Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “resume”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

In-Flight Operation of the Dawn Ion Propulsion System Through Orbit Capture at Vesta

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta -II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. Onboard the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide most of the ?V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer among Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer among Ceres science orbits. The first 80 days after launch were dedicated to the initial checkout of the spacecraft which was followed by about ten months of full-power thrusting leading to a Mars gravity assist in February 2009 that provided 1 km/s of heliocentric energy increase and is the only part of the mission following launch in which a needed velocity change is not accomplished by the IPS. Deterministic thrusting for heliocentric transfer to Vesta resumed in June 2009 and was concluded with orbit capture at Vesta in July 2011. IPS was operated for approximately 23,400 hours, consumed approximately 250 kg of xenon, and provided a delta-V of approximately 6.7 km/s to achieve orbit capture at Vesta. IPS performance characteristics are very close to the expected performance characteristics based on analysis performed pre-launch. The only significant problem to have occurred over the almost four years of IPS operations in flight was the temporary failure of a valve driver board in DCIU-1, resulting in a loss of thrust of approximately 29 hours. Thrusting operations resumed after switching to DCIU-2, and power cycling conducted after orbit capture indicates DCIU-1 is completely operational. After about three weeks of survey operations IPS will be used to maneuver the spacecraft as needed for science operations including orbit transfers. After approximately one year of science operations IPS will then be used for escape from Vesta and begin thrusting for cruise to Ceres with a planned arrival date at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through orbit capture and the start of science operations at Vesta.

Garner, Charles E.↗

In the Hot Seat: STS-115 Lightning Strike Stand Down Debate - NASA Case Study

There is no way the PIC's could have seen any current' was the gist of Mike Griffin's assessment. Griffin was the NASA Administrator at the time. The buck stopped at his desk. Holding a napkin out to Pat Lampton, Griffin showed Lampton the calculations he'd made over dinner that predicted that the Pyrotechnic Initiator Controllers (PIC's) at the base of the Space Shuttle Solid Rocket Boosters (SRBs) were fine. A lightning strike the day before, the worst ever experienced with a Space Shuttle on the launch pad, caused a halt to the launch count down as technicians, engineers, and managers scrambled identify any damage to the launch system. SRB technicians and engineers assessed the data against their Lightning Strike Re-Test Requirements, determining that all but one of the requirements could be checked if they resumed the countdown. For the one remaining requirement, testing the integrity of the PIC's would require 96 hours to set up, test, and reassemble. The engineers were convinced that there was no way to do calculations to show the PIC's were okay. The only option was to stand down. It was SRB Deputy Project Manager (PM) Pat Lampton's responsibility to decide what the SRB project position needed to be to certify that their hardware was safe to fly. He had to communicate that decision to the Mission Management Team (MMT) as a Go or No Go position to resume the count down. If the answer was Go they could still meet a delayed, but acceptable launch schedule. If the answer was No Go, rescheduling the launch would be a grueling shuffling of hardware, personnel, and mission timelines to accommodate Russian missions to the Space Station, supplies for the launch, and personnel manning launch operations. On top of that, Hurricane Ernesto was spinning off the coast of Florida, threatening the need for the Shuttle to roll back to the hangar if they waited too long.

Kummer, Lizette↗

In-Flight Operation of the Dawn Ion Propulsion System Through Survey Science Orbit at Ceres

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide a total delta V of 11 km/s for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer between Ceres science orbits. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional delta V of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in September 2012 and concluded with the start of the approach to Ceres phase on December 26, 2015, leading to orbit capture on March 6, 2015. Deterministic thrusting continued during approach to place the spacecraft in its first science orbit, called RC3, which was achieved on April 23, 2015. Following science operations at RC3 ion thrusting was resumed for twenty-five days leading to arrival to the next science orbit, called survey orbit, on June 3, 2015. The IPS will be used for all subsequent orbit transfers and trajectory correction maneuvers until completion of the primary mission in approximately June 2016. To date the IPS has been operated for over 46,774 hours, consumed approximately 393 kg of xenon, and provided a delta V of over 10.8 km/s to the spacecraft. The IPS performance characteristics are very close to the expected performance based on analysis and testing performed pre-launch. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through arrival at the second science orbit at Ceres.

