Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “reserve requirement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Impact of operating reserve rules on electricity prices with high penetrations of renewable energy

In competitive wholesale electricity markets, significant effort is devoted to designing markets that set efficient prices for maintaining supply-demand balance. One factor that can impact prices is administratively-set scarcity pricing, which sets prices to a preset level when the market is not able to meet operating reserve or energy requirements. When energy and operating reserves are co-optimized, assumptions surrounding operating reserve requirements and scarcity pricing can impact system-wide price outcomes for both operating reserves and energy. This study uses production cost modeling of an ERCOT-like system to evaluate the impact of operating reserve eligibility, scarcity pricing, and quantity rules on electricity prices, and therefore also on generator revenues. Results reveal economic and operational benefits with allowing open participation in reserve markets, as this enables greater access to the full set of capable resources at lowest cost. Furthermore, both energy and reserve prices are strongly impacted by reserve scarcity pricing events, which reveals that reserve scarcity pricing assumptions can impact price outcomes even for units not providing reserves. This study highlights the importance of operating reserve scarcity pricing rules because of the strong coupling between energy and reserve prices and because these rules serve as proxies for true price responsive demand.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Machine Learning-Based PV Reserve Determination Strategy for Frequency Control on the WECC System

Frequency control from photovoltaic (PV) power plants has great potential to address the frequency response challenge of the power system with high penetrations of renewable generation. Using model-based approaches to determine the optimal PV headroom reserve, however, requires significant online computation and is intractable for an interconnection level system. This paper proposes a machine learning based strategy, that is suitable for real-time operation, to determine the optimal PV reserve for frequency control. The proposed machine learning algorithm is trained and tested on 1,987 offline simulations of a 60% renewable penetration Western Electricity Coordinating Council (WECC) system. Furthermore, the proposed reserve determination strategy is applied on a realistic 1-day operation profile of the WECC system and demonstrates a savings of more than 40% PV headroom compared to a conservative approach. It is evident that the proposed strategy can efficiently and effectively determine the optimal PV frequency control reserve for realistic interconnection systems.

frequency control↗

Impacts and Benefits of a Satellite Power System on the Electric Utility Industry

The purpose of this limited study was to investigate six specific issues associated with interfacing a Satellite Power System (5 GW) with large (by present standards) terrestrial power pools to a depth sufficient to determine if certain interface problems and/or benefits exist and what future studies of these problems are required. The issues investigated are as follows: (1) Stability of Power Pools Containing a 5 GWe SPS; (2) Extra Reserve Margin Required to Maintain the Reliability of Power Pools Containing a 5 GWe SPS; (3) Use of the SPS in Load Following Service (i.e. in two independent pools whose times of peak demand differ by three hours); (4) Ownership of the SPS and its effect on SPS Usage and Utility Costs; (5) Utility Sharing of SPS related RD and D Costs; (6) Utility Liability for SPS Related Hazards.

Winer, B. M.↗

Regulatory Considerations for Future Regional Air Mobility Aircraft

Regional Air Mobility (RAM) is a term that is used to describe equitable, economical, and environmentally friendly access to air commerce at local airports. The term “regional” can imply a wide range of aircraft payload and/or number of passengers carried, types of airports served, distances between aircraft origin/destination pairs, crew requirements, runways lengths, required energy reserves, and much more. This paper describes the regulations and other considerations that apply to RAM operations in the conterminous United States and defines a notional set of requirements to apply to a planned NASA study on RAM aircraft sizing. These notional requirements include: (1) a payload sufficient to carry up to nine passengers or equivalent cargo, (2) nominal distances between the origin and destination of at least 100 miles, with 300 miles desired, (3) ability to operate from a runway that is no more than 3,364 ft in length at a density altitude of 3,100 ft, with a desire for a 2,665 ft runway at 4,100 ft density altitude, and (4) energy reserves at least sufficient for 45 minutes of operation at normal cruise power, with a desire for energy reserves that also include diversion to an alternate airport at least 50 nautical miles away. Aircraft that meet these desired capabilities will be able to provide commercial access to at least 2,507 airports in the conterminous United States without revision to airworthiness, operating, or security regulations.

