Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “resource planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Long term load forecasting accuracy in electric utility integrated resource planning

Forecasts of electricity consumption and peak demand over time horizons of one or two decades are a key element in electric utilities’ meeting their core objective and obligation to ensure reliable and affordable electricity supplies for their customers while complying with a range of energy and environmental regulations and policies. These forecasts are an important input to integrated resource planning (IRP) processes involving utilities, regulators, and other stake-holders. Despite their importance, however, there has been little analysis of long term utility load forecasting accuracy. We conduct a retrospective analysis of long term load forecasts on twelve Western U. S. electric utilities in the mid-2000s to find that most overestimated both energy consumption and peak demand growth. A key reason for this was the use of assumptions that led to an overestimation of economic growth. We find that the complexity of forecast methods and the accuracy of these forecasts are mildly correlated. In addition, sensitivity and risk analysis of load growth and its implications for capacity expansion were not well integrated with subsequent implementation. As a result, we review changes in the utilities load forecasting methods over the subsequent decade, and discuss the policy implications of long term load forecast inaccuracy and its underlying causes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Implications of a regional resource adequacy program on utility integrated resource planning: Study for the Western United States

LBNL collaborated with the Western Interstate Energy Board and the University of Texas, Austin to investigate the implications of a regional resource adequacy (RA) program on utility integrated resource planning. This report is focused on an active policy discussion to develop a novel voluntary program to share capacity resource and improve RA in the Western Interconnection. This report identifies two RA components of IRP that will be highly impacted by a regional RA program: resource capacity accreditation and RA targets. There are at least four resources that will require specific attention for their capacity credit calculation: (1) variable renewable resources, (2) demand-side resources, (3) hydropower, and (4) contracts. It will then be necessary to decide on a RA target reliability metric (e.g., a planning reserve margin) that is at least the minimum requirement in IRPs to ensure consistency in RA requirement calculations. The report finds that load forecasting and transmission expansion analyses will be moderately impacted, but that most of IRP components will not be significantly impacted. The report includes (i) a review of traditional resource adequacy practices in IRP; (ii) a case study of an existing regional RA program that interacts with IRP (Southwest Power Pool) and (iii) an overview of the NWPP regional resource adequacy proposal that is the object of this work. This paper does not (1) advocate for or against a regional RA program for the NWPP, (2) make detailed design recommendations for this program, or (3) assess its benefits and costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

MO-F-CAMPUS-T-05: SQL Database Queries to Determine Treatment Planning Resource Usage

Purpose: A radiation oncology clinic’s treatment capacity is traditionally thought to be limited by the number of machines in the clinic. As the number of fractions per course decrease and the number of adaptive plans increase, the question of how many treatment plans a clinic can plan becomes increasingly important. This work seeks to lay the ground work for assessing treatment planning resource usage. Methods: Care path templates were created using the Aria 11 care path interface. Care path tasks included key steps in the treatment planning process from the completion of CT simulation through the first radiation treatment. SQL Server Management Studio was used to run SQL queries to extract task completion time stamps along with care path template information and diagnosis codes from the Aria database. 6 months of planning cycles were evaluated. Elapsed time was evaluated in terms of work hours within Monday – Friday, 7am to 5pm. Results: For the 195 validated treatment planning cycles, the average time for planning and MD review was 22.8 hours. Of those cases 33 were categorized as urgent. The average planning time for urgent plans was 5 hours. A strong correlation between diagnosis code and range of elapsed planning time was as well as between elapsed time and select diagnosis codes was observed. It was also observed that tasks were more likely to be completed on the date due than the time that they were due. Follow-up confirmed that most users did not look at the due time. Conclusion: Evaluation of elapsed planning time and other tasks suggest that care paths should be adjusted to allow for different contouring and planning times for certain diagnosis codes and urgent cases. Additional clinic training around task due times vs dates or a structuring of care paths around due dates is also needed.

60 APPLIED LIFE SCIENCES↗

Become EV Friendly With Planning Resources for Charging Infrastructure

State and local governments are key to the successful build-out of a nationwide electric vehicle (EV) charging infrastructure network. Visit the Alternative Fuels Data Center for resources on EV infrastructure planning, including key considerations and best practices for navigating regulatory updates to streamline infrastructure build-out.