Garner, Charles E.↗

CloudSat - From the A-Train to the C-Train

The CloudSat satellite was launched from Vandenberg Air Force Base, in California, on April 28, 2006. It was launched with the CALIPSO satellite, a joint mission between the National Aeronautics and Space Administration (NASA) and the Centre National D'Etudes Spatiales (CNES). CloudSat and CALIPSO were designed to fly in formation with each other, to combine their complimentary scientific measurements. The two missions were maneuvered into the Earth Science Afternoon Constellation (A-Train) shortly after launch and have flown in formation together since then. Originally designed to fly for 22 months, the CloudSat satellite has far exceeded expectations. Inflight anomalies on CloudSat necessitated changes to both the daily concept of operations and formation flying operations with CALIPSO. In 2011, a severe battery anomaly restricted CloudSat science data collection and maneuverability to the sunlit portions of the orbit. In 2017, CloudSat suffered a reaction wheel failure, triggering the criteria established to exit the A-Train. CloudSat successfully exited the A-Train in early 2018, suspending formation flying and joint science observations with CALIPSO. The joint CloudSat/CALIPSO science team continued collaboration with discussions focused on resuming joint observations. As both satellites were aging and CALIPSO was nearing the exhaustion of satellite propellant, the decision was made to lower CloudSat to the CALIPSO graveyard orbit, to be joined by CALIPSO as soon as feasible. With NASA’s approval, CloudSat was maneuvered to the lower orbit over the course of several months in mid-2018. Once CloudSat was in place, and with approval from CNES, CALIPSO began the delicate dance of lowering their orbit and re-aligning the satellite ground tracks. CloudSat and CALIPSO resumed formation flying in the newly dubbed C-Train (CloudSat and CALIPSO) orbit in the Fall of 2018. The ingenuity of the CloudSat and CALIPSO teams made the concept of the C-Train a reality. This paper will discuss the decision processes and the operational challenges the CloudSat flight team faced while designing and implementing the C-Train.

Witkowski, M.M.↗

Photosynthetic Gas Exchange in the Closed Ecosystem for Space. Phase II, Part II. Studies on the Growth of Thermophilic Chlorella 71105

Bench-scale studies with Chlorella pyrenoidosa 71105 were conducted in four- and eight-liter culture vessels, with and without recycling. It was established that the algal strain could be maintained for periods up to 72 days with supplemented re-cycled medium. In a factorial series of experiments, the highest yields were obtained with a 2.0% concentration of carbon dioxide, a 0.07 dilution factor (nutrient dilution rate/culture volume), and an 8.5 ft(exp -1) ratio of light surface to liquid culture volume. Optimum pH and concentrations of the constituents of the growth medium were determined in corollary test-tube studies. Other test-tube studies showed that the nutrient medium used for mass culture could be stored up to five weeks at 25 C or at refrigerator temperature (4 C) with little change in nitrogen-urea level. Algal suspensions stored at 4 C remained viable for periods of at least 12 weeks; growth resumed after a lag period when stored suspensions were cultured at 39 C. Streptomycin was found suitable for controlling a blue-green containment.

ALGAE↗

The flight experiments program

Flight experiments resumes managed by MSFC in fluid behavior, materials, atmospherics, optical technology, environmental engineering, assembly and maintenance, and thermodynamics

Source record↗

Audio signal processor

System provides automatic volume control for an audio amplifier or a voice communication system without introducing noise surges during pauses in the input, and without losing the initial signal when the input resumes.

Hymer, R. L.↗

Performance and Dynamics of Aerospace Vehicles

This publication consists of a series of lectures prepared by personnel of the NASA Langley Research Center. Collectively, they were presented as a graduate seminar at Rensselaer Polytechnic Institute, Troy, New York, under the auspices of Professor Robert E. Duffy. The lectures summarize theoretical and experimental work in a number of areas of current interest in the design of aeronautical and space vehicles and were intended as an extension of general academic studies toward applications to solutions of practical problems. The material presented is not intended to be a comprehensive survey of the state of the art but rather a series of resumes of work in several areas, some of which represent fairly recent developments and others in which the significant contributions are distributed in various publications. The material covered reflects the specialties and viewpoints of the individual lecturers and little effort has been made to provide continuity between the different papers. The topics are, nevertheless, grouped under three general headings, as follows: 1. Aerodynamics of vehicles in various speed ranges 2. Problems involving aeroelasticity and unsteady aerodynamics 3. Methods and application of analytical techniques in dynamic stability problems The material is considered suitable for providing aeronautical engineering students with background information and working knowledge in a number of specialized fields which are usually omitted or discussed only briefly in an undergraduate curriculum.

Source record↗

Apollo/Saturn 5 space vehicle countdown. Volume 2: Turnaround from scrub

The procedures required to prepare a space vehicle for subsequent launch attempt after cancelling lift-off activities are presented. The cancellation must occur after the start of cryogenic loading, but prior to initiation of ignition sequences. The sequence of operations necessary to return the space vehicle to a predetermined configuration at which time the launch count can be resumed or rescheduled for following launch opportunities is developed. The considerations and constraints that are the basis for the scrub/turnaround times are described.

Source record↗

Fatigue Tests with Random Flight Simulation Loading

Crack propagation was studied in a full-scale wing structure under different simulated flight conditions. Omission of low-amplitude gust cycles had a small effect on the crack rate. Truncation of the infrequently occurring high-amplitude gust cycles to a lower level had a noticeably accelerating effect on crack growth. The application of fail-safe load (100 percent limit load) effectively stopped subsequent crack growth under resumed flight-simulation loading. In another flight-simulation test series on sheet specimens, the variables studied are the design stress level and the cyclic frequency of the random gust loading. Inflight mean stresses vary from 5.5 to 10.0 kg/sq mm. The effect of the stress level is larger for the 2024 alloy than for the 7075 alloy. Three frequencies were employed: namely, 10 cps, 1 cps, and 0.1 cps. The frequency effect was small. The advantages and limitations of flight-simulation tests are compared with those of alternative test procedures such as constant-amplitude tests, program tests, and random-load tests. Various testing purposes are considered. The variables of flight-simulation tests are listed and their effects are discussed. A proposal is made for performing systematic flight-simulation tests in such a way that the compiled data may be used as a source of reference.