Nicholas K Borer↗

Regulatory Considerations for Future Regional Air Mobility Aircraft

Regional Air Mobility (RAM) is a term that is used to describe equitable, economical, and environmentally friendly access to air commerce at local airports. The term “regional” can imply a wide range of aircraft payload and/or number of passengers carried, types of airports served, distances between aircraft origin/destination pairs, crew requirements, runways lengths, required energy reserves, and much more. This paper describes the regulations and other considerations that apply to RAM operations in the conterminous United States and defines a notional set of requirements to apply to a planned NASA study on RAM aircraft sizing. These notional requirements include: (1) a payload sufficient to carry up to nine passengers or equivalent cargo, (2) nominal distances between the origin and destination of at least 100 miles, with 300 miles desired, (3) ability to operate from a runway that is no more than 3,364 ft in length at a density altitude of 3,100 ft, with a desire for a 2,665 ft runway at 4,100 ft density altitude, and (4) energy reserves at least sufficient for 45 minutes of operation at normal cruise power, with a desire for energy reserves that also include diversion to an alternate airport at least 50 nautical miles away. Aircraft that meet these desired capabilities will be able to provide commercial access to at least 2,507 airports in the conterminous United States without revision to airworthiness, operating, or security regulations.

Nicholas K Borer↗

Adaptive Protection of Scientific Backbone Networks Using Machine Learning

In this article, we propose a new protection scheme for backbone networks to guarantee high service availability. The presented scheme does not require any reconfiguration immediately after the failure (i.e., it is proactive). At the same time, it does not require any reserved backup network resources either. To achieve these seemingly contradictory goals, we utilize the recent advancements in Machine Learning (ML) to implement a network intelligence that periodically re-allocates the unused capacity as protection bandwidth to meet the service availability requirements of each connection. Our goal is achieved by two components (1) predicting the traffic for the next period on each link, and (2) intelligently selecting the best fit dedicated protection scheme for the next period depending on the estimated unused (spare) bandwidth and the previous service availability violations. Note that re-allocating protection bandwidth affects neither the operational connections nor the current best practice of operators to over-provision network bandwidth to support elephant flows. Finally, we provide a case study on the real traffic from Energy Sciences Network (ESnet), a high-speed, international scientific backbone network. The key benefit of our framework is that adaptively utilizing the over-provisioned bandwidth for spare capacity is sufficient to improve the availability from three-nines to five-nines (in ESnet for the 30 examined connections). The drawback is negligible bandwidth limitations; the user perceives a minor and very temporal bandwidth limitation in less than 0.1% of the time.

42 ENGINEERING↗

The 100 kW space station

Solar array power systems for the space construction base are discussed. Nickel cadmium and nickel hydrogen batteries are equally attractive relative to regenerative fuel cell systems at 5 years life. Further evaluation of energy storage system life (low orbit conditions) is required. Shuttle and solid polymer electrolyte fuel cell technology appears adequate; large units (approximately four times shuttle) are most appropriate and should be studied for a 100 KWe SCB system. A conservative NiH2 battery DOD (18.6%) was elected due to lack of test data and offers considerable improvement potential. Multiorbit load averaging and reserve capacity requirements limit nominal DOD to 30% to 50% maximum, independent of life considerations.