ADVANCED PROPULSION SYSTEMS↗

Application of remote sensing to land and water resource planning: The Pocomoke River Basin, Maryland

Because of the size of the Pocomoke River Basin, the inaccessibility of certain areas, and study time constraints, several remote sensing techniques were used to collect base information on the river corridor, (a 23.2 km channel) and on a 1.2 km wooded floodplain. This information provided an adequate understanding of the environment and its resources, thus enabling effective management options to be designed. The remote sensing techniques used for assessment included manual analysis of high altitude color-infrared photography, computer-assisted analysis of LANDSAT-2 imagery, and the application of airborne oceanographic Lidar for topographic mapping. Results show that each techniques was valuable in providing the needed base data necessary for resource planning.

Wildesen, S. E.↗

Addressing trend-related changes within cumulative effects studies in water resources planning

Summarized herein are 28 case studies wherein trend-related causative physical, social, or institutional changes were connected to consequential changes in runoff, water quality, and riparian and aquatic ecological features. The reviewed cases were systematically evaluated relative to their identified environmental effects; usage of analytical frameworks, and appropriate models, methods, and technologies; and the attention given to mitigation and/or management of the resultant causative and consequential changes. These changes also represent important considerations in project design and operation, and in cumulative effects studies associated therewith. The cases were grouped into five categories: institutional changes associated with legislation and policies (seven cases); physical changes from land use changes in urbanizing watersheds (eight cases); physical changes from land use changes and development projects in watersheds (four cases); physical, institutional, and social changes from land use and related policy changes in river basins (three cases); and multiple changes within a comprehensive study of land use and policy changes in the Willamette River Basin in Oregon (six cases). A tabulation of 110 models, methods and technologies used in the studies is also presented. General observations from this review were that the features were unique for each case; the consequential changes were logically based on the causative changes; the analytical frameworks provided relevant structures for the studies, and the identified methods and technologies were pertinent for addressing both the causative and consequential changes. One key lesson was that the cases provide useful, “real-world” illustrations of the importance of addressing trend-related changes in cumulative effects studies within water resources planning. Accordingly, they could be used as an “initial tool kit” for addressing trend-related changes.

54 ENVIRONMENTAL SCIENCES↗

North Slope Decision Support for Water Resource Planning and Management (Final Technical Report)

The objective of this project was to enhance the water resource decision-making process with respect to oil and gas exploration/production activities on Alaska’s North Slope. To this end, a web-based software tool was developed to allow stakeholders to assemble, evaluate, and communicate relevant information between and amongst themselves. The software, termed North Slope Decision Support System (NSDSS), is a visually-referenced database that provides a platform for running complex natural system, planning, and optimization models. The NSDSS design was based upon community input garnered during a series of stakeholder workshops, and the end product software is freely available to all stakeholders via the project website. The tool now resides on servers hosted by the UAF Water and Environmental Research Center, and will remain accessible and free-of-charge for all interested stakeholders. The development of the tool fostered new advances in the area of data evaluation and decision support technologies, and the finished product is envisioned to enhance water resource planning activities on Alaska’s North Slope.

02 PETROLEUM↗

Beginner's Guide to Understanding Power System Model Results for Long-Term Resource Plans

This guide was developed to improve decision-making in the electricity planning process by strengthening dialogue between electricity system planners and stakeholders throughout the process. This document was created for anyone who is first getting exposed to scenario results from power system planning models, or for those who are beginning to interact with power system modelers. It does not assume any experience with power system modeling, or familiarity with electricity planning concepts. This guide can be helpful to a wide range of people, including but not limited to state utility commissioners and commission staff, state energy offices, and intervenors in the planning process. It is targeted to those who are evaluating or reviewing model results presented by a utility, which typically span utility-scale generation and storage (and associated transmission) assets. This guide is designed to provide enough background and guidance that stakeholders can formulate and ask questions to evaluate model results through a deeper understanding of the key assumptions, data, and methods that drive decision outcomes. The ultimate purpose of this work is to increase transparency in the electricity planning process by enabling stakeholders to better engage and evaluate model results. A follow-on guide will provide a deeper dive into emerging topics, which are expected to become more prominent in the electricity planning process, but whose methods and approaches are still being refined.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Estimating the Value of Improved Distributed Photovoltaic Adoption Forecasts for Utility Resource Planning

