recycling increases energy use by an average of 721 Terawatt hours, cumulatively from 2020 to 2070. Cropland retirement and aquifer recharge adaptations increase the ability to meet agricultural water demand, increase groundwater storage, and reduce summertime electricity use. While most of these findings are consistent across different climate projections, the benefits of aquifer recharge are sensitive to spatial variation of precipitation. Given the limitations and tradeoffs of each individually, the results suggest that a portfolio of adaptation measures will be needed for a climate‐resilient water and energy future in the Western US. Plain Language Summary The Western US faces increased water stress from the impacts of climate change, making it difficult to meet demands for cities, agriculture, and hydropower facilities. Adaptation measures like water conservation, retiring agricultural lands, recycling wastewater, and storing water underground can address these challenges. However, there is little modeling to understand the impact of these adaptations if they were implemented across the entire Western US while also considering climate change. We use a Western US‐wide water systems model to evaluate how implementing adaptation measures impacts groundwater levels, the ability to meet water demands, and electricity use related to water in three different possible climate futures. We find that recycling wastewater to drinking water standards does a better job of meeting urban water demands than water conservation measures. However, indoor water conservation reduces energy use for water while recycling wastewater increases energy use for water. Retiring agricultural lands and storing water underground both increase the ability to meet agricultural water demands, increase underground water storage, and reduce summertime energy use. No adaptation measures provides benefits across every metric we track. Therefore, multiple adaptation measures will likely be needed to achieve a climate‐resilient future for energy and water in the Western US. Key Points Water‐related climate change adaptations have different benefits and tradeoffs for interconnected water‐energy systems in the Western U.S. Wastewater recycling most increases urban water coverage, but has a significant tradeoff in the form of greater electricity use Cropland retirement and aquifer recharge benefit water and electricity systems most in the summer when those systems are most stressed

Singhal, A↗

Business Models for Coal Plant Decommissioning

Aging coal-fired power plants are retiring across the United States. Researchers at Pacific Northwest National Laboratory studied coal-fired power plant decommissioning business models to support program development for the Department of Energy’s Office of Energy Efficiency & Renewable Energy (EERE) to engage with communities affected by power plant retirement processes. Evaluating and reducing the impact on coal-dependent communities from phasing out coal production is a crucial piece of nationwide economic development and community-directed engagement in the clean energy future. This report describes the steps in the typical coal-fired power plant decommissioning process, including analysis of the following key factors: Drivers including policy and regulations, competition with other fuels, and corporate responsibility goals; Types of coal plant decommissioning including plant retirement without full decommissioning, repurposing with fuel switch, redeveloping to utilize existing transmission, and decommissioning and repurposing with other commercial activities; and, Costs of coal plant decommissioning, including variations across regulated and deregulated markets and the funding resources to support decommissioning activities. The details described in this report relied heavily on the availability of local news reports and communications regarding plant retirements, as the researchers identified a lack of formal literature surrounding business models for coal plant decommissioning and a need for a more robust source material collection. In addition, a lack of oversight entities responsible for decommissioning processes may have led to this shortfall of information. Future research regarding coal plant decommissioning can include quantitative studies on power plant retirement drivers, procedures, and costs, qualitative assessments on affects decommissioning has on surrounding communities, investors, and other stakeholders, and identifying best practices to engage community stakeholders in the decommissioning process.

01 COAL, LIGNITE, AND PEAT↗

How Today's Hydropower Impacts Tomorrow's Grid: Counterfactual Scenarios Showing Grid Impacts if Hydropower Goes Away

Amidst ongoing discussions about hydropower removals, retirements, and reduced availability due to drought and other environmental considerations, it is important to understand the long-term effects of reduced hydropower resources on the U.S. electric grid. This analysis uses the Regional Energy Deployment System (ReEDS™) grid planning model to compare several representative scenarios of retiring hydropower and pumped storage hydropower (PSH) capacity over time and explore the overall implications on the U.S. grid from present day through 2050. Reduced hydropower capacity and generation is replaced by a mix of both fossil and non-fossil resources, including natural gas, wind, solar, and battery technologies. Additional natural gas usage leads to an increase in cumulative national electric sector carbon dioxide and criteria pollutant operating emissions of less than 1% in many scenarios but up to 4-5.3% in some cases. Total electric sector costs also increase by <1% in many scenarios but up to 3.6% in the most extreme scenarios where nearly all the hydropower and PSH fleet retires, equating to $\$$340 billion in undiscounted costs. National results indicate that absent additional interventions, retiring hydropower and PSH capacity could increase electric sector emissions and direct capital and operating costs. However, more focused analysis is required to evaluate specific asset-level, local, and regional implications, and a broader scope is necessary to weigh these electric sector impacts alongside economic, ecological, water management, and other cross-sectoral effects that could be either negative or positive.

14 SOLAR ENERGY↗

A plant-by-plant strategy for high-ambition coal power phaseout in China

More than half of current coal power capacity is in China. A key strategy for meeting China’s 2060 carbon neutrality goal and the global 1.5 °C climate goal is to rapidly shift away from unabated coal use. Here we detail how to structure a high-ambition coal phaseout in China while balancing multiple national needs. We evaluate the 1037 currently operating coal plants based on comprehensive technical, economic and environmental criteria and develop a metric for prioritizing plants for early retirement. We find that 18% of plants consistently score poorly across all three criteria and are thus low-hanging fruits for rapid retirement. We develop plant-by-plant phaseout strategies for each province by combining our retirement algorithm with an integrated assessment model. With rapid retirement of the low-hanging fruits, other existing plants can operate with a 20- or 30-year minimum lifetime and gradually reduced utilization to achieve the 1.5 °C or well-below 2 °C climate goals, respectively, with complete phaseout by 2045 and 2055.

20 FOSSIL-FUELED POWER PLANTS↗

Capacity Expansion Planning for LA Basin: the Role of Energy Storage

The paper evaluates the deployment of energy storage to support equitable energy outcomes and the clean energy transition in the Los Angeles Basin (LAB). The deployment of energy storage is considered in a 10 zone capacity expansion planning model from 2022-2045. The model is based on the California Public Utility Commission’s 7 zone RESOLVE model but has been modified to give greater spatial granularity in the LAB area by addig 3 new zones representing the Eastern Los Angeles, Western Los Angeles and the El Nido subzones. Three different scenarios are studied in this work; a base case with no natural gas retirements in the LAB, and two cases exploring extreme natural gas retirements, where the 8GW of natural gas belonging to the LAB are retired by 2045. Study results indicate that storage can play a significant role in helping the LAB meeting its energy requirements. However, when considering extreme retirement scenarios, either new generation (such as solar) or capacity (such as new import capacity via transmission lines) will likely be needed to serve projected system loads.

Maloney, Patrick R.↗