Mckhann, G.↗

Managing Solar Photovoltaic Integration in the Western United States: Resource Adequacy Considerations

This study examines the impact of reserve margin-based reliability assessment, as commonly used in capacity expansion models, on planning resource-adequate power systems under high penetrations of solar photovoltaics (PV). As a generation resource, PV is operationally different from the conventional dispatchable resources for which most capacity expansion models were designed. The question this study attempts to answer is whether large amounts of PV on a system (in this case, the Western Interconnection of North America) would bias the results of conventional reserve margin-based capacity expansion modeling towards an over- or under-provisioning of resource adequacy. This analysis used NREL’s Resource Planning Model (RPM) for capacity expansion modeling and NREL’s Probabilistic Resource Adequacy Suite (PRAS) for resource adequacy assessment. RPM uses a reserve margin requirement to enforce resource adequacy. PRAS, a collection of tools for studying the resource adequacy of power systems and the adequacy contributions of individual resources on a probabilistic basis, was used to compute multiple resource adequacy metrics across a number of simulated scenarios and system representations with differing regional detail. In all cases, including high PV penetrations (up to 33% annual generation from PV, interconnection-wide), RPM was able to produce resource-adequate systems as measured by normalized expected unserved energy and loss-of-load expectation results from PRAS. The accuracy of reserve margin approaches depends heavily on the underlying assumptions informing the capacity credit assigned to variable and energy-limited resources, particularly when such resources are abundant in the modeled system. RPM’s standard methodology for estimating variable and flexible resources’ capacity contributions, which is based on the top 100 hours of net load, did not appear to systematically undervalue or overvalue variable generation relative to a more rigorous equivalent firm capacity assessment using PRAS, although both over- and under-valuations were observed in specific scenarios. In the worst cases, the top 100 hour method underestimated the equivalent firm capacity of PV by two percentage points, and overestimated the equivalent firm capacity of PV by five percentage points. Calculating capacity contributions based on the top 10 hours of net load systematically underestimated equivalent firm capacities at more modest PV penetrations, but was often a better approximation of equivalent firm capacity than the existing 100-hour approach in scenarios with higher PV penetrations.

14 SOLAR ENERGY↗

Supervisory Control with Dual Tasking in Post G-Transition Vehicle Landings

BACKGROUND Landing during exploration spaceflight may consist of both planned automated supervisory control and unplanned crew override. Supervisory control, particularly when performed under cognitive load with additional monitoring tasks, is essential for ensuring overall mission success during landing contingencies. Evaluating performance in a relevant Human Landing System (HLS) supervisory landing task after long-duration microgravity exposure can help identify potential risks from human error and sensorimotor alterations. Adaptive changes in the sensorimotor system can manifest during g-transitions as spatial disorientation. Although training and landing aids facilitate successful landings despite disorientation, these adaptive changes may heighten cognitive demand, which must be considered in the landing strategy. It is important to characterize these effects as soon as possible following the G-transition while the sensorimotor system remains in a state of adaptive flux to inform appropriate countermeasures. METHODS A Multi-attribute Lunar Table Battery (MALTB) task was developed for an iOS tablet device to provide flexible crew testing and training capabilities in-flight and on the ground. Elements of the tablet task were derived from the Multi-Attribute Task Battery (MATB, Cegarra et al. 2020). The task requires crew members to study a map of a planned landing site and memorizing the terrain and surface landmarks to inform potential divert maneuvers during landing. The user will oversee a series of approaches through touchdown simulations on the tablet with an external camera view of the Lunar surface. The primary responsibility of the crew member will be to execute a divert if the guidance recommended site is erroneous (e.g., the guidance projected landing target is not within 10m of the planned landing site center), or the projected landing site is no longer suitable due to surface obstacles. Considering vehicle maneuverability and fuel reserves, the divert capabilities will diminish as the task progresses. In cases where a divert is initiated, a new landing target will need to be designated by the user and will be evaluated for the proximity to the original pre-planned site. A secondary operational monitoring task will challenge the user's cognitive reserve by requiring the user to maintain several gauges within acceptable limits and respond to a visual indicator while completing the landing approach. Outcome measures include distance from the planned landing site to the user-initiate divert landing location, ground slope at the new landing site, time to divert, the ability to accomplish the secondary monitoring tasks, and perceived workload. The tablet task is being evaluated in a ground-based study to determine the learning effect of first-time users. The tablet task will be utilized in a flight study to test performance multiple times postflight. Future potential testing in-flight have been identified for capsules with iOS tablet devices. Multi-attribute Lunar Table Battery Task MALTB comprises video footage of thirty distinct landing conditions. The landing scenarios feature various landing sites (n = 3), hazardous object sizes (n = 6), sun azimuth degrees (n = 4), camera modes (i.e., fixed or gimbaled), and navigation bias (i.e., true or false). Each seventy second trial uses a sixty-degree constant glideslope trajectory. The application architecture and layout include user identification setup and data storing, a guided walkthrough of the task and interface components, practice mode for task familiarization, and a modified Bedford workload scale administered following task completion. The time-based dependent measures are saved locally to the iOS Files application and post-processing scripts have been developed to evaluate the remaining measures of performance. RELEVANCE This project will deliver an operational demonstration of crew monitoring capability following spaceflight and identify potential deficits that may require remediation. Comparison of individual vestibular and cognitive changes with crew performance will help better characterize the landing risks associated with sensorimotor alterations. ACKNOWLEDGEMENTS: This project is funded by NASA’s Human Research Program Human Health Countermeasures Element. REFERENCES Cegarra J, Valery B, Avril E, Calmettes C, Navarro J (2020) OpenMATB: A Multi-Attribute Task Battery promoting task customization, software extensibility and experiment replicability. Behav Res Methods 52:1980-1990 doi: 10.3758/s13428-020-01364-w

Matthew McDonnell↗

Market Implications of Alternative Operating Reserve Modeling in Wholesale Electricity Markets

Pricing and settlement mechanisms are crucial for efficient resource allocation, investment incentives, market competition, and regulatory oversight. In the United States, Regional Transmission Operators (RTOs) adopts a uniform pricing scheme that hinges on the marginal costs of supplying additional electricity. This study investigates the pricing and settlement impacts of alternative reserve constraint modeling, highlighting how even slight variations in the modeling of constraints can drastically alter market clearing prices, reserve quantities, and revenue outcomes. Focusing on the diverse market designs and assumptions in ancillary services by U.S. RTOs, particularly in relation to capacity sharing and reserve substitutions, the research examines four distinct models that combine these elements based on a large-scale synthetic power system test data. Our study provides a critical insight into the economic implications and the underlying factors of these alternative reserve constraints through market simulations and data analysis.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Zero-Gravity Vortex Vent and PVT Gaging System

Space Station and satellite reservicing will require the ability to vent gas on orbit from liquid supply or storage tanks and to gage liquid quantity under microgravity conditions. In zero gravity, (zero-g) the vortex vent is capable of venting gas from a tank of liquid containing gas randomly distributed as bubbles. The concept uses a spinning impeller to create centrifugal force inside a vortex tube within a tank. This creates a gas pocket and forces the liquid through a venturi and back into the tank. Gas is then vented from the gas pocket through a liquid detector and then out through an exhaust port. If the liquid detector senses liquid in the vent line, the fluid is directed to the low-pressure port on the venturi and is returned to the tank. The advantages of this system is that it has no rotating seals and is compatible with most corrosive and cryogenic fluids. A prototype was designed and built at the NASA Johnson Space Center and flown on the KC-135 zero-g aircraft. During these test flights, where microgravity conditions are obtained for up to 30 sec, the prototype demonstrated that less than 0.10 percent of the volume of fluid vented was liquid when the tank was half full of liquid. The pressure volume temperature (PVT) gaging system is used in conjunction with the vortex vent to calculate the amount of liquid remaining in a tank under microgravity conditions. The PVT gaging system is used in conjunction with the vortex vent to gage liquid quantity in zero or low gravity. The system consists of a gas compressor, accumulator, and temperature and pressure instrumentation. To measure the liquid in a tank a small amount of gas is vented from the tank to the compressor and compressed into the accumulator. Pressure and temperature in the tank and accumulator are measured before and after the gas transfer occurs. Knowing the total volume of the tank, the volume of the accumulator, the volume of the intermediate lines, and initial and final pressures and temperatures, the mass of the gas leaving the tank is equated to the mass of the gas entering the accumulator. The volume of liquid remaining in the tank is calculated using the ideal gas law.

Downey, M. G.↗

Benefits associated with advanced technologies applied to a high-speed civil transport concept

Results of a first-order assessment of the mission performance benefits associated with the technology improvements and goals of the Phase II High-Speed Research (HSR) Program are presented. A breakdown of the four major disciplines resulted in the following estimated TOGW savings from the 1990 vehicle: propulsion at 14.3 percent, structures at 11.7 percent, flight-deck systems at 4.0 percent, and aerodynamics at 15.0 percent. Based on 100 percent success of the HSR Phase II proposed technology advancements, the overall combined impact is estimated to result in a 45 percent reduction in TOGW from a 1990 entry-into-service (EIS) date, which could result in a viable 2005 EIS vehicle with an acceptable TOGW that meets Stage III community noise restrictions. Through supersonic laminar flow control and the possible reduction in reserve fuel requirements resulting from synthetic vision capability, the potential exists for an additional 9.6 percent reduction in TOGW.

Ozoroski, L. P.↗

A Remote, Human-in-the-Loop Evaluation of a Multiple-Drone Delivery Operation

Over time, advances in unmanned aircraft systems (UAS) have enabled a shift in the operational paradigm from one operator managing one aircraft to that of multiple operators working together to manage multiple aircraft. This shift has highlighted the need for effective human-autonomy teaming methods to maintain manageable workload levels for operators as well as high standards of system performance and safety. This paper presents a study aimed at evaluating whether automation can help operators manage workload during small UAS (sUAS) package delivery scenarios featuring contingency situations. These contingency situations, resulting from unplanned UAS Volume Reservations (UVRs), required flight path reroutes for multiple aircraft simultaneously. The study manipulated the number of aircraft affected by the UVRs and the level of automation support. The presence of terrain conflicts was also controlled within each scenario. Due to the COVID-19 pandemic, subjects were not able to gain direct access to the Ground Control System (GCS). Therefore, the study was conducted using a subject-surrogate paradigm that required subjects to relay commands through a verbal protocol from remote locations outside of the lab to a researcher surrogate who had direct control of the GCS interfaces at the lab location. Results show that the automated support condition was associated with faster reroute response times, more efficient reroute maneuvers, and significantly lower levels of perceived workload than the manual reroute condition. However, the automation support level did not significantly impact pilots’ ability to avoid the UVR successfully; pilots were overwhelmingly capable of avoiding the UVR in all conditions. The presence of terrain conflicts primarily impacted pilot performance by leading to multiple uploads per vehicle, which was not typically required when pilots only needed to maneuver laterally. Although subjects did not have direct control over the GCS, subjective ratings indicate that the displays under test provided them with sufficient information to manage their aircraft and promptly respond to the unplanned UVRs. Overall, the objective and subjective data strongly suggest that the verbal protocol and subject-surrogate paradigm were effective methods for collecting data remotely amid the COVID-19 pandemic.

multi-UAS↗

Coordinated Ramping Product and Regulation Reserve Procurements in CAISO and MISO using Multi-Scale Probabilistic Solar Power Forecasts (Pro2R)

How can probabilistic solar forecasts lower costs and improve reliability for independent system operator (ISO) markets? We tackle this question in three steps. First, we enhance an existing solar forecasting system to provide well-calibrated hours-ahead probabilistic forecasts. We then relate the degree of uncertainty in those forecasts to error distributions for net load ramps for the California ISO (CAISO) using statistical and machine learning methods. Projected net load errors conditioned on solar uncertainty are translated into flexible ramp requirements that therefore reflect real-time meteorological and solar conditions, improving on typical ISO procedures. Finally, a multi-period look-ahead production cost model quantifies how conditional ramp requirements can a) decrease operating costs by lowering requirements compared to often conservative unconditional methods, and b) reduce generation scarcity events and consequently improve reliability by increasing flexibility requirements at times when unconditional forecast-based requirements understate actual ramp uncertainty. In addition to the products just described (quantification of solar uncertainty, its translation into requirements for ramp capability product, and quantification of the benefits of more accurate ramp requirements), this project also developed a visualization system that alerts system operators of ramp and uncertainty conditions within the network based on solar forecasts. The system is called Resource Forecast and Ramp Visualization for Situational Awareness (RaVIS). These four products represent significant advances in the state-of-the-art of probabilistic solar forecasting, development of weather-informed reserve requirements, production costing methods for estimating the benefits of more accurate reserve requirements, and visualization of system status, respectively. Yet the products are also practical and can be immediately implemented, potentially enabling system operators to save millions of dollars in ramp product procurement costs per year.

14 SOLAR ENERGY↗

Performance and policy dimensions in internet routing

The Internet Routing Project, referred to in this report as the 'Highball Project', has been investigating architectures suitable for networks spanning large geographic areas and capable of very high data rates. The Highball network architecture is based on a high speed crossbar switch and an adaptive, distributed, TDMA scheduling algorithm. The scheduling algorithm controls the instantaneous configuration and swell time of the switch, one of which is attached to each node. In order to send a single burst or a multi-burst packet, a reservation request is sent to all nodes. The scheduling algorithm then configures the switches immediately prior to the arrival of each burst, so it can be relayed immediately without requiring local storage. Reservations and housekeeping information are sent using a special broadcast-spanning-tree schedule. Progress to date in the Highball Project includes the design and testing of a suite of scheduling algorithms, construction of software reservation/scheduling simulators, and construction of a strawman hardware and software implementation. A prototype switch controller and timestamp generator have been completed and are in test. Detailed documentation on the algorithms, protocols and experiments conducted are given in various reports and papers published. Abstracts of this literature are included in the bibliography at the end of this report, which serves as an extended executive summary.

Mills, David L.↗

Adaptive PV Frequency Control Strategy Based on Real-time Inertia Estimation

The declining cost of solar Photovoltaics (PV) generation is driving its worldwide deployment. As conventional generation with large rotating masses is being replaced by renewable energy such as PV, the power system’s inertia will be affected. As a result, the system’s frequency may vary more dramatically in the case of a disturbance, and the frequency nadir may be low enough to trigger protection relays such as under-frequency load shedding. The existing frequency-watt function mandated in power inverters cannot provide grid frequency support in a loss-of-generation event, as PV plants usually do not have power reserves. Here, a novel adaptive PV frequency control strategy is proposed to reserve the minimum power required for grid frequency support. A machine learning model is trained to predict system frequency response under varying system conditions, and an adaptive allocation of PV headroom reserves is made based on the machine learning model as well as real-time system conditions including inertia. Case studies show the proposed control method meets the frequency nadir requirements using minimal power reserves compared to a fixed headroom control approach.

14 SOLAR ENERGY↗

Geothermal Reserve Pits: Considerations for Installation on BLM-Administered Lands

Reserve pits, also known as sumps, are a common aspect of geothermal drilling operations. This paper describes the Bureau of Land Management's regulatory authorities and key environmental considerations associated with geothermal reserve pits. Reserve pit design, the need for environmental compliance measures, and reclamation approaches will vary depending on site-specific conditions. Groundwater and wildlife impacts are the most common environmental considerations related to reserve pits. In some cases, regulations or groundwater or soil conditions necessitate the use of a synthetic liner. However, the chemical composition of most geothermal drilling fluids and muds, completion fluids, and produced fluids that are discharged to reserve pits does not warrant pit liners. The potential for hazardous fluids, high water temperatures, and entrapment are concerns for wildlife. Common wildlife impact avoidance and mitigation measures include fencing, netting, and escape ramps. The need for these measures depends on localized site and environmental conditions. There are requirements to reclaim reserve pits following geothermal drilling operations. Reserve pits often remain in place to accommodate multiple phases of drilling and well testing. They are eventually backfilled and decommissioned.

BLM↗