Misforecasting the adoption of customer-owned distributed photovoltaics (DPV) can have operational and financial implications for utilities - forecasting capabilities can be improved, but generally at a cost. This paper informs this decision-space by quantifying the costs of misforecasting across a wide range of DPV growth rates and misforecast severities. Using a simplified probabilistic method presented within, an analyst can make a first-order estimate of the financial benefit of improving a utility's forecasting capabilities, and thus be better informed about whether to make such an investment. For example, we show that a utility with 10 TWh per year of retail electric sales who initially estimates that the increase in DPV's contribution to total generation could range from 2 to 7.5 percent over the next 15 years could expect total present-value savings of approximately 4 million dollars if they could keep the severity of successive five-year misforecasts within plus or minus 25 percent. We also have more general discussions about how misforecasting DPV impacts the buildout and operation of the bulk power system - for example, we observed that misforecasting DPV most strongly influenced the amount of utility-scale PV that gets built, due to the similarity in the energy and capacity services offered by the two solar technologies.

14 SOLAR ENERGY↗

Estimating the Value of Improved Distributed Photovoltaic Adoption Forecasts for Utility Resource Planning

Misforecasting the adoption of customer-owned distributed photovoltaics (DPV) can have operational and financial implications for utilities - forecasting capabilities can be improved, but generally at a cost.This paper informs this decision-space by quantifying the costs of misforecasting across a wide range of DPV growth rates and misforecast severities. Using a simplified probabilistic method presented within, an analyst can make a first-order estimate of the financial benefit of improving a utility's forecasting capabilities, and thus be better informed about whether to make such an investment. For example, we show that a utility with 10 TWh per year of retail electric sales who initially estimates that the increase in DPV's contribution to total generation could range from 2 percent to 7.5 percent over the next 15 years could expect total present-value savings of approximately 4 million if they could keep the severity of successive five-year misforecasts within +/- 25 percent. We also have more general discussions about how misforecasting DPV impacts the buildout and operation of the bulk power system - for example, we observed that misforecasting DPV most strongly influenced the amount of utility-scale PV that gets built, due to the similarity in the energy and capacity services offered by the two solar technologies.

14 SOLAR ENERGY↗

Business Continuity Planning Resources for Small- and Medium-Sized Businesses

This document/memo summarizes existing resources and guidance on business continuity planning for small- to medium-sized businesses. DTRA will share this information with large commercial businesses who identified the need to help their suppliers and other key collaborators prepare business continuity plans in order to speed recovery from a wide-area bioterrorism incident.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Risk Analysis for Resource Planning Optimization

The main purpose of this paper is to introduce a risk management approach that allows planners to quantify the risk and efficiency tradeoff in the presence of uncertainties, and to make forward-looking choices in the development and execution of the plan. Demonstrate a planning and risk analysis framework that tightly integrates mathematical optimization, empirical simulation, and theoretical analysis techniques to solve complex problems.

resource planning optimization↗

NREL Planning Resources for States

This presentation summarizes some NREL resources and capabilities that states might want to access to help with decarbonization planning. It describes three types of resources: already-available, public datasets describing technology costs and future grid evolution; jurisdiction-specific integration studies that require directly partnering with NREL; and an envisioned new data product comprising state-specific standard scenarios that could be collaboratively funded by the states.

annual technology baseline↗

VIRTUAL HYDROPOWER PROSPECTING: A FOUNDATION FOR WATER ENERGY RESOURCE PLANNING AND DEVELOPMENT

A comprehensive assessment of the gross power potential of the natural stream water energy resources of the United States was performed using state-of-the-art digital elevation models (DEMs) and geographic information system (GIS) tools. Water energy resource sites (stream segments) assessed in the basic resource assessment were further evaluated to identify which can be developed using a set of feasibility criteria. The gross power potential of each site was refined to determine its developable hydropower potential using a set of development criteria corresponding to a damless low power (less than 1 MWa) or small hydro (between 1 and 30 MWa) project. The methodologies for performing the basic resource assessment and subsequent feasibility assessment are described and the summary results for the nation are presented.

13 HYDRO ENERGY↗

An innovative approach for distributed and integrated resources planning for the Space Station Freedom

This paper presents a planning approach to the Space Station Freedom program which takes into account the widely distributed nature of that program. The program management structure is organized into three major levels: a strategic level, a tactical level, and an execution level. For each level, resource availabilities are determined, the resources are distributed, schedules are built independently within the resource limits, the schedules are integrated into a single schedule, and conflicts are resolved by negotiating requirements and/or relaxing contraints. This approach distributes resources to multiple planning entities in such a way that when the multiple plans are collected, they fit together with minimal modification. The up-front distribution is planned in such a way and to a sufficient degree that a fit is virtually assured.

Hornstein, Rhoda S.↗