Schijve, J.↗

Remote sensing of some sedimentary rocks.

Sedimentary rocks including varying sized clastics and carbonates were overflown by aircraft between 1966 and 1971 producing data in the ultraviolet to microwave regions of the electromagnetic spectrum. This paper reports that multispectral analysis increases the ease and rapidity of discrimination of rock types having subtle differences in physical characteristics, but fails to enhance and may degrade distinctions where physical characteristics are significantly different. Brief resumes of color and color IR photographic data are presented. Thermal infrared is found to be useful in the mapping of rock units, but limitations such as moisture variation, soil cover, and vegetation may exceed in one formation the distinction between differing lithologies. A brief review of previously published SLAR data is included for completeness. Remote sensing techniques should reduce field geological effort by as much as 50%.

Brennan, P. A.↗

Digest of NASA earth observation sensors

A digest of technical characteristics of remote sensors and supporting technological experiments uniquely developed under NASA Applications Programs for Earth Observation Flight Missions is presented. Included are camera systems, sounders, interferometers, communications and experiments. In the text, these are grouped by types, such as television and photographic cameras, lasers and radars, radiometers, spectrometers, technology experiments, and transponder technology experiments. Coverage of the brief history of development extends from the first successful earth observation sensor aboard Explorer 7 in October, 1959, through the latest funded and flight-approved sensors under development as of October 1, 1972. A standard resume format is employed to normalize and mechanize the information presented.

Drummond, R. R.↗

Material Fatigue Testing System

A system for cyclicly applying a varying load to a material under test is described. It includes a load sensor which senses the magnitude of load being applied to a material, and, upon sensing a selected magnitude of loading, causes the load to be maintained for a predetermined time and then cause the system to resume cyclical loading.

Gilley, P. J.↗

Lunar atmospheric composition experiment

On the Apollo 17 mission, a miniature mass spectrometer, called the lunar atmospheric composition experiment (LACE), was carried to the moon as part of the Apollo lunar surface experiments package (ALSEP) to study the composition of and variation in the lunar atmosphere. The instrument was successfully deployed in the Taurus-Littrow valley with its entrance aperture oriented upward to intercept and measure the downward flux of gases at the lunar surface. Initial activation of the LACE instrument occurred on December 27, 1972, approximately 50 hr after sunset, and operation continued throughout the first lunar night. Sunrise brought a high background gas level and necessitated discontinuing operation during lunar daytime except for a brief check near noon. Near sunset, operation was resumed and continued throughout the night. This sequence was repeated for the second and third lunations.

J. H. Hoffman↗

Intrathoracic and venous pressure relationships during responses to changes in body position

Simultaneous end-expiratory pressures, referred to midthoracic level, in the superior and abdominal venae cavae, pericardial space, and right and left heart, were recorded without thoracotomy in three anesthetized dogs during sudden changes from supine to vertical head-up or head-down body positions. Intrathoracic and dependent great vein pressures referred to midchest level (sixth thoracic vertebra) decreased and showed simple hydrostatic gradients in either vertical position. However, a discontinuity in the large vein hydrostatic gradient occurred just distal to the superior margin of the thorax in either body position and was resumed again above this level. It is concluded that, just as the cerebrospinal fluid and intraperitoneal pressures minimize the effects of gravitational and inertial forces on the cerebral and visceral circulations, the pericardial and pleural pressures have a similar role for the heart proper.

Avasthey, P.↗

A control system formulation of the mechanism that controls the secretions of serum group hormone in humans during sleep

Plasma growth hormone concentrations during sleep were determined experimentally. An elevated level of plasma growth hormone was observed during the initial phase of sleep and remained elevated for approximately 3 hr before returning to the steady-state level. Moreover, subsequent to a prolonged interruption of sleep, of the order of 2-3 hr, an elevated level of plasma growth hormone was again observed during the initial phase of resumed sleep. A control system formulation of the mechanism that controls the secretions of serum growth hormone in humans was used to account for the growth hormone responses observed.

Howard, J. C.↗

Hemodynamics, renal function, plasma renin, and aldosterone in man after 5 to 14 days of bedrest

Continuous bedrest for 5 to 14 days had no significant effect on resting heart rate, blood pressure, or cardiac output in six normal men. Head-up tilt induced greater tachycardia in 5 of 6 patients after bed rest than in the control period. Propranolol diminished both tachycardia and the incidence of hypotension and faintness in upright posture. Plasma volume fell, extracellular fluid volume increased, and plasma renin activity was significantly elevated following bedrest. Unusually large increases in plasma renin followed head-up tilt or administration of isoproterenol during bedrest and after resuming normal activity. During bedrest, plasma aldosterone was often increased in the early morning. It is concluded that after bedrest, upright posture evokes strong beta-adrenergic activity as well as exaggerated metabolic and circulatory responses which can be reduced or abolished by the beta-adrenergic blocker, propranolol.

Melada, G. A